Professional Documents
Culture Documents
June 13
Network Proposal
2011
CCNA Discovery Networking for Home and Small Businesses: Capstone Project Putting it All Together
Enclosed in this packet is a network proposal for the Anycompany Corperation. This packet contains the hardware specifics for the computers that will be used by the administrative manager, film and graphics editor, and the mobile film crew. This packet also contains the cost of those specific computers along with the cost of the server wireless router and DSl Modem. The physical layout of the network and the Adressing Scheme for the Server and other user computers. After assessing your Building and Budget in this packet I have given you my best recommendations of what you need to start your business over. Your IT advisor , Shannon Milliken
Component Processor: (Manufacture/model/speed) Memory: (typem, amount) Hard Drive: (type, capacity) CD-ROM/DVD: (R,R/W,speed) USB Ports: (number, location) Video Card: (manufacturer, model, video RAM) Sound Card: (Manufacture, model) Modem: (Internal/external, speed, standard) Network Card(s): (Ethernet: speed, wireless, standard) Operating System: (manufacturer, version, compatibility) Monitor: (size, resolution, refresh) Printer: (manufacturer, model, type, speed) Speakers: (manufacturer, model, type) Internet Connection: (USB/Ethernet/wireless)
Recommendation
AMD Pheonix X6 10907/3.2Ghz Kingston ram/ 4GB SEAGATE /2TB HP/ 130ms 4 integrated on the front MSI / 768MB Aseus Xonar DS Audiocard Integrated Rosewill 100/1000 Mbps/ 802.3 standard Windows XP 17x10 inch lcd Hp laser All in one N/A
Computer System Planning Form Job Role: Film and Graphics Editor Component Processor: (Manufacture/model/speed) Memory: (typem, amount) Hard Drive: (type, capacity) CD-ROM/DVD: (R,R/W,speed) USB Ports: (number, location) Video Card: (manufacturer, model, video RAM) Sound Card: (Manufacture, model) Modem: (Internal/external, speed, standard) Network Card(s): (Ethernet: speed, wireless, standard) Operating System: (manufacturer, version, compatibility) Monitor: (size, resolution, refresh) Printer: (manufacturer, model, type, speed) Speakers: (manufacturer, model, type) Internet Connection: (USB/Ethernet/wireless) Recommendation
AMD Pheonix X6 10907/3.2Ghz Kingston ram/ 4GB SEAGATE /2TB HP/ 130ms 4 integrated on the front MSI / 768MB Aseus Xonar DS Audiocard Integrated Rosewill 100/1000 Mbps/ 802.3 standard Windows XP 17x10 inch lcd Hp laser All in one N/A
Component Processor: (Manufacture/model/speed) Memory: (typem, amount) Hard Drive: (type, capacity) CD-ROM/DVD: (R,R/W,speed) USB Ports: (number, location) Video Card: (manufacturer, model, video RAM) Sound Card: (Manufacture, model) Modem: (Internal/external, speed, standard) Network Card(s): (Ethernet: speed, wireless, standard) Operating System: (manufacturer, version, compatibility) Monitor: (size, resolution, refresh) Printer: (manufacturer, model, type, speed) Speakers: (manufacturer, model, type) Internet Connection: (USB/Ethernet/wireless)
Recommendation
Seagate 320GB
Sony optime Black 18x Dvd/Cd rom 4 integrated left side 1024 Ati HD SSOU Integrated None Integrated Windows XP Given Shared Integrated Wireless
*Shared Printer:
The Following Printer will be installed and shared to all workers. Brother MFC Series MFC-7840W MFC Monochrome Laser Printer
ISP y y y Verizon : Small Business Quick Plan with Static IP Speed: 3MBPS/768KBPS Services: o Email o Static Public Ip o DNS o Internet Connectivity o 74.99 per month
Internal Services: y y y y y FTP/File Server Mail Server DHCP DNS Network Connectivity
Devices providing these services: y y Windows 2003 Server ( FTP/File Server and Email Server ) Linksys ISR ( DHCP, DNS, Firewall, and Network Connectivity )
Equipment is to be installed after hours when possible. y Wireless Security WPA2 Key : K!@#112345 SSID : Main Office ESSID-Broadcast: disabled Windows Server 2003 Static IP : 182.18.1.167 Host Name: Company server Server Services: Mail, FTP, File sharing Linksys ISR Linksys Wireless-G Broadband Router WRT54GL
Are Wired connections required? Are Wireless connections required? Wireless standard Firewall required? ISP connectivity required? Type of ISP connectivity Internal or external modem required? Cables required? Battery backup required?
