1 SET UP OF TA OFFICE
Time Line from effective date on June 07, 2011 1 2 3 4 5 6 7 8 9 10 Mobilisation Inception
11
1.1 Renting, refurbishing and equipping office Identification of premises close to future PCU office 1.1.1 1.1.2 Signing of rental contract Organising all refurbishment works (installing of 1.1.3 network, telephone lines) Preparing equipment tender (shopping approach with 1.1.4 three quotations) 1.1.5 Purchase of equipment 1.2 Mobilisation of staff 1.2.1 Mobilising CTA 1.2.1.1 First meeting with PCU director Mobilising local TA (after signature of contract 1.2.2 between NIRAS and VIDECO) 1.2.3 Hiring of support staff 1.2.3.1 Administrator 1.2.3.2 Translator Inception workshop of TA team and distribution of 1.2.4 tasks 1.3 Launching of TA activities 1.3.1 Official registration of project 1.3.2 Opening of bank account 1.3.3 Transfer of funds
Interviews
Start
2 DOCUMENTS REQUIRED
The national livestock development plans (including plans for LPZs) The environmental impact and potential land 2.2 acquisition plans 2.1
2.3 The various policy frameworks The Environmental Management Framework (EMF), 2.3.1 2.3.2 The Resettlement Policy Framework (RPF) The Policy Framework for Ethnic Minority 2.3.3 Development (EMDF)
The market and the consumer (market value chain and 3.3.2.3 SCP (strategy, conduct, performance) analyses, consumer behaviour and preferences An environmental impact assessment of livestock production, processing and marketing A HACCP (hazard analysis critical control points) to 3.3.2.5 identify food security risks in the existing meat marketing chain) 3.3.2.4 Need assessment (training, equipment, infrastructure 3.3.2.5 with regard to sewage and waste management) for slaughter facilities SWOT analysis of the veterinary sector (public and 3.3.2.6 private actors) using the PVS assessment of OIE as basis 3.4 M&E&MIS 3.4.1 Design MIS database Design questionnaires for the various surveys 3.4.2 compatible with the MIS system 3.5 Reporting Inception report to be submitted to PCU within 8 weeks 3.5.1 of the commencement date of the consulting services 3.5.2 Quarterly report, 12 weeks after commencement date
:
achieved on-going scheduled