Professional History:

Urban Archaeology
New York, NY
Production Manager 10/2007- Present
Summary:
o Manage production Team of 42
o Prioritize and stage workflow through all production groups and outside vendor
s
o Estimate custom projects from conceptual sketches and drawings
o Re-design current products to eliminate excessive assembly time
o Train and mentor Production Artists on the best means of assembly
o Re-structure behind the scenes framework of company systems to better manage l
ead-times and inventory control
o Materials Management
o Train the sales staff on production techniques and custom finishes to widen th
eir knowledge of Urban product

Studio Iron, LLC


Mesa, AZ
Projects Manager 07/2004 - 10/2007
Summary:
o Estimate projects from blueprints, shop drawings, and conceptual sketches
o Design and Value engineer architectural features for projects
o Produce working shop drawings for the fabrication shop
o Schedule the production shop and installation teams
o Establish relationships and maintain positive interactions with clients
o Oversee the production of items in our fabrication shop, by means of hands on
interaction with my employees, both fabricators and shop foreman.
o Measure and layout complicated projects on jobsites
o Structure training systems for SI apprenticeship program
Notable commercial projects include:
Hotel Valley Ho, private residences Scottsdale, AZ
Hideaway Golf Club La Quinta, CA
Santaluz Clubhouse San Diego, CA
Javino Winebar Scottsdale, AZ
The Sanctuary Golf Club Denver, CO
Shop Manager 4/2001-3/2003
Summary:
o Managed fabricator production and workflow through the shop
o Lay-out panels and misc. architectural features for fabricators
o Q. C. production from fabrication to finishing
o Scheduled items for production in the fabrication shop
o Hired and trained new employees

Independent Consulting, Design, and Fabrication:


Geisler Residence (private)| Design and Fabrication (Contract)| Phoenix, AZ| 10/
2004 - 01/2005
o Engineered and designed a monumental art piece to solve a structural issue cre
ated by the contractor
o Fabricated, installed, and chemically finished art piece
Unreal Steel |Project Consultant (Contract)| Atlanta, GA| 5/2004 - 11/2004
o Re-established relationship with existing client
o Re-designed and re-created shop drawings for flawed railing structure
o Re-oriented existing staff to new project guidelines and quality standards
o Hired qualified fabricators to produce the work
Classic Craft Construction | Assistant Project Manager (Contract) | Atlanta, GA|
7/2003 - 5/2004
o Scheduled and supervised sub-contractors
o Purchased and procured necessary tool, supplies, and products for project
o Proactively managed project to achieve quality, schedule, budget and safety