Professional Documents
Culture Documents
este archivo
PRODUCTO
Mata de cacao clonal
PRECIO
SUCRES
PRECIO
DLARES
S/12,500
US$ 0.50
Cepa de pltano
S/1,500
US$ 0.06
S/5,000
US$ 0.20
S/5,000
US$ 0.20
S/75,000
US$ 3.00
Urea
S/180,000
US$ 7.20
Muriato de potasio
S/274,000
US$ 10.96
Superfosfato triple
S/346,500
US$ 13.86
Stimufol (kg)
S/154,000
US$ 6.16
Thiodn (lt)
S/100,000
US$ 4.00
Basudn (lt)
S/355,000
US$ 14.20
S/80,000
US$ 3.20
S/200,000
US$ 8.00
S/30,000
US$ 1.20
S/1,000,000
US$ 40.00
S/30,000
US$ 1.20
Jornal
Cobrenordox (kg)
qq de cacao seco
Racimo de verde
PROYECTO ECU-B7-3010/93/176
COSTOS DE PRODUCCIN
Renovacin de 1 ha de cacao clonal. Distancia 3 x 3 (1 111 plantas)
CONCEPTO
A. LABOR DE INSTALACIN
- Socola, tumba, repique, despalizada y limpieza.
- Alineada, estaquillada, huequeada de cacao.
- Alineada, estaquillada, huequeada de pltano.
- Distribucin y siembra de sombra provisional.
- Distribucin y siembra de sombra permanente.
- Distribucin, siembra y resiembra de cacao.
Subtotal A
B. INSUMOS, MATERIALES Y SERVICIOS
- Sombra provisional (cepas de pltano)
- Plantas de cacao clonal (+10 % resiembra)
- Puntales, sombra provisional
- Costo de agua para riego (tasa anual)
- Bombeo de agua para riego por gravedad
- Puntales para cacao
- Apuntalamiento de cacao
- Fertilizantes
Urea
Muriato de potasio
Superfosfato triple
- Abono foliar (Stimufol)
- Insecticida (Thiodan)
- Insecticida (Basudn)
- Fungicida (Cobrenordox)
- Alquitrn vegetal
Subtotal B
C. LABORES DE FORMACIN Y DESARROLLO
- Control de malezas
- Riego
- Fertilizacin
- Control fitosanitario
- Mantenimiento de sombra provisional
- Mantenimiento de canales
- Cosecha de pltano
- Poda
- Eliminacin de sombra provisional
- Cosecha de cacao
- Labor postcosecha
Subtotal C
COSTO
UNITARIO
1er AO
UNIDAD
VALOR
75,000
75,000
75,000
75,000
75,000
75,000
20 J
8J
8J
8J
1J
10 J
55 J
1,500,000
600,000
600,000
600,000
75,000
750,000
4,125,000
1,500
12,500
5,000
30,000
75,000
5,000
75,000
1,111
1,222
600
1
6J
1,666,500
15,275,000
3,000,000
30,000
450,000
-
180,000
274,000
346,500
154,000
100,000
355,000
80,000
200,000
75,000
75,000
75,000
75,000
75,000
75,000
75,000
75,000
75,000
75,000
75,000
TOTAL INGRESOS
UTILIDAD
300
1
6J
600
2J
24 J
12 J
2J
3J
4J
6J
12 J
1,800,000
900,000
150,000
225,000
300,000
450,000
900,000
4,725,000
20 J
12 J
2J
3J
6J
6J
12 J
5J
3J
2J
30,173,500
30,000
1,000,000
1,500,000
30,000
450,000
3,000,000
150,000
3er AO
UNIDAD
VALOR
1
6J
500
2J
1 saco
180,000
360,000en la 3
sacosde
Antes de imprimir,
actualice2elsacos
costo de los productos
pgina
"Precios
1 sacovariables" 274,000
1 saco
1 saco
346,500
1 saco
3 kg
462,000
2 kg
308,000
1 lt
100,000
1 lt
100,000
