Professional Documents
Culture Documents
• When you have finished viewing, click on in the toolbar to return to this screen.
view return to
publication publications
chosen list
P R O J E C T
P R O F I L E
97.324 Published by the British Cement Association on behalf of
First published 1992 the industry sponsors of the Reinforced Concrete Council.
ISBN 0 7210 1444 5 British Cement Association
Telford Avenue, Crowthorne, Berkshire RG11 6YS
Price Group C Telephone (0344) 762676
© British Cement Association 1992 Fax (0344) 761214
All advice or information from the British Cement Association is intended for those who will evaluate the significance and limitation of its contents and take responsibility
for its use and application. No liability (including that for negligence) for any loss resulting from such advice or information is accepted. Readers should note that all BCA
publications are subject to revision from time to time and should therefore ensure that they are in possession of the latest version.
C.H.Goodchild BSc, CEng, MCI0B, MIStructE
P. Seilin BA, BArch, RIBA
FOREWORD
This publication was commissioned by the
Reinforced Concrete Council, which was
set up to promote better knowledge and
understanding of reinforced concrete
design and building technology.
Its members are Sheerness Steel plc and
Allied Steel and Wire, representing the
major suppliers of reinforcing steel in the
UK, and the British Cement Association,
representing the major manufacturers of
Portland cement in the UK.
Charles Goodchild is a Senior Engineer
for the Reinforced Concrete Council.
Phoebe Seilin is an Architect Associate
with Building Design Partnership and was
Project Architect on City Harbour.
CONTENTS
■ THE PROJECT 2
■ BUILDING Description 3
SPECIFICATION Space provisions 4
Structure 4
Cladding 4
Services 4
■ DESIGN Architecture 5
Structure 6
Services 7
■ CONSTRUCTION General 8
Substructures 8
Superstructures 8
Following trades 10
■ THE PRECAST
CONCRETE SOLUTION 10
■ APPENDIX Project details 12
1
P R O J E C T P R O F I L E
THE PROJECT
Merchant House and Woodchester House are
two office buildings that form a significant part of
the City Harbour development in the heart of
London’s Docklands.
The site adjoins the east side of Millwall Docks
and is at the centre of an expanding communications
network - only minutes from City Airport and
immediately adjacent to Crossharbour Station on the
Docklands Light Railway.
The scheme for the five-acre development
includes three major office buildings (totalling some
240 000 ft2), individual office units, a luxury hotel, a
multi-storey car park and other ancillary buildings.
The architecture and planning take full advantage of
the site’s extensive dockside frontage, creating a
modern working environment with attractive views.
Merchant House and Woodchester House overlook
the water and border a tree-lined piazza called
Waterman’s Square.
2
P R O J E C T P R O F I L E
BUILDING SPECIFICATION
Description
Merchant House and Woodchester House offer
high-quality office accommodation in a central
London location, but with much lower occupancy
costs than those in the City. Their design offers the
flexibility for changing the layout to accommodate a
wide range of future uses.
Each building may be used as a self-contained
office headquarters, with its own entrance, servicing
and car parking, or may be sub-divided into separate
tenancies. The two buildings incorporate varied
floor plans, with balconies and terraces that form a
distinctive stepped profile and provide unobstructed
views across the water.
The buildings have the following principal The distinctive dockside elevations
features:
• Eight levels of office accommodation in Merchant
House and six in Woodchester House.
• Ground floor reception lobbies with high-speed
automatic passenger lifts to all floors.
• Flexibility for open-plan or cellular office layout
on a 1.5m grid.
• Raised access floors for electrical and communi-
cations installations.
• Fully accessible suspended ceilings allowing
partition-head fixings on a 1.5 m module.
• Knock-out panels in floors for additional vertical
services distribution.
• Fixed sealed double glazing with tinted solar-
control glass.
• Full air conditioning. Office adjoining one of the terraces
Conservatory office
3
P R O J E C T P R O F I L E
Space provisions
The net floor area of Merchant House is 55 000 ft2,
with typically 7000 ft2 per floor from ground to fifth
floor levels, and 6000 ft2 and 5000 ft2 respectively at
sixth and seventh floor levels. Woodchester House
has a net floor area of 37 000 ft2, typically 7000 ft2 per
floor; but reducing at the third, fourth and fifth floor
levels. Because of the high water table, the buildings
have no basements.
The internal clear height, from finished floor
level to underside of ceiling, is 2.6 m for all office
areas. A 700 mm deep ceiling void and 150 mm deep
floor void are provided for installing services.
Structure
Precast concrete frames were specified for both buildings
The superstructures consist of precast reinforced
concrete columns, shear walls, beams and stairs, and
precast prestressed hollow-core floor units. The
precast frames are based on 6.0 x 6.0 and 6.0 x 7.5 m
grids, and are supported on piled foundations.
