BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.

o. 1 ITEM DESCRIPTION GENERAL ITEMS UNIT QUANTITY RATE SHS.

Provide for a performance Bond. See Conditions of contract, Clause 10

Sum

13,000,000.00

13,000,000.00 -

Provide for Insurance of the works. See conditions of contract, clause 21

Sum

6,500,000.00

6,500,000.00 -

Provide for Third Party Insurance see Conditions of Contract, Clause

Sum

6,500,000.00

6,500,000.00 -

Provide for Insurance against accident or injury to Workmen. See conditions of Contract, Clause 24

Sum

6,500,000.00

6,500,000.00 -

Establish and Maintain Contractors camps, offices, facilities, etc., and move Plant to site. See Conditions of Contract, Part III, Clause 60.

Sum

13,000,000.00

13,000,000.00 -

SPECIFIED REQUIREMENTS

Provide, furnish and maintain Resident Engineers house type MOPW Highland D on land provided by the Employer in accordance with the specifications and as directed by the Engineer for the duration of the Contract. Ownership to revert to the Employer on completion of the Contract Refer to clause 4.2 (iv) of the instructions to Tenderers.

Nr

3,900,000.00

3,900,000.00 -

Total carried to collected at the end of Bill No. 1

49,400,000.00

1/1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No. 1 ITEM DESCRIPTION AlLTERNATIVE TO ITEM (a) GENERAL ITEMS UNIT QUANTITY RATE SHS.

Provide adequate rented housing with furnishing and facilities acceptable to the Resident Engineer for the duration of the Contract. (Rate only)

Sum

1,300,000.00

1,300,000.00

Provide, furnish and maintain Assistant Resident Engineers House type MOWP Highland E on land provided by the Employer in accordance with specifications and as directed by the Engineer for the duration of the Contract. Ownership to revert to Employer on completion of the Contract.

Nr

3,900,000.00

3,900,000.00

Provide adequate rented housing acceptable to the Engineer for the duration of the Contract. (Rate only)

Sum

780,000.00

780,000.00

Include a Prime Cost for purchase of one 4 wheel drive vehicles Engine capacity 2800 c.c.. Ownership to revert to the Employer upon completion of contract. Specification clause 1.36

P.C

1,950,000.00

1,950,000.00

Add a percentage of item (b) for profit administration, overhead and all Head Office charges

3,900,000

0.25

975,000.00 -

Include a Prime Cost of Kshs 6,500,000 for the maintenance, running, servicing and insurance of the vehicles under Item (b)

P.C

6,500,000.00

6,500,000.00 -

Add a percentage of Item (d) for profit, administration etc.

6,500,000

0.25

1,625,000.00 -

Total carried to collected at the end of Bill No. 1

17,030,000.00

1/2

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No. 1 ITEM DESCRIPTION GENERAL ITEMS UNIT QUANTITY RATE SHS. a Provide 1 No. qualified drivers to man vehicles under (b) (PROVISIONAL) Month 24 19,500.00 468,000.00 b Provide a suitable 4-Wheel drive car of not less than 1200 c.c for use by Resident Engineer prior to receipt of vehicle under Item b (See General Specified Clause 1.52) PROVISIONAL Week 4 65,000.00 260,000.00 c Provide and maintain Resident Engineers Office in accordance with the specification and as directed by the Engineer. Ownership to revert to the contractor upon completion of contract Sum 1 1,950,000.00 1,950,000.00 e Provide survey equipment as specified for the exclusive use of the Resident Engineer for the duration of the contract. Equipment reverts to Contractor. Sum 1 650,000.00 650,000.00 f Provide a suitable camera for exclusive use of the Engineers Representative. Camera to revert to Contractor. Sum 1 45,500.00 45,500.00 g Allow a Prime Cost Kshs 65,000 to cover photographic expenses. Sum 1 65,000.00 65,000.00 h Percentage addition to item (e) for overheads and profits % 65,000 0.25 16,250.00 i Allow the provisional sum of Ksh.300,000 for material testing at an independent laboratory Sum 1 300,000.00 300,000.00 j Percentage addition to item (i) for overheads and profits % 300,000.00 25% 75,000.00 Total carried to collected at the end of Bill No. 1 3,829,750.00

1/ 3

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No. 1 ITEM DESCRIPTION GENERAL ITEMS UNIT QUANTITY RATE SHS. a Include a P.C sum of Kshs. 65,000 for the installation, use and maintenance of a telephone for the sole use of the Resident Engineer. Ownership to revert to Employer after completion of the Contract. Sum 1 65,000.00 65,000.00 b Provide for Contractors expenses profit etc. on Item 1.4 (g) % 156,000 0.25 39,000.00 c Provide, sign write, erect and maintain signboards at the Site of works as directed by the Resident Engineer and inclusive of removal after completion of maintenance period. Nr 8 65,000.00 520,000.00 d Test run Scheme for a period of two weeks prior to Substantial completion of the contract, inclusive of all require fuel, lubrications etc. Sum 1 1,300,000.00 1,300,000.00 e Include a provisional sum of Kshs 390,000 for rented accommodation to be approved by the Engineer. Sum 1 390,000.00 390,000.00 f Provide permanent project sign boards at the completion of the works at the direction of Engineer. Nr 8 65,000.00 520,000.00 g Provide a computer with rating Pentium 4 256MB Ram and hard disc of 40GB and a processor capacity of 2.8 GH together with a compatible printer. Nr 7 85,000.00 595,000.00 Total carried to collected at the end of Bill No. 1 3,429,000.00

1/4

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No. 1 ITEM DESCRIPTION GENERAL ITEMS UNIT QUANTITY RATE SHS. a The contractor is referred to General Conditions of Contract, together with the Conditions of Particular application and amendments to Part 1, and to specifications and drawings, and to include in this item amounts considered necessary to ensure compliance therewith except for those items shown hereunder. Sum b If no sum is inserted against items elsewhere, the sum herewith shall cover such items and any other items which may be considered to have been omitted from the Bills of Quantities and for which water the contractor desires to enter a separate charge. The items or clause No. should be described here and the price inserted Sum c Include a P.C sum of Kshs. 6,500,000 for the acquisition of land for general use outside the TARDA nuclear zone Sum 1 6,500,000.00 6,500,000.00 Total carried to collected at the end of Bill No. 1 6,500,000.00

1/5

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No. 1 COLLECTION PAGE: 1/1 GENERAL ITEMS SHS. SHS. 49,400,000.00 1/2 17,030,000.00 1/3 3,829,750.00 1/4 3,429,000.00 1/5 6,500,000.00 Total carried to Grand Summary 80,188,750.00

1/6

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No. 2 ITEM DESCRIPTION INTAKE WORKS UNIT QUANTITY RATE SHS. a Provide an electrical submersible pump 42.6 l/s, against 67 m head at the existing pontoon cw switchgear and control system Nr 4 1,950,000.00 7,800,000.00 b Provide for supply and place Flanged DN 150 mm cast iron gate valve Nr 4 55,250.00 221,000.00 c Supply and place Flanged non-return valve ND 150 mm (cast iron construction) Nr 4 39,000.00 156,000.00 d Provide for the floating platform and other miscellaneous works. Sum 1 6,500,000.00 6,500,000.00 e Supply and place Flexible 200 mm ND pipe. m 100 5,200.00 520,000.00 f Allow for provision and placing intake works in the reservoir similar to the existing one. Sum 1 2,600,000.00 2,600,000.00 Total carried to Grand Summary 17,797,000.00

2/1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No. 3 ITEM DESCRIPTION CLEARANCE RAW WATER MAIN UNIT QUANTITY RATE SHS. a General bush clearance along pipe route specifications clause 2.1 m 400 130.00 52,000.00 b Trees and stump girth n.e 320 mm Nr 20 650.00 13,000.00 TRENCH EXCAVATION c Trench for 200 mm DN depth n.e 1.0 m m 200 260.00 52,000.00 d Ditto but depth 1.0 - 1.5 m m 90 330.00 29,700.00 e Ditto but depth 1.0 - 2.0 m m m3 m3 84 390.00 32,760.00 f E.O items for excavation in rock 200 2,600.00 520,000.00 g Ditto for cutting and reinstating murram roads. 20 2,600.00 52,000.00 PIPELINE h 200 mm DN flexible pipe. m 100 3,400.00 340,000.00 i 200 mm DN steel pipe m 400 3,650.00 1,460,000.00 BENDS 200 mm DN steel 90 0 Ditto 45 0 Ditto 22.5 0 j Nr 3 12,130.00 36,390.00 k Nr 2 9,245.00 18,490.00 l Nr 2 7,865.00 15,730.00 Total carried to collected at the end of Bill No. 3 2,622,070.00

3/1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No. 3 ITEM DESCRIPTION MARKER POSTS RAW WATER MAIN UNIT QUANTITY RATE SHS. c d e f Sluice valve maker post Washout maker post Pipeline maker post Airvalve marker posts Nr Nr Nr Nr 0 0 1 0 1,950.00 1,950.00 1,950.00 1,950.00 1,950.00 -

THRUST AND ANCHOR BLOCKS

Thrust and anchor blocks in grade 20 concrete, volume n.e 0.1 m3 Ditto concrete volume 0.6 - 0.65 m3

Nr

3,900.00

Nr

13,000.00

39,000.00

i j

DN 200 mm GI sluice valve DN 200 mm flanged adaptor c/w bolts, nuts, washers and assessories to make water tight joint

Nr Nr

2 4

132,600.00 10,556.00

265,200.00 42,224.00

MANHOLES

Manhole with light duty manhole covers and frames, depth ne. 1.0 m

Nr

13,000.00

b c d e

Ditto depth 1.0 1.5 m Ditto depth 1.5 2.0 m Ditto depth 2.0 - 3.0 m Outfall for wastewater pipe

Nr Nr Nr m3

0 0 0 10

19,500.00 26,000.00 39,000.00 260.00

2,600.00

Total carried to collected at the end of Bill No. 3

350,974.00

3/2

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No. 3 COLLECTION PAGE: 3/1 2,622,070.00 RAW WATER MAIN SHS. SHS.

3/2

350,974.00

Total carried to Grand Summary

2,973,044.00

3/3

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.4 ITEM TREATMENT WORKS EXTERNAL & STAFF HOUSES DESCRIPTION CLEARANCE m2 UNIT QUANTITY RATE SHS.

General bush clearance

14,266

130.00

1,854,580.00 -

Remove trees and stumps girth n.e 320 mm (Provisional)

Nr

650.00

3,250.00 -

Ditto girth 320 - 500 mm

Nr

700.00

2,100.00 -

EXCAVATION

Strip top soil 200 mm thick and stockpile for re-use

4,500

130.00

585,000.00 -

Bulk excavation at area of treatment units, plant building, chemical house and staff houses

m3

759

260.00

197,340.00 -

E.O. item (d) for excavation in rock (Provisional)

m3

76

2,600.00

197,600.00 -

Fill in layers not exceeding 200 mm compacted to 100 % BS compaction

m3

632

390.00

246,480.00 -

SEWERAGE

Manholes m3 m3 m3 m3

Ditto depth 1.0 - 1.5 m

13,000.00

52,000.00 -

Ditto depth 1.5 - 2.0 m

26,000.00

104,000.00 -

Ditto depth 2.0 - 2.5 m

32,500.00

130,000.00 -

Ditto depth 2.5 - 3.0 m

39,000.00

156,000.00 -

Total carried to collected at the end of Bill No. 4

3,528,350.00

4/1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.4 ITEM TREATMENT WORKS EXTERNAL & STAFF HOUSES DESCRIPTION EXCAVATIONS a E.O items (h) - (k) for excavation in rock m3 320 2,600.00 UNIT QUANTITY RATE SHS. 832,000.00 b 100 mm golden brown Upvc pipes including 150 mm thick grade 15 concrete bed and surround m 100 650.00 65,000.00 c Manhole, depth n.e. 1.0 m with heavy duty manhole cover and frame Nr 20 13,000.00 260,000.00 d Ditto depth 1.0 1.5 m Nr 3 15,600.00 46,800.00 e Ditto depth 1.5 2.0 m Nr 3 19,500.00 58,500.00 f Ditto depth 2.0 2.5 m Nr 3 26,000.00 78,000.00 g h Ditto depth 2.5 3.0 m E.O.items for excavation in rock for items c - g. Nr m3 3 50 32,500.00 2,600.00 97,500.00 130,000.00 SEPTIC TANK i j Excavation for septic tank E.O. item (m) for excavation in rock (Provisional) m3 m3 80 10 390.00 2,600.00 31,200.00 26,000.00 Concrete k 50 mm thick grade 7 concrete m2 m2 25 7,800.00 195,000.00 l 150 mm thick grade 30 concrete in floor slab, steel trowel finish m2 23 11,700.00 269,100.00 m Ditto in roof slab steel trowel 23 15,600.00 358,800.00 n Ditto in 150 x 250 mm deep support beam for baffle wall m 3.5 1,950.00 6,825.00 Total carried to collected at the end of Bill No. 4 2,454,725.00

4/2

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.4 ITEM TREATMENT WORKS EXTERNAL & STAFF HOUSES DESCRIPTION Formwork UNIT QUANTITY RATE SHS. a Sawn formwork to the soffit of roof slab m 21 650.00 13,650.00 b Ditto at external edge of roof slab m 20 650.00 13,000.00 c Ditto at soffit of baffle wall support beam m 0.5 650.00 325.00 d Ditto at side of baffle wall support beam m 1.7 650.00 1,105.00 e E.O. formwork for boxing out for manhole opening 600 x 600mm nr 5 650.00 3,250.00 Reinforcement f Mesh reinforcement BS mesh A142 in floor slab m 25 650.00 16,250.00 g Mild steel reinforcement in roof slab kg 375 130.00 48,750.00 Blockwork h 200mm solid concrete blockwork with hoop iron in every second course m 58 1,560.00 90,480.00 i 150mm ditto m 3 1,300.00 3,900.00 j 400 x 200mm block work pillars 2800mm high Nr 4 2,600.00 10,400.00 Total carried to collected at the end of Bill No. 4 201,110.00

4/3

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.4 ITEM TREATMENT WORKS EXTERNAL & STAFF HOUSES DESCRIPTION FINISHES m2 UNIT QUANTITY RATE SHS. a 1:3 cement/sand rendering to internal and external blockwork walls 122 390.00 47,580.00 MISCELLANEOUS b 150mm diameter cast iron tee and spigot at septic tank inlet Nr 1 6,500.00 6,500.00 c Ditto at sceptic tank outlet Nr 1 6,500.00 6,500.00 d Light duty manhole cover and frame for manholes Nr 5 3,250.00 16,250.00 SEEPAGE BEDS m3 e Excavation of 3.0 m wide trenches for seepage beds m2 m2 m2 65 260.00 16,900.00 f 100 mm loose sand at bottom of trench 65 130.00 8,450.00 g h 320 mm aggregate size 16 25 mm 500 gauge clear polythene sheet on top of aggregate i 100 mm DN PVC golden brown perforated pipe as per relevant drawing. j 100 mm DN Upvc end caps Nr 3 130.00 m 66 520.00 65 65 1,040.00 130.00 67,600.00 8,450.00 34,320.00 390.00 WASTEWATER DRAINAGE m3 m3 m3 k Excavation of trenches for pipes n.e. 225 mm DN, depth 1.0 - 1.5 m l m Ditto depth 1.5 2.0 m Ditto depth 2.0 2.5 m 24 9 330.00 360.00 36 260.00 9,360.00 7,920.00 3,240.00 Total carried to collected at the end of Bill No. 4 233,460.00