1 lt
2 kg
160,000
2 kg
160,000
2 kg
2 gl
21,323,500
6,678,500
TOTAL EGRESOS
D. INGRESOS
- Produccin de pltano
- Produccin de cacao
2do AO
UNIDAD
VALOR
800 racimos
1,500,000
900,000
150,000
225,000
450,000
450,000
900,000
375,000
225,000
112,500
5,287,500
18 J
12 J
2J
3J
4J
6J
8J
8J
3J
6J
3J
11,966,000
33,000,000
3,000,000
30,000
450,000
2,500,000
150,000
4to AO
UNIDAD
VALOR
1
6J
540,000
274,000
346,500
100,000
160,000
400,000
4,950,500
4 sacos
1 saco
1 saco
1,350,000
900,000
150,000
225,000
300,000
450,000
600,000
600,000
225,000
450,000
225,000
5,475,000
18 J
12 J
2J
3J
1J
6J
3J
8J
2J
12 J
6J
1 lt
2 kg
2 gl
10,425,500
800 racimos
6 qq
24,000,000
6,000,000
30,000
450,000
720,000
274,000
346,500
355,000
160,000
400,000
2,735,500
1,350,000
900,000
150,000
225,000
75,000
450,000
225,000
600,000
150,000
900,000
450,000
5,475,000
8,210,500
300 racimos
12 qq
9,000,000
12,000,000
24,000,000
36,000,000
30,000,000
21,000,000
-6,173,500
24,034,000
19,574,500
12,789,500
PROYECTO ECU-B7-3010/93/176
COSTOS DE PRODUCCIN
Renovacin de 1 ha de cacao clonal. Distancia 3 x 3 (1 111 plantas)
CONCEPTO
A. LABOR DE INSTALACIN
- Socola, tumba, repique, despalizada y limpieza.
- Alineada, estaquillada, huequeada de cacao.
- Alineada, estaquillada, huequeada de pltano.
- Distribucin y siembra de sombra provisional.
- Distribucin y siembra de sombra permanente.
- Distribucin, siembra y resiembra de cacao.
Subtotal A
B. INSUMOS, MATERIALES Y SERVICIOS
- Sombra provisional (cepas de pltano)
- Plantas de cacao clonal (+10 % resiembra)
- Puntales, sombra provisional
- Costo de agua para riego (tasa anual)
- Bombeo de agua para riego por gravedad
- Puntales para cacao
- Apuntalamiento de cacao
- Fertilizantes
Urea
Muriato de potasio
Superfosfato triple
- Abono foliar (Stimufol)
- Insecticida (Thiodan)
- Insecticida (Basudn)
- Fungicida (Cobrenordox)
- Alquitrn vegetal
Subtotal B
C. LABORES DE FORMACIN Y DESARROLLO
- Control de malezas
- Riego
- Fertilizacin
- Control fitosanitario
- Mantenimiento de sombra provisional
- Mantenimiento de canales
- Cosecha de pltano
- Poda
- Eliminacin de sombra provisional
- Cosecha de cacao
- Labor postcosecha
Subtotal C
COSTO
UNITARIO
5to AO
UNIDAD
VALOR
TOTAL INGRESOS
UTILIDAD
7mo AO
UNIDAD
VALOR
8vo - 10mo AO
UNIDAD
VALOR
75,000
75,000
75,000
75,000
75,000
75,000
1,500
12,500
5,000
30,000
75,000
5,000
75,000
180,000
274,000
346,500
154,000
100,000
355,000
80,000
200,000
75,000
75,000
75,000
75,000
75,000
75,000
75,000
75,000
75,000
75,000
75,000
1
6J
30,000
450,000
-
1
6J
18 J
12 J
4J
3J
6J
8J
18 J
10 J
1,350,000
900,000
300,000
225,000
450,000
600,000
1,350,000
750,000
5,925,000
18 J
12 J
3J
3J
3J
8J
