3Rd Line Calibration Centre-MAM

3 rd Line calibration Center- RF Shielding Works


SN A Description Amount Copper RF Shielding Quotation on 16 November 2009 (Included Each Rm 32 A SP power filter & 2 Nos AC cooling pipe penetrations-Based on sent detail @ tender stage) 338,571.00 a.) 01 No Copper & 4 Nos Steel RF Shielding Quotation on 07 sept. 2010 as per the meeting held on 8th -June -2010. (Referred revised drawings AR -01 -R6) 422,103.00 b). New Filter requirement as per Gullf Engineering instruction on 27 -June 2010. 74,911.00 Total Quotation from EEP 0n 07 sept. 2010 (a+b) 497,014.00 Additional fitter requirements as per the meeting held on 19 -20 th september 2010. (Quot. - 03 nov-2010 by EEP) Deduction of filter's amount due to changing of copper cable to fiber optic cable as per meeting held on 19-20 th sept. 2010.( Qut-03 -nov-2010 EEP) Additional Filters for DC power in calibration Rooms & fire filters in copper room ,quotation on 17 -February -2011 by EEP Additional 4 Nos filters for the fire alarm system, quotation on 17 -February -2011 by EEP Total Cost for All the filters {B(b)+C+D+E+F} RF shielding Cost as per revised drawing -AR-01-R6 ,{B(a)} Total cost for RF shielding & FOC By EEP ,(G+H) 43,500.00 17,500.00 16,100.00 2,276.00 119,287.00 422,103.00 541,390.00

C D E F G H

3Rd Line Calibration Centre-MAM RF shielding Filters - As per Quotation Received on 16-Nov- 2009 No Of Filters No Description
Mechanic al Calibrati on Area

1 17

Power -1 Phase 240V, 50 Hz (32 A ) AC Cooling Pipe Penetration

1 Total for filters for Cabling 2

Total for filters for Pipes Grand Total Of All The Filters accounted @ tender stage BY EEP

3Rd Line Calibration Centre-MAM

ers - As per Quotation Received on 16-Nov- 2009 No Of Filters


Optical & Repair Repair Electroni Room Room Office Screen c Optical Optical calibratio Room Calibrati Calibrati Calibrati n Area on Area on on

Library

1 1 1 1 1 Total for filters for Cabling 2 2 2 2 2 Total for filters for Pipes f All The Filters accounted @ tender stage BY EEP

1 2

3Rd Line Calibration Centre-MAM

Office -2 Store 02

Total

1 2

1 2

9 9 18 18 27

3Rd Line Calibration Centre-MAM Mechanical Calibration Area SI No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 No of Filters requried 1 1 1 1 1 1 3 2 1 1 1 1 1 1 17 Description Power - 3 Phase(415V/240V), 50Hz Power - 1 Phase 240V,400Hz Cable type and Size 4Core x 16 Sq mm Cable + 1Core x 16 Sq mm Wire 3Core x 10 Sq mm Cable

4Core x 16 Sq mm Cable + 1Core x 16 Sq mm Wire Power - 3 Phase(415V/240V), 60Hz Power - 28V DC 3Core x 10 Sq mm Cable Power - 1 Phase 240V,50Hz 3Core x 2.5 Sq mm Cable Signal - From VAV Connected to AC Duct to *** Thermostat on theAlarm Panel(FM200) to Smoke Signal - From Fire wall Detector 2Core x 1.5 Sq mm Signal - Fire Alarm Cable Passing Through FM200 Panel 2Core x 1.5 Sq mm Signal Telephone CAT - 6 (20 Pair) signal Data Fiber Obtic Earthing 25mm x 6mm Copper Strip Room Pressure Sensor to Roof 2 x Beldon 8762 Cable Room Thermostat to Roof 2 x Beldon 8762 Cable Data loger Connected to Computer 8mm USB Cable

Optical & Electronic Calibration Area SI No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 No of Filters requried 1 1 1 1 4 6 2 1 1 1 1 1 2 1 1 25 Description Power - 3 Phase(415V/240V), 50Hz Power - 1 Phase 240V,400Hz Cable type and Size 4Core x 36 Sq mm Cable + 1Core x 25 Sq mm Wire 3Core x 10 Sq mm Cable