4/4

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.4 ITEM a b c TREATMENT WORKS EXTERNAL & STAFF HOUSES DESCRIPTION Ditto depth 2.5 3.0m E.O items k - m for excavation in rock 225 mm uPVC golden brown pipe UNIT m3 m3 m QUANTITY 17 20 80 RATE 390.00 2,600.00 2,795.00 SHS. 6,630.00 52,000.00 223,600.00 MANHOLES d Manhole with light duty manhole covers and frames, depth ne. 1.0 m e f g h i j Ditto depth 1.0 1.5 m Ditto depth 1.5 2.0 m Ditto Depth 2.0 - 2.5 m Ditto depth 2.5 - 3.0 m Outfall for wastewater pipe Excavate for and trim wastewater earth drain. Nr Nr Nr Nr Nr m3 2 2 1 2 2 200 15,600.00 26,000.00 32,500.00 39,000.00 1,300.00 260.00 Nr 1 13,000.00 13,000.00 31,200.00 52,000.00 32,500.00 78,000.00 2,600.00 52,000.00 WATER PIPES k Excavate trenches for 320mm DN PVC GS pipes n.e. 1.5 m m 40 260.00 10,400.00 l Ditto depth 1.5 2.0 m m 10 330.00 3,300.00 m Ditto Depth 2.0 - 3.0 m m 10 260.00 2,600.00 n Excavate trench for 225 mm DN PVC n.e. 1.5 m m 25 260.00 6,500.00 o p q Ditto depth 1.5 - 2.0 m Ditto depth 2.0 - 3.0 m Excavate trench for 150 mm DN n.e. 1.5 m m m m 5 5 65 330.00 390.00 260.00 1,650.00 1,950.00 16,900.00 -

Total carried to collected at the end of Bill No. 4 586,830.00

4/5

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.4 ITEM a TREATMENT WORKS EXTERNAL & STAFF HOUSES DESCRIPTION Ditto depth 1.5 2.0m UNIT m QUANTITY 30 RATE 330.00 SHS. 9,900.00 b Ditto depth 2.0 - 3.0 m m 30 390.00 11,700.00 c Excavate trenches for pipes DN n.e. 63 mm, depth n.e. 1.0 m m 207 260.00 53,820.00 d Ditto depth 1.0 - 1.5 m m 104 330.00 34,320.00 e 320 mm DN PVC Class B m 50 3,510.00 175,500.00 f 225 mm DN PVC Class B m 30 2,795.00 83,850.00 g 150 mm DN steel m 70 3,320.00 232,400.00 h 50 mm DN GS m 100 890.00 89,000.00 i 25 mm DN GS m 107 330.00 35,310.00 j 320 mm DN 900 PVC bend 225 mm DN 450 PVC bend 150 mm DN steel 900 bend 50 mm DN GS 900 bend 25 mm DN GS 900 bend Nr 1 5,850.00 5,850.00 k Nr 1 3,900.00 3,900.00 l Nr 2 7,960.00 15,920.00 m Nr 2 440.00 880.00 n Nr 4 170.00 680.00 o 320 x 50 mm G.S. sandle bend Nr 1 3,250.00 3,250.00 p q s 160 x 50 mm steel ditto socketed tee 50 x 25 mm G.S ditto socketed tee 25 x 25 mm G.S ditto socketed tee Nr Nr Nr 1 5 4 5,395.00 330.00 130.00 5,395.00 1,650.00 520.00 Total carried to collected at the end of Bill No. 4 763,845.00

4/6

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.4 ITEM TREATMENT WORKS EXTERNAL & STAFF HOUSES DESCRIPTION VALVE AND VALVE CHAMBERS UNIT QUANTITY RATE SHS. The rate the valves shall include a 800 mm long G.S. pipe on either side of the gate valve necessary adaptors, union and nipples a 50 mm brass gate valve, PN 10 Nr 2 1,950.00 3,900.00 b 25 mm ditto Nr 5 1,040.00 5,200.00 c Valve chamber type 1, depth n.e 800mm Nr 4 13,000.00 52,000.00 d Ditto type 2, depth n.e. 1.0m Nr 3 13,000.00 39,000.00 THRUST AND ANCHOR BLOCKS e Thrust and anchor blocks in grade 20 concrete, volume n.e 0.1 m3 Ditto concrete volume 0.6 - 0.65 m3 Nr 4 3,900.00 15,600.00 f Nr 3 13,000.00 39,000.00 ROADS AND STORMWATER DRAINAGE Roads m3 m3 m2 g Excavate for roads 1,870 260.00 486,200.00 h E.O. item (h) for excavation in rock 50 2,600.00 130,000.00 i Grade to correct falls, cambers and gradient as specified and compact to 100% B.S. compaction m2 1,310 390.00 510,900.00 j 150mm compacted natural sub grade 1,310 390.00 510,900.00 Total carried to collected at the end of Bill No. 4 1,792,700.00

4/7

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.4 ITEM a b TREATMENT WORKS EXTERNAL & STAFF HOUSES DESCRIPTION 150 mm compacted Gravel base course 150 mm compacted gravel wearing course UNIT m2 m2 QUANTITY 1,310 1,310 RATE 650.00 650.00 SHS. 851,500.00 851,500.00 STORMWATER DRAINAGE m3 c Excavate form stormwater drain and trenches for culverts 454 260.00 118,040.00 d Headwall as for 460mm diameter concrete pipe Nr 2 13,000.00 26,000.00 e Ditto for 200 mm DN uPVC "B" pipe Nr 3 2,960.00 8,880.00 f 460mm diameter concrete culvert including 150mm grade concrete surrounding m 8 10,400.00 83,200.00 FENCING The rate for the fence posts and gate posts shall include for excavation and concrete surround g Concrete fence post Nr 135 2,600.00 351,000.00 h Ditto for bracings at corners and gateposts and intermediate bracings Nr 30 2,600.00 78,000.00 i Ditto for gateposts Nr 6 13,000.00 78,000.00 j Chain link fencing fitted to fence posts m 620 1,300.00 806,000.00 k 4 m wide double leaf steel gate Nr 2 52,000.00 104,000.00 l 1.2 m wide single leaf steel gate Nr 1 19,500.00 19,500.00 Total carried to collected at the end of Bill No. 4 3,375,620.00

4/8

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.4 ITEM TREATMENT WORKS EXTERNAL & STAFF HOUSES DESCRIPTION OPERATORS HOUSES UNIT QUANTITY RATE SHS. a Double grade 9 house, type A (uplands) all in accordance with Ministry of Water Development's standard drawings Nos.H4/12, H4/13 and H4/14 Nr 4 3,900,000.00 15,600,000.00 b Senior Operators house as per Ministry of Works standard Housing "Type upland E" Nr 1 5,200,000.00 5,200,000.00 SITE FINISHES m2 c 600 X 600 X 75mm thick grade 20 concrete precast paving slabs laid and pointed in mortar mix 1:3 on 50mm thick sand bedding m2 260 2,600.00 676,000.00 d 75mm thick in situ grade 20 concrete slab reinforced with BS mesh A142 in 2 layers at the bottom at footpath drain crossing m2 2 2,600.00 5,200.00 e Spread top soil where directed, rake and plant approved grass seedlings at 150mm c/c m3 250 390.00 97,500.00 f Concrete grade 15 steps including formwork 3 11,700.00 35,100.00 Total carried to collected at the end of Bill No. 4 21,613,800.00

4/9

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No. 4 TREATMENT WORKS EXTERNAL & STAFF HOUSES SHS. SHS. 4/1 3,528,350.00 4/2 2,454,725.00 4/3 201,110.00 4/4 233,460.00 4/5 586,830.00 4/6 763,845.00 4/7 1,792,700.00 4/8 3,375,620.00 4/9 21,613,800.00 Total carried to Grand Summary 34,550,440.00

COLLECTION PAGE:

4/10

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.5 ITEM TREATMENT WORKS CHEMICAL BUILDING DESCRIPTION EARTHWORKS Excavation a 200mm top soil m2 m3 194 260.00 UNIT QUANTITY RATE SHS. 50,440.00 b Further excavation to firm ground 0.2 - 1.0m m3 m3 m3 60 260.00 15,600.00 c Trench excavation 0 - 1.0m 31 260.00 8,060.00 d Ditto 1.0 - 2.0m 18 330.00 5,940.00 e E.O. items (a) -(d) for reuse (PROVISIONAL) m3 30 390.00 11,700.00 f E.O. items (a) - (c) for excavation in rocks (PROVISIONAL) 5 2,600.00 13,000.00 Filling and Compaction g Backfill to reduce levels m3 m3 160 390.00 62,400.00 h 150mm hardcore 27 650.00 17,550.00 i Make up levels around building Item 1 6,500.00 6,500.00 CONCRETE TO BS 8110 Mass concrete m3 m3 j 50mm grade 10 blinding 7 7,800.00 54,600.00 k Grade 15 concrete in footing 7 11,700.00 81,900.00 Reinforced concrete grade 25 l Foundation m3 m3 12 15,600.00 187,200.00 m 150mm ground floor slab 18 15,600.00 280,800.00 Total carried to collected at the end of Bill No. 5 795,690.00

5/1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.5 ITEM a b c d e TREATMENT WORKS CHEMICAL BUILDING DESCRIPTION 200mm chemical tank walls Ditto 150mm walls Ditto 100 mm walls Stairs Lintels and Beams UNIT m3 m3 m3 m3 m3 QUANTITY 2 4 2 1 4 RATE 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 SHS. 31,200.00 62,400.00 31,200.00 15,600.00 62,400.00 CONCRETE ANCILLARIES Rough finish formwork m2 m2 m2 m2 m2 f Sides of strip footing 40 650.00 26,000.00 g Soffits of tanks 66 650.00 42,900.00 h Sides of staircase 4 650.00 2,600.00 i Ditto soffit of staircase 2 650.00 1,300.00 j Sides of 150 x 320 and 150 x 200mm channels m2 m2 6 650.00 3,900.00 k Sides of Ring beam and lintels 36 650.00 23,400.00 l Ditto soffit beam and lintels 6 650.00 3,900.00 REINFORCEMENT TO BS 4449 MILD STEEL BARS m 8mm diameter kg 90 130.00 11,700.00 HIGH YIELD BARS TO BS4461 n o p 8 mm diameter 10 mm diameter 12 mm diameter kg kg kg 20 950 200 150.00 150.00 150.00 3,000.00 142,500.00 30,000.00 Total carried to collected at the end of Bill No. 5 494,000.00

5/2

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.5 ITEM TREATMENT WORKS CHEMICAL BUILDING DESCRIPTION FINISHES m2 m2 m2 m2 m2 UNIT QUANTITY RATE SHS. a 40mm screed, cement : sand 1:3 1% fall smooth trowel finish b c d Ditto stair treads Ditto stair risers 80mm screed to chemical tank floors 2% fall e Ditto tank walls 45 650.00 4 3 9 390.00 390.00 650.00 119 390.00 46,410.00 1,560.00 1,170.00 5,850.00 29,250.00 MISCELLANEOUS f g 50 x 50 x 3mm RHS steel section RHS 80 x 60 x 4mm sections in pipe shelves h i 25mm block board in pipe shelves 1650 x 200 x 6mm chequered steel plate j Precast grade 20 concrete scoles 600 x 290 x 50mm Nr 21 1,300.00 m2 Nr 27 1 1,560.00 7,800.00 m kg 2 1,115 390.00 130.00 780.00 144,950.00 42,120.00 7,800.00 27,300.00 BLOCKWORK OR MASONRY m2 k 200mm solid blockwork in superstructure l m 200mm wide damp proof course 150mm solid blockwork in superstructure n External Spray of tyrolean coloured soft white to Ks 10 B 15 or similar o Internal 20mm mortar rendering, cement/sand 1:4 painted "soft white" to KS 10 B 15 or similar. m2 195 390.00 m2 166 390.00 m m2 80 30 200.00 1,300.00 148 1,560.00 230,880.00 16,000.00 39,000.00 64,740.00 76,050.00 Total carried to collected at the end of Bill No. 5 733,860.00

5/3

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.5 ITEM a b TREATMENT WORKS CHEMICAL BUILDING DESCRIPTION Hoop iron in every other course 100mm diam. vent pipes 200mm long UNIT m Nr QUANTITY 680 6 RATE 130.00 330.00 SHS. 88,400.00 1,980.00 ROOFING c d e f g h i 50 x 150mm wall plate Timber truss type T 50 x 150mm purlins 50 x 150mm Ridge Board 50 x 150mm Fascia Board Galvanished Rain water Gutter 100mm diameter rain water down pipe m Nr m m m m m 42 8 80 15 53 15 16 650.00 13,000.00 650.00 650.00 650.00 650.00 650.00 27,300.00 104,000.00 52,000.00 9,750.00 34,450.00 9,750.00 10,400.00 CLADDING m2 j Super seven corrugated asbestos sheeting k Ridge cap m 20 650.00 176 1,300.00 228,800.00 13,000.00 JOINERY PAINTED TO KS 18 E 49 "SKY BLUE" l Double leaf grill metal door 1800mm wide Nr 1 13,000.00 13,000.00 m Sliding door Nr 1 13,000.00 13,000.00 n T & G door 1000mm wide Nr 1 13,000.00 13,000.00 o Window type W1 1200 mm wide Nr 2 7,800.00 15,600.00 p Window type W2 1800 mm wide Nr 2 13,000.00 26,000.00 q Window type W3 1600 mm wide Nr 2 10,400.00 20,800.00 Total carried to collected at the end of Bill No. 5 681,230.00

5/4

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.5 ITEM TREATMENT WORKS CHEMICAL BUILDING DESCRIPTION INTERNAL WATER SUPPLY UNIT QUANTITY RATE SHS. The rate for the GS pipes shall also include for fittings a b c d e 40mm DN GS pipe medium duty 25mm DN ditto 20mm DN ditto 20mm DN hose connection 20mm DN brass gate valve m m m Nr Nr 8 6 6 6 2 650.00 520.00 260.00 260.00 520.00 5,200.00 3,120.00 1,560.00 1,560.00 1,040.00 CHEMICAL DOSING PIPEWORKS AND EQUIPMENT f 63mm DN chemical solution decanting pipework including 2 No short pipes (approximately length 200 mm), 2 No. valve sockets, elbow and brass gate valve with rising spindle g 50mm DN PVC chemical solution outlet pipework including 2 No short pipes (approximately 200 mm long), 2 No valve sockets 1 No. 50 x 32 mm DN reducing socket and 1 No. 40mm DN and 1 No. brass gate valve h 25mm DN nominal bore rubber hose pipe approximately 800mm long Nr 2 2,600.00 Nr 2 2,600.00 Nr 2 2,600.00 5,200.00 5,200.00 5,200.00 i 90mm DN PVC pipe to house chemical dosing tubes rate to include 1 No.90 0 bend m 2 1,300.00 2,600.00 j 25mm DN bore rubber tubes for chemical solution dosing 6m long Nr 2 1,300.00 2,600.00 k FRN gravity solution doser rate of dosing not less that 181 1/h Nr 2 260,000.00 520,000.00 Total carried to collected at the end of Bill No. 5 553,280.00