24 J
13 J
8,660,500
30,000
1,000,000
30,000
450,000
-
1
6J
4 sacos
720,000
720,000en la 4
sacosde
Antes de imprimir,
actualice4elsacos
costo de los productos
pgina
1 saco
274,000 "Precios
1 sacovariables" 274,000
1 saco
1 saco
346,500
1 saco
346,500
1 saco
1 lt
355,000
1 lt
355,000
1 lt
2 kg
160,000
2 kg
160,000
2 kg
2 gl
400,000
2 gl
400,000
2 gl
2,735,500
2,735,500
TOTAL EGRESOS
D. INGRESOS
- Produccin de pltano
- Produccin de cacao
6to AO
UNIDAD
VALOR
20 qq
20,000,000
1,350,000
900,000
225,000
225,000
225,000
600,000
1,800,000
975,000
6,300,000
18 J
12 J
2J
3J
6J
8J
30 J
18 J
9,035,500
26 qq
26,000,000
30,000
450,000
-
1
6J
720,000
274,000
346,500
355,000
160,000
400,000
2,735,500
4 sacos
1 saco
1 saco
1,350,000
900,000
150,000
225,000
450,000
600,000
2,250,000
1,312,500
7,237,500
18 J
12 J
2J
3J
1 lt
2 kg
2 gl
6J
8J
36 J
20 J
9,973,000
35 qq
35,000,000
30,000
450,000
720,000
274,000
346,500
355,000
160,000
400,000
2,735,500
1,350,000
900,000
150,000
225,000
450,000
600,000
2,700,000
1,500,000
7,875,000
10,610,500
40 qq
40,000,000
20,000,000
26,000,000
35,000,000
40,000,000
11,339,500
16,964,500
25,027,000
29,389,500
PROYECTO ECU-B7-3010/93/176
COSTOS DE PRODUCCIN
CONCEPTO
COSTO
UNITARIO
Rehabilitacin de 1 ha de cacao
1er AO
UNIDAD
VALOR
2do AO
UNIDAD
VALOR
3er AO
UNIDAD
VALOR
4to AO
UNIDAD
VALOR
5to AO
UNIDAD
VALOR
6to AO - 7mo AO
UNIDAD
VALOR
A. LABORES
- Control de malezas
75,000
18 J
1,350,000
- Identificacin de fallas
75,000
0.5 J
37,500
75,000
1.5 J
112,500
- Regulacin de sombra
75,000
2J
150,000
2J
150,000
- Podas
75,000
40 J
3,000,000
20 J
1,500,000
- Resiembras
75,000
2J
150,000
- Fertilizacin
75,000
2J
150,000
2J
150,000
2J
150,000
2J
150,000
2J
150,000
2J
150,000
- Riego
75,000
12 J
900,000
12 J
900,000
12 J
900,000
12 J
900,000
12 J
900,000
12 J
900,000
- Control fitosanitario
75,000
3J
225,000
3J
225,000
3J
225,000
3J
225,000
3J
225,000
3J
225,000
- Mantenimiento de canales
75,000
3J
225,000
3J
225,000
3J
225,000
3J
225,000
3J
225,000
3J
225,000
- Cosecha de cacao
75,000
12 J
900,000
18 J
1,350,000
24 J
1,800,000
30 J
2,250,000
30 J
2,250,000
30 J
2,250,000
- Labor postcosecha
75,000
3J
225,000
4.5 J
337,500
6J
450,000
7.5 J
562,500
8J
600,000
8J
7,425,000
79.5 J
5,962,500
80 J
6,000,000
87.5 J
6,562,500
Subtotal A
99 J
15 J
1,125,000
15 J
1,125,000
15 J
1,125,000
15 J
1,125,000
15 J
1,125,000
15 J
1,125,000
15 J
1,125,000
15 J
1,125,000
15 J
88 J
6,600,000
1,125,000
-
88 J
600,000
6,600,000
180,000
4 sacos
720,000
4 sacos
720,000
4 sacos
720,000
4 sacos
720,000
4 sacos
720,000
4 sacos
720,000
- Muriato de potasio
274,000
1 saco
274,000
1 saco
274,000
1 saco
274,000
1 saco
274,000
1 saco
274,000