Number: 4 Number: 6 Standard N Yes Yes DSL Yes External DSL Yes Straight Threw Yes
Logical Topology
Physical Topology
10
Processor RAM Hard Drive CD-RW/DVD Video Card Monitor Speakers Total
Mobile Worker
Bundle of laptops $2819.99
11
Film and Graphics Editor Install and Check Processor Install and Check RAM Install and Check Hard Drive Install and Check CD-ROM/DVD Install and Check Video Card Install and Check The Operating System Connect and Check the Monitor Connect and Check Speakers Verify NIC is functioning, then connect to the office network. Administrative Manager Install and Check Processor Install and Check RAM Install and Check Hard Drive Install and Check CD-ROM/DVD Install and Check The Operating System Connect and Check the Monitor Connect and Check Speakers Verify NIC is functioning, then connect to the office network. Mobile Workers Install and Check Processor Install and Check RAM Install and Check Hard Drive Install and Check CD-ROM/DVD Install and Check Video Card Install and Check The Operating System
12
Connect and Check the Monitor Connect and Check Speakers Verify NIC is functioning, then connect to the office network.
Checklist for the configuration and installation of the network equipment at the customer site. Connect and verify power to the Linksys ISR Change IP of Router to 172.16.1.1 Set DHCP Range and settings on the ISR Set Authentication to TSK and Encryption to WPA2 On the ISR Change ISR ESSID to accompany Disable ISR Broadcast ESSID Set Username and Password on the ISR Checklist for overall Security at A Company 6 Key pass code on all doors Password Policies that require a password change every 60 Days Installation of ADT Small Business Security Systems Site Survey Penetration test for the networks security and wireless security Router Configuration:
13
Installation Documentation 1/14/11 Started at 1:00 P.M. -Dcomputer1 Set to DHCP Successfully -Dcomputer2 Set to DHCP Successfully -ISR IP set to 172.16.1.1 -ISR DHCP Enabled -ISR DHCP Range set to 182.16.1.150-250 -Server IP Set to 182.16.1.151
14
-Server Subnet Set to 255.255.255.0 -Printer IP Set to 182.16.1.162 -Printer Subnet Set to 255.255.255.0 -1:03 P.M. Ran Simulation of packet from Server to WComputer 1 Result : Unsuccessful -1:07 P.M. Ran Simulation of packet from Server to WComputer 2 Result : successful -1:09 P.M. Checked WComputer 1 & 2 IP settings and found DHCP Failed then set the IP s Statically but within the DHCP Range. Set WComputer 1 ip to 182.16.1.54 Set WComputer 2 ip to 182.16.1.102 -1:12 P.M. Ran Simulation of packet from Server to DComputer 1 Result : Successful -1:17 P.M. Ran Simulation of packet from Server to DComputer 2 Result P: Successful -1:20 P.M. Tested DComputer 1 and DComputer 2 connectivity to the printer Result : Successful -1:26 PM Tested Wireless Connectivity with the ISR to all Mobile Workers Computers Result : Successful -1:30 PM There was an average 1.5 Second Time Delay for the transportation of Wired Packets, and 2.3 Second Time Delay for all Wireless Packets.
15