5/5

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.5 ITEM TREATMENT WORKS CHEMICAL BUILDING DESCRIPTION WASTE WATER DRAINAGE AND SANITARY FITTINGS UNIT QUANTITY RATE SHS. a 63mm DN uPVC drain pipe work for chemical tanks as per relevant drg Gate valve is measured separately Nr 4 650.00 2,600.00 b 50mm DN brass gate valve Nr 4 1,300.00 5,200.00 c 110mm DN uPVC drain pipe 1m long Nr 3 650.00 1,950.00 d 90mm DN uPVC 90 degrees bend Nr 1 260.00 260.00 e White vitreous china wash hand basin size approximately 400 x 320 mm complete with concealed wall brackets, plug, 40mm DN chrommium plated waste water pipe, bottle trap and connection to drain channel Nr 1 19,500.00 19,500.00 MISCELLANEOUS m2 f One coat of lead oxide primer on RHS sections 38 390.00 14,820.00 g MS 16 anchor bolts Nr m2 42 130.00 5,460.00 h 2 coats of emulsion paint to internal wall surfaces in the pipe store m2 45 390.00 17,550.00 i 2 coats of emulsion oil paint to RHS sections in pipe store 38 390.00 14,820.00 Total carried to collected at the end of Bill No. 5 82,160.00

5/6

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No. 5 TREATMENT WORKS CHEMICAL BUILDING SHS. SHS. 5/1 795,690.00 5/2 494,000.00 5/3 733,860.00 5/4 681,230.00 5/5 553,280.00 5/6 82,160.00 Total carried to Grand Summary 3,340,220.00

COLLECTION PAGE:

5/7

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.6 ITEM INLET CHAMBER AND FLOCCULATION TANKS DESCRIPTION EARTHWORKS Excavation m2 m3 m3 m3 UNIT QUANTITY RATE SHS. a 200mm top soil excavation 100 260.00 26,000.00 b Further excavation 0.2 - 1.5m 106 330.00 34,980.00 c Ditto 1.5 - 2.5m 25 390.00 9,750.00 d Extra over excavated material for re-use (PROVISIONAL) 50 520.00 26,000.00 Filling and Compaction m3 m3 e Fill to levels shown in drawing 115 390.00 44,850.00 f 150mm Hardcore 30 650.00 19,500.00 g Make up levels around Item 1 6,500.00 6,500.00 CONCRETE TO BS 8110 Mass concrete m2 m3 h 50mm blinding concrete in grade 15 100 7,800.00 780,000.00 i Concrete in grade 7 for phasing the works 2 11,700.00 23,400.00 Reinforced concrete grade 25 m3 m3 j 150mm slab 15 15,600.00 234,000.00 k 150mm walls 13 15,600.00 202,800.00 Total carried to collected at the end of Bill No. 6 1,407,780.00

6/1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.6 ITEM INLET CHAMBER AND FLOCCULATION TANKS DESCRIPTION Fair finish plane formworks m2 m2 UNIT QUANTITY RATE SHS. a b Ground slab Vertical sides of walls 9 152 650.00 650.00 5,850.00 98,800.00 Reinforcement c High yield steel to BS 4461 8mm diameter kg 1,247 150.00 187,050.00 Joints d Expansion joint in 150mm slab and wall m 6 260.00 1,560.00 Ancillaries m2 m2 e 40mm screed, steel trowel finish to top face of slab f Ditto 10mm render to 150mm walls 85 390.00 72 390.00 28,080.00 33,150.00 Steelworks (Include for bolts, welding painting and fixing) g Weir, include for gauge Nr 1 260,000.00 260,000.00 h Penstock Nr 3 390,000.00 1,170,000.00 i Grout penstock Nr 3 390,000.00 1,170,000.00 Blockwork Solid Blockwork j k 100 mm walls Hoop iron in every other course m2 m 96 350 1,040.00 130.00 99,840.00 16,250.00 Total carried to collected at the end of Bill No. 6 3,070,580.00

6/2

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.6 ITEM INLET CHAMBER AND FLOCCULATION TANKS DESCRIPTION FINISHES m2 UNIT QUANTITY RATE SHS. a 10mm Rendering in all visible blockwork 192 390.00 74,880.00 PIPEWORK b 320mm DN double flanged steel pipe 600mm long Nr 1 15,600.00 15,600.00 c Ditto with welded on GS water seal 275mm long Nr 1 16,250.00 16,250.00 d 320mm DN single flanged steel pipe 320mm long Nr 1 13,000.00 13,000.00 e 100mm DN single flanged steel pipe approximately 2000mm long with a GS water seal 75mm from one end Nr 3 6,500.00 19,500.00 f 100mm DN double flanged steel pipe approximately 1100mm long g Removable grating cover for 100mm DN pipe h 315mm DNe x 320mm DN uPVC/steel flange adaptor i j 320 x 320mm DN all flanged steel tee 100mm DN double flanged steel bend, 900 Nr Nr 1 3 26,000.00 6,500.00 Nr 1 16,640.00 Nr 3 1,300.00 Nr 3 5,200.00 15,600.00 3,900.00 16,640.00 26,000.00 19,500.00 k 320mm DN flanged CI sluice valve Nr 1 265,200.00 265,200.00 l 100mm DN ditto Nr 3 33,150.00 99,450.00 m Pipe support brackets as per Drg.No. Nr 1 3,900.00 3,900.00 Total carried to collected at the end of Bill No. 6 589,420.00

6/3

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.6 INLET CHAMBER AND FLOCCULATION TANKS COLLECTION PAGE: 6/1 SHS. SHS. 1,407,780.00 6/2 3,070,580.00 6/3 589,420.00 Total carried to Grand Summary 5,067,780.00

6/4

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.7 ITEM TREATMENT WORKS - SEDIMENTATION TANKS DESCRIPTION EARTHWORKS Excavation m2 m3 m3 m3 m3 m3 UNIT QUANTITY RATE SHS. a 200mm top soil excavation 126 260.00 32,760.00 b Further excavation 0.2 - 1.0m 100 260.00 26,000.00 c Ditto 1.0 - 2.0m 126 330.00 41,580.00 d Ditto 2.0 - 3.0m 65 390.00 25,350.00 e Ditto over 3.0m PROVISIONAL 50 520.00 26,000.00 f Extra over excavation for re-use (PROVISIONAL) 35 650.00 22,750.00 Filling and Compaction m3 g 150mm hardcore 80 650.00 52,000.00 h Make up levels around structure Item 1 3,900.00 3,900.00 ANCILLARIES m2 i Prepare sloping surface below slab 80 390.00 31,200.00 CONCRETE WORKS TO BS 8110 Mass concrete m2 j 50 mm blinding concrete in grade 15 168 7,800.00 1,310,400.00 Total carried to collected at the end of Bill No. 7 1,571,940.00

7/1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.7 ITEM a TREATMENT WORKS - SEDIMENTATION TANKS DESCRIPTION Grade 7 concrete for phasing the works UNIT m3 QUANTITY 6 RATE 11,700.00 SHS. 70,200.00 Reinforced concrete grade 25 m3 b Ground floor slab (270mm average thickness) m3 m3 m3 45 11,700.00 526,500.00 c 200mm ground slab for man holes 2 11,700.00 23,400.00 d i e 150mm manhole walls 6 11,700.00 320mm walls 73 11,700.00 854,100.00 70,200.00 f Channels, walking platforms and collection launders 100\150mm thick m3 5 15,600.00 78,000.00 Rough Finish Formwork (Fill Side) m2 m2 g Ground floor slab 150/320mm 40 650.00 26,000.00 h 320 and 150mm walls 179 650.00 116,350.00 Fairface Formwork (Tank Internal) m2 m2 m2 i 100 mm walls 271 650.00 176,150.00 j 150mm manhole walls 64 650.00 41,600.00 k Channels, walkways 150/100mm thick 43 650.00 27,950.00 Total carried to collected at the end of Bill No. 7 2,010,450.00

7/2

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.7 ITEM a TREATMENT WORKS - SEDIMENTATION TANKS DESCRIPTION Extra for forming sumps UNIT Nr QUANTITY 4 RATE 650.00 SHS. 2,600.00 JOINTS b 150mm water Bar in 320mm thick slabs mid walls m 20 390.00 7,800.00 c Key surface of horizontal joints m 200 260.00 52,000.00 Reinforcement to BS 4461 d High tensile reinforcement 8mm diameter kg 2696 150.00 404,400.00 e High tensile reinforcement 10 mm diameter kg 231 150.00 34,650.00 f High tensile reinforcement 12mm diameter kg 4034 130.00 524,420.00 g Mild steel to BS 4449 8mm diameter kg 24 150.00 3,600.00 Ancillaries m2 h Steel trowel finishes to ground floor slab (3% slope) m2 m2 m2 m2 112 390.00 43,680.00 i Ditto vertical walls 250 390.00 97,500.00 j Ditto manholes base slabs 3 390.00 1,170.00 k Ditto vertical walls in manholes 30 390.00 11,700.00 l Ditto channels, walkways and launders 60 390.00 23,400.00 Total carried to collected at the end of Bill No. 7 1,206,920.00

7/3

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.7 ITEM TREATMENT WORKS - SEDIMENTATION TANKS DESCRIPTION BLOCKWORK m2 UNIT QUANTITY RATE SHS. a 150mm diffusion wall 19 1,300.00 24,700.00 MISCELLANEOUS STEELWORK b 6300 x 175 x 6mm GMS weir plate as per relevant Drg. Rate to include for all bolts, nuts, washers etc c 600 x 870 x 10mm GMS penstock. Rate to include for penstock frame and guide as per Drg. No. d e f 20mm DN GS pipe handrail 50 x 20mm RHS posts Manhole chequered cover plates m m Nr 30 30 3 260.00 520.00 6,500.00 Nr 3 260,000.00 Nr 12 26,000.00 312,000.00 780,000.00 7,800.00 15,600.00 19,500.00 PIPEWORKS g 500mm DN single flanged steel pipe 822mm long with a GS water seal 100mm from plain end Nr 1 65,000.00 65,000.00 h Dito double flanged steel pipe approximately 600mm long Nr 1 65,000.00 65,000.00 i Ditto 2200 mm long Nr 1 130,000.00 130,000.00 j 500mm DN single flanged pipe 1750mm long with a GS water seal 100mm from plain end Nr 1 97,500.00 97,500.00 k 150mm DN steel pipe single flange approximately 325mm long with 1 No. welded on GS water seal, 150mm from plain end. Nr 2 3,900.00 7,800.00 Total carried to collected at the end of Bill No. 7 1,524,900.00

7/4

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.7 ITEM TREATMENT WORKS - SEDIMENTATION TANKS DESCRIPTION UNIT QUANTITY RATE SHS. a 80mm DN GS pipe 250mm long Nr 60 650.00 39,000.00 b 500mm DN double flanged steel bend, 900 Nr 1 65,000.00 65,000.00 c 500mm DN flanged CI sluice valve with rising spindle (approximately 1400mm long) and handwheel Nr 1 650,000.00 650,000.00 d 150mm DN ditto with rising spindle (approximately 2250mm long) and handwheel Nr 2 55,250.00 110,500.00 Total carried to collected at the end of Bill No. 7 864,500.00

7/5

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.7 TREATMENT WORKS - SEDIMENTATION TANKS COLLECTION PAGE: 7/1 SHS. SHS. 1,571,940.00 7/2 2,010,450.00 7/3 1,206,920.00 7/4 1,524,900.00 7/5 864,500.00 Total carried to Grand Summary 7,178,710.00

7/6

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.8 ITEM TREATMENT WORKS - PLANT BUILDING, AND FILTERS DESCRIPTION EARTHWORKS Excavation m2 m3 m3 m3 UNIT QUANTITY RATE SHS. a 200mm top soil excavation 190 260.00 49,400.00 b Further excavation 0.2 - 0.6m 76 260.00 19,760.00 c Trench excavation (0.6 - 1.0m) 18 260.00 4,680.00 d Further excavation for basement and filters 0.6 - 1.0m m3 m3 m3 m3 m3 44 260.00 11,440.00 e Ditto 1.0 - 2.0m 110 330.00 36,300.00 f Ditto 2.0 - 3.0m 110 390.00 42,900.00 g Ditto 3.0 - 4.0m 110 520.00 57,200.00 h Over 4.0m (PROVISIONAL) 105 650.00 68,250.00 i E.O. excavation for re-use (PROVISIONAL) 105 650.00 68,250.00 Filling and Compaction m3 m3 j Backfill to reduced level 85 390.00 33,150.00 k 150mm hardcore 22 650.00 14,300.00 l Making up levels around structure Item 1 6,500.00 6,500.00 Ancillaries m2 m Prepare sloping surfaces for floor gutters and basement footings 6 3,960.00 23,760.00 n Prepare sloping surfaces under stair Sum 1 3,900.00 3,900.00 Total carried to collected at the end of Bill No. 8 439,790.00 8/1 -

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.8 ITEM TREATMENT WORKS - PLANT BUILDING, AND FILTERS DESCRIPTION CONCRETE TO BS 8110 Mass concrete m2 UNIT QUANTITY RATE SHS. a 50mm blinding grade 15 13 7,800.00 101,400.00 Reinforced Concrete Grade 25 to BS 8110 m3 m3 m3 m3 m3 m3 m3 m3 m3 b c d 200mm filter floor slab 200/320mm basement floor slab 200mm walls 7 26 60 11,700.00 11,700.00 11,700.00 81,900.00 304,200.00 702,000.00 e 150mm suspended slab 15 15,600.00 234,000.00 f Footing concrete 10 15,600.00 156,000.00 g 150mm ground floor slab 16 15,600.00 249,600.00 h Columns 1 11,700.00 11,700.00 i Beams 4 15,600.00 62,400.00 k Staircases 2 15,600.00 31,200.00 l Channels, walkways, manholes and inlet chamber Nr 10 15,600.00 156,000.00 FORMWORK Sawn Formwork m2 m2 m2 m2 m n o p Ground floor sides Filter walls - external Basement walls (external and internal) Columns 33 109 146 5 650.00 650.00 650.00 650.00 21,450.00 70,850.00 94,900.00 3,250.00 Total carried to collected at the end of Bill No. 8 2,280,850.00 8/2

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.8 ITEM a TREATMENT WORKS - PLANT BUILDING, AND FILTERS DESCRIPTION Inlet drain, mamholes and inlet chamber UNIT m2 m2 QUANTITY 52 RATE 650.00 SHS. 33,800.00 b Chemical tanks 32 650.00 20,800.00 Fair Faced Plane Formwork m2 m2 m2 m2 m2 c Filter units (material) 100 650.00 65,000.00 d Suspended slab - soffit 60 650.00 39,000.00 e Staircase 7 650.00 4,550.00 f Ring beam 22 650.00 14,300.00 g Beams (soffits and slides) 26 650.00 16,900.00 REINFORCEMENT h Mild steel kg 470 130.00 61,100.00 i High yield steel to BS 4461 kg m2 15,623 150.00 2,343,450.00 j Fabric A142 mesh 110 650.00 71,500.00 PRECAST CONCRETE WORKS k Filter beams of reinforced concrete grade 25 Nr 120 650.00 78,000.00 STEEL WORK l 20 mm DN GS pipe handrail m 35 260.00 9,100.00 m 50 x 20 mm RHS posts m 30 390.00 11,700.00 n Manhole cover Nr 3 6,500.00 19,500.00 Total carried to collected at the end of Bill No. 8 2,788,700.00 8/3

