You are on page 1of 11

M.

SUGUNESVARAN@ SUGU
Contact Info

Address Telephone No. Mobile No. Email

: No 502, Tingkat 4 Block C, Pangsapuri Subang Impian, Jalan Zuhal U5/177, Seksyen U5 40106 Shah Alam, Selangor. : : 012-3257968 : s.avee@yahoo.com
Personal Particulars

Age Date of Birth Nationality Gender IC No.

: 32 years : 30 Jan 1979 : Malaysia : Male : 790130-08-5583

Highest Qualification

Qualification Field of Study Major Institute/University Grade Graduation Date

: Higher National Diploma in Civil & Structure : Engineering (Civil & Structure) : Civil & structure : WIT(Workers Institute of Technology), Malaysia : Grade A/1st Class : Oct 1999

Latest Employment

Company Name Position Title Position Level Specialization Industry Duration

: Ericsson Telecommunications Inc (Papua New Guniea) : Implementation Coordinator : Executive : Civil & Transmission : Telecommunication : Oct 2010 March 2011

Top Skills Skill Years Proficiency

Project Managment

Intermediate

Copyright 1996-2006, JobStreet.com. All rights reserved.

Language

Languages Spoken

Written

Bahasa Malaysia English Tamil

10 10 10

10 10 3

Preferences

Expected Monthly Salary Availability

: RM 6000.00 : Immediately ASAP


Text Resume

A capable, enthusiastic civil engineering major with on site construction experience seeks a challenging. Having very good experience in construction works e.g Foundation works(Borepile, Span pile,RC pile,Micro pile, stump, footing,) Earth work e.g excavation and backfilling, Hacking, Bridge Highbeam, Drainage, Manholes, Road works e.g premix, Load test, PIT test, SPT test, Sonilogging.

1) IJM Corpration Sdn. Bhd as a Site Supervisor Project Coordinator (March 2000 Jan 2002)

- supervise for foundation works e.g excavation, back filling, bore pilling for highway brigde, span pile, micro pile - RC pile, High beam, Drainage, Manholes, Premix works, box gedder, infra structure, sub structure and super structure works. - to do necessary arrangment for tomorrow progress. - follow up with contractor for today progress and task to complete by the day. - look after the materials which received and going out from project site. - to receive materials (reinforcement, mechinery, tools, ext) in correct order and in good good condition. - to make arrangement with batching plan for concrete delivers. - to liase with consultant / cleck of work before the schedule for today started. - to prepare dialy and monthly progress report. - to attend weekly meeting with contractor, consultant and Project Manager for progress update.

Copyright 1996-2006, JobStreet.com. All rights reserved.

2) Trisilco Folec sdn. bhd. as a Technical Executive. (Feb 2002 Feb 2004)

- TSS survey - Prepared engineering requirement checklist for materials and equipment for every particular site. -Troubleshooting of equipment after commissioning and testing. Ericsson RBS and mini-link equipment installation. -Integration and commissioning of Ericsson RBS equipment. -Troubleshooting on Ericsson RBS equipment -Supervised installation for DXX module -Supervised for installation for antenna, checking for azimuth and orientation. -Prepare construction drawing and work order -Prepare engineering quality checklist according to client requirement. -Supervision of 7/8 and 15/8 feeder cable laying and sweep test. -Installation and programming of Ericsson Mini-Link -Instructed contract troubleshooting on RBS, Ericsson Mini-Link or to erection, excavation, and laid fiber optic cable. -Synchronizing of radio loop alignment for expected AGC level Civil works -Soil test for candidate tower location. -Supervision on 3 legged, 4 legged, monopole, monopole tree, minimast and unipole erection. -Supervision on earthwork eg. Cutting earth, backfilling, compactions, crush run and ect. -Supervision on tower foundation work eg. Pilling(RC pile), excavation, formwork, reinforcement(rebar) works, concreting for stump, footing and ect. -Supervision on tower erection and painting works. -Supervision on CME work eg. Cabin(PU Panel), Cabin Slab, Platform, Premix, fencing access road and drainage work and ect. -Also supervise on slab cutting, rubber wall, retaining wall and deiform wall. Power Transmission/ Electrical work -To supervise electrical works for outdoor equipment and indoor equipment and power up the equipment in required voltage. -To supervise power cable laying works from nearest pole to proposed indoor or outdoor equipment. -Need to liaise with TNB(Malaysian Power Distributor) for confirmation on the overhead and underground power cable laying for proposed site. -Need to liaise with genset supplier and arrange supplier to deliver 2 unit of required voltage genset to be delivered at site when having delay on permanent power transmission supply. -Has been worked in 3 phase power supply and 25KVA genset.