3Core x 10 Sq mm Cable Power - 28V DC Power - 1 Phase 115V,60Hz 3Core x 10 Sq mm Cable Power From Fire Alarm Panel(FM200) to Smoke 3Core x 4 Sq mm Cable Signal - 1 Phase 240V,50Hz Detector 2Core x 1.5 Sq mm Signal - Fire Alarm Cable Passing Through FM200 Panel 2Core x 1.5 Sq mm Antanna Port - VHF RG 59 Co axial Cable Antanna Port - UHF RG 59 Co axial Cable Signal Telephone CAT - 6 (30 Pair) signal Data Fiber Obtic Earthing 25mm x 6mm Copper Strip Room Pressure Sensor to Roof 2 x Beldon 8762 Cable Room Thermostat to Roof 2 x Beldon 8762 Cable Data loger Connected to Computer 8mm USB Cable

3Rd Line Calibration Centre-MAM

SI No 1 2 3 4 5 6 7

Repair Room Optical Calibration No of Filters requried Description 7 Power - 1 Phase 240V, 50Hz 4 1 1 3 1 1 18 Power - 1 Phase 115V,60Hz Power - 1 Phase 240V,50Hz Signal - From VAV Connected to AC Duct to Thermostat on the wall Signal - From Fire Alarm Panel(FM200) to 2 No of Smoke Detectors and a Gas Cylinder Signal Telephone signal Data -

Cable type and Size 3Core x 4 Sq mm Cable 3Core x 4 Sq mm Cable 3Core x 2.5 Sq mm Cable *** 2Core x 1.5 Sq mm CAT - 6 (5 Pair) Fiber Obtic

SI No 1 2 3 4 5 6 7

Repair Room Mechanical Calibration No of Filters requried Description 7 Power - 1 Phase 240V, 50Hz 4 1 1 3 1 1 18 Power - 1 Phase 115V,60Hz Power - 1 Phase 240V,50Hz Signal - From VAV Connected to AC Duct to Thermostat on the wall Signal - From Fire Alarm Panel(FM200) to 2 No of Smoke Detectors and a Gas Cylinder Signal Telephone signal Data -

Cable type and Size 3Core x 4 Sq mm Cable 3Core x 4 Sq mm Cable 3Core x 2.5 Sq mm Cable *** 2Core x 1.5 Sq mm CAT - 6 (5 Pair) Fiber Obtic

SI No 1 2 3 4 5 6 7

Office Calibration Area No of Filters requried Description 6 Power - 1 Phase 240V, 50Hz 2 1 3 1 1 8 22 Power - 1 Phase 240V,60Hz Signal - From VAV Connected to AC Duct to Thermostat on theAlarm Panel(FM200) to Smoke Signal - From Fire wall Detectors Signal Telephone signal Data Signal - From BMS Panel to AHUs, Humidifiers & Temperature Sensors

Cable type and Size 3Core x 4 Sq mm Cable 3Core x 2.5 Sq mm Cable *** 2Core x 1.5 Sq mm CAT - 6 (5 Pair) Fiber Obtic

3Rd Line Calibration Centre-MAM

SI No 1 2 3 4 5 6 7 8 9

Screen Room No of Filters requried Description 4 Power - 12V, 15A, DC 2 Power - 1 Phase 240V,60Hz 1 Power - 1 Phase 240V,60Hz Signal - From VAV Connected to AC Duct to 1 Thermostat on the wall 1 Antanna Port - VHF 1 Antanna Port - UHF 3 Signal Telephone 1 signal Data 1 Earthing 15 No of Filters requried 1 1 4 6 6 18 133

Cable type and Size 3Core x 4 Sq mm Cable 3Core x 4 Sq mm Cable 3Core x 2.5 Sq mm Cable *** RG 59 Co axial Cable RG 59 Co axial Cable CAT - 6 (5 Pair) Fiber Obtic 25mm x 6mm Copper Strip

SI No 1 2 3 4 5

Description Nitrogen Gas 15mm dia GI Pipe Nitrogen Gas 25mm dia GI Pipe Compressed Air 50mm dia GI Pipe Compressed Air 25mm dia GI Pipe Vaccum 65mm dis Copper Pipe