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.8 ITEM TREATMENT WORKS - PLANT BUILDING, AND FILTERS DESCRIPTION BLOCKWORK Solid Blockwork m2 m2 m2 UNIT QUANTITY RATE SHS. a 150mm diffusion wall 82 1,300.00 106,600.00 b 200 mm walls 175 1,560.00 273,000.00 c Blockwork below chemical tank 5 1,560.00 7,800.00 Ancillaries d Hoop- iron in each second course in all blockwalls m 525 130.00 68,250.00 e 200mm dpc in external blockwalls m 49 260.00 12,740.00 f 100mm diameter vents in gable ends Nr 6 390.00 2,340.00 ROOF STRUCTURE g Timber truss type T Nr 10 13,000.00 130,000.00 h 50 x 50mm purlins m 900 520.00 468,000.00 i 50 x 200mm ridge board m m2 15 1,040.00 15,600.00 j "Super seven" asbestos sheeting 175 1,300.00 227,500.00 k "Super seven" asbestos close fitting ridges l 75 x 100mm wall plate m 28 780.00 m 15 390.00 5,850.00 21,840.00 JOINERY WORKS m n o p Door type D1 Door Type D2 Door type D3 Door type D4 Nr Nr Nr Nr 2 2 3 2 10,400.00 10,400.00 10,400.00 10,400.00 20,800.00 20,800.00 31,200.00 20,800.00 Total carried to collected at the end of Bill No. 8 1,433,120.00 8/4

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.8 ITEM a TREATMENT WORKS - PLANT BUILDING, AND FILTERS DESCRIPTION Door type D5 UNIT Nr QUANTITY 2 RATE 10,400.00 SHS. 20,800.00 b Window type W1 Nr 6 7,800.00 46,800.00 c Window type W2 Nr m2 3 6,500.00 19,500.00 d Concrete louvres 5 390.00 1,950.00 e Light partitioning Item 1 6,500.00 6,500.00 f Workshop Tables & Cupboard Item 1 26,000.00 26,000.00 g Laboratory table with sink cupboards, drawers and shelf Item 1 26,000.00 26,000.00 MISCELLANEOUS STEELWORKS h Roof gutter 24 gauge m 33 390.00 12,870.00 i 100mm DN GS down pipe m 10 390.00 3,900.00 j Gutter cover of 6mm chequer plate and frame Nr 2 3,900.00 7,800.00 FINISHES Screed m2 k Steel - trowel - finish - screed mix 1:3, for 1% falls on floors and gutter surfaces, min 40mm l m Ditto screed on stair treads, min 40 mm Ditto screed on stair risers and gutter sides, 10/20mm n Ditto screed for 2% fall on bottom of chemical tanks, min 20 mm m2 10 390.00 m2 m2 6 11 390.00 390.00 210 390.00 81,900.00 2,340.00 4,290.00 3,900.00 Total carried to collected at the end of Bill No. 8 264,550.00 8/5

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.8 ITEM TREATMENT WORKS - PLANT BUILDING, AND FILTERS DESCRIPTION Rendering m2 UNIT QUANTITY RATE SHS. a Min 10mm rendering on all visible external wall surfaces m2 175 390.00 68,250.00 b Ditto on internal wall surface, beams and columns m2 m2 385 390.00 150,150.00 c Ditto beam soffits 10 390.00 3,900.00 d Ditto basement slab and stairs 75 390.00 29,250.00 Plastering m2 e Pigmented "TYROLEAN" plaster finish to all rendered external surface 175 390.00 68,250.00 Painting f 3 coats of emulsion paint to all visible surfaces of walls, beams, columns and slabs m2 470 300.00 141,000.00 g 1 coat of lead oxide primer and 2 coats of oil paint to all steelworks and rails Item 1 300.00 300.00 Water Proofing h 2 coats of approved bitumen paint to external surface of basement walls m2 85 390.00 33,150.00 Lining m2 i Epoxy of similar lining in chemical tanks 30 650.00 19,500.00 Total carried to collected at the end of Bill No. 8 513,750.00 8/6

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.8 ITEM TREATMENT WORKS - PLANT BUILDING, AND FILTERS DESCRIPTION SUNDRIES UNIT QUANTITY RATE SHS. a Uniform layers of graded sand and gravel to 1m height in 3 No. filters Item 1 650,000.00 650,000.00 INTERNAL WATER SUPPLY The rate for the pipes shall include for all necessary brackets and fittings for complete installation b 50mm DN GS pipe medium duty m 6 1,170.00 7,020.00 c 40mm DN ditto m 14 650.00 9,100.00 d 25mm DN ditto m 24 390.00 9,360.00 e 20mm DN ditto m 18 260.00 4,680.00 f g h i 15mm DN ditto 25mm DN brass gate valve 20mm DN ditto 15mm DN bibcock m Nr Nr Nr 6 2 2 3 195.00 520.00 520.00 780.00 1,170.00 1,040.00 1,040.00 2,340.00 j 20mm DN hose connection complete with isolating gate valve and necessary fittings Nr 5 780.00 3,900.00 k 20mm DN chromium plated supply tap with swan neck flanged for screwing to laboratory table and connection to GS pipe Nr 2 650.00 1,300.00 l 100mm diameter shower hose with overhead arm wall flange and 350mm extension Nr 2 650.00 1,300.00 Total carried to collected at the end of Bill No. 8 692,250.00 8/7

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.8 ITEM TREATMENT WORKS - PLANT BUILDING, AND FILTERS DESCRIPTION CHEMICAL DOSING PIPEWORKS AND EQUIPMENT UNIT QUANTITY RATE SHS. a 63mm DN PVC chemicl solution decanting pipework including 2 No. short pipes (approximate length 200 mm) 2No. Valve sockets, elbow and a brace gate valve with rising spindle Nr 2 2,600.00 5,200.00 b 50mm DN PVC chemical solution outlet pipework including 2 No. short pipes (approximately 200 mm long), 2 No. valve sockets 1 No. 50 x 32 mm DN reducing socket and 1 No. 40 mm DN brass gate valve Nr 2 2,600.00 5,200.00 c 50 mm DN PVC pipe class C (1.2 MPa) anchored to wall. Rate to include for all fittings and anchors. m 4 240.00 960.00 d 25mm DN nominal bore rubber hose pipe approximately 800mm long Nr 2 260.00 520.00 e 25mm DN bore rubber tubes for chemical solution dosing m 10 260.00 2,600.00 f FRN gravity solution dosers, rate of dosing not less than 181 l/h Nr 2 195,000.00 390,000.00 WASTE WATER DRINAGE AND SANITARY FITTINGS g h 90mm DN uPVC drain pipe 63mm DN drain pipe 3200mm long at chemical tank outlet. m Nr 7 4 520.00 250.00 3,640.00 1,000.00 Total carried to collected at the end of Bill No. 8 409,120.00 8/8

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.8 ITEM a TREATMENT WORKS - PLANT BUILDING, AND FILTERS DESCRIPTION 50mm DN brass gate valve. Rate to include for 2 No. valve sockets and one adaptor union UNIT Nr QUANTITY 4 RATE 1,560.00 SHS. 6,240.00 b 90mm DN uPVC 90 degrees bend Nr 1 1,170.00 1,170.00 c 110mm DN uPVC pipe. Rate to include all necessary fittings m 13 1,560.00 20,280.00 d 40mm DN uPVC drain pipe. Rate to include for bends and other fittings m 20 130.00 2,600.00 e White vitreous china wash hand basin size approximately 400 x 320 mm complete with concealed wall bracket, plug, 40mm DN chromium plated waste water pipe, bottle trap, pipe, bottle trap, and connection to gulley trap Nr 3 19,500.00 58,500.00 f White vitreous china with WC suite complete strap, cistern, ball valve, flush pipe joining to water pipe and drain pipe Nr 3 39,000.00 117,000.00 g Hook for clothes fixed to wall or door Nr 2 650.00 1,300.00 h 600mm long chromium plated towel rail fixed to wall or door Nr 2 1,300.00 2,600.00 i White fireclay soap dish and toilet roll holder fixed to wall Nr 2 650.00 1,300.00 j 6mm polished plate glass mirror size 450 x 600mm with levelled and polished edges and four Nos. chromium plated dome headed screws Nr 2 2,600.00 5,200.00 Total carried to collected at the end of Bill No. 8 216,190.00 8/9

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.8 ITEM TREATMENT WORKS - PLANT BUILDING, AND FILTERS DESCRIPTION PIPEWORKS IN FILTER SECTION UNIT QUANTITY RATE SHS. a 320mm DN double flanged steel pipe approximately 800mm long with a welded on GS water seal 320 mm from one end and a 65mm DN hole where backwash delivery pipe shall be welded Nr 1 15,600.00 15,600.00 b 320mm DN single flanged steel pipe 1425mm long Nr 1 19,500.00 19,500.00 c Ditto 2375mm long Nr 2 32,500.00 65,000.00 d 320mm DN single flanged steel pipe 450mm long with a welded on GS water seal 125mm from plain end Nr 3 10,400.00 31,200.00 e 315mm DN PVC - A (0.6MPa) m 8 5,655.00 45,240.00 f 250mm DN single flanged steel pipe 250mm long with a welded on GS water seal 100mm from plain end Nr 3 5,200.00 15,600.00 g Ditto 250mm long with a welded on GS water seal 50mm from plain end Nr 1 5,200.00 5,200.00 h 250mm DN double flanged steel pipe 1070mm long i j k l m Ditto 2380mm long Ditto 4050mm long Ditto 600mm long Ditto 6300mm long 150mm DN single flanged steel pipe 600mm long with a welded on GS water seal 125mm from plain end n 160mm DN uPVC - A (0.6MPa) Nr 6 1,560.00 Nr Nr Nr Nr Nr 2 1 1 1 1 26,000.00 52,000.00 10,400.00 78,000.00 6,500.00 Nr 3 13,000.00 39,000.00 52,000.00 52,000.00 10,400.00 78,000.00 6,500.00 9,360.00 Total carried to collected at the end of Bill No. 8 444,600.00 8/10

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.8 ITEM a TREATMENT WORKS - PLANT BUILDING, AND FILTERS DESCRIPTION 80mm DN 900 steel elbow UNIT Nr QUANTITY 3 RATE 1,950.00 SHS. 5,850.00 b 50mm ditto 100 mm DN 900 steel elbow m 6 650.00 3,900.00 c Nr 3 3,250.00 9,750.00 d 250mm blank flange with 80mm socket outlet welded on Nr 1 1,560.00 1,560.00 e 320 x 320mm DN all flanged steel tee Nr 3 78,000.00 234,000.00 f 320 x 250mm DN all flanged steel tee with a 50mm DN GS pipe piece approximately 80mm long welded to tee around a 50mm nominal bore hole Nr 3 65,000.00 195,000.00 g 320 x 250mm DN all flanged tee but one in -line flange blank Nr 1 65,000.00 65,000.00 h 250 x 250mm DN steel ditto Nr 1 52,000.00 52,000.00 i 250 x 250mm DN all flanged on steel tee Nr 3 52,000.00 156,000.00 j 250 x 250mm DN tee flanged on the branch and single flanged on in line section only Nr 1 52,000.00 52,000.00 k 250 x 250mm DN steel tee flanged on the branch Nr 3 52,000.00 156,000.00 l 80 x 50mm DN flanged steel tee Nr 1 5,200.00 5,200.00 m 350 x 320mm DN flanged steel taper Nr 1 19,500.00 19,500.00 n 80 x 50 DN reducing socket Nr 3 1,950.00 5,850.00 Total carried to collected at the end of Bill No. 8 961,610.00 8/11

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.8 ITEM a TREATMENT WORKS - PLANT BUILDING, AND FILTERS DESCRIPTION 355 DN x 350mm DN uPVC/steel flange adaptor UNIT Nr QUANTITY 1 RATE 26,000.00 SHS. 26,000.00 b 315mm DN x 320mm DN Ditto Nr 1 20,800.00 20,800.00 c 80 x 80mm GS tee Nr 1 5,200.00 5,200.00 d 250mm DN CI flanged sluice valve PN 10 Nr 1 187,850.00 187,850.00 e 50mm DN brass gate valve, PN 10 Nr 4 1,300.00 5,200.00 f Ditto Non-return valve Nr 2 1,300.00 2,600.00 g 320mm DN flanged butterfly valve Nr 4 265,200.00 1,060,800.00 h 250mm DN ditto Nr 6 99,450.00 596,700.00 i 250mm DN approved water meter Nr 1 773,500.00 773,500.00 j Pipe support as per relevant Drg. Nr 3 13,000.00 39,000.00 k 75 x 75 x 4mm angle wash water tee support welded to pipe and fixed on wash water channel by M16 bolts Nr 3 1,300.00 3,900.00 Total carried to collected at the end of Bill No. 8 2,721,550.00 8/12

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.8 TREATMENT WORKS - SEDIMENTATION TANKS COLLECTION PAGE: 8/1 SHS. SHS. 439,790.00 8/2 2,280,850.00 8/3 2,788,700.00 8/4 1,433,120.00 8/5 264,550.00 8/6 513,750.00 8/7 692,250.00 8/8 409,120.00 8/9 216,190.00 8/10 444,600.00

8/11

961,610.00

8/12

2,721,550.00 -

Total carried to Grand Summary 13,166,080.00

8/13

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.9 TREATMENT WORKS - CLEAR WATER & BACKWASH WATER TANKS ITEM DESCRIPTION 200m3 CLEAR WATER TANK EARTHWORKS UNIT QUANTITY RATE SHS. Excavation m2 m3 m3 m3 a 200mm top soil 93 260.00 24,180.00 b Further excavation 0.2 - 1.0m 73 260.00 18,980.00 c Ditto 1.0 - 2.0mm 20 330.00 6,600.00 d 150 mm hardcore 15 650.00 9,750.00 e Making up levels around the structure m3 Item 1 13,000.00 13,000.00 f Prepare sloping surface to wall footing 15 390.00 5,850.00 CONCRETE TO BS 8110 Mass Concrete m3 g 50mm blinding in grade 10 7 7,800.00 54,600.00 Reinforced concrete grade 25 m3 m3 m3 h In 150 mm floor slab 14 11,700.00 163,800.00 i Ditto in 200 mm slab 6 11,700.00 70,200.00 j Ditto 200 mm suspended roof slab 23 15,600.00 358,800.00 Total carried to collected at the end of Bill No. 9 725,760.00

9/1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.9 TREATMENT WORKS - CLEAR WATER & BACKWASH WATER TANKS ITEM DESCRIPTION Reinforcement a b Mild tensile High tensile steel kg kg 325 2004 150.00 130.00 48,750.00 260,520.00 Formwork m2 m2 m2 Item c Sawn formwork to edge of curve floor slab width ne. 0.2 m d e f Ditto to edges of roof slab Ditto to soffit of suspended roof slab Allow for boxing out for mahole and air vent 8 7 1 650.00 650.00 650.00 8 650.00 5,200.00 5,200.00 4,550.00 650.00 BLOCK WORK m2 g 230 mm solid block circular wall in 1.3 cement sand mortar 136 1,690.00 229,840.00 SUNDRIES/FINISHES h Install 1No. internal steel ladder Item 1 6,500.00 6,500.00 i Ditto but external steel ladder Item 1 6,500.00 6,500.00 j 50 mm G.S. air vent to tank Nr 2 1,950.00 3,900.00 k Steel manhole cover frame complete with padlock m2 Nr 2 6,500.00 13,000.00 l 10 mm water proof plaster 1:2 in 2 layers to walls internally steel trowelled smooth m2 115 390.00 44,850.00 m Ditto but in 20 mm thick screed on concrete floor slab 79 390.00 30,810.00 Total carried to collected at the end of Bill No. 9 660,270.00 UNIT QUANTITY RATE SHS.

