You are on page 1of 3

Patrick Cohick

P.O. Box 5871


Orange California 92863
(714) 639-0472

Discipline: Electrical / Control Systems Design

5/2007 a" 10/2010 Fluor Corporation, 47 Discovery, Irvine,


California. Principal Designer
Front end estimate: material takeoff, updated existing installation
details and
created new assembly details. created preliminary design documents

Design: Created equipment connection drawings, cable schedules,


cable tray
section drawings, coordinate with design to address model review
comments,
checked instrumentation design drawings.

2/2005 a" 5/2007 Tiger Electric. Brea, California. Project Designer

Power, lighting and grounding design, Utility company coordination,


plan
check submittal, correction, pulling building permits. Title 24
state of
California energy calculations, field construction support and
as-builts

3 /1995 a" 6/1997 Brown and Root Alhambra, California Principal


Designer
Modernization and expansion design for utility plant and refining
unit
SADAF Project, Saudi National Oil Company Al Jubail, Saudi Arabia

Design: Power lighting, grounding and revising cable tray system to


support
increased capacity.
5/1993 a" 10/1994 Markrist Engineers, Anaheim, California. Project
Designer
Lomita gasoline plant modernization projection.
Performed electrical, instrumentation. controls field survey
Created electrical, instrumentation, control systems as-built
archive plans.
Provided power lighting, grounding, design plans for modernization.

10/1992 a" 4/1993 Marmac Engineers. Cyprus, California. Senior


Designer
Pre-design: Site survey of existing fabrication shops and aircraft
manufacturing facility to be relocated. Survey an existing hanger
for
relocation. Design: Redesign existing hanger to accept new
fabrication shops
and aircraft manufacturing unit. Client: Lockheed Aircraft Burbank
CA

12/1990 a" 4/1992 Brown and Root Braun, Alhambra, California.


Project Designer
Drill sites modernization project Prudhoe Bay Alaska, Predesign:
Site survey
and document search for archive drawings vendor fabrication
drawings and
related design calculations, Design: Power, lighting and grounding
and
instrumention upgrades per Braun I Controls per ARCO Automation
for existing drill sites. Post Design: Preconstruction meeting with
client
engineers and facility personnel and construction support.

11/1989 - 7/1990 L* A Water Treatment, City of Industry, California.


Project Designer
NOPWASD Project, Design Water Treatment Plants in the cities of
Beni Suef, Fayoum, and Minia ( Arab Republic of Egypt. Power,
lighting and
grounding for filter blocks, sub-stations, control buildings.
auxiliary
generators and remote ancillary equipment. Created standard details
and
associated termination details, definitive material take-off.

4/1989 a" 10/1989 Fluor Engineers and Constructors, 3333 Michaelson


Irvine, California
Principal Designer & Field Survey Team Leader, material take-off
and design
checker: Coin Roll-Up Project for Bank of America Project: The
scope was to
redesign and reconfigured the electrical and lan systems of
existing Bank
of America branch offices to prepare sites for the installation a
new computer
equipment.

Education: Cogswell Polytechnic College, Sunnyvale, California 2002


BA Computer video Imaging, with an emphasis on Digital Motion
Pictures.
Irvine Valley College, Irvine, California 1999
AA Liberal Arts
RWM Associates, Carson California
Fiber optic cable systems: Design, installation, termination and
testing.

You might also like