3Rd Line Calibration Centre-MAM Optical & Electronic Calibration SI No


1 2

No of Filters requried
1 1

Description
Power - 3 Phase(415V/240V), 50Hz Power - 1 Phase 240V,400Hz

Cable type and Size


4Core x 16 Sq mm Cable + 1Core x 16 Sq mm Wire 3Core x 10 Sq mm Cable 4Core x 16 Sq mm Cable + 1Core x 16 Sq mm Wire 3Core x 10 Sq mm Cable 3Core x 2.5 Sq mm Cable 2Core x 1.5 Sq mm 2Core x 1.5 Sq mm RG 59 Co Axial Cable RG 59 Co Axial Cable Cat 6 (30 Pair) Fiber Obtic 25mm x 6mm Copper Strip 2 x Beldon 8762 Cable 2 x Beldon 8762 Cable 8mm USB Cable 3 x 1.5 mm+2 Beldon 8762 Cable DC Power 60A 60A Ordered - Delivery to EEP 28.02.11 Ordered - Delivery to EEP 28.02.11 Ordered - Delivery to EEP 28.02.11 Ordered - Delivery to EEP 28.02.11 Ordered - Delivery to EEP 28.02.11 Ordered - 17.02.11 Ordered - 17.02.11 Ordered - Delivery to EEP 28.02.11 Ordered - Delivery to EEP 28.02.11 Ordered - Delivery to EEP 28.02.11 Ordered - Delivery to EEP 28.02.11 Stock Ordered - 17.02.11 Ordered - 17.02.11 Information Required:- Data Rate, Impedance, R.S. Protocal? Ordered - 17.02.11 Ordered - 17.02.11 Ordered - 17.02.11

3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

1 1 1 1 3 2 1 1 1 1 1 1 1 1 1 6

Power - 3 Phase(415V/240V), 60Hz Power - 28V DC Power - 1 Phase 240V,50Hz Signal - From Fire Alarm Panel(FM200) to Smoke Detector Signal - Fire Alarm Cable Passing Through FM200 Panel Antena Port VHF Antena Port UHF Signal -Telephone signal Data Earthing Room Pressure Sensor to Roof Room Thermostat to Roof Data loger Connected to Computer Modulating Thermostat to AHU Panel Roof Supply to DC power rectifier Power - 28 V DC

60A 60A 10A 1A 100V 2 Wire D.C Control Filter 1A 100V 2 Wire D.C Control Filter Coaxial Surge protected Filter Coaxial Surge protected Filter Fiber Obtic Fiber Obtic M 10 Earth Bolt 1 Amp 4 Line A.C.Control Filter 1 Amp 4 Line A.C.Control Filter Fiber Optic? 5Amp 8 Line AC Control Filter 60 A AC power filter 60A Dc Filters

26 Copper Seilded Room SI No


1 2 3 4 5 6 7 8

No of Filters requried
4 2 1 1 1 1 3 1 12V , 15A DC

Description

Cable type and Size


3Core x 4 Sq mm Cable 3Core x 4 Sq mm Cable 3Core x 2.5 Sq mm Cable ?

Comments by EEP
15A 30A 15A 5 Amp 8 Line A.C.Control Filter Coaxial surge protected filter Coaxial surge protected filter Fiber Obtic Fiber Obtic Ordered - Delivery to EEP 28.02.11 Ordered - Delivery to EEP 28.02.11 Ordered - Delivery to EEP 28.02.11 2x1.5mm PVC insulated + 2xBeldon 8762 Cables Ordered - Delivery to EEP 28.02.11 Ordered - Delivery to EEP 28.02.11 CAT - 6 (5 Pair) Copper Cable Fiber Obtic Cable

Power - 1 Phase 240V, 50Hz Power - 1 Phase 240V, 50Hz Signal - From VAV Connected to AC Duct to Thermostat on the wall Antanna Port - VHF Antanna Port - UHF Signal Telephone signal Data -

RG 59 Co axial Cable RG 59 Co axial Cable


CAT - 6 (5 Pair) Fiber Obtic

3Rd Line Calibration Centre-MAM


9 10 1 1 Earthing Signal - From Fire Alarm Panel(FM200) to Smoke Detectors 25mm x 6mm Copper Strip 2Core x 1.5 Sq mm M 10 Earth Bolt 1A 100V 2 Wire D.C Control Filter Stock Ordered - 17.02.11