9/2

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.9 TREATMENT WORKS - CLEAR WATER & BACKWASH WATER TANKS ITEM a DESCRIPTION Min 20 mm screed mix 1:3 laid on roof slab steel trowel finish m2 UNIT m2 QUANTITY 90 RATE 390.00 SHS. 35,100.00 b 15 mm rendering mix 1:3 floated smooth to wall externally m2 m2 102 390.00 39,780.00 c 2 ply roofing felt on top of wall 7 390.00 2,730.00 d 2 coats flinkote to floor slab 7 390.00 2,730.00 PAINTING m2 e Prepare and apply 2 coats of approved alkali resistant primes to roof screed m2 90 300.00 27,000.00 f Ditto but in aluminium alkycl reflective paint m2 90 300.00 27,000.00 g Prepare and apply 2 coats of approved emulsion paint to rendering walls externally 102 300.00 30,600.00 PIPEWORKS h 320mm DN steel inlet Nr 1 65,000.00 65,000.00 i 320mm DN steel outlet Nr 1 65,000.00 65,000.00 j 320mm DN steel overflow Nr 1 65,000.00 65,000.00 k 50mm DN scour Nr 1 3,900.00 3,900.00 l 320mm GI sluice valve Nr 1 265,200.00 265,200.00 m 50mm brass gate valve Nr 1 1,300.00 1,300.00 Total carried to collected at the end of Bill No. 9 630,340.00

9/3

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.9 TREATMENT WORKS - CLEAR WATER & BACKWASH WATER TANKS ITEM DESCRIPTION 100m3 BACKWASH WATER TANK SITE CLEARANCE (PROVISIONAL) UNIT QUANTITY RATE SHS. a General clearance of vegetation ha 0.06 130,000.00 7,800.00 b Trees and stumps girth n.e. 320mm Nr 8 650.00 5,200.00 FENCING c Specified concrete fence posts Nr 30 2,600.00 78,000.00 d Bracing posts Nr 8 2,600.00 20,800.00 e Gate posts Nr 2 13,000.00 26,000.00 f 4m wide double leaf steel gate Nr 1 52,000.00 52,000.00 g Chain link fencing m 80 1,300.00 104,000.00 EARTHWORKS EXCAVATION m2 m3 h 200mm top layer for disposal 44 260.00 11,440.00 i Excavtion to foundation level as shown on drawings depth n.e 2.5m, material for re-use 101 390.00 39,390.00 j Trench excavation for pipes upto 110mm DN depth n.e 1.0m m 12 260.00 3,120.00 k Ditto depth 1.0 - 1.5m m 6 330.00 1,980.00 l Unlined 750mm earth drawn side slopes n.e 1:1.5 depth n.e 1.0m m 7 260.00 1,820.00 Total carried to collected at the end of Bill No. 9 351,550.00

9/4

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.9 TREATMENT WORKS - CLEAR WATER & BACKWASH WATER TANKS ITEM DESCRIPTION FILLING AND COMPACTION m2 m2 UNIT QUANTITY RATE SHS. a Compaction of excavation bottom 44 390.00 17,160.00 b 200mm well compacted hardcore 44 650.00 28,600.00 c Make up levels around the structure Item 1 13,000.00 13,000.00 CONCRETE TO BS 8110 MASS CONCRETE m2 d 50mm blinding in grade 15 plain concrete 70 7,800.00 546,000.00 Reinforced Concrete Grade 25 m3 m3 m3 e In 150mm floor slab 6 11,700.00 70,200.00 f Ditto in 200mm floor slab 4 11,700.00 46,800.00 g Ditto in 200mm suspended roof slab 11 15,600.00 171,600.00 FORMWORK m2 a Sawn form work to edges of curve floor slab width n.e 0.2 m m2 m2 6 650.00 3,900.00 b Ditto but to edges of roof slab 6 650.00 3,900.00 c Ditto but to soffits of suspended roof slab height 37 650.00 24,050.00 d Allow for boxing out for manhole and air vent Item 1 650.00 650.00 Total carried to collected at the end of Bill No. 9 925,860.00

9/5

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.9 TREATMENT WORKS - CLEAR WATER & BACKWASH WATER TANKS ITEM DESCRIPTION REINFORCEMENT TO BS 4449 UNIT QUANTITY RATE SHS. a b Mild steel High tensile steel kg kg 828 569 130.00 130.00 107,640.00 73,970.00 BLOCKWORK m2 c 200mm solid blockwork circular wall in 1:3 cement sand mortar 82 1,560.00 127,920.00 SUNDRIES/FINISHES d e f g Install 1 No. internal steel ladder Ditto but external steel ladder 50mm DN GS air vent to tank Steel manhole cover and frame complete with padlock h Making good after installation of level indicators etc. i 10 mm water proof plaster mix 1:2 in 2 layers to walls internally steel trowelled smooth j Ditto but in 20 mm thick screed on concrete floor slab k l 2 coats flintkore to floor slab Approved joint sealing compound in 20 x 40 mm groove to floor slab m n 2 play roofing felt on top of wall 15 mm rendering mix 1:3 floated smooth to wall externally m2 m2 4 76 390.00 390.00 m2 m 4 21 390.00 390.00 m2 38 390.00 m2 78 390.00 Item 1 3,900.00 Item Item Nr Nr 1 1 1 1 6,500.00 6,500.00 1,950.00 6,500.00 6,500.00 6,500.00 1,950.00 6,500.00 3,900.00 30,420.00 14,820.00 1,560.00 8,190.00 1,560.00 29,640.00 Total carried to collected at the end of Bill No. 9 421,070.00

9/6

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.9 TREATMENT WORKS - CLEAR WATER & BACKWASH WATER TANKS ITEM a DESCRIPTION 20 mm thick cement sand screed 1:3 mix floated smooth on roof slab UNIT m2 QUANTITY 41 RATE 390.00 SHS. 15,990.00 PAINTING m2 b Prepare and apply 2 coats of approved alkali resistant primes to roof screed c Ditto but in aluminium alkyd reflective paint d Prepare and apply 2 coats of approval emulsion paint to rendering walls externally m2 76 300.00 m2 41 300.00 41 300.00 12,300.00 12,300.00 22,800.00 PIPEWORKS e f g h 80mm DN steel inlet 320mm DN steel outlet 100mm DN steel overflow 50mm DN GS scour Item Item Item Item 1 1 1 1 13,000.00 65,000.00 19,500.00 3,900.00 13,000.00 65,000.00 19,500.00 3,900.00 PIPEWORKS EXTERNAL i 320mm DN double flanged steel pipe 1.0m in valve chamber j 50mm DN GS pipe to be cut to various sizes k 100mm DN double flanged steel pipe 1.5m long in outfall Nr 1 6,500.00 m 6 8,230.00 Nr 2 15,600.00 31,200.00 49,380.00 6,500.00 l 110mm DNe uPVC - B pipe to outfall m 12 770.00 9,240.00 BENDS/ELBOWS 110mm DNe uPVC 90 0 Ditto 45 0 m n Nr Nr 1 1 1,040.00 1,300.00 1,040.00 1,300.00 Total carried to collected at the end of Bill No. 9 263,450.00

9/7

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.9 TREATMENT WORKS - CLEAR WATER & BACKWASH WATER TANKS ITEM DESCRIPTION OTHER FITTINGS UNIT QUANTITY RATE SHS. a 110mm DN steel/uPVC flange adaptor Nr 2 4,720.00 9,440.00 b 320mm DN ditto Nr 2 16,640.00 33,280.00 c 110mm DN blank flange with 50mm DN threaded hole for sour pipe Nr 1 1,300.00 1,300.00 d 50mm DN GS union Nr 2 440.00 880.00 e Ditto GS sockets Nr 2 130.00 260.00 f Ditto GS nipples Nr 2 130.00 260.00 VALVES g 320mm DN CI flanged sluice valve Nr 1 265,200.00 265,200.00 h 50mm DN brass gate valve Nr 1 1,300.00 1,300.00 OVERFLOW/SCOUR OUTFALL i Outfall as per relevant drg. Pipe not included Nr 1 1,300.00 1,300.00 VALVE CHAMBERS j Type 2 depth n.e 1.0m Nr 1 13,000.00 13,000.00 k Ditto depth 1.0 - 1.5m Nr 1 19,500.00 19,500.00 MISCELLANEOUS j Proprietary water level indicators complete with scale graduated in m3 Item 1 6,500.00 6,500.00 Total carried to collected at the end of Bill No. 9 352,220.00

9/8

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.9 TREATMENT WORKS - CLEAR WATER AND BACKWASH WATER TANKS COLLECTION PAGE: 9/1 SHS. SHS. 725,760.00 9/2 660,270.00 9/3 630,340.00 9/4 351,550.00 9/5 925,860.00 9/6 421,070.00 9/7 263,450.00 9/8 352,220.00 Total carried to Grand Summary 4,330,520.00

9/9

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.10 TREATMENT WORKS - ELECTRICAL AND MECHANICAL WORKS ITEM DESCRIPTION PLANT BUILDING UNIT QUANTITY RATE SHS. a Lighting point complete with 1.5mm2 PVC/SC cables drawn into concealed pvc conduit, one way switched but excluding switch and luminaire. Nr 15 3,900.00 58,500.00 b As item (a) above but two way switched. Nr 12 4,680.00 56,160.00 c Supply and install 6 Amp one gang, one way, white moulded plate switch as Crabtree 4070. Nr 6 780.00 4,680.00 d As item (c) above but two gang two way as Crabtree 4172. Nr 1 1,400.00 1,400.00 e As item (c) above but two way as Crabtree 4170. Nr 7 1,880.00 13,160.00 f Supply and install 60 watt screwneck spherical luminaire complete with lamp as thorn MTC 1060 -Type 'D'. Nr 2 3,510.00 7,020.00 g Supply and install 100 watt tungsten bulkhead luminaire complete with lamp as thorn OLG 1100 - Type 'G'. Nr 4 7,600.00 30,400.00 h Supply and install 1525mm, 58 watt single batten fluorescent luminaire complete with tube as thorn PP 158 Type 'B1'. Nr 7 9,360.00 65,520.00 i Supply and install 1595mm 58 watt single corrosion-resistant fluorescent luminaire complete with tube as thorn FNDV 1065-Type 'C1'. Nr 12 39,000.00 468,000.00 Total carried to collected at the end of Bill No. 10 704,840.00

10/1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.10 TREATMENT WORKS - ELECTRICAL AND MECHANICAL WORKS ITEM a DESCRIPTION As item 12.1(i) above but 1320mm, 36 watt twin luminaire as thorn FNDV 2040 - Type 'C'. UNIT Nr QUANTITY 2 RATE 62,400.00 SHS. 124,800.00 b 13 Amp. socket outlet point complete with 2.5mm2 PVC/SC cables drawn into concealed PVC conduit white moulded single switched socket outlet and all necessary accessories. Nr 1 4,900.00 4,900.00 c As item b. above but twin socket outlet Nr 4 5,620.00 22,480.00 d Fan circuit complete with 2.5mm2 PVC/SC cables drawn into into concealed PVC conduit, white moulded 13 Amp fused and DP switched connection unit, all necessary accessories and final connection Nr 1 11,700.00 11,700.00 e Supply and install 320mm wall fan complete with automatic shutter and control switch as xpelair GX 12. Nr 1 273,000.00 273,000.00 f Supply and install float switch in the clear water tank & in tank C.1.1 as Telemecanique XLI - AC. Nr 2 31,200.00 62,400.00 g Supply and install floatless level switch as Omron 61F - G. Nr 1 62,400.00 62,400.00 h As item (g) above but long distance type (2 Km) as Omron 61F - GL Nr 2 78,000.00 156,000.00 i Supply and install a set of three level control electrodes (long, medium and short) as Omron F03-60-SUS-201. Nr 3 81,640.00 244,920.00 Total carried to collected at the end of Bill No. 10 962,600.00

10/2

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.10 TREATMENT WORKS - ELECTRICAL AND MECHANICAL WORKS ITEM a DESCRIPTION Supply and install Electrode holders as Omron PS -3S. UNIT Nr QUANTITY 2 RATE 24,570.00 SHS. 49,140.00 b Supply and install Solenoid valve suitable for connection to 150mm water pipe and 240V A.C. supply. Motor circuit complete with 6mm2 PVC/SC cables drawn into H.G. galvanised steel conduit including final connection using flexible steel conduit and wired for star - Delta starting but excluding motor starter. Nr 2 421,200.00 842,400.00 c Nr 2 56,160.00 112,320.00 d Supply and install motor control panel comprising of 1 x 60 Amp T.P$N. isolator, 2 x 18.5 Kw. Star - Delta motor starters, 1 No. selector switch, 2No. Control relays, 4 No. signal lamps, 16 SWG sheet steel enclosure, internal wiring and any necessary items to complete the panel. Supply and install 5 x 10mm2 PVC/SC cables in 38mm PVC conduit from the Distribution board to the motor control panel. Nr 1 702,000.00 702,000.00 e m 2 2,340.00 4,680.00 f Supply and install 4 way TP&N MCB Distribution Board complete with main main switch but excluding MCBS as Crabtree C50. Nr 1 702,000.00 702,000.00 g h i Supply and install 5 Amp SP MCB. As item (g) above but 30 Amp. As item (g) above but 40 Amp. Nr Nr Nr 3 1 1 4,100.00 4,100.00 4,100.00 12,300.00 4,100.00 4,100.00 Total carried to collected at the end of Bill No. 10 2,433,040.00

10/3

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.10 TREATMENT WORKS - ELECTRICAL AND MECHANICAL WORKS ITEM a DESCRIPTION Supply and install 60 Amp. TP MCB. UNIT Nr QUANTITY 1 RATE 19,500.00 SHS. 19,500.00 b Supply and install blanking plates for distribution board. Nr 4 1,170.00 4,680.00 c Supply and install 600mm x 600mm x 230 mm 16 SWG galvanised sheet steel, weather proof meter box suitable for three phase metering with removable metal mounting plate, hinged door with sight glass, conduit for service cable entry and PME link. Nr 1 3,900.00 3,900.00 d Supply and install 5 x 25 mm2 PVC?SC sub-main cables in 50mm conduit from the meter box entry and PME link. m 2 4,680.00 9,360.00 e Supply and install 3 x 16 mm2 PVC/ SC cables in 32mm conduit from cable loop-in box to the distribution board. m 2 3,900.00 7,800.00 f Provide earthing comprising of 12 mm diameter x 1500mm long copper earth earth electrode, 16mm2 green/yellow earthing conductor, any necessary bonding conductors and concrete inspection manhole. g All other work to complete the plant building. Item 1 Nr 1 31,200.00 31,200.00 CHEMICAL HOUSE Lighting point complete with 1.5 mm2 PVC/SC cables drawn into concealed PVC conduit, one way switched but excluding switch and luminaire. but excluding switch and luminaire. h Nr 10 39,000.00 390,000.00 Total carried to collected at the end of Bill No. 10 466,440.00

10/4

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.10 TREATMENT WORKS - ELECTRICAL AND MECHANICAL WORKS ITEM a DESCRIPTION As item 22.4 h above but two way switched. UNIT Nr QUANTITY 12 RATE 4,680.00 SHS. 56,160.00 b Supply and install 6 Amp. one gang, one way, white moulded plate switch as Crabtree 4070. Nr 1 780.00 780.00 c As item (b) above but two way as Crabtree 4170. Nr 2 1,180.00 2,360.00 d As item (b) above but two gang, two way as Crabtree 4172. Nr 2 1,400.00 2,800.00 e Supply and install 100 Watt tungsten bulkhead luminaire complete with lamp as Thorn OLG 1100 - Type 'G'. Nr 4 7,610.00 30,440.00 f Supply and install 1525mm, 58 Watt single batten fluorescent luminaire complete with tube as Thorn PP 158 - Type 'B1'. Nr 6 9,360.00 56,160.00 g Supply and install 1595mm 58 Watt single corrosion-resistant fluorescent luminaire complete tube as Thorn FNDV 1065 - Type 'C'. Nr 12 3,900.00 46,800.00 h 13 Amp. socket outlet point complete with 2.5mm2 PVC/SC cables drawn into concealed PVC conduit, white moulded single switched socket outlet and all necessary accessories. Nr 2 4,910.00 9,820.00 i Supply and install 6 way SP&N consumer unit complete with D.P. main switch but excluding MCBS as crabtree C50. Nr 1 11,700.00 11,700.00 Total carried to collected at the end of Bill No. 10 217,020.00

