Home Abstract Abstract of CPWD-Part 1 Abstract of IS Code. IS 15652/IS 11171 IS 1678/IS 1445 IS 5613 (I-II-II) IS 694/IS 1255/IS 1554/ IS 11892 IS 1255 IS 3043 IS 5039 Abstract of IE Rules Electrical Notes Electrical Q&A Electrical Q&A Part-1 Electrical Q&A Part-2 Electrical Q&A Part-3 IE Rules for DP Structure Posts Comments Uncategorized Fuse PCV Cable-Current Rating

Minimum Electrical Clearance.


April 22, 2011 by Jignesh.Parmar Leave a Comment Minimum Electrical Clearance As Per BS:162. INDOOR Voltage in KV 0.415 0.600 3.3 6.6 11

Phase to earth in mm 15.8 19.05 50.8 63.5 76.2

Phase to phase in mm 19.05 19.05 50.8 88.9 127.0

15 22 33

101.6 139.7 222.25

165.1 241.3 355.6

Minimum Electrical Clearance As Per BS:162. OUTDOOR Voltage in KV 6.6 11 22 33 66 110 132 220

Phase to earth in mm 139.7 177.8 279.4 381 685.8 863.6 1066.8 1778

Phase to phase in mm 177.8 228.6 330.2 431.8 787.4 990.6 1219.2 2057.4

Minimum Working Clearance: OUTDOOR SWITCHYARD Voltage in KV To ground in mm 11 33 66 132 220 2750 3700 4000 4600 5500

Between section in mm 2500 2800 3000 3500 4500

Minimum Ground Clearance As Per IE-1957 (Rule 77) Voltage in KV 132 220 400 800 To ground in mm 6.10 7.00 8.84 12.40

Minimum Clearance between Lines Crossing Each Other As Per IE-1957 Rules System Voltage Low & Medium 11-66KV 132KV 132KV 3.05 3.05 3.05 220KV 4.58 4.58 4.58 400KV 5.49 5.49 5.49 800KV 7.94 7.94 7.94

220KV 400KV 800KV

4.58 5.49 7.94

4.58 5.49 7.94

5.49 5.49 7.94

7.94 7.94 7.94

Minimum Height above Railway As Per IE-1957 Voltage Broad Meter & Narrow Gauges Above 66KV up to 132KV 14.60 Meter Above 132KV up to 220KV 15.40 Meter Above 220KV up to 400KV 17.90 Meter Above 400KV up to 500KV 19.30 Meter Above 500KV up to 800KV 23.40 Meter Various Air clearances to be provided as per IE rule 64 Voltage KV BIL (Kvp) P-E (cm) P-P(cm) P-G (Meter) Section Clearance(Mt) 33KV 170 30 40 3.7 2.8 66KV 325 63 75 4.0 3.0 110KV 550 115 135 4.6 3.5 220KV 1050 240 210 5.5 4.3 400KV 1425 350 410 8.0 6.5

Clearances from Buildings of high and extra-high voltage lines IE Rule 80 Vertical Distance High voltage lines up to 33KV 3.7 Meter Extra High Voltage 3.7 Meter + Add 0.3 meter for every additional 33KV Horizontal clearance between the conductor and Building High Voltage Up to 11 KV 1.2 Meter 11KV To 33KV 2.0 Meter Extra High Voltage 2.0 Meter + Add 0.3 meter for every additional 33KV Clearance above ground of the lowest conductor As per IE Rule 77

Over head Line Across Street Low and Medium Voltage 5.8 Meter High Voltage 6.1 Meter Over head Line Along Street (Parallel To Street) Low and Medium Voltage 5.5 Meter

High Voltage 5.8 Meter Over head Line Without Across or Along Street Low/Medium /HT line up to 4.6 Meter 11KV If Bare Conductor Low/Medium /HT line up to 4.0 Meter 11KV If Insulated Conductor Above 11 KV Line 5.2 Meter Above 33KV Line 5.8 Meter + Add 0.3 meter for every additional 33KV Clearance between conductors and Trolley / Tram wires As per IE Rule 78