16 Repair Room Optical Calibration SI No


1 2 3 4 5 6 7

No of Filters requried
7 4 1 1 3 1 1

Description
Power - 1 Phase 240V, 50Hz Power - 1 Phase 115V,60Hz Power - 1 Phase 240V,50Hz Signal - From VAV Connected to AC Duct to Thermostat on the wall Signal - From Fire Alarm Panel(FM200) to 2 No of Smoke Detectors and a Gas Cylinder Signal Telephone signal Data -

Cable type and Size


3Core x 4 Sq mm Cable 3Core x 4 Sq mm Cable 3Core x 2.5 Sq mm Cable *** 2Core x 1.5 Sq mm CAT - 6 (5 Pair) Fiber Obtic 30A 30A 30A 5 Amp 8 Line A.C.Control Filter 1A 100V 2 Wire D.C Control Filter Fiber Obtic Fiber Obtic Ordered - Delivery to EEP 28.02.11 Ordered - Delivery to EEP 28.02.11 Ordered - Delivery to EEP 28.02.11 Ordered - 17.02.11 Ordered - 17.02.11 Ordered - Delivery to EEP 28.02.11 Ordered - Delivery to EEP 28.02.11

18

Repair Room Mechanical Calibration SI No


1 2 3 4 5 6 7

No of Filters requried
7 4 1 1 3 1 1

Description
Power - 1 Phase 240V, 50Hz Power - 1 Phase 115V,60Hz Power - 1 Phase 240V,50Hz Signal - From VAV Connected to AC Duct to Thermostat on the wall Signal - From Fire Alarm Panel(FM200) to 2 No of Smoke Detectors and a Gas Cylinder Signal Telephone signal Data -

Cable type and Size


3Core x 4 Sq mm Cable 3Core x 4 Sq mm Cable 3Core x 2.5 Sq mm Cable *** 2Core x 1.5 Sq mm CAT - 6 (5 Pair) Fiber Obtic 30A 30A 30A 5 Amp 8 Line A.C.Control Filter 1A 100V 2 Wire D.C Control Filter Fiber Obtic Fiber Obtic Ordered - Delivery to EEP 28.02.11 Ordered - Delivery to EEP 28.02.11 Ordered - Delivery to EEP 28.02.11 2x1.5mm PVC insulated + 2xBeldon 8762 Cables Ordered - 17.02.11 Ordered - Delivery to EEP 28.02.11 Ordered - Delivery to EEP 28.02.11

18 Office Calibration Area SI No


1 2 3 4 5 6

No of Filters requried
6 2 1 3 1 1

Description
Power - 1 Phase 240V, 50Hz Power - 1 Phase 240V,60Hz Signal - From VAV Connected to AC Duct to Thermostat on the wall Signal - From Fire Alarm Panel(FM200) to Smoke Detectors Signal Telephone signal Data -

Cable type and Size


3Core x 4 Sq mm Cable 3Core x 2.5 Sq mm Cable *** 2Core x 1.5 Sq mm CAT - 6 (5 Pair) Fiber Obtic

Comments by EEP
30A 30A 5 Amp 8 Line A.C.Control Filter 1A 100V 2 Wire D.C Control Filter Fiber Obtic Fiber Obtic Ordered - Delivery to EEP 28.02.11 Ordered - Delivery to EEP 28.02.11 Ordered - 17.02.11 Ordered - 17.02.11 Ordered - Delivery to EEP 28.02.11 Ordered - Delivery to EEP 28.02.11

3Rd Line Calibration Centre-MAM


7 6 Signal - From BMS Panel to AHUs, Humidifiers & Temperature Sensors 1 Amp 2 Line Control Filter Ordered - 17.02.11

20

Mechanical Calibration Area SI No


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

No of Filters requried
1 1 1 1 1 1 3 2 1 1 1 1 1 1 6

Description
Power - 3 Phase(415V/240V), 50Hz Power - 1 Phase 240V,400Hz Power - 28V DC Power - 1 Phase 115 V,60 Hz Power - 1 Phase 240V,50Hz Signal - From Fire Alarm Panel(FM200) to Smoke Detector Signal - From Fire Alarm Panel(FM200) to Smoke Detector Signal - Fire Alarm Cable Passing Through FM200 Panel Signal Telephone signal Data Earthing Room Pressure Sensor to Roof Room Thermostat to Roof Data loger Connected to Computer Power - 28 V DC