10/5

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.10 TREATMENT WORKS - ELECTRICAL AND MECHANICAL WORKS ITEM a DESCRIPTION Supply and install 5 Amp. SP. MCB. UNIT Nr QUANTITY 3 RATE 4,100.00 SHS. 12,300.00 b Supply and install 20 Amp. SP. MCB. Nr 2 4,100.00 8,200.00 c Supply and install blanking plates for the consumer unit. Nr 1 1,170.00 1,170.00 d Supply and install 3 x 16mm2 PVC/SC sub-main cables in 32 mm conduit from cable loop-in-box to the consumer unit. Nr 8 1,950.00 15,600.00 e Provide earthing comprising of 12mm diameter x 1500mm long copper earth electrode, 16mm2 green/yellow earthing conductor, any necessary bonding conductors and concrete inspection manhole. Nr 1 31,200.00 31,200.00 f All other work to complete the chemical house. Item 1 OPERATOR'S HOUSE Lighting point complete with 1.5mm2 PVC/SC cables drawn into concealed PVC conduit, one way switched but excluding switch and luminaire. g Nr 10 3,900.00 39,000.00 h As item (g) above but two way switched. Nr 2 4,680.00 9,360.00 i Supply and install 6 Amp. One gang one gang one way, white moulded plate switch as Crabtree 4070. Nr 5 780.00 3,900.00 j As item (i) above but two way as crabtree 4170. Nr 1 1,180.00 1,180.00 Total carried to collected at the end of Bill No. 10 121,910.00

10/6

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.10 TREATMENT WORKS - ELECTRICAL AND MECHANICAL WORKS ITEM a DESCRIPTION As item 22.6 (i) above but two gang, two way as Crabtree 4172. UNIT Nr QUANTITY 4 RATE 1,400.00 SHS. 5,600.00 b Supply and install ceiling rose complete with C.G lamp holder and 0.75mm2 flexible cord. Nr 7 780.00 5,460.00 c Supply and install 60 watt screwneck spherical luminaire complete with lamp as Thorn MTC 1060. Nr 3 3,510.00 10,530.00 d Supply and install 100 Watt tungsten bulkhead luminaire complete with lamp as Thorn OLG 1100. Nr 2 7,610.00 15,220.00 e 13 Amp. socket outlet point complete with 2.5mm2 PVC/SC cables drawn into concealed PVC conduit, white moulded single swiched socket outlet and all necessary accessories. Nr 4 4,910.00 19,640.00 f Water heater circuit complete with 2.5mm2 PVC/SC cables drawn into concealed PVC conduit, white moulded 20 Amp. D.P. switch with pilot light, flex outlet and final connection in heat resistant flex. Nr 1 11,700.00 11,700.00 g Cooker circuit complete with 6mm2 PVC/SC cables drawn into concealed PVC conduit, 45A D.P. switched cooker control unit with socket outlet and cooker connector units. Nr 1 15,600.00 15,600.00 h Supply and install 6 way Sp&N consumer unit complete with D.P. main switch but excluding MCBS Crabtree C50. Total carried to collected at the end of Bill No. 10 Nr 1 11,700.00 11,700.00 95,450.00

10/7

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.10 TREATMENT WORKS - ELECTRICAL AND MECHANICAL WORKS ITEM a DESCRIPTION Supply and install 5 Amp. SP. MCB. UNIT Nr QUANTITY 1 RATE 4,100.00 SHS. 4,100.00 b Supply and install 30 Amp. Sp. MCB. Nr 2 4,100.00 8,200.00 c Supply and install blanking plates for the consumer unit. Nr 3 1,170.00 3,510.00 d Supply and install 3 x 16mm2 PVC/SC sub-main cables in 32mm conduit from the meter box to the consumer unit. m 8 1,950.00 15,600.00 e Provide earthing comprising of 12mm diameter x 1500mm long copper earth electrode 16mm2 green /yellow earthing conductor, any necessary bonding conductors and concrete inspection manhole. Nr 1 31,200.00 31,200.00 f Supply and install dual tariff weather proof meter box complete with conduit for service cable entry and PME link. Nr 1 23,400.00 23,400.00 g Supply and install 60 Amp. S.P.&N switch fuse as MEM 60 KMBG. Nr 1 19,500.00 19,500.00 524,600.00 h As item (g) above but 15 Amp. as MEM 15 KMBG. Nr 1 9,750.00 25,740.00 i All other work to complete the operator's house. Item 1 222,300.00 7,800.00 Total carried to collected at the end of Bill No. 10 885,950.00

10/8

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.10 TREATMENT WORKS - ELECTRICAL AND MECHANICAL WORKS ITEM DESCRIPTION GRADE 9 HOUSES a Lighting point complete with 1.5 mm2 PVC/SC cables drawn into concealed PVC conduit, one way switched but excluding switch and luminaire Nr 42 3,900.00 UNIT QUANTITY RATE SHS. 163,800.00 b As item (a) above but two way switched. Nr 6 4,680.00 28,080.00 c Supply and install 6 Amp. One gang, one way, white moulded plate switch as Crabtree 4070. Nr 18 780.00 14,040.00 d As item (c) above but two way as Crabtree 4170. Nr 12 1,050.00 12,600.00 e As item (c) but two gang, two way as Crabtree 4172. Nr 12 1,400.00 16,800.00 f Supply and install ceiling rose complete with C.G lamp holder and 0.75mm2 flexible cord. Nr 24 780.00 18,720.00 g Supply and install 60 Watt screwneck spherical luminaire complete with lamp as Thorn MTC 1060. Nr 12 3,510.00 42,120.00 h Supply and install 100 Watt tungsten bulkhead luminaire complete with lamp as Thorn OLG 1100. Nr 12 7,610.00 91,320.00 i 13 Amp. socket outlet point complete with 2.5mm2 PVC/SC cables drawn into concealed PVC conduit, white moulded single switched socket outlet and all necessary accessories. Nr 18 4,910.00 88,380.00 Total carried to collected at the end of Bill No. 10 475,860.00

10/9

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.10 TREATMENT WORKS - ELECTRICAL AND MECHANICAL WORKS ITEM a DESCRIPTION Supply and install 4 way SP&N consumer unit complete with D.P. main switch but excluding MCBS as Crabtree C50. UNIT Nr QUANTITY 6 RATE 10,140.00 SHS. 60,840.00 b Supply and install 5 Amp. SP. MCB. Nr 6 4,100.00 24,600.00 c Supply and install 30 Amp. SP. MCB. Nr 6 4,100.00 24,600.00 d Supply and install blanking plates for the consumer unit. Nr 12 1,170.00 14,040.00 e Supply and install single tariff double unit for two houses weather proof meter box complete with conduit for service cable entry and PME link. Nr 3 23,400.00 70,200.00 f Supply and install 45 Amp. S.P.&N. switchfuse as MEM 45 KMBG. Nr 6 19,500.00 117,000.00 g Supply and install 3 x 16mm2 PVC/SC sub-main cables in 32mm conduit from the meter box to the consumer unit. Nr 120 31,200.00 3,744,000.00 h Provide earthing comprising of 12mm diameter x 1500mm long copper earth electrode, 16mm2 green/yellow earthing conductor, any necessary bonding conductors and concrete inspection manhole. Nr 3 31,200.00 93,600.00 i All other work to complete grade 9 houses. Item 1 Total carried to collected at the end of Bill No. 10 4,148,880.00

10/10

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.10 TREATMENT WORKS - ELECTRICAL AND MECHANICAL WORKS ITEM DESCRIPTION ELECTRICAL DISTRIBUTION AND SECURITY LIGHTING UNIT QUANTITY RATE SHS. a Supply and install 4 way S.P.&N. MCB consumer unit complete with D.P. main switch but excluding MCBS as crabtree C50. Nr 1 10,140.00 10,140.00 b Supply and install 5 Amp. SP. MCB. Nr 3 4,100.00 12,300.00 c Supply and install blanking plates for the consumer unit. Nr 1 1,170.00 1,170.00 d Supply and install 20 Amp. D.P. contactor complete with enclosure as Telemecanique. Nr 1 31,200.00 31,200.00 e Supply and install photo electric lighting control unit with clear plastic enclosure and mounting bracket as Thorn QPK. Supply and install 3x6mm2 PVC/SC cables in 32mm conduit from the consumer unit to the contactor. Supply and install 3x6mm2 PVC/SC cables in 32mm conduit from the contactor to the security lighting consumer unit. Supply and install 3 x 1.5mm2 PVC/SC cables in 20mm conduit from the contactor to the photo electric control unit. Nr 1 31,200.00 31,200.00 f m 10 1,170.00 11,700.00 g m 1 1,170.00 1,170.00 h m 10 390.00 3,900.00 Total carried to collected at the end of Bill No. 10 102,780.00

10/11

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.10 TREATMENT WORKS - ELECTRICAL AND MECHANICAL WORKS ITEM DESCRIPTION ELECTRICAL DISTRIBUTION AND SECURITY LIGHTING UNIT QUANTITY RATE SHS. a Supply and install 7x6mm2 PVC/SC cables in 38mm conduit from cable loop-in box to the consumer unit. m 4 2,730.00 10,920.00 b Supply and install standard size 16 SWG galvanised sheet steel weather proof cable loop-in box complete with lucy connectors. Nr 2 15,600.00 31,200.00 c Supply and install 5 metres high street lighting column suitable for post top lantern concreted in the ground complete with gland plate, lucy connectors, 5 Amp. cutout and internal wiring. Nr 11 55,900.00 614,900.00 d Supply and install street lighting post top lantern as Thorn Gamma six Cat. No. QG6V/W/B1125.4 complete with 125 Watt MBF lamp and control gear. Supply and install 2 core 1.5mm2 PVC/SWA/PVC copper cable. Nr 11 55,900.00 614,900.00 e m 150 590.00 88,500.00 f Supply and install 20mm cable gland complete with sleeve for item (e) Nr 6 1,170.00 7,020.00 g Supply and install 3 core 1.5mm2 PVC/SWA/PVC copper cable. m 2200 590.00 1,298,000.00 h Supply and install 20mm cable gland complete with sleeve for item (g) Nr 4 1,170.00 4,680.00 Total carried to collected at the end of Bill No. 10 2,670,120.00

10/12

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.10 TREATMENT WORKS - ELECTRICAL AND MECHANICAL WORKS ITEM a DESCRIPTION Supply and install 2 core 6mm2 PVC/SWA/PVC copper cable. UNIT m QUANTITY 430 RATE 1,220.00 SHS. 524,600.00 b Supply and install 20mm cable gland complete with sleeve for item (a) Supply and install 2 core 16mm2 PVC/SWA/PVC copper cable. Nr 22 1,170.00 25,740.00 c m 95 2,340.00 222,300.00 d Supply and install 25mm cable gland complete with sleeve for item (c) Nr 2 3,900.00 7,800.00 e Trenching, sifting, laying, tiling and backfilling. m 2780 780.00 2,168,400.00 f Supply and install 100mm pitch fibre duct. m 200 1,120.00 224,000.00 g Provide earthing comprising of 12mm diameter x 1500 mm long copper earth electrode, 6 mm2 green/yellow earthing conductor and concrete inspection manhole. Nr 3 31,200.00 93,600.00 h All other work to complete electrical distribution and security lighting. Item 1 MISCELLANEOUS ITEMS i Allow for inspection, testing and commissioning of the entire installation in accordance with the I.E.E. Regulations to the satisfaction of the Engineer and Kenya Power & Lighting Co. Ltd. Item 1 3,900.00 3,900.00 Total carried to collected at the end of Bill No. 10 3,270,340.00

10/13

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.10 TREATMENT WORKS - ELECTRICAL AND MECHANICAL WORKS ITEM a DESCRIPTION Allow for the preparation of "Working Drawings" and "As Installed Drawings" including printing as detailed in the specification. UNIT Item QUANTITY 1 RATE 65,000.00 SHS. 65,000.00 b Allow for attendance to Kenya Power & Lighting Co. Ltd. Item 1 65,000.00 65,000.00 c Allow for preliminaries and conditions of the contract. Item 1 65,000.00 65,000.00 d Provisional Sum for service line charges by Kenya Power and Lighting Company Ltd. Item 1 2,600,000.00 2,600,000.00 Total carried to collected at the end of Bill No. 10 2,795,000.00

10/14

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.10 TREATMENT WORKS - ELECTRICAL AND MECHANICAL WORKS ITEM PAGE: 10/1 DESCRIPTION RATE SHS. 704,840.00 10/2 962,600.00 10/3 2,433,040.00 10/4 466,440.00 10/5 217,020.00 10/6 121,910.00 10/7 95,450.00 10/8 885,950.00 10/9 475,860.00 10/10 4,148,880.00 10/11 102,780.00 10/12 2,670,120.00 10/13 3,270,340.00 10/14 2,795,000.00 Total carried to Grand Summary 19,350,230.00

10/15

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.11 ITEM EXISTING TREATMENT PLANT - AUGMENTATION DESCRIPTION AUGMENTATION UNIT QUANTITY RATE SHS. a Supply and instal electrical high lift pump set 135 m3/hr against 606 m head at provided printh. Rate to include appropriate switch gear and control system, fittings and assessories b Supply and instal an electrical pump set to transfer treated water from clarifier to filters, capacity 140 m3/hr against 14 m head. Rate to include appropriate switch gear and control system, fittings and assessories Nr 4 2,600,000.00 10,400,000.00 c Supply and instal complete filter unit of specifications similar to the installed on site. Nr 1 6,500,000.00 6,500,000.00 d Supply and install electrical transformer of capacity 1250 KVA to replace the existing duty transformer rated 1000 KVA. Rate include all the necessary assessories and specials. Nr 1 6,500,000.00 6,500,000.00 Nr 4 26,000,000.00 104,000,000.00

Total carried to Grand Summary 127,400,000.00

11/1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.12 ITEM DESCRIPTION CLEARANCE RISING MAIN UNIT QUANTITY RATE SHS. a General bush clearance along pipe line. b Remove trees and stumps, girth n.e 320 mm. Nr 230 650.00 m 11,175 130.00 1,452,750.00 149,500.00 TRENCH EXCAVATION c d e f g Excavation of trench for DN 250mm pipe Ditto but depth 1.0 - 1.5m Ditto but depth 1.5 - 2.0 m. Ditto but depth 2.0 - 3.0 m. E.O.excavation in rock for items nos c-f m m m m m3 6,850 1,775 1,550 1000 177 260.00 330.00 390.00 520.00 2,600.00 1,781,000.00 585,750.00 604,500.00 520,000.00 460,200.00 PIPE AND FITTINGS h DN 250 mm steel pipe m 11,175 5,000.00 55,875,000.00 BENDS i Supply and install 250 mm steel bend 11 0 j k l Ditto 22 0 Ditto 45 0 Ditto 90 0 Nr Nr Nr Nr 18 25 10 2 11,700.00 11,700.00 14,240.00 18,670.00 210,600.00 292,500.00 142,400.00 37,340.00 FITTINGS ON LINE m 250 mm x 80 mm flanged steel tee for washouts, airvalves and branches n o DN 250 mm GI sluice valve DN 250 mm flanged adaptor c/w bolts, nuts, washers and assessories to make water tight joint Nr Nr 3 6 187,850.00 10,790.00 Nr 18 12,250.00 220,500.00 563,550.00 64,740.00 -