Low and Medium Voltage High Voltage Line Up to 11KV High Voltage Line Above to 11KV Extra High Voltage Line

1.2 Meter 1.8 Meter 2.5 Meter 3.0 Meter

Clearances from Buildings of low & medium voltage lines As Per IE Rule 79

For Flat roof, Open Balcony, Verandah Roof and lean to Roof Line Passes Over Building Vertical Clearance 2.5 Meter Line Passes Adjustment of Building Horizontal 1.2 Meter Clearance For pitched Roof Line Passes Over Building Vertical Clearance 2.5 Meter Line Passes Adjustment of Building Horizontal 1.2 Meter Clearance
Electrical Training Call 0800 298 4200. Full training & business / job support - Nationwide
www.olci.info

Electronic Concepts Film Capacitors for wide range of applications


www.ecicaps.co m

Lightning & Surge devices DEHN lightning and surge arrestors from Surgetek - are all you need!
www.surgetek.co .za

Filed under Uncategorized

About Jignesh.Parmar B.E(Electrical Engineer) having experience in Power Generation-Transmission-Distribution-MaintenanceProject. PLC/SCADA/Autocad/Advance Excel. Language Ability:English-Hindi-Gujarati-French. Website: www.jiguparmar.com
Like One blogger likes this post.

Leave a Reply

Guest

Notify me of follow-up comments via email. Notify me of new posts via email.

Authors

Jignesh.Parmar

Jignesh.Parmar Blog Stats 19,533 hits About Me: By Profession I am an electrical engineer having more than 10 years experience in Power Transmission, Power Distribution, Electrical Maintenance,Electrical Projects and Freelancer Programmer of Advance Excel. Designed some useful Excel Tools of Electrical Engineering as per NEC and IEEE codes.Through Blogging I want to share my experience and knowledge and also help technical enthusiasts to find suitable solutions and updating themselves about various Electrical Engineering Topics. Recent Posts 11KV/415V Overhead Line Specification(REC) Tampering Methods of Energy Meter Sub Station Abstracts Specification for Rewireable Porcelain Cut Out Fuse Unit Low Voltage and High Voltage Cable Testing Electrical Programs( Excel Base) Excel Base Program for Home / Office. Over Load Relay & Contactor for Starter Type of Gland Gland Size Selection EHV XLPE Current Rating XLPE Cable-Current Rating PCV Cable-Current Rating Minimum Electrical Clearance. Fuse Current Transformer Difference between Power T.C & Distribution T.C Transformer Electrical Clearance in Substation Minimum Acceptable Specification of C.T for Metering
Search

April 2011 M T WT F S S 1 2 3 4 5 6 7 8 9 10

11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Mar May

Email Subscription Enter your email address to subscribe to this blog and receive notifications of new posts by email.

Sign me up!

Top Clicks Archives June 2011 (5) May 2011 (3) April 2011 (12) March 2011 (17) Pages Abstract Abstract of CPWD-Part 1 Abstract of IE Rules Abstract of IS Code. IS 1255 IS 15652/IS 11171 IS 1678/IS 1445 IS 3043 IS 5039 IS 5613 (I-II-II) IS 694/IS 1255/IS 1554/ IS 11892 Electrical Notes Electrical Q&A Electrical Q&A Part-1 Electrical Q&A Part-2 Electrical Q&A Part-3 IE Rules for DP Structure Recent Comments

Jignesh.Parmar on Electrical Excel Tools raj on Electrical Excel Tools Rajesh SBV on Current Transformer bias on Current Transformer S. Balamurugan on Lighting Arrester Dilip on Overhead Conductors Madhusudhana Reddy on Ferranti Effect Sanjay Kumar on Electrical Programs( Excel irwan on IS 5613 (I-II-II) Blog at WordPress.com. Theme: Enterprise by StudioPress.

You might also like