The floors were designed to carry an imposed
load of 5.0 kN/m2 (including 1.0 kN/m2 allowance
for partitions) plus 0.4 kN/m2 for services.
Cladding
The aluminium cladding system is based on
top-quality products and workmanship, and the
elevations feature dark grey glazing units used
full-height or within colour-coated panels.
Services
Details of the curtain wall cladding
The buildings have full variable air volume (VAV) air
conditioning, with individually controlled terminal
boxes in each structural bay, at all levels, to provide
an efficient and highly flexible system.
4
P R O J E C T P R O F I L E
DESIGN
Architecture
The site encompasses a landscaped setting on the
former Olsen 3 site, to the east of Millwall Docks on
the Isle of Dogs. The City Harbour masterplan
integrates three separate self-contained headquarters-
style office buildings, seven smaller terraced ‘front
door’ office units, a major hotel, a multi-storey car
park, a health centre, restaurant, and wine bar.
Merchant House and Woodchester House occupy
the east and north sides of Waterman’s Square - a
The dockside setting of the two buildings
paved and tree-planted piazza. The elevations take
full advantage of the site’s extensive dockside
frontage to make a strong visual impact.
The exteriors are clad with a high-quality
colour-coated aluminium curtain wall system, the
solid panels having outer panels that act as a
secondary rain screen to the fully weatherproofed
inner system.
Waterman’s Square
5
P R O J E C T P R O F I L E
Structure
A number of different frame designs were considered
and reviewed to determine which would best suit
the project requirements. Least cost and minimum
time were paramount. Flexibility, quality and ease of
erection were also crucial.
Only precast concrete could meet all these
criteria. It was found to be cheaper and quicker to
erect than either steelwork or in-situ concrete
frames, and it beat steelwork on lead-in time.
The use of precast, prestressed concrete floor
units obviated the need for transverse internal floor
beams and kept the floor plate thickness to a
minimum. This in turn generated the maximum
depth of ceiling void. The flat soffits of the floor
units, and the clear longitudinal runs, made it easier
The simplicity of the precast concrete frames to install services. They also allow for future
alterations to services and office layouts.
The floor units in Merchant House were 150 mm
and 200 mm thick, and 200 mm thick units were
used in Woodchester House. Small service
penetrations were formed in situ through the voids
of the hollow-core floor units. Major penetrations
were preformed within the floor layout, and
knock-out panels are provided to allow for possible
future modification of the services.
The precast reinforced concrete internal spine
beams were restricted to 500 mm deep overall to suit
the distribution of services. The precast spandrel
beams are generally 900 mm deep, with a downstand
providing a fire break in the ceiling void below, so no
time-consuming blockwork was needed. Upstands
for roof balcony and terrace details are provided by
1350 mm deep spandrel beams.
The versatility of precast concrete easily enabled
the stepped profile, irregnlar-shaped terraces, and
curved balconies to be produced. A late change in the
location of the lifts was also easily accommodated.
The components are durable and quality assured,
and have immediate structural loading capacity. They
also have in-built fire resistance, both in service and
Floor units span onto longitudinal beams
during construction.
The in-situ concrete slab at ground level is
supported by precast concrete beams resting on the
pile caps.
Lateral stability is provided by a minimum number
of precast concrete shear walls located around the stair
6
P R O J E C T P R O F I L E
wells and lift cores. Thus the structure behaves as a Precast walls for the lift shafts
and stairs act as shear walls
‘braced’ frame, which permitted economy of
column design. As the building was over five storeys
high, full provision against progressive collapse was
provided by simple horizontal and vertical ties.
The design of the precast columns took full
advantage of high-strength concrete and the quality
control available under factory conditions. The use
of grade 50 concrete resulted in 450 mm square
internal columns at the ground floor of Merchant
House. The column sections were cast up to
11.4 m long to support three storeys, with cast-in
rectangular hollow section billets to carry the shear
forces from the beams.
The precast concrete stair units, with cantilevered
half-landings, are supported by precast mid-storey
beams and floor landings.
Generally the connections were made, and the
ties installed, by stitching-in with in-situ concrete.
Precast column units are up to 11.4 m long
Channel and other fixings, as required for the
following trades, were cast into the precast units to
speed construction on site.
The detailed design, manufacture and erection
of the precast frames were carried out by the
manufacturer. This single-point responsibility was seen
as another benefit of precast concrete construction.
Services
The services were designed for an office occupancy
level of 10 m2 per person with a fresh air supply of
12 litres per person per second and an interual tem-
perature of 21°C ± 2°C with 30 to 70% r.h.
The warm air supply of the air conditioning serves
the perimeter wall panels and is controlled from the
rooftop plant room. Each panel is individually isolated
and the system is zoned, with thermostatically
controlled circuits.