1 saco
274,000
- Superfosfato triple
346,500
1 saco
346,500
1 saco
346,500
1 saco
346,500
1 saco
346,500
1 saco
346,500
1 saco
346,500
- Insecticida (Thiodn)
100,000
1 lt
100,000
1 lt
100,000
1 lt
100,000
- Insecticida (Basudn)
355,000
1 lt
355,000
1 lt
355,000
1 lt
355,000
- Fungicida (Cobrenordox)
80,000
2 kg
160,000
2 kg
160,000
2 kg
160,000
2 kg
160,000
2 kg
160,000
2 kg
160,000
- Alquitrn vegetal
200,000
2 gl
400,000
2 gl
400,000
1 gl
200,000
1 gl
200,000
1 gl
200,000
1 gl
200,000
- Plantas de cacao
12,500
200
2,500,000
200
2,500,000
200
2,500,000
200
2,500,000
200
2,500,000
200
2,500,000
30,000
30,000
30,000
30,000
30,000
30,000
30,000
75,000
6J
450,000
6J
450,000
6J
450,000
6J
450,000
6J
450,000
6J
450,000
Subtotal B
TOTAL EGRESOS
4,980,500
4,980,500
4,780,500
5,035,500
5,035,500
5,035,500
12,405,500
10,943,000
10,780,500
11,598,000
11,635,500
11,635,500
C. INGRESOS
- Produccin de cacao
TOTAL INGRESOS
UTILIDAD
1,000,000
6 qq
6,000,000
9 qq
9,000,000
12 qq
12,000,000
15 qq
15,000,000
15 qq
15,000,000
16 qq
16,000,000
6,000,000
9,000,000
12,000,000
15,000,000
15,000,000
16,000,000
-6,405,500
-1,943,000
1,219,500
3,402,000
3,364,500
4,364,500
PROYECTO ECU-B7-3010/93/176
COSTOS DE PRODUCCIN
Mantenimiento de 1 ha de cacao
CONCEPTO
COSTO
UNITARIO
A. LABORES
- Control de malezas
75,000
18 J
1,350,000
- Regulacin de sombra
75,000
1J
75,000
- Poda
75,000
20 J
1,500,000
20 J
1,500,000
- Riego
75,000
6J
450,000
6J
450,000
- Fertilizacin
75,000
1J
75,000
1J
75,000
- Muestreo de suelo
75,000
1J
75,000
1J
75,000
- Control fitosanitario
75,000
3J
225,000
3J
225,000
- Mantenimiento de canales
75,000
3J
225,000
3J
225,000
- Cosecha
75,000
10 J
750,000
35 J
2,625,000
- Postcosecha
75,000
600,000
20 J
1,500,000
5,325,000
107
8,025,000
Subtotal A
8J
71 J
18 J
1,350,000
-
180,000
3 sacos
540,000
4 sacos
720,000
Muriato de potasio
274,000
1 saco
274,000
1 saco
274,000
Superfosfato triple
346,500
1 saco
346,500
1 saco
346,500
- Insecticida (Thiodn)
100,000
1 lt
100,000
1 lt
100,000
80,000
2 kg
160,000
2 kg
160,000
- Fungicida (Cobrenordox)
- Alquitrn vegetal
200,000
2 gl
400,000
2 gl
400,000
30,000
30,000
30,000
75,000
6J
450,000
6J
Subtotal B
TOTAL GENERAL
450,000
2,300,500
2,480,500
7,625,500
10,505,500
PROYECTO ECU-B7-3010/93/176
COSTOS DE PRODUCCIN (US$)
Renovacin de 1 ha de cacao clonal. Distancia 3 x 3 (1 111 plantas)
CONCEPTO
A. LABOR DE INSTALACIN
- Socola, tumba, repique, despalizada y limpieza.
- Alineada, estaquillada, huequeada de cacao.
- Alineada, estaquillada, huequeada de pltano.
- Distribucin y siembra de sombra provisional.
- Distribucin y siembra de sombra permanente.
- Distribucin, siembra y resiembra de cacao.
