PROJECT REPORT

Name of the Project: Design of Shopping Mall Name of the guide: Ms T.V. Alice Name of team members: 1. 2. 3. 4. 5. 6. Dickins John Eldho Varghese Fathima S Thaikudiyil Femina K.A. Hage Habung Jerril Sebastian S7CA S7CA S7CA S7CA S7CA S7CA Roll No:17 Roll No:18 Roll No:19 Roll No:20 Roll No:24 Roll No:27

ABSTRACT
The aim of the project is to design a shopping mall as an alternative to the conventional shopping mall -The Summit being constructed near Kavitha theatre MG Road by PEEVEES PROJECTS PVT. LTD. It is supposed to be one of the largest commercial buildings in Kerala. The total plot area is around 10540sq.m. The proposed site is situated in a highly congested area, surrounded by buildings of nearly 20m height, making it difficult to excavate soil for the construction of the three storey (11m) deep basement to be used as an underground parking, without disturbing the foundations of adjacent buildings. So for the first time in Kerala diaphragm walls were introduced. The project will emphasis on the design of diaphragm wall and its bracings.

METHODOLOGY
The soil data from nearby sites will be collected. The functional planning of the building is done in accordance with National Building Code and Kerala Building Rules and will be drafted using drafting softwares like AutoCAD 2011. The structure will be analysed using StaadPro 2007 and similar packages. Design based on the analysis result will be done manually or using custom built softwares.

WORKS COMPLETED
y y y y

Site visited on 28th August 2010 Soil details were collected from nearby site on 4th September 2010. Layout of site, diaphragm walls were obtained on 7th September 2010. Functional plan of basement and ground floor completed.

PROJECT SCHEDULE

WORK Site Visit Collection of site layout and soil details including bore log Functional plan of building Based on NBC 2005 Study of diaphragm walls including case studies Analysis and design of diaphragm walls Structural Modelling Structural Analysis in StaadPRO 2007 Interpretation and correction of results Design of building components Completion of project in all respects

TIME 28th August 2010 4th September 2010 3rd week of September 2010 4th week of September 2010 1st week of October to 3rd week of October 2010 4th week of October 2nd week of December 2010 to 1st week of January 2011 2nd week of January 2011

STATUS Completed Completed In Progress Pending Pending Pending Pending Pending

3rd week of January to 2nd week Pending of February 2011 3rd week of February 2011 Pending