Copyright 1996-2006, JobStreet.com. All rights reserved.

3) Instacom Engineering sdn bhd. as a Site Engineer. (March 2004 July 2006) - TSS survey

- Prepared engineering requirement checklist for materials and equipment for every particular site. -Troubleshooting of equipment after commissioning and testing. Ericsson RBS and mini-link equipment installation. -Integration and commissioning of Ericsson RBS equipment. -Troubleshooting on Ericsson RBS equipment -Supervised installation for DXX module -Supervised for installation for antenna, checking for azimuth and orientation. -Prepare construction drawing and work order. -Prepare engineering quality check list according to client requirement. -Supervision of 7/8 and 15/8 feeder cable laying and sweep test. -Installation and programming of Ericsson Mini-Link -Instructed contract troubleshooting on RBS, Ericsson Mini-Link or to erection, excavation, and laid fiber optic cable. -Synchronizing of radio loop alignment for expected AGC level Civil works -Soil test for candidate tower location. -Supervision on 3 legged, 4 legged, monopole, monopole tree, minimast and unipole erection. -Supervision on earthwork eg. Cutting earth, backfilling, compactions, crush run and ect. -Supervision on tower foundation work eg. Pilling(RC pile), excavation, formwork, reinforcement(rebar) works, concreting for stump, footing and ect. -Supervision on tower erection and painting works. -Supervision on CME work eg. Cabin(PU Panel), Cabin Slab, Platform, Premix, fencing access road and drainage work and ect. -Also supervise on slab cutting, rubber wall retaining wall and deiform wall. -Supervision on tower foundation and earthing work. Power Transmission/ Electrical work -To supervise electrical works for outdoor equipment and indoor equipment and power up the equipment in required voltage. -To supervise power cable laying works from nearest pole to proposed indoor or outdoor equipment. -Need to liaise with TNB(Malaysian Power Distributor) for confirmation on the overhead and underground power cable laying for proposed site. -Need to liaise with genset supplier and arrange supplier to deliver 2 unit of required voltage genset to be delivered at site when having delay on permanent power transmission supply. -Has been worked in 3 phase power supply and 25KVA genset.

Copyright 1996-2006, JobStreet.com. All rights reserved.

4) KEN Holdings Sdn. Bhd. as a Site Engineer. July 2006 Jun 2008

-to supervise a highrise building construction. -daily task to make arrangment with suppliers eg. Concrete, rienforcement, timber, ect. -to liase with bacthing plan for concrete. -to liase with store supervisor for materials. -supervision on shearwall concreting, slab concreting, podium, cooridoor, and staircase. -to confirm the alligment of the steel mould and the electrical work on the shearwall before concreting. -to confirm the reinforcement on the slab before concreting the slab. -to do dialy report on the workers (numbers of the carpenter/ barbender/ electrician/ general workers and mechine operators and their task complete on the day. -to confirm with the contractor on the concreating progress on the day and concrete supply in correct order. -to make sure that the workers follows safety requirement. Safety net always enough to served at site. -to liase with consultant / cleck of work before the schedule for today started. -to prepare dialy and monthly progress report. -to attend weekly meeting with contractor, consultant and Project Manager for progress update. -Sound knowledge of construction methods, project planning, project implementation, cost & quality control and interpretation of contracts. -Familiar with client-consultant-contractor-local authorities coordination activities. -Flexible and able to lead the team and to work under pressure

Copyright 1996-2006, JobStreet.com. All rights reserved.

