You are on page 1of 3

EXCAVATION SOR 1 SCHEDULE OF RATES EXCAVATION S/N DESCRIPTION Excavation oversite commencing from ground level in ordinary ground,

including backfilling, forming of surfaces and removal of surplus excavated materials within site, for the following average overall depth (Removal of surplus excavated material to contractors own dumping grounds measured separately) :1 2 3 4 Not exceeding 150mm deep. Exceeding 150mm but not exceeding 300mm deep. Exceeding 300mm deep. Excavation in Embankment commencing from reduced level in ordinary ground including forming of surface and removal of surplus excavated materials within site (Removal of surplus excavated material to contractors own dumping grounds measured separately) :-. Excavate to form trenches for stumps, pilecaps, foundations, beams, basements, drains, manholes, pier holes etc in ordinary ground including forming of bottom, necessary planking and strutting, part return, fill and ram, and remainder get out and deposit on site as directed in stages of the following depth (Removal of surplus excavated material to contractors own dumping grounds measured separately):5 6 7 8 Not exceeding 2.00m deep. Exceeding 2.00m but not exceeding 4.00m deep. Exceeding 4.00m but not exceeding 6.00m deep. Exceeding 6.00m but not exceeding 8.00m deep. Excavation for HARD GROUND where blasting will not be permitted. HARD GROUND is defined as:- cemented sand, shale, decomposed rock or other material with Standard Penetration Values not exceeding 70 blows per 30cm and bulk density not exceeding 2100 kg/m3 and can be excavated by heavy machinery with a maximum breakout force of 13,000 kg such as Caterpillar 977L or its equivalent :9 10 11 Not exceeding 2.00m deep. Exceeding 2.00m but not exceeding 4.00m deep. Exceeding 4.00m but not exceeding 6.00m deep. m3 m3 m3 20.00 23.35 27.55 m3 m3 m3 m3 13.90 15.70 18.90 21.60 m2 m2 m3 m3 1.00 1.80 5.50 6.40 UNIT RATE ($)

EXCAVATION SOR 2 SCHEDULE OF RATES EXCAVATION S/N DESCRIPTION Excavate to form trenches for drain lines in ordinary ground including forming of bottom, necessary planking and strutting, get out and deposit on site as directed and backfill excavated trench with granite dust/fines in stages of the following depth (Removal of surplus excavated material to contractors own dumping grounds measured separately):12 13 Not exceeding 2.00m deep. Exceeding 2.00m but not exceeding 4.00m deep. Excavate to form trenches for service pipes, cable crossings, etc in ordinary ground including forming bottom and get out, deposit on site as directed and backfill trench in stages of the following depth (Removal of surplus excavated material to contractors own dumping grounds measured separately) :14 15 Not exceeding 2.00m deep with granular materials. Exceeding 2.00m but not exceeding 4.00m deep with granular materials. Not exceeding 2.00m deep with selected excavated material. Exceeding 2.00m deep but not exceeding 4.00m deep with selected excavated material. Not exceeding 2.00m deep with selected imported earth. Exceeding 2.00m but not exceeding 4.00m deep with selected imported earth. CART AWAY surplus excavated material off site and deposit at the Contractor's own dumping ground. Supply Dry approved earth filling obtained from outside source and fill in layers of 300mm thick; including labour for spreading, trimming and consolidating to form earth mounds or to form levels outside buildings and/or under floor slabs, etc. Supply and lay minimum 80mm diameter bakau piles as roller supports. m3 m3 m3 m3 m3 m3 m3 m3 20.90 18.70 m3 m3 24.10 25.10 UNIT RATE ($)

16 17

7.00 9.05

18 19

14.60 15.25

20

5.00

21

10.70

22

1.20

EXCAVATION SOR 3 SCHEDULE OF RATES EXCAVATION S/N DESCRIPTION Excavate to form trenches for drain lines in ordinary ground including forming of bottom, necessary planking and strutting, get out and deposit on site as directed and backfill excavated trench with granite dust/fines in stages of the following depth (Removal of surplus excavated material to contractors own dumping grounds measured separately):23 Supply unwashed sand including spreading, levelling and consolidating. Supply Hardcore in beds, comprising of clean broken bricks/concrete, deposit, spread, levelled, mechanically consolidated and including 25mm thick sand blinding/topping commencing from surface level for the following overall average depth :24 25 26 27 28 Not exceeding 150mm thick. Exceeding 150mm but not exceeding 300mm thick. Exceeding 300mm thick. Supply quarry waste, spread, level and consolidate. Pre-treatment of soil for protection of building against subterranean termites using Chlorpyrifos including provision of a layer of black polythene sheets on top of the treated area with provision of 5-year warranty (treated/untreated area shall be measured flat on plan). Supply and deliver Grade 43 steel sheet pile for use as temporary shoring to retain the sides of excavation in approved section and lengths. Drive Grade 43 steel sheet pile including the provision of all labour, construction equipment, tools and everything necessary for the installation. Extract, recover and stack steel sheet piles including the provision of all labour, construction equipment, tools and everything necessary for the execution. Supply, deliver and drive steel sheet piles left - in permanently including the provision of all labour, construction equipment, tools and everything necessary for the installation. Providing and assembling of necessary piling equipment to drive/extract steel sheet piles of any sizes including all necessary tools and appliances, subsequent dismantling and removal on completion of the work on site. m2 m2 m3 m3 m2 3.80 6.60 19.00 29.00 7.60 m3 21.80 UNIT RATE ($)

29

ton

151.05

30

ton

322.00

31

ton

230.00

32

ton

1,616.10

33

item

6,258.75

You might also like