Total carried to collected at the end of Bill No. 12 62,960,330.00

12/1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.12 ITEM DESCRIPTION VALVES (INCLUDE CHAMBERS FITTINGS ETC) a 80 mm flanges double acting air relief valve PN10 capable of giving an inflow of 30 m / mm at a pressure of 0.2 bar eg Neptune Clenfield cat no. 1271 size 400 Nr 9 45,500.00 RISING MAIN UNIT QUANTITY RATE SHS. 409,500.00 WASHOUTS b 80mm DN washout on 320 mm DN steel pipe Nr 7 12,250.00 85,750.00 MARKER POSTS c d e f Sectional valves Washout maker post Pipeline maker post Airvalve marker posts Nr Nr Nr Nr 2 7 11 4 1,950.00 1,950.00 1,950.00 1,950.00 3,900.00 13,650.00 21,450.00 7,800.00 THRUST AND ANCHOR BLOCKS g Thrust and anchor blocks in grade 20 concrete, volume n.e 0.1 m3 h Ditto concrete volume 0.6 - 0.65 m3 Nr 20 13,000.00 Nr 0 3,900.00 260,000.00 ON LINE VALVES & FITTINGS i j DN 320 mm GI sluice valve DN 320 mm flanged adaptor c/w bolts, nuts, washers and assessories to make water tight joint k Non-return valves DN 320 Nr 2 156,000.00 Nr Nr 2 26 265,200.00 16,640.00 530,400.00 432,640.00 312,000.00 MANHOLES a Manhole with light duty manhole covers and frames, depth ne. 1.0 m b c d e Ditto depth 1.0 1.5 m Ditto depth 1.5 2.0 m Ditto depth 2.0 - 3.0 m Outfall for wastewater pipe Nr Nr Nr Nr 4 5 4 7 19,500.00 26,000.00 39,000.00 1,300.00 Nr 2 13,000.00 26,000.00 78,000.00 130,000.00 156,000.00 9,100.00 2,476,190.00

Total carried to collected at the end of Bill No. 12

12/2

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.12 ITEM PAGE: 12/1 DESCRIPTION RISING MAIN UNIT QUANTITY RATE SHS. 62,960,330.00 12/2 2,476,190.00 Total carried to Grand Summary 65,436,520.00

12/3

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.13 ITEM DISTRIBUTION LINE KYOEA - KYANDOO DESCRIPTION CLEARANCE UNIT QUANTITY RATE SHS. a General bush clearance along pipe line. b Remove trees and stumps, girth n.e 320 mm. Nr 20 650.00 m 14719 130.00 1,913,470.00 13,000.00 TRENCH EXCAVATION c d e f g Excavation of trench for DN 250mm pipe Ditto but depth 1.0 - 1.5m Ditto but depth 1.5 - 2.0 m. Ditto but depth 2.0 - 3.0 m. E.O.excavation in rock for items nos c-f m m m m m3 8138 1788 3558 547 177 130.00 330.00 390.00 520.00 2,600.00 1,057,940.00 590,040.00 1,387,620.00 284,440.00 460,200.00 PIPE AND FITTINGS h DN 250 mm steel pipe m 14719 5,000.00 73,595,000.00 BENDS i Supply and install 250 mm steel bend 11 0 j k l Ditto 22 0 Ditto 45 0 Ditto 90 0 Nr Nr Nr Nr 18 25 8 2 11,710.00 11,710.00 16,840.00 18,670.00 210,780.00 292,750.00 134,720.00 37,340.00 TEES m 250 mm x 80 mm flanged steel tee for washouts, airvalves and branches Nr 18 12,250.00 220,500.00 Total carried to collected at the end of Bill No. 13 80,197,800.00

13/1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.13 ITEM DISTRIBUTION LINE KYOEA - KYANDOO DESCRIPTION VALVES (INCLUDE CHAMBERS FITTINGS ETC) a 80 mm flanges double acting air relief valve PN10 capable of giving an inflow of 30 m / mm at a pressure of 0.2 bar eg Neptune Clenfield cat no. 1271 size 400 Nr 9 45,500.00 UNIT QUANTITY RATE SHS. 409,500.00 WASHOUTS b 80mm DN washout on 250 mm DN steel pipe Nr 9 12,250.00 110,250.00 MARKER POSTS c d e f Sluice valve maker post Washout maker post Pipeline maker post Airvalve marker posts Nr Nr Nr Nr 1 9 14 9 1,950.00 1,950.00 1,950.00 1,950.00 1,950.00 17,550.00 27,300.00 17,550.00 THRUST AND ANCHOR BLOCKS g Thrust and anchor blocks in grade 20 concrete, volume n.e 0.1 m3 h Ditto concrete volume 0.6 - 0.65 m3 Nr 20 13,000.00 Nr 0 3,900.00 260,000.00 ON LINE VALVES & FITTINGS i j DN 250 mm GI sluice valve DN 250 mm flanged adaptor c/w bolts, nuts, washers and assessories to make water tight joint Nr Nr 1 2 187,850.00 10,790.00 187,850.00 21,580.00 MANHOLES a Manhole with light duty manhole covers and frames, depth ne. 1.0 m b c d e Ditto depth 1.0 1.5 m Ditto depth 1.5 2.0 m Ditto depth 2.0 - 3.0 m Outfall for wastewater pipe Nr Nr Nr Nr 6 6 6 18 19,500.00 26,000.00 39,000.00 1,300.00 Nr 6 13,000.00 78,000.00 117,000.00 156,000.00 234,000.00 23,400.00 Total carried to collected at the end of Bill No. 13 1,661,930.00

13/2

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.13 COLLECTION PAGE: 13/1 DISTRIBUTION LINE KYOEA - KYANDOO KYOEA - KYANDOO SHS. SHS. 80,197,800.00 -

13/2

1,661,930.00 -

Total carried to Grand Summary

81,859,730.00

13/3

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.14 ITEM DISTRIBUTION LINE KYANDOO - KANDWIA DESCRIPTION CLEARANCE UNIT QUANTITY RATE SHS. a General bush clearance along pipe line. b Remove trees and stumps, girth n.e 320 mm. Nr 8 650.00 m 4155 130.00 540,150.00 5,200.00 TRENCH EXCAVATION c d e f g Excavation of trench for DN 200 mm Ditto but depth 1.0 - 1.5m Ditto but depth 1.5 - 2.0 m. Ditto but depth 2.0 - 3.0 m. E.O.excavation in rock for items nos c-f m m m m m3 1010 1175 1650 320 50 260.00 330.00 390.00 520.00 2,600.00 262,600.00 387,750.00 643,500.00 166,400.00 130,000.00 PIPE AND FITTINGS h DN 200 mm steel pipe m 4155 2,950.00 12,257,250.00 BENDS DN 200 mm steel 11 0 Ditto 22 0 Ditto 45 0 Ditto 90 0 i j k l Nr Nr Nr Nr 8 6 0 0 7,870.00 7,870.00 9,300.00 12,130.00 62,960.00 47,220.00 TEES m 200 mm x 80 mm flanged steel tee for washouts, airvalves and branches Nr 4 8,660.00 34,640.00 Total carried to collected at the end of Bill No. 14 14,537,670.00

14/1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.14 ITEM DISTRIBUTION LINE KYANDOO - KANDWIA DESCRIPTION VALVES (INCLUDE CHAMBERS FITTINGS ETC) a 80 mm flanges double acting air relief valve PN10 capable of giving an inflow of 30 m / mm at a pressure of 0.2 bar eg Neptune Clenfield cat no. 1271 size 400 Nr 1 45,500.00 UNIT QUANTITY RATE SHS. 45,500.00 WASHOUTS b 80mm DN washout on 200 mm DN steel pipe Nr 2 8,660.00 17,320.00 MARKER POSTS c d e f Sluice valve maker post Washout maker post Pipeline maker post Airvalve marker posts Nr Nr Nr Nr 1 2 4 1 1,950.00 1,950.00 1,950.00 1,950.00 1,950.00 3,900.00 7,800.00 1,950.00 THRUST AND ANCHOR BLOCKS g Thrust and anchor blocks in grade 20 concrete, volume n.e 0.1 m3 h Ditto concrete volume 0.6 - 0.65 m3 Nr 6 13,000.00 Nr 0 3,900.00 78,000.00 ON LINE VALVES & FITTINGS i j DN 200 mm GI sluice valve DN 200 mm flanged adaptor c/w bolts, nuts, washers and assessories to make water tight joint Nr Nr 1 0 132,600.00 10,550.00 132,600.00 MANHOLES a Manhole with light duty manhole covers and frames, depth ne. 1.0 m b c d e Ditto depth 1.0 1.5 m Ditto depth 1.5 2.0 m Ditto depth 2.0 - 3.0 m Outfall for wastewater pipe Nr Nr Nr Nr 1 1 1 3 19,500.00 26,000.00 39,000.00 1,300.00 Nr 0 13,000.00 19,500.00 26,000.00 39,000.00 3,900.00 Total carried to collected at the end of Bill No. 14 377,420.00

14/2

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.14 COLLECTION PAGE: 14/1 DISTRIBUTION LINE KYANDOO - KANDWIA SHS. SHS. 14,537,670.00 14/2 377,420.00 Total carried to Grand Summary 14,915,090.00

14/3

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.15 ITEM DISTRIBUTION LINE KANDWIA-GAI-MIVUKONI DESCRIPTION CLEARANCE UNIT QUANTITY RATE SHS. a b General bush clearance along pipe line. Remove trees and stumps, girth n.e 320 mm. m Nr 38893 50 130.00 650.00 5,056,090.00 32,500.00 TRENCH EXCAVATION c d e f g Excavation of trench for DN 200 mm Ditto but depth 1.0 - 1.5m Ditto but depth 1.5 - 2.0 m. Ditto but depth 2.0 - 3.0 m. E.O.excavation in rock for items nos c-f m m m m m3 11000 11858 13035 3200 467 260.00 330.00 390.00 520.00 2,600.00 2,860,000.00 3,913,140.00 5,083,650.00 1,664,000.00 1,214,200.00 PIPE AND FITTINGS h DN 200 mm steel pipe m 38893 2,950.00 114,734,350.00 BENDS 200 mm DN 11 0 Ditto 22 0 Ditto 45 0 Ditto 90 0 i j k l Nr Nr Nr Nr 50 50 6 0 7,870.00 7,870.00 9,300.00 12,130.00 393,500.00 393,500.00 55,800.00 TEES m 200 mm x 80 mm flanged steel tee for washouts, airvalves and branches Nr 26 8,660.00 225,160.00 Total carried to collected at the end of Bill No. 15 135,625,890.00

15/1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.15 ITEM DISTRIBUTION LINE KANDWIA-GAI-MIVUKONI DESCRIPTION VALVES (INCLUDE CHAMBERS FITTINGS ETC) UNIT QUANTITY RATE SHS. a 80 mm flanges double acting air relief valve PN10 capable of giving an inflow of 30 m / mm at a pressure of 0.2 bar eg Neptune Clenfield cat no. 1271 size 400 Nr 13 45,500.00 591,500.00 WASHOUTS b 80mm DN washout on 200 mm DN steel pipe Nr 11 8,660.00 95,260.00 MARKER POSTS c d e f Sluice valve maker post Washout maker post Pipeline maker post Airvalve marker posts Nr Nr Nr Nr 2 11 53 13 1,950.00 1,950.00 1,950.00 1,950.00 3,900.00 21,450.00 103,350.00 25,350.00 THRUST AND ANCHOR BLOCKS g Thrust and anchor blocks in grade 20 concrete, volume n.e 0.1 m3 h Ditto concrete volume 0.6 - 0.65 m3 Nr 58 13,000.00 Nr 50 3,900.00 195,000.00 754,000.00 ON LINE VALVES & FITTINGS i j DN 200 mm GI sluice valve DN 200 mm flanged adaptor c/w bolts, nuts, washers and assessories to make water tight joint Nr Nr 2 4 132,600.00 10,550.00 265,200.00 42,200.00 MANHOLES a Manhole with light duty manhole covers and frames, depth ne. 1.0 m b c d e Ditto depth 1.0 1.5 m Ditto depth 1.5 2.0 m Ditto depth 2.0 - 3.0 m Outfall for wastewater pipe Nr Nr Nr Nr 6 6 6 24 19,500.00 26,000.00 39,000.00 1,300.00 Nr 6 13,000.00 78,000.00 117,000.00 156,000.00 234,000.00 31,200.00 Total carried to collected at the end of Bill No. 15 2,713,410.00

15/2

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.15 COLLECTION PAGE: 15/1 DISTRIBUTION LINE KANDWIA-GAI-MIVUKONI SHS. SHS. 135,625,890.00

15/2

2,713,410.00 -

Total carried to Grand Summary

138,339,300.00

15/3

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.16 ITEM DISTRIBUTION LINE MIVUKONI - TSEIKURU DESCRIPTION CLEARANCE UNIT QUANTITY RATE SHS. a General bush clearance along pipe line. b Remove trees and stumps, girth n.e 320 mm. Nr 15 650.00 m 10065 130.00 1,308,450.00 9,750.00 TRENCH EXCAVATION c d e f g Excavation of trench for DN150 mm pipe Ditto but depth 1.0 - 1.5m Ditto but depth 1.5 - 2.0 m. Ditto but depth 2.0 - 3.0 m. E.O.excavation in rock for items nos c-f m m m m m3 2865 2900 3500 800 121 260.00 330.00 390.00 520.00 2,600.00 744,900.00 957,000.00 1,365,000.00 416,000.00 314,600.00 PIPE AND FITTINGS h DN 150 mm steel pipe m 10065 2,585.00 26,018,025.00 BENDS 150 mm diameter 11 0 Ditto 22 0 Ditto 45 0 Ditto 90 0 i j k l Nr Nr Nr Nr 9 9 0 0 4,780.00 4,780.00 6,480.00 7,960.00 43,020.00 43,020.00 TEES m 150 mm x 80 mm flanged steel tee for washouts, airvalves and branches Nr 8 5,400.00 43,200.00 Total carried to collected at the end of Bill No. 16 31,262,965.00

16/1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.16 ITEM DISTRIBUTION LINE MIVUKONI - TSEIKURU DESCRIPTION VALVES (INCLUDE CHAMBERS FITTINGS ETC) a 80 mm flanges double acting air relief valve PN10 capable of giving an inflow of 30 m / mm at a pressure of 0.2 bar eg Neptune Clenfield cat no. 1271 size 400 Nr 3 45,500.00 UNIT QUANTITY RATE SHS. 136,500.00 WASHOUTS b 80mm DN washout on 150mm DN steel pipe Nr 3 5,400.00 16,200.00 MARKER POSTS c d e f Sluice valve maker post Washout maker post Pipeline maker post Airvalve marker posts Nr Nr Nr Nr 2 3 10 3 1,950.00 1,950.00 1,950.00 1,950.00 3,900.00 5,850.00 19,500.00 5,850.00 THRUST AND ANCHOR BLOCKS g Thrust and anchor blocks in grade 20 concrete, volume n.e 0.1 m3 h Ditto concrete volume 0.6 - 0.65 m3 Nr 0 13,000.00 Nr 9 3,900.00 35,100.00 ON LINE VALVES & FITTINGS i j DN 150 mm GI sluice valve DN 150 mm flanged adaptor c/w bolts, nuts, washers and assessories to make water tight joint Nr Nr 2 4 55,250.00 6,730.00 110,500.00 26,920.00 MANHOLES a Manhole with light duty manhole covers and frames, depth ne. 1.0 m b c d e Ditto depth 1.0 1.5 m Ditto depth 1.5 2.0 m Ditto depth 2.0 - 3.0 m Outfall for wastewater pipe Nr Nr Nr Nr 2 2 2 6 19,500.00 26,000.00 39,000.00 1,300.00 Nr 0 13,000.00 39,000.00 52,000.00 78,000.00 7,800.00 Total carried to collected at the end of Bill No. 16 537,120.00