Subtotal A
B. INSUMOS, MATERIALES Y SERVICIOS
- Sombra provisional (cepas de pltano)
- Plantas de cacao clonal (+10 % resiembra)
- Puntales, sombra provisional
- Costo de agua para riego (tasa anual)
- Bombeo de agua para riego por gravedad
- Puntales para cacao
- Apuntalamiento de cacao
- Fertilizantes
Urea
Muriato de potasio
Superfosfato triple
- Abono foliar (Stimufol)
- Insecticida (Thiodan)
- Insecticida (Basudn)
- Fungicida (Cobrenordox)
- Alquitrn vegetal
Subtotal B
C. LABORES DE FORMACIN Y DESARROLLO
- Control de malezas
- Riego
- Fertilizacin
- Control fitosanitario
- Mantenimiento de sombra provisional
- Mantenimiento de canales
- Cosecha de pltano
- Poda
- Eliminacin de sombra provisional
- Cosecha de cacao
- Labor postcosecha
Subtotal C
COSTO
UNITARIO
1er AO
UNIDAD
VALOR
3.00
3.00
3.00
3.00
3.00
3.00
20 J
8J
8J
8J
1J
10 J
55 J
60.00
24.00
24.00
24.00
3.00
30.00
165.00
0.06
0.50
0.20
1.20
3.00
0.20
3.00
1,111
1,222
600
1
6J
66.66
611.00
120.00
1.20
18.00
-
7.20
10.96
13.86
6.16
4.00
14.20
3.20
8.00
1 saco
7.20
18.48
4.00
6.40
852.94
2 sacos
1 saco
1 saco
2 kg
1 lt
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
24 J
12 J
2J
3J
4J
6J
12 J
72.00
36.00
6.00
9.00
12.00
18.00
36.00
189.00
20 J
12 J
2J
3J
6J
6J
12 J
5J
3 kg
1 lt
2 kg
TOTAL EGRESOS
D. INGRESOS
- Produccin de pltano
- Produccin de cacao
TOTAL INGRESOS
UTILIDAD
2do AO
UNIDAD
VALOR
300
1
6J
600
2J
2 kg
3J
2J
1,206.94
1.20
40.00
800 racimos
60.00
1.20
18.00
120.00
6.00
3er AO
UNIDAD
VALOR
1
6J
500
2J
14.40
10.96
13.86
12.32
4.00
6.40
267.14
3 sacos
1 saco
1 saco
60.00
36.00
6.00
9.00
18.00
18.00
36.00
15.00
9.00
4.50
211.50
18 J
12 J
2J
3J
4J
6J
8J
8J
3J
6J
3J
1 lt
2 kg
2 gl
478.64
1,320.00
120.00
1.20
18.00
100.00
6.00
4to AO
UNIDAD
VALOR
1
6J
21.60
10.96
13.86
4.00
6.40
16.00
198.02
4 sacos
1 saco
1 saco
54.00
36.00
6.00
9.00
12.00
18.00
24.00
24.00
9.00
18.00
9.00
219.00
18 J
12 J
2J
3J
1J
6J
3J
8J
2J
12 J
6J
1 lt
2 kg
2 gl
417.02
800 racimos
6 qq
960.00
240.00
1.20
18.00
28.80
10.96
13.86
14.20
6.40
16.00
109.42
54.00
36.00
6.00
9.00
3.00
18.00
9.00
24.00
6.00
36.00
18.00
219.00
328.42
300 racimos
12 qq
360.00
480.00
960.00
1,440.00
1,200.00
840.00
(246.94)
961.36
782.98
511.58
PROYECTO ECU-B7-3010/93/176
COSTOS DE PRODUCCIN (US$)
Renovacin de 1 ha de cacao clonal. Distancia 3 x 3 (1 111 plantas)
CONCEPTO
A. LABOR DE INSTALACIN
- Socola, tumba, repique, despalizada y limpieza.
- Alineada, estaquillada, huequeada de cacao.
- Alineada, estaquillada, huequeada de pltano.
- Distribucin y siembra de sombra provisional.
- Distribucin y siembra de sombra permanente.
- Distribucin, siembra y resiembra de cacao.
