You are on page 1of 3

ALLISTER E.F.

DEMAS
5815 Lawton Court, Lanham, MD 20706 a 301-577-3714 a E-mail: adf015c4@westpost.n
et

Objective:
To contribute strong background in all areas of architectural design and
construction
administration, along with a tremendous drive for excellence and success,
to your firm in a
project architect / manager capacity.
Experience:
Grimm + Parker Architects a" Calverton, Maryland
Project Architect / Team Member
a Barack Obama Elementary School
Upper Marlboro, MD
New 86,000 s.f. LEED Gold state-of-the-art elementary school located in Upper Ma
rlboro next to Prince Georges Countyas largest and newest High school to create
a campus setting while at the same time keeping the students separate. This proj
ect included geothermal fields under its playing fields.
Project Manager, responsibilities included single handedly taking project from D
D thru construction, on time and on budget, including client meetings, preparati
on and coordination of construction documents and construction administration.
a George Washington Carver Performing Arts High School
Baltimore, MD
The new 220,000 s.f. replacement school to accommodate a student population of 1
,000 and designed with the goal of achieving LEED Silver Certification per LEED
for Schools guidelines. Responsibilities included designing green roof and detai
ls.
a Queen Anne High School
Queen Anneas County, MD
Complete renovation and modernization of old high school to state-of-the-art 221
,061 s.f. high school while the building was occupied. Responsibilities included
generation and coordination of all new and existing wall sections with consulta
nts.
a Sousa Middle School
Washington, DC
Complete renovation and modernization of existing Middle School (a National Hist
oric Landmark) to accommodate a middle school on three levels and an alternative
use on the lower level. This renovation also addressed the aclusteringa needs o
f a middle school and combine acommunitya spaces in one wing to improve site and
service access. Responsibilities including SD coordination with client and fiel
d surveys with consultants.
a Frostburg Library - Governoras Smart Growth Awardee
Frostburg, MD
This new 20,000 s.f. Award-Winning public library is located on Main Street in d
owntown Frostburg. The exterior massing and facade is a response to the local an
d regional context of traditional masonry buildings. Project architect, responsi
bilities included single handedly taking project from SD thru bidding including
preparation and coordination of construction documents.
a North Harford High School
Harford, MD
Complete phased modernization and addition of a 220,000s.f. 1950as building to i
nclude a new administrative suite, state-of-the-art auditorium, music wing, gym
and new main entrance to accommodate 1,600 students. Responsibilities included g
eneration and coordination of all new and existing building and wall sections an
d coordination of with client and consultants.
Southern Middle School
Lothian, MD
Complete modernization and classroom addition to 1940as school. Project included
adding a science, music classroom wing, multi-level cafetorium for school and c
ommunity events and updating of the gym. Project Architect, responsibilities inc
luded single handedly taking project from DD thru construction, on time and on b
udget, including client meetings, preparation and coordination of construction d
ocuments and construction administration.
a Brooklyn Park Middle School & Creative Arts Center a" Governoras Smart Growth
Awardee
Brooklyn Park, MD
Renovation and modernization of a 1940as high school that sat vacant for several
years, including new entry lobbies, cafetorium, media center addition, creation
of a senior center and creative and performing arts center. Responsibilities in
cluded generation and coordination of all new and existing building and wall sec
tions and coordination with client and consultants.
a Eastern Middle School
Silver Spring, MD
Addition of administrative suite and cafetorium to 1960as school. This project
also served to give the school a new grand main student and visitor entrance. Pr
oject Manager, responsibilities included taking project from DD thru constructio
n, on time and on budget, including client meetings, preparation and coordinatio
n of construction documents and construction administration.
a Georgeas Creek Library
Lonaconing, MD
New 6,000 s.f. residential scale rural public library. The new library was desig
ned to fit into the historic context by celebrating traditional architectural re
ferences appropriate to its mountain location. Project architect, responsibiliti
es included single handedly taking project from SD thru bidding including prepar
ation and coordination of construction documents.
a Queen Anne School Science Building
Upper Marlboro, MD
New Science Building, Lecture Hall and Alumni Gallery located on a small private
high school campus. Project Architect, responsibilities included single handedl
y taking project from SD thru bidding, on time and on budget, including client m
eetings, preparation and coordination of construction documents and construction
administration.
Stewart Cooper Newell Architects a" Gastonia, North Carolina
a Cape Fear Fire Training Center
Wilmington, NC
New state-of-the-art professional training facility for the Police and Emergency
Services of Wilmington located on the campus of Cape Fear Community College, in
cluding an educational building, residential and commercial live Fire Training B
urn buildings. Project architect - Responsibilities included single handedly tak
ing project from SD thru bidding, including client meetings, consultant coordina
tion and preparation and coordination of construction documents.
a City of Ashville Fire Stations Nos. 6 & 11
Ashville, NC
Simultaneous design and construction of two 12,000 s.f. fire stations that inclu
de Police sub-stations for the City of Asheville. Project architect - Responsibi
lities included single handedly taking project from SD thru bidding, including c
lient meetings, consultant coordination and preparation and coordination of cons
truction documents.
Sullivan & Almy, Inc. a" Bethesda, Maryland
Design/Production Team Member
a Longbranch Community Center - Montgomery County Energy Award for Excellence in
Energy Efficient Design
Silver Spring, MD
This project included the construction of a new community center and the renovat
ion of the bathhouse and swimming pool. Team member responsible for plan and sec
tion coordination and detailing.
a The Greenbelt Natatorium and Outdoor Pool
Greenbelt, MD
This project consisted of the design and construction of a new natatorium and ou
tdoor pool and the renovation of the community center for the historic city of G
reenbelt. Team member responsible for building detail and consultant coordinatio
n.
a I.R.S. Offices
Wheaton, MD
Surveyed existing building conditions, designed and produced construction docume
nts for the new I.R.S. offices on 4 floors in the existing building. Team member
responsible for plan
and consultant coordination.
Education: Bachelor of Architecture, Howard University, Washington, DC
Registration: Pending
Skills:
a ACA 2008
a Construction drawings
a MS office
a Construction administration
a Programming and space planning

References:
Mr. David Strang, AIA
Principal, Grimm + Parker Architects
301.595.1000
Ms. Melissa Wilfong
Senior Associate, Grimm + Parker Architects
301.595.1000
Mr. David Almy
President, Almy Architects
301.942.2378

You might also like