5) Alcatel Lucent Network Malaysia as a Site Engineer. (Jun 2008 Jun 2009)

- Worked as Site Project Engineer with Alcatel Lucent Network for Packet1 WIMAX Project. -Job scope P1 WIMAX ROLLOUT TEAM - -Survey for all candidate sites. -To attend for site survey for CME e.g proposed structure which comply RF and MCMC requirement, type of structure, grounding rough, proposed equipment location, permanent TNB power cable rough and etc. -Conformation on LOS with TE engineer. -Need to follow up with contractor to produce Technical Drawing and Construction drawing within KPI dates -To supervise the sites which construction already stated ( to supervise on installation of structure, outdoor equipment, ODU, IDU, Antenna, GPS, WBS, Laying feeder cable, highbrid cable, laying of M/W IF cable, Alarm panel, Patch panel and labiling works. -Managed Quality Control and Safety -Ensured Contractual Commitments were met On Time, Within Budget and customer satisfaction. -Managed Interface between Customer, Project Team and Sub-contractors. -To attend CME and TI acceptance once the site complete. -To handover the site to customer without and defect.

Copyright 1996-2006, JobStreet.com. All rights reserved.

6) SKYLINE TECHNOLOGY (M) Sdn. Bhd as a Rollout/Implementation Manager for Maxis NEC Pasolink Project. (Eastern/Southern) and NSN Flexipacket (Central/Northern) SDH Trunk Link & PDH 9400Lux DiGi (M) Sdn.Bhd MW AWY / 3G NODE-B PROJECT Celcom (M) Jun 2009 Sept 2010 Maxis NEC Pasolink Project - To explain about the NEC Pasolink Project to contractor and priceing to

Subcontractor. - To arrange sub-contractor for safety breifing with PERNEC before awarde site to contractor and make sure all the workers have relevent document before start work at height. - Need to arrange materials collection from warehouse for awarded site once received SO(servive order) from customer. - Need to liase with Project Engineer/Site Supervisor for on going progress work and get update. - To arrange tester for new link and hotswap site for NEC NEO and NEC V4 equipment - Need to attend weekely meeting with PERNEC regarding site status, progress status, futhure awarde site and ect. - Having good experience in Testing and commisioning for NEC Pasolink (PERNEC). - To clear punchlist for Nokia siemens link (SRAL XD). 6 months experience in NSN SRAL XD equipment(testing and commisioning). Maxis NSN Flexipacket project -Look after Northern / Central Rollout progress for NSN Flexipacket project. -Get site from costumer weekly basis. -Awarde site to contractor and in house team as per state. -Need to liase with warehouse incharge person for material collection with warehouse. -Need to apply for work permit for scheduled site and also service effecting work permit. -Need to arrange for access letter for rooftop site. -Prepare and send out the progress tracker to customer every day. -Prepare and send out the progress tracker to internal department every 3 days in a week. -Plan for swap and upgrade site with customer and tester for configuration. -Attend weekly meeting with customer. -Need to follow up with project coordinator for on going site status. -Need to arrange Tester and plan their schedule for every week. -Need to send out completion report to customer once link BIS. -Need to get necessary document (BIS check list, BER test report, Field commisioning Report) from tester once link up and upload in customer eletronic project management. -Need to follow up with contractor / inhouse team for completion phots to send out SAR report. -Need to follow up with customer Quality Team for punch list sites. -Need to visit the site for Quality works as request by customer. -Need to arrange and prepare punch list clearance team to clear punch list at site.

Copyright 1996-2006, JobStreet.com. All rights reserved.

7) Ericsson Telecommunications Inc. (Papua New Guinea, Daru) as Implementation Coordinator for Digicel project. (Oct 2010 March 2011) -Having good experience worked at remote area in Papua New Guniea and having

different experience worked in civil works for tower erection without using piling and concreting works for foundation. -To do early preperation for the CME works which majorly for new tower erection and transmission works as per scheduled KPI date. -To arrange material delivery date from warehouse to jetty and from jetty to site -Need to arrange with Project Manager for helicopter for material delivery from jetty to proposed site. -Need to confirm that all the material for new tower erection reach at site as per scheduled without any shortage of material. -Need to liase with local sub contractor for the tower erection date and estimated complete date. -Need to hire local people for travel to site. -Need to visit the site while works in progress and completion with client. -Need to arrange for the Quality team to do Quality inpection as per client requirement. -Need to arrange transmission team to do necessary works(antenna installation, equipment installation, cabling works and alligment) once civil works complete. -Need to arrange for Ericsson Microwave Traffic Node installation and testing commissioning. -Responsible to supervise the PDH installation for Microwave link. -To support transmission team for Troubleshooting and communicate with DIGICEL NOC department to check the link status and the alarm after intergration of Traffic Node. Power Transmission/ Electrical works -To supervise solar power panel and electrical works for Ericsson Mini link equipment.

