Rajasthan Electricity Regulatory Commission

Shed No. 5, Vidyut Bhawan, Jyoti Nagar, JAIPUR - 302005 Phone: 0141-2741181, 2741016 Fax: 0141-2741018, Website: www.rerc.gov.in E-mail: rercjpr@yahoo.co.in

Commission Order No. 9 Dated 31, March 2010


Sub: Determination of tariff for sale of electricity from Wind Power Plants in the State to Distribution Licensees during FY 2010-11 of the control period 2009-14.
1. The RERC Tariff Regulations 2009 under regulation 85 provide for automatic tariff revision through Tariff Indexation Mechanism for every financial year as outlined therein for wind energy projects to be commissioned during the Control Period. The performance parameters for tariff determination of wind power plants for the base year of MYT Control Period i.e. FY 2009-10 have also been specified at regulation 83. Based on these parameters, the commission has determined the Generic tariff for sale of electricity from wind power plants for the first year of control period i.e. FY 2009-10 vide its order dated 16.07.2009 as under: Jaisalmer, Barmer and Jodhpur Particulars Other Districts Districts Levelised Tariff Rs 4.28/kWh Rs 4.50/kWh The above tariff is linked to the indexation mechanism specified under Regulation 85 of the Tariff Regulations 2009.Accordingly,the Tariff for the Wind Energy Projects for the year FY 2010-11 shall be as under: Jaisalmer, Barmer and Jodhpur Particulars Other Districts Districts Levelised Tariff Rs 3.83/kWh Rs 4.03/kWh The detailed computations of indexation mechanism and determination of tariff for FY 2010-11 thereof, have been enclosed as Annexure-I of this order. (Ashwini Bhagat) Secretary RERC/Secy/SS(T)/F.DS(T).798/DDated:31-3-2010 Copy to the following for information : 1. The Secretary, Central Electricity Authority,6th floor,Sewa Bhawan,R.K.Puram,New Delhi-110 066. 2. The Secretary-Energy Department, Government of Rajasthan, Secretariat,Jaipur. 3. The Chairman and Managing Director, RRVPNL, Vidyut Bhawan, Jaipur. 4. The Chairman & Managing Director,Rajasthan Renewable Energy Corporation Ltd,E-166,Yudhistir Marg,C-Scheme,Jaipur. 5. The Chairman and MD,JVVNL,Vidyut Bhawan,Jaipur 6. The Managing Director,AVVNL/JdVVNL,Ajmer/Jodhpur. Spl. Secretary(Tech.)

2.

3.

Annex-I Tariff Indexation for Wind Power Projects to be commissioned in FY2010-11 Indexation Formula Tn = T1 * (1 + dn) + [0.08 * [LTPLRn LTPLR0] ] Where,dn = [a * (SIn-1/SI0 - 1) + b * (CIn-1/CI0 - 1)]/ (a+b) Variable T1 T1 a b LTPLR0 Description Base levelised Tariff for Barmer,Jaisalmer & Jodhpur Districts (FY2009-10)(Rs/kWh) Base Levelised Tariff for other Districts of Rajasthan (FY-200910)(Rs/kWh) Weightage for steel Index Weightage for Cement Index Long term PLR of SBI as prevalent on 31st January,2008 Value 4.28 4.50 0.70 0.30 12.25%

Month/Year January February March April May June July August September October November December Average Parameter SI0 SIn-1 CI0 CIn-1 dn T2 T2

Iron & Steel 2008(SI0) 2009(SIn-1) 303.1 279.9 286.6 281.7 288.4 337.7 285.8 359 286.3 353.3 286.4 357.6 286.5 362.6 293.3 362.8 290 360.4 291.4 355.1 290.8 329.2 290.8 321.3 290 338.28

Cement 2009(CIn-1) 2008(CI0) 221.4 221.1 223.6 220.9 225.4 221 227.9 221.4 228.1 222.4 229.9 221.7 230.8 222 229.6 223.3 227.5 225.3 225.8 225.2 225.8 225.2 219.3 225.5 226.26 222.92 Value 338.28 290.00 222.92 226.26 -9.56%

Description Average WPI Steel index prevalent for calendar year 2008 Average WPI Steel index prevalent for calendar year 2009 Average WPI cement index prevalent for calendar year 2008 Average WPI cement index prevalent for calendar year 2009 Capital Cost escalation factor for the nth year(FY 2010-11)

Levelised Tariff for Barmer,Jaisalmer & Jodhpur Districts for FY 2010-11 3.83 (Rs/kWh) Levelised Tariff for other Districts of Rajasthan for FY 2010-11 (Rs/kWh) 4.03 (Source :WPI (Iron and steel and Cement): Office of the Economic Advisor, Ministry of Commerce and Industry www.eaindustry.nic.in and Long Term Prime Lending Rate of SBI (LTPLR): www.in.reuters.com)