Cable type and Size


4Core x 16 Sq mm Cable + 1Core x 16 Sq mm Wire 3Core x 10 Sq mm Cable 3Core x 10 Sq mm Cable 3Core x 10 Sq mm Cable 3Core x 4 Sq mm Cable 2Core x1.5 sqmm 2Core x 1.5 Sq mm 2Core x 1.5 Sq mm CAT - 6 (20 Pair) Fiber Obtic 25mm x 6mm Copper Strip 2 x Beldon 8762 Cable 2 x Beldon 8762 Cable 8mm USB Cable 3Core x 4 Sq mm Cable 60A D.C Power Filters 60A 60A 60A 60A 10A 1 A 100 V 2 wire DC control filter 1A 100V 2 Wire D.C Control Filter 1A 100V 2 Wire D.C Control Filter Fiber Obtic Fiber Obtic M 10 Earth bolt 1 Amp 4 Line A.C.Control Filter 1 Amp 4 Line A.C.Control Filter Ordered - Delivery to EEP 28.02.11 Ordered Ordered Ordered Ordered Delivery Delivery Delivery Delivery to to to to EEP EEP EEP EEP 28.02.11 28.02.11 28.02.11 28.02.11

Ordered - 17.02.11 Ordered - 17.02.11 Ordered - 17.02.11 Ordered - Delivery to EEP 28.02.11 Ordered - Delivery to EEP 28.02.11 Stock Ordered - 17.02.11 Ordered - 17.02.11 Information Required:- Data Rate, Impedance, R.S. Protocal? Ordered - 17.02.11

23

242 121 Total filters

171

3Rd Line Calibration Centre-MAM

Information sent to Mr Muralidharen 21.12.10 Information sent to Mr Muralidharen 21.12.10

To be confirmed if required

EEP Comments

3Rd Line Calibration Centre-MAM

Information sent to Mr Muralidharen 21.12.10

Information sent to Mr Muralidharen 21.12.10

Information sent to Mr Muralidharen 21.12.10

EEP Comments

Information sent to Mr Muralidharen 21.12.10

3Rd Line Calibration Centre-MAM

Information sent to Mr Muralidharen 21.12.10 Information sent to Mr Muralidharen 21.12.10

To be confirmed if required

3Rd Line Calibration Centre-MAM ISKAN CONTRACTING CO LLC TENDER NO: 16/2009 FOR PROJECT MOD/2002/042 3 RD LINE WORKSHOP AND CALIBRATION CENTRE IN MAM R.F SHIELDING FLOOR AREA REF-AR-01-R2 (OLD DRAWINGS) REF-AR-01-R6 (REVISED DRAWINGS) TOTAL FLOOR AREA M2 ISSUED FOR CONSTRUCTION (AR01-R2) 78.74 20 20 20 222.92 21.25 4.63 3.33 27 18.68 27 17.1 480.64 TOTAL FLOOR AREA M2 REVISED DRAWING (AR-01R6) 78.74 20 20 20 222.92 DELETED DELETED DELETED DELETED DELETED DELETED 17.1 378.76 37.5 18 18 18 61.7 22 8.7 7.3 21 17.3 21 16.6 267.1 621800 37.5 18 18 18 61.7

SR NO

DESCRIPTION

LENGTH M WIDTH M

1 2 3 4 5

6 7 8 9

MECHANICAL CALIBRATION 12.4 REPAIR ROOM 5 REPAIR ROOM 5 OFFICE 5 ELECTRONICS & OPTICAL CALIBRATION 19.3 8.5 2.5 1.85 STORE 2 6 OFFICE 4.5 LIBRARY 6 SCREEN ROOM 4.5 TOTAL R.F SHIELDIN FLOOR AREA

6.35 4 4 4 11.55 2.5 1.85 1.8 4.5 4.15 4.5 3.8

17.1 170.3 ###

SR NO A B C D

R.F SHIEDING DOORS AD 3a (Single doors) DV2 (Double doors) D6 (Single doors) D1 (Double doors) TOTAL QTY total amount BOQ Amount R.O Revised Amount R.O Cost Saving R.O

