III B.Tech Supplimentary Examinations, Aug/Sep 2008
POWER PLANT INSTRUMENTATION
(Instrumentation & Control Engineering)
Time: 3 hours Max Marks: 80
Answer any FIVE Questions
All Questions carry equal marks
⋆⋆⋆⋆⋆
5. What is draft? Explain in detail the working of U tube draft gage? [16]
8. Draw the schematic circuit diagram of a null balance pH meter and explain the
principle if operation. [16]
⋆⋆⋆⋆⋆
1 of 1
Code No: RR322201 Set No. 2
III B.Tech Supplimentary Examinations, Aug/Sep 2008
POWER PLANT INSTRUMENTATION
(Instrumentation & Control Engineering)
Time: 3 hours Max Marks: 80
Answer any FIVE Questions
All Questions carry equal marks
⋆⋆⋆⋆⋆
1. What is the basic principle involved Solar power generation. Explain in detail[16]
2. List the importance parameters that are to be monitored in tidal mill. [16]
4. Explain how the air flow rate is measured in a power plant with a relevant diagram.
[16]
5. Explain in detail with neat sketches pulverizer control system used in power plants?
[16]
6. Explain in detail with neat sketches main and reheat stream temperature control
system used in power plants? [16]
7. Mention the sources of vibration in a turbine . How the vibrations are measured
and controlled. [16]
8. Draw the schematic circuit diagram of a null balance pH meter and explain the
principle if operation. [16]
⋆⋆⋆⋆⋆
1 of 1
Code No: RR322201 Set No. 3
III B.Tech Supplimentary Examinations, Aug/Sep 2008
POWER PLANT INSTRUMENTATION
(Instrumentation & Control Engineering)
Time: 3 hours Max Marks: 80
Answer any FIVE Questions
All Questions carry equal marks
⋆⋆⋆⋆⋆
3. Mention the types of frequency meters and explain the principle of operation of
electrical resonance type with a neat diagram. [16]
4. Explain in detail how driving pressure calculation is made in a down comer riser
system. [16]
6. What is the importance of chimney used in thermal power plants. Explain in detail.
[16]
8. Describe with a neat schematic, the principle and constructional details of thermal
conductivity type oxygen analyzer. [16]
⋆⋆⋆⋆⋆
1 of 1
Code No: RR322201 Set No. 4
III B.Tech Supplimentary Examinations, Aug/Sep 2008
POWER PLANT INSTRUMENTATION
(Instrumentation & Control Engineering)
Time: 3 hours Max Marks: 80
Answer any FIVE Questions
All Questions carry equal marks
⋆⋆⋆⋆⋆
2. Give a brief description of the boiler process with a neat diagram. [16]
3. (a) Explain the principle of a basic potentiometer used for the measurement of
DC voltage. What is meant by standardization?
(b) What are the two types of A.C. Potentiometer? Explain the theory and work-
ing of any one type with a neat diagram. [6+10]
5. Explain in detail with neat sketches control of main header pressure system used
in power plants? [16]
6. What is the importance of chimney used in thermal power plants. Explain in detail.
[16]
8. List the different types of detectors used in chromatography. Explain the principle
of thermal conductivity type and thermionic emission type of detectors with a neat
schematic. [16]
⋆⋆⋆⋆⋆