Subtotal A
B. INSUMOS, MATERIALES Y SERVICIOS
- Sombra provisional (cepas de pltano)
- Plantas de cacao clonal (+10 % resiembra)
- Puntales, sombra provisional
- Costo de agua para riego (tasa anual)
- Bombeo de agua para riego por gravedad
- Puntales para cacao
- Apuntalamiento de cacao
- Fertilizantes
Urea
Muriato de potasio
Superfosfato triple
- Abono foliar (Stimufol)
- Insecticida (Thiodan)
- Insecticida (Basudn)
- Fungicida (Cobrenordox)
- Alquitrn vegetal
Subtotal B
C. LABORES DE FORMACIN Y DESARROLLO
- Control de malezas
- Riego
- Fertilizacin
- Control fitosanitario
- Mantenimiento de sombra provisional
- Mantenimiento de canales
- Cosecha de pltano
- Poda
- Eliminacin de sombra provisional
- Cosecha de cacao
- Labor postcosecha
Subtotal C
COSTO
UNITARIO
5to AO
UNIDAD
VALOR
TOTAL INGRESOS
UTILIDAD
7mo AO
UNIDAD
VALOR
8vo - 10mo AO
UNIDAD
VALOR
3.00
3.00
3.00
3.00
3.00
3.00
0.06
0.50
0.20
1.20
3.00
0.20
3.00
1
6J
7.20
10.96
13.86
6.16
4.00
14.20
3.20
8.00
4 sacos
1 saco
1 saco
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
18 J
12 J
4J
3J
1 lt
2 kg
2 gl
6J
8J
18 J
10 J
TOTAL EGRESOS
D. INGRESOS
- Produccin de pltano
- Produccin de cacao
6to AO
UNIDAD
VALOR
1.20
18.00
-
1
6J
28.80
10.96
13.86
14.20
6.40
16.00
109.42
4 sacos
1 saco
1 saco
54.00
36.00
12.00
9.00
18.00
24.00
54.00
30.00
237.00
18 J
12 J
3J
3J
1 lt
2 kg
2 gl
3J
8J
24 J
13 J
346.42
1.20
40.00
20 qq
800.00
1.20
18.00
-
1
6J
28.80
10.96
13.86
14.20
6.40
16.00
109.42
4 sacos
1 saco
1 saco
54.00
36.00
9.00
9.00
9.00
24.00
72.00
39.00
252.00
18 J
12 J
2J
3J
1 lt
2 kg
2 gl
6J
8J
30 J
18 J
361.42
26 qq
1,040.00
1.20
18.00
-
1
6J
28.80
10.96
13.86
14.20
6.40
16.00
109.42
4 sacos
1 saco
1 saco
54.00
36.00
6.00
9.00
18.00
24.00
90.00
52.50
289.50
18 J
12 J
2J
3J
1 lt
2 kg
2 gl
6J
8J
36 J
20 J
398.92
35 qq
1,400.00
1.20
18.00
28.80
10.96
13.86
14.20
6.40
16.00
109.42
54.00
36.00
6.00
9.00
18.00
24.00
108.00
60.00
315.00
424.42
40 qq
1,600.00
800.00
1,040.00
1,400.00
1,600.00
453.58
678.58
1,001.08
1,175.58
PROYECTO ECU-B7-3010/93/176
COSTOS DE PRODUCCIN (US$)
CONCEPTO
COSTO
UNITARIO
Rehabilitacin de 1 ha de cacao
1er AO
UNIDAD
VALOR
2do AO
UNIDAD
VALOR
3er AO
UNIDAD
VALOR
4to AO
UNIDAD
VALOR
5to AO
UNIDAD
VALOR
6to AO - 7mo AO
UNIDAD
VALOR
A. LABORES
- Control de malezas
3.00
18 J
54.00
- Identificacin de fallas
3.00
0.5 J
1.50
3.00
2J
4.50
- Regulacin de sombra
3.00
2J
6.00
2J
- Podas
3.00
40 J
120.00
20 J
60.00
- Resiembras
3.00
2J
6.00
- Fertilizacin
3.00
2J
6.00
2J
6.00
2J
6.00
2J
6.00
2J
6.00
2J
6.00
- Riego
3.00
12 J
36.00
12 J
36.00
12 J
36.00
12 J