UNIT NOS NOS NOS NOS

AR-01-R2 QTY 2 3 4 3 12

R.F SHIEDING DOORS AD 3a (Single doors) DV2 (Double doors) D6 (Single doors) D1 (Double doors)

UNIT NOS NOS NOS NOS

REVISED DRAWING AR-01R6 QTY 2 2 2 2 8

480.635m2 621,800.000 378.755m2 489,997.314 131,802.686

3Rd Line Calibration Centre-MAM

AD 3a(2000x2200) DV2(2000X2200)mm D6(1000X2200)mm D1(1800x2200)mm

3Rd Line Calibration Centre-MAM ISKAN CONTRACTING CO LLC TENDER NO: 16/2009 FOR PROJECT MOD/2002/042 3 RD LINE WORKSHOP AND CALIBRATION CENTRE IN MAM R.F SHIELDING FLOOR AREA REF-AR-01-R2 (OLD DRAWINGS) REF-AR-01-R6 (REVISED DRAWINGS) TOTAL FLOOR AREA M2 ISSUED FOR CONSTRUCTION (AR01-R2) 350.82 127.3 127.3 127.3 844.38 155.85 155.85 155.85 114.71 2159.35 TOTAL FLOOR AREA M2 REVISED DRAWING (AR-01R6) 350.82 127.3 127.3 127.3 844.38 DELETED DELETED DELETED 114.71 1691.80 38.3 18 18 18 67.5 21 21 21 16.6 239.4 621800

SR NO

DESCRIPTION

LENGTH M WIDTH M

HIEGHT M

1 2 3 4 5 6 7 8 9

MECHANICAL CALIBRATION REPAIR ROOM REPAIR ROOM OFFICE ELECTRONICS & OPTICAL CALIBRATION STORE 2 OFFICE LIBRARY SCREEN ROOM TOTAL R.F SHIELDIN FLOOR AREA

12.6 5 5 5 22 6 4.5 4.5 4.5

6.55 4 4 4 11.75 4.5 6 6 3.8

4.85 4.85 4.85 4.85 4.85 4.85 4.85 4.85 4.85

SR NO A B C D

R.F SHIEDING DOORS AD 3a (Single doors) DV2 (Double doors) D6 (Single doors) D1 (Double doors) TOTAL QTY total amount BOQ Amount R.O Revised Amount R.O Cost Saving R.O

UNIT NOS NOS NOS NOS

AR-01-R2 QTY 2 3 4 3 12

R.F SHIEDING DOORS AD 3a (Single doors) DV2 (Double doors) D6 (Single doors) D1 (Double doors)

UNIT NOS NOS NOS NOS

REVISED DRAWING AR-01R6 QTY 2 2 2 2 8

2159.35m2 621,800.000 1691.80m2 487,165.693 134,634.307

3Rd Line Calibration Centre-MAM

3Rd Line Calibration Centre-MAM

37.5 18 18 18 61.7

17.1 170.3 ###

3Rd Line Calibration Centre-MAM

3Rd Line Calibration Centre-MAM

3 rd Line calibration CenterComparison of Changing of Copper cable to Fiber optic cable, SN Description Amount A Cost Reduction Of filters, Due to Fiber optic cable 17,500.00 Conversion Factor 0.63 10,937.500 B Additional cost for Passive Equipment due to fiber optic as per the Assarain Quotation on 10 -oct-2010 C Additional cost for Active Equipment Suppling by MOD due to fiber optic cable. -Ref: J9230/MODES/MAM/INT/165/2165 Total Additional Cost Due to above change D (B+C) E Cost saving due to above change (A) Net Effect on above change (A-(B+C)) 12,155.200 18,979.320 10,937.500 -8,041.820 6,824.120

3Rd Line Calibration Centre-MAM

3 rd Line calibration Center- Workbenches


Location Type of work benches T3 T4 T5 1 4 5 3 Total 70A 70C 14 4 8 18 14 15 73

T1 optical & Electrical calibration 8 Repair Room Mechanical calibration Area (Y2,Y9/ X7,X3) Area (Y25,Y27/ X11,X3) Area (Y24,Y27a/ X19,X14) Total 8

T2 5

18 14 15 29

18

You might also like