Copyright 1996-2006, JobStreet.com. All rights reserved.

Having good experience as below: 2G BTS & 3G Node-B To coordinate the local sub-contractor on MW installation & Node-b sites. Handling 3G NODE-B for CELCOM (M) SDN.BHD at Central Region and Eastern Region ( Pahang ,Kelantan and Terengganu ) 3G Node-B (Alcatel MBO1 / 2/& MBI 3 and 3G NORTEL Node B 12010, 12020). Responsible for equipment delivery at site until the site to be On-Air & To update daily work progress at site to the Project Manager. To do test calls for all the sector after the site integrated and update to immediate Project Manager. Supervising Engineering team when Installation, Testing & Commissioning for Celcom 3G swapping project in eastern region and Central region. Troubleshooting 2G MBO1 & MBI3 Evolium BTS & 3G Evolium & 3G Node-B Nortel.

PDH & SDH / NMS


Well versed in Alcatel Link Upgrade Supervising & Testing and commissioning with DiGi /Celcom Clients in Peninsular Malaysia. Commissioning & Alignment Alcatel PDH Microwave 9400LUX/40/50. Perform software upgrading, link switch test, site handover via NMS terminal with customer to reduce multiple site visit etc. External alarm connection on DDF and 2G & 3G NMS connection. Troubleshooting MW AWY links. Supervised SDH LSY Installation at Sabah & Sarawak region. Responsible for Wimax WBS & Microwave implemented on schedule. Key person in central charge to setup first Microwave trail site for P1 Wimax project in Central region. Conduct ping test, throughput test with customer after swap. Prepare weekly report on sites status and issue faced during pre-install.

Copyright 1996-2006, JobStreet.com. All rights reserved.

Professional Trainings

Huawei Sdn.Bhd (Malaysia) MW RTN 600 & 900 series installation & commissioning training Alcatel-Lucent (Malaysia) - Cisco Router & Switching IP network. - Alcatel-Lucent (Malaysia) - WiMax Digital Microwave Packet Radio 9500 MPR. - Alcatel-Lucent (Malaysia) GPRS and EGRPS Quality of Service and algorithms B9-B10 evolution. - Alcatel-Lucent (Malaysia) - WiMax PDH Microwave 9400 AWY. - Alcatel-Lucent (Malaysia) - Power-One PODS BTS outdoor cabinets Training. - Alcatel-Lucent (Malaysia) - 3G WCDMA Nortel 12010 & 12020 series. - Alcatel-Lucent (Malaysia) 3G WCDMA Evolium Node-B MBO1 & MBI3 series. - Alcatel-Lucent (Malaysia) - Work Safety & Tools box briefing. Alcatel-Lucent (Malaysia) - SDH LSY. - MAX Safety & Engineering Training (Malaysia) Intelligent Protection Systems. Ericsson Cyberjaya (Malaysia) 3G node-b installation spec & Qualities. Motorola (Malaysia) 2G Motorola MH2 and MH6 installation, testing & commissioning training.

Copyright 1996-2006, JobStreet.com. All rights reserved.

* Having 10 years working experince in Telecommunication Project Managment

-Quick leaner. Motivated and dedicated to getting the job done right.
-Eagle eye for details -Strong communications skill. Work well with other at various level. -Courteous and professional. Good sense of humour.

Reference; Mr. Devadass Ramadass Nokia Seimens Network Malaysia Rollout Manager Tel: +6012-3077676 Mr. Ramond Juwet Alcatel Lucent Network Malaysia SAQ Senior Manager Tel: +6019-6602343 Mr. Rome Miranda Ericsson Telecommunications Inc. (Papua New Guinea) Project Manager Mr. Randall Zeledon Ericsson Telecommunications Inc. (Papua New Guinea) Total Project Manager

Copyright 1996-2006, JobStreet.com. All rights reserved.

You might also like