36.00
12 J
36.00
12 J
36.00
- Control fitosanitario
3.00
3J
9.00
3J
9.00
3J
9.00
3J
9.00
3J
9.00
3J
9.00
- Mantenimiento de canales
3.00
3J
9.00
3J
9.00
3J
9.00
3J
9.00
3J
9.00
3J
9.00
- Cosecha de cacao
3.00
12 J
36.00
18 J
54.00
24 J
72.00
30 J
90.00
30 J
90.00
30 J
90.00
- Labor postcosecha
3.00
3J
9.00
4.5 J
13.50
6J
18.00
7.5 J
22.50
8J
24.00
8J
24.00
99 J
297.00
79.5 J
238.50
80 J
240.00
87.5 J
262.50
88 J
264.00
88 J
264.00
Subtotal A
15 J
45.00
15 J
45.00
15 J
45.00
15 J
45.00
15 J
45.00
6.00
15 J
45.00
15 J
45.00
15 J
45.00
15 J
45.00
-
7.20
4 sacos
28.80
4 sacos
28.80
4 sacos
28.80
4 sacos
28.80
4 sacos
28.80
4 sacos
28.80
- Muriato de potasio
10.96
1 saco
10.96
1 saco
10.96
1 saco
10.96
1 saco
10.96
1 saco
10.96
1 saco
10.96
- Superfosfato triple
13.86
1 saco
13.86
1 saco
13.86
1 saco
13.86
1 saco
13.86
1 saco
13.86
1 saco
13.86
- Insecticida (Thiodn)
4.00
1 lt
4.00
1 lt
4.00
1 lt
4.00
- Insecticida (Basudn)
14.20
1 lt
14.20
1 lt
14.20
1 lt
14.20
- Fungicida (Cobrenordox)
3.20
2 kg
6.40
2 kg
6.40
2 kg
6.40
2 kg
6.40
2 kg
6.40
2 kg
6.40
- Alquitrn vegetal
8.00
2 gl
16.00
2 gl
16.00
1 gl
8.00
1 gl
8.00
1 gl
8.00
1 gl
8.00
- Plantas de cacao
0.50
200
100.00
200
100.00
200
100.00
200
100.00
200
100.00
200
100.00
1.20
1.20
1.20
1.20
1.20
1.20
1.20
3.00
6J
18.00
6J
18.00
6J
18.00
6J
18.00
6J
18.00
6J
18.00
Subtotal B
TOTAL EGRESOS
199
199.22
191.22
201.42
201.42
201.42
496.22
437.72
431.22
463.92
465.42
465.42
C. INGRESOS
- Produccin de cacao
TOTAL INGRESOS
UTILIDAD
40.00
6 qq
240
9 qq
360
12 qq
480
15 qq
600
15 qq
600
16 qq
640
240.00
360.00
480.00
600.00
600.00
640.00
-256.22
-77.72
48.78
136.08
134.58
174.58
PROYECTO ECU-B7-3010/93/176
COSTOS DE PRODUCCIN (US$)
Mantenimiento de 1 ha de cacao
CONCEPTO
COSTO
UNITARIO
A. LABORES
- Control de malezas
3.00
18 J
54.00
- Regulacin de sombra
3.00
1J
3.00
- Poda
3.00
20 J
60.00
20 J
60.00
- Riego
3.00
- Fertilizacin
3.00
6J
18.00
6J
18.00
1J
3.00
1J
- Muestreo de suelo
3.00
3.00
1J
3.00
1J
3.00
- Control fitosanitario
3.00
3J
9.00
3J
9.00
- Mantenimiento de canales
3.00
3J
9.00
3J
9.00
- Cosecha
3.00
10 J
30.00
35 J
105.00
- Postcosecha
3.00
8J
24.00
20 J
60.00
71 J
213.00
107 J
321.00
7.20
3 sacos
21.60
4 sacos
28.80
Muriato de potasio
10.96
1 saco
10.96
1 saco
10.96
Superfosfato triple
13.86
1 saco
13.86
1 saco
13.86
- Insecticida (Thiodn)
4.00
1 lt
4.00
1 lt
4.00
- Fungicida (Cobrenordox)
3.20
2 kg
6.40
2 kg
6.40
- Alquitrn vegetal
8.00
2 gl
16.00
2 gl
16.00
1.20
1.20
1.20
3.00
6J
18.00
6J
18.00
Subtotal A
18 J
54.00
Subtotal B
TOTAL GENERAL
92.02
99.22
305.02
420.22