You are on page 1of 2

STEVEN LEE TAYLOR

1120 Wynncrest Lane, #1107 * Arlington, TX 76006


Cell 817.262.1826 * email stc1c188@westpost.net

PRODUCTION ASSEMBLY
Accomplished professional adept at performing a wide array of repair projects wi
th extensive experience in repairing v2500, pw4000, pw200, pw4000hpt blades, vac
uum furnaces, and pw2000 blades. Consistently complete all aspects of projects w
ithin established timelines and set budgets. Effectively define and implement ta
rgeted action plans to maximize productivity and profitability while maintaining
quality assurance levels. Dynamic communication, presentation, relationship bui
lding and problem-solving abilities. Highly versatile; quickly master new roles,
responsibilities, technologies, and environments. Demonstrate outstanding criti
cal thinking and active listening skills; diffuse difficult situations with tact
and ease.

CORE COMPETENCIES
Project Management * Quality Assurance * Budget Development * Project Planning
Strategic Planning * Problem-Solving * Troubleshooting

PROFESSIONAL EXPERIENCE
Body Cote 2009-Present
Arbar & Ipsen Furnace Operator
* Observed temperature gauges and recorders, set weight indicator gauge, and acc
urately recorded operation data, exhibiting strong multitasking and
prioritizing abilities
* Handled a broad spectrum of repair activities, including applying braze alloy.
* Loaded ipsen and abar to heat treat tools and dies for machine shop and all ty
pes of tool steels
* Forklift Operator
Pratt Whitney, 2000-2009
Repair Specialist
* Demonstrated strong strategic planning, prioritization, and organization skill
s in steering full-scope projects from inception through completion, including p
erforming accurate costing to ensure competitiveness while controlling expenses
to optimize profits.
* Handled a broad spectrum of repair activities, including repairing airfoil tur
bine blades, coating blades with pw400 and v2500 in order to load vacuum furnace
s to heat treat parts, and brazing of 201 and 202 blades to repair cracks.
* Forklift Operator
* Troubleshot, analyzed, and researched problems and quickly developed innovativ
e problem resolutions to ensure continuing quality assurance.
MULTI ARC, 1986-2000
Arbar & Ipsen Furnace Operator
* Participated in all aspects of engineering and project management duties, from
pre-project planning sessions to project completion.
* Loaded pvd machine with tools and applied a thin layer of titanium; loaded ips
en and abar to heat treat tools and dies for machine shops.
* Observed temperature gauges and recorders, set weight indicator gauge, and acc
urately recorded operation data, exhibiting strong multitasking and prioritizing
abilities.
* Directed staff in tracking inventory and project progression,Scheduling..
* Efficiently compiled and produced detailed maintenance reports, demonstrating
organizational skills and strong attention to detail in achieving goals and time
lines.
Rotec Engineering. 1981-1986
UltraLight Aircraft Assembly
* Fabracted aircraft parts working in machine shop, Dutities included drilling h
oles bending tubing and cutting metals.
* Went offsite to assemble ultralight aircraft.
* Shipping and Receiving, duties included packaging and bundling of aircraft com
ponits to insure safe dilevery of aircraft parts.

You might also like