The principal feature of the heating system is that
the cold radiation and downdraught effects of the
The pland room -
glazing are offset by the strategically placed heating
Woodchester House
panels in the flush under-sill panels. This arrangement
ensures that the heaters do not encroach upon usable
floor or wall space.
The gas boilers and all other major plant are
contained within plant rooms and screened
compounds at roof level.
The lighting level was set at 500 lux average and
was achieved using continuous twin tube low-glare
recessed luminaires which incorporated return air
slots. On-floor power requirements were assessed at
25 w/m2 with outlets provided in the raised floor.
Other services included hot and cold water, lifts,
sanitation, drainage, fire alarms, and facilities for Flush under-sill heating
telecommunications and data wiring. panels in office areas
7
P R O J E C T P R O F I L E
Substructures
Generally, the driven piles have a nominal diameter of
400 mm and a safe working load of 110 tonnes, but
vibration during construction close to the existing dock
wall and sewers was identified as a potential problem.
Therefore, bored continuous-flight-augured piles
(CFA), with a nominal diameter of 600 mm and a
safe working load of 90 tonnes, were used within a
distance of 24 m from the existing dock wall and
within 10 m of the main sewers. Ground vibrations
were monitored for both forms of piling.
Where necessary, the pile caps were restrained
laterally by the precast concrete ground beams.
Holding-down bolts for the first section of the precast
concrete columns were cast direcdy into the pile caps.
Column base detail
Superstructures
Delivery of the frame components was carefully
scheduled so that they could be lifted directly from
the delivery vehicles and placed into position using a
rail-mounted tower crane. This had the capacity to
lift the heaviest component, which weighed 6.2
tonnes, and was supplemented by mobile cranes as
required. Erection of the frame was unaffected by
weather, and the required storage area was minimal.
The columns were usually erected in three-storey
lifts and temporarily propped. They have bolted steel
base plates and the splice joints were formed with
loose continuity reinforcing bars inserted in
preformed ducts in the ends of the units. When the
units had been lined and levelled, the voids were
filled by pressure grouting.
The main precast concrete beams were securely
seated on projecting RHS steel billets cast into the
The first lift of columns
columns, and the tops of the beams were fixed in
for Merchant House position by an angle cleat. Generally the beams sit
8
P R O J E C T P R O F I L E
9
P R O J E C T P R O F I L E
Following trades
The inherently dry construction and total absence of
formwork allowed safe, clear and rapid access for
following trades using the precast stairs. Fixings for the
cladding, temporary handrails, and the conservatory
and plant room steelwork were cast into the factory-
produced units to speed following trades. For
The frames for both buildings were quality assured example, the aluminium curtain walling on
Woodchester House was fixed only two floors
behind the precast concrete frame.
The curtain walling is an aluminium ‘stick’
system and the two-or three-storey high mullions
were fixed before infliling with transomes, and the
solid and glazed panels.
Meanwhile internal concrete block walls were
being constructed just ahead of first-fix services and
joinery. The absence of transverse beams or drops
encouraged the prefabrication and fast installation of
M & E services. Small service holes were formed in
situ through the easily locatable voids in the hollow-
core units. Supports for the services and suspended
ceiling grids were fixed directly into the concrete
soffits using drilled and self-tapping devices.
Suspended ceilings and raised floors were installed
before final decoration. Wet trades were confined
Curtain walling mainly to the stairs, lobbies and toilets.
during erection
Flat roofs and terraces are of inverted roof con-
struction laid to falls, and were made weathertight
before first fixing began. The waterproof membrane
is covered with 100 mm insulation board protected
Paving on the
by concrete paving slabs.
completed terraces
Merchant House was completed ahead of
programme in 22 months and Woodchester House
was completed in 20 months.
10
P R O J E C T P R O F I L E
frame. It gave rapid erection with less contractor May 1987: piling commenced
Woodchester House was handed over in January 1989 and Merchant House in April 1989
11
P R O J E C T P R O F I L E
THE PROGRAMME
AREAS
Merchant Woodchester
House House
Gross floor area 6540m2 4500m2
Net lettable area 5100m2 3500m2
Number of storeys 8 6
CONSTRUCTION
COSTS £/m2 gross
Woodchester
House
Enabling works 15
Piling 15
Substructure 25
Frame 100
M&E 295
Cladding/roofing 335
Finishes 215
External works 35
Preliminaries 125
Sundries 30
Total 1190
12
P R O J E C T P R O F I L E
CONSTRUCTION TIME
Woodchester Merchant
House House
Start May 1987 May 1987
Finish January 1989 April 1989
Duration 20 months 22 months
Woodchester
House
Floor one
Merchant
House
Floor one
Woodchester
House
Floor five
Merchant
House
Floor seven
13
PROJECT PROFILE: MERCHANT HOUSE AND WOODCHESTER HOUSE