16/2

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.16 COLLECTION PAGE: 16/1 DISTRIBUTION LINE MIVUKONI - TSEIKURU SHS. SHS. 31,262,965.00 16/2 537,120.00 Total carried to Grand Summary 31,800,085.00

16/3

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.17 ITEM DISTRIBUTION LINE KANDWIA - KANZERU DESCRIPTION CLEARANCE UNIT QUANTITY RATE SHS. a General bush clearance along pipe line. b Remove trees and stumps, girth n.e 320 mm. Nr 5 650.00 m 2400 130.00 312,000.00 3,250.00 TRENCH EXCAVATION c d e f g Excavation of trench for DN150 mm pipe Ditto but depth 1.0 - 1.5m Ditto but depth 1.5 - 2.0 m. Ditto but depth 2.0 - 3.0 m. E.O.excavation in rock for items nos c-f m m m m m3 450 1060 640 250 29 260.00 330.00 390.00 520.00 2,600.00 117,000.00 349,800.00 249,600.00 130,000.00 75,400.00 PIPE AND FITTINGS h DN 150 mm steel pipe m 2400 2,585.00 6,204,000.00 BENDS 150 mm diameter 11 0 Ditto 22 0 Ditto 45 0 Ditto 90 0 i j k l Nr Nr Nr Nr 8 3 1 0 4,780.00 4,780.00 6,480.00 7,960.00 38,240.00 14,340.00 6,480.00 TEES m 150 mm x 80 mm flanged steel tee for washouts, airvalves and branches Nr 4 5,400.00 21,600.00 Total carried to collected at the end of Bill No. 17 7,521,710.00

17/1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.17 ITEM DISTRIBUTION LINE KANDWIA - KANZERU DESCRIPTION VALVES (INCLUDE CHAMBERS FITTINGS ETC) a 80 mm flanges double acting air relief valve PN10 capable of giving an inflow of 30 m / mm at a pressure of 0.2 bar eg Neptune Clenfield cat no. 1271 size 400 Nr 1 45,500.00 UNIT QUANTITY RATE SHS. 45,500.00 WASHOUTS b 80mm DN washout on 150mm DN steel pipe Nr 2 5,400.00 10,800.00 MARKER POSTS c d e f Sluice valve maker post Washout maker post Pipeline maker post Airvalve marker posts Nr Nr Nr Nr 2 2 2 1 1,950.00 1,950.00 1,950.00 1,950.00 3,900.00 3,900.00 3,900.00 1,950.00 THRUST AND ANCHOR BLOCKS g Thrust and anchor blocks in grade 20 concrete, volume n.e 0.1 m3 h Ditto concrete volume 0.6 - 0.65 m3 Nr 2 13,000.00 Nr 2 3,900.00 7,800.00 26,000.00 ON LINE VALVES & FITTINGS i j DN 150 mm GI sluice valve DN 150 mm flanged adaptor c/w bolts, nuts, washers and assessories to make water tight joint Nr Nr 2 4 55,250.00 6,730.00 110,500.00 26,920.00 MANHOLES a Manhole with light duty manhole covers and frames, depth ne. 1.0 m b c d e Ditto depth 1.0 1.5 m Ditto depth 1.5 2.0 m Ditto depth 2.0 - 3.0 m Outfall for wastewater pipe Nr Nr Nr Nr 1 1 1 6 19,500.00 26,000.00 39,000.00 1,300.00 Nr 0 13,000.00 19,500.00 26,000.00 39,000.00 7,800.00 Total carried to collected at the end of Bill No. 17 333,470.00

17/2

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.17 COLLECTION PAGE: 17/1 DISTRIBUTION LINE KANDWIA - KANZERU SHS. SHS. 7,521,710.00 17/2 333,470.00 Total carried to Grand Summary 7,855,180.00

17/3

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.18 ITEM DISTRIBUTION LINE KANZERU - KIMU DESCRIPTION CLEARANCE UNIT QUANTITY RATE SHS. a General bush clearance along pipe line. b Remove trees and stumps, girth n.e 320 mm. Nr 5 650.00 m 3260 130.00 423,800.00 3,250.00 TRENCH EXCAVATION c d e f g Excavation of trench for DN 100 mm pipe Ditto but depth 1.0 - 1.5m Ditto but depth 1.5 - 2.0 m. Ditto but depth 2.0 - 3.0 m. E.O.excavation in rock for items nos c-f m m m m m3 350 1630 1190 90 39 260.00 330.00 390.00 520.00 2,600.00 91,000.00 537,900.00 464,100.00 46,800.00 101,400.00 PIPE AND FITTINGS h DN 100 mm steel pipe m 3260 1,860.00 6,063,600.00 BENDS 100 steel 11 0 Ditto 22 0 Ditto 45 0 Ditto 90 0 i j k l Nr Nr Nr Nr 14 6 8 2 2,580.00 2,580.00 3,060.00 4,230.00 36,120.00 15,480.00 24,480.00 8,460.00 TEES m 100 mm x 80 mm flanged steel tee for washouts, airvalves and branches Nr 5 4,910.00 24,550.00 Total carried to collected at the end of Bill No. 18 7,840,940.00 18/1 -

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.18 ITEM DISTRIBUTION LINE KANZERU - KIMU DESCRIPTION VALVES INCLUDE CHAMBERS FITTINGS ETC) a 80 mm flanges double acting air relief valve PN10 capable of giving an inflow of 30 m / mm at a pressure of 0.2 bar eg Neptune Clenfield cat no. 1271 size 400 Nr 2 45,500.00 UNIT QUANTITY RATE SHS. 91,000.00 WASHOUTS b 80mm DN washout on 100 mm DN steel pipe Nr 2 4,910.00 9,820.00 MARKER POSTS c d e f Sluice valve maker post Washout maker post Pipeline maker post Airvalve marker posts Nr Nr Nr Nr 2 2 3 2 1,950.00 1,950.00 1,950.00 1,950.00 3,900.00 3,900.00 5,850.00 3,900.00 THRUST AND ANCHOR BLOCKS g Thrust and anchor blocks in grade 20 concrete, volume n.e 0.1 m3 Ditto concrete volume 0.6 - 0.65 m3 Nr 6 3,900.00 23,400.00 h Nr 8 13,000.00 104,000.00 ON LINE VALVES & FITTINGS i j DN 100 mm CI sluice valve DN 100 mm flanged adaptor c/w bolts, nuts, washers and assessories to make water tight joint Nr Nr 2 4 33,150.00 4,720.00 66,300.00 18,880.00 MANHOLES a Manhole with light duty manhole covers and frames, depth ne. 1.0 m b c d e Ditto depth 1.0 1.5 m Ditto depth 1.5 2.0 m Ditto depth 2.0 - 3.0 m Outfall for wastewater pipe Nr Nr Nr Nr 1 1 1 6 19,500.00 26,000.00 39,000.00 1,300.00 Nr 1 13,000.00 13,000.00 19,500.00 26,000.00 39,000.00 7,800.00 Total carried to collected at the end of Bill No. 18 436,250.00 18/2

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.18 COLLECTION PAGE: 18/1 DISTRIBUTION LINE KANZERU - KIMU SHS. SHS. 7,840,940.00 18/2 436,250.00 Total carried to Grand Summary 8,277,190.00

18/3

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.19 ITEM DISTRIBUTION LINE KANZERU - JUNCTION TO KIMANGAO DESCRIPTION CLEARANCE UNIT QUANTITY RATE SHS. a General bush clearance along pipe line. b Remove trees and stumps, girth n.e 320 mm. Nr 10 650.00 m 7640 130.00 993,200.00 6,500.00 TRENCH EXCAVATION c d e f g Excavation of trench for DN 150 mm pipe Ditto but depth 1.0 - 1.5m Ditto but depth 1.5 - 2.0 m. Ditto but depth 2.0 - 3.0 m. E.O.excavation in rock for items nos c-f m m m m m3 1050 2729 1550 2311 92 260.00 330.00 390.00 520.00 2,600.00 273,000.00 900,570.00 604,500.00 1,201,720.00 239,200.00 PIPE AND FITTINGS h DN 150 mm steel pipe m 7640 2,585.00 19,749,400.00 BENDS AND TEES DN 150 mm steel 11 0 Ditto 22 0 Ditto 45 0 Ditto 90 0 i j k l Nr Nr Nr Nr 14 18 11 2 4,780.00 4,780.00 6,480.00 7,960.00 66,920.00 86,040.00 71,280.00 15,920.00 TEES m 150 mm x 80 mm flanged steel tee for washouts, airvalves and branches n Ditto 150 mm x 150 mm DN Nr 1 9,900.00 Nr 13 5,400.00 70,200.00 9,900.00 Total carried to collected at the end of Bill No. 19 24,288,350.00

19/1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.19 ITEM DISTRIBUTION LINE KANZERU - JUNCTION TO KIMANGAO DESCRIPTION VALVES (INCLUDE CHAMBERS FITTINGS ETC) a 80 mm flanges double acting air relief valve PN10 capable of giving an inflow of 30 m / mm at a pressure of 0.2 bar eg Neptune Clenfield cat no. 1271 size 400 Nr 6 45,500.00 UNIT QUANTITY RATE SHS. 273,000.00 WASHOUTS b 80mm DN washout on 150 mm DN steel pipe Nr 5 5,400.00 27,000.00 MARKER POSTS c d e f Sluice valve maker post Washout maker post Pipeline maker post Airvalve marker posts Nr Nr Nr Nr 2 5 7 6 1,950.00 1,950.00 1,950.00 1,950.00 3,900.00 9,750.00 13,650.00 11,700.00 THRUST AND ANCHOR BLOCKS g Thrust and anchor blocks in grade 20 concrete, volume n.e 0.1 m3 h Ditto concrete volume 0.6 - 0.65 m3 Nr 13 13,000.00 Nr 18 3,900.00 70,200.00 169,000.00 ON LINE VALVES & FITTINGS i j DN 150 mm GI sluice valve DN 150 mm flanged adaptor c/w bolts, nuts, washers and assessories to make water tight joint Nr Nr 2 4 55,250.00 6,730.00 110,500.00 26,920.00 MANHOLES a Manhole with light duty manhole covers and frames, depth ne. 1.0 m b c d e Ditto depth 1.0 1.5 m Ditto depth 1.5 2.0 m Ditto depth 2.0 - 3.0 m Outfall for wastewater pipe Nr Nr Nr Nr 3 3 3 11 19,500.00 26,000.00 39,000.00 1,300.00 Nr 2 13,000.00 26,000.00 58,500.00 78,000.00 117,000.00 14,300.00 Total carried to collected at the end of Bill No. 19 1,009,420.00

19/2

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.19 DISTRIBUTION LINE KANZERU - JUNCTION TO KIMANGAO SHS. SHS. 19/1 24,288,350.00 19/2 1,009,420.00 Total carried to Grand Summary 25,297,770.00

COLLECTION PAGE:

19/3

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.20 ITEM DISTRIBUTION LINE JUNCTION TO KIMANGAO - KATSE DESCRIPTION CLEARANCE UNIT QUANTITY RATE SHS. a General bush clearance along pipe line. b Remove trees and stumps, girth n.e 320 mm. Nr 20 650.00 m 5,279 130.00 686,270.00 13,000.00 TRENCH EXCAVATION c d e f g Excavation of trench for DN 100 mm pipe Ditto but depth 1.0 - 1.5m Ditto but depth 1.5 - 2.0 m. Ditto but depth 2.0 - 3.0 m. E.O.excavation in rock for items nos c-f m m m m m3 950 2,310 1,669 350 63 260.00 330.00 390.00 520.00 2,600.00 247,000.00 762,300.00 650,910.00 182,000.00 163,800.00 PIPES AND FITTINGS h DN 100 mm steel pipe m 5,279 1,860.00 9,818,940.00 BENDS 100 mm DN steel 11 0 Ditto 22 0 Ditto 45 0 Ditto 90 0 i j k l Nr Nr Nr Nr 16 8 5 3 2,580.00 2,580.00 3,060.00 4,230.00 41,280.00 20,640.00 15,300.00 12,690.00 TEES m 100 mm x 80 mm flanged steel tee for washouts, airvalves and branches Nr 9 4,900.00 44,100.00 Total carried to collected at the end of Bill No. 20 12,658,230.00

19/1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.20 ITEM DISTRIBUTION LINE JUNCTION TO KIMANGAO - KATSE DESCRIPTION VALVES (INCLUDE CHAMBERS FITTINGS ETC) a 80 mm flanges double acting air relief valve PN10 capable of giving an inflow of 30 m / mm at a pressure of 0.2 bar eg Neptune Clenfield cat no. 1271 size 400 Nr 5 45,500.00 UNIT QUANTITY RATE SHS. 227,500.00 WASHOUTS b 80mm DN washout on 100 mm DN steel pipe Nr 4 4,900.00 19,600.00 MARKER POSTS c d e f Sluice valve maker post Washout maker post Pipeline maker post Airvalve marker posts Nr Nr Nr Nr 2 4 5 6 1,950.00 1,950.00 1,950.00 1,950.00 3,900.00 7,800.00 9,750.00 11,700.00 THRUST AND ANCHOR BLOCKS g Thrust and anchor blocks in grade 20 concrete, volume n.e 0.1 m3 h Ditto concrete volume 0.6 - 0.65 m3 Nr 3 13,000.00 Nr 5 3,900.00 19,500.00 39,000.00 ON LINE VALVES & FITTINGS i j DN 100 mm GI sluice valve DN 100 mm flanged adaptor c/w bolts, nuts, washers and assessories to make water tight joint Nr Nr 2 2 33,150.00 4,720.00 66,300.00 9,440.00 MANHOLES a Manhole with light duty manhole covers and frames, depth ne. 1.0 m b c d e Ditto depth 1.0 1.5 m Ditto depth 1.5 2.0 m Ditto depth 2.0 - 3.0 m Outfall for wastewater pipe Nr Nr Nr Nr 3 3 3 11 19,500.00 26,000.00 39,000.00 1,300.00 Nr 2 13,000.00 26,000.00 58,500.00 78,000.00 117,000.00 14,300.00 Total carried to collected at the end of Bill No. 20 708,290.00

20/2

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.20 DISTRIBUTION LINE JUNCTION TO KIMANGAO - KATSE SHS. SHS. 20/1 12,658,230.00 20/2 708,290.00 Total carried to Grand Summary 13,366,520.00

COLLECTION PAGE:

20/3

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.21 DISTRIBUTION LINE JUNCTION TO KIMANGAO-KIMANGAO-KYUSO ITEM DESCRIPTION CLEARANCE UNIT QUANTITY RATE SHS. a General bush clearance along pipe line. b Remove trees and stumps, girth n.e 320 mm. Nr 20 650.00 m 14520 130.00 1,887,600.00 13,000.00 TRENCH EXCAVATION c d e f g Excavation of trench for DN 150 mm pipe Ditto but depth 1.0 - 1.5m Ditto but depth 1.5 - 2.0 m. Ditto but depth 2.0 - 