You are on page 1of 2

Myung-Ho Pee

8863 Papillon Dr.


Ellicott City, MD. 21043
Home: (410) 988-5569
Mobil: (571) 269-6496
OBJECTIVE:
To obtain a senior level technical and project management position that can util
ize my skills and experience.
EDUCATION:
Ph.D. University of Minnesota; Electrical Engineering, 1987
MS University of Minnesota; Electrical Engineering, 1984
BS Seoul National University; Electrical Engineering, 1977
QUALIFICATION SUMMARY
* Demonstrated project management skills.
* Demonstrated leadership skills
* Over 20 years of experience in weapon systems analysis, development, and integ
ration
* Over 30 years of experience in design and development in the technical area of
motion control, weapon control, and fire control.
* Technical expert in system engineering, target tracking, and fire control
* Computer modeling and simulation development experience
WORK EXPERIENCE:
DIS Gulp Property, LLC 2009 - Present
Vice President
* Coordinating the contract effort with Iraqi govenrmrnt to develop residential
towns.
* In charge of teaming arrangement with international construction companies for
new town development.
BAE Systems, Armament Systems (Formerly United Defense L.P.) 1998 - 2009
Principal System Engineer
* As fire control IPT lead, has led formulation of fire control concept and prov
ided fire control section of Palletized Protection System (PPS) proposal. Has de
veloped target tracking algorithm for PPS under IRAD.
* Has led Embedded Training software development team for Manned Ground Vehicle
(MGV) portion of Future Combat System (FCS).
* As fire control IPT lead for Advanced Gun System (AGS), has led fire control s
ystem development. The effort includes fire control system architecture and requ
irements development, system definition, interface requirements development. Has
also led development of fire control algorithms.
* Has participated in TBMD feasibility Study, and provided consultation to devel
op computer simulation to analyze effectiveness of force level engagement for th
e Dutch Navy.
Technology Service Corporation 1998
Scientist
Has developed Radar Acquisition Pattern (RAP) model for AEGIS Tactical Ballistic
Missile Defense (TBMD) effort under contract with the US Navy.
BAE Systems, Armament Systems (Formaly United Defense L.P.)1986 - 1998
Principal Engineer 1997- 1998
Was stationed in the Netherlands to provide technical consultation and to partic
ipate in Tactical Ballistic Missile Defense (TBMD) feasibility study for the Dut
ch Navy. Won follow on contract to continue the effort upon returning to the US.
Senior Project Engineer 1991 - 1998
As a project manager and/or technical leader, directed and participated in the f
ollowing development programs
* Development of the TBM Engagement Model (TBMEM) for use in analyzing performan
ce of weapon control algorithms, interceptor, and weapon systems for TBM defense
.
* Development of Model for AAW and TBMD Engagement (MATE).
* TBM Threat Assessment Model (TBMTAM) simulation.
* Surface to Air Warfare Simulation (SAWS) development.
* Technical leader of several AEGIS Engineering Service contract tasks related t
o algorithm development, effectiveness and performance analysis for the Weapons
Control System (WCS) element of the AEGIS Weapon system (AWS).
Project Engineer 1988 - 1991
* Has led a team for the Advanced Weapon Control and Stabilization project to de
velop state-of-the art digital motion control system for weapon/turret drive and
stabilization. Demonstrated the performance in the lab.
Senior Engineer 1986 - 1988
* Initiated digital motion control system development technology for the Future
Infantry Fighting Vehicle (FIFV) and the next generation Bradley Fighting Vehicl
e.
* Has developed gun pointing system with suppressed barrel vibration.
University of Minnesota 1982 - 1988.
Instructor 1986 - 1988
* Taught courses in electrical engineering, control theory, digital signal proce
ssing and supervised junior electronics laboratory experiments.
Teaching/Research Assistant 1982 - 1986
* Conducted research on two-dimensional optimal control theory and digital signa
l processing.
LG Cable Company: 1976 - 1980.
Project Engineer
* Developed long term/short term capital investment plan
* Was responsible for importing machineries, and spare parts to execute capital
plan.
* Participated in ultra high voltage transmission cable development

Reference available upon request


Publication available upon reqest

You might also like