Case History

Completion Solutions

Deepest Openhole SmartWell® System Completed in the Middle East


Location: Middle East

OPERATOR’S CHALLENGE – A major operator in the


Middle East needed a four-zone openhole intelligent completion
in an extended-reach well that had been drilled in a carbonate
reservoir. Perceived risk factors including instability of the open
hole and higher friction while running the completion had, in
the past, limited the wider adoption of intelligent completions in
openhole conditions.

HALLIBURTON’S SOLUTION – Halliburton


WellDynamics mitigated these risks by helping to ensure the

HAL30638
right technology selection, proper well planning and best
practices adoption from previous jobs.
HVC-ICV Valve
Following extensive evaluation and planning, a downhole
interval control valve was installed at 16,024 ft (4,884 m), ®
VALUE CREATED – The Swellpacker swellable elastomer
making this well the deepest intelligent completion run to date cable system provided isolation between zones and, with its
in the region. These downhole valves will be used to choke back cable feed-through feature, enabled the passage of control lines
zones with high water cut, improving oil production. This for downhole monitoring and control of devices, through the
intelligent completion allowed the operator to monitor and packer, without splicing control lines. The self-healing
optimize the inflow from sections of the reservoir, all done properties of the Swellpacker swellable elastomer cable system
remotely from surface without downhole well intervention. helped ensure a perfect seal around the control lines and against
the formation as the packer swelled and sealed downhole.

ROC -D electronic pressure and temperature gauges
continuously monitored downhole parameters and transmitted ®
Openhole SmartWell completion system eliminated the need
data to surface in real time while HVC surface-controlled for a liner, making these wells less costly and requiring less rig
downhole valves were used to optimize production from the time. Moreover the SmartWell completion system extended the
different zones. (HVC valves have 10 discrete choke settings and operators well life by choking back segments with high water cut
can be hydraulically operated from surface to optimize the while continuing to flow from other zones. Additionally, these
production from each zone during the life of the well.) openhole wells have higher well productivity compared to cased
and perforated wells.

As the world’s largest adopter of intelligent well technology, this


operator typically installs SmartWell completion systems within
cased or liner sections. Halliburton’s successful integration of the
SmartWell completion system with the Swellpacker technology
enables operators to install SmartWell completion systems
within openhole sections.
7-in., 26-lb MC Packer

3 1/2-in. HVC ICV

Permanent Downhole Gauges 6 1/8-in. Open Hole

3 1/2-in. HVC ICV

HAL33545
®
3 1/2-in. Swellpacker Cable System

Openhole Horizontal SmartWell® Completion System

For more information on any of the details featured here, please email us at
welldynamics@halliburton.com.

© 2011 Halliburton. All rights reserved. Sales of Halliburton products and services will be in accord solely with the terms and conditions contained in the contract
between Halliburton and the customer that is applicable to the sale. Actual results may vary in accordance with conditions and other variables. H07242 02/11

www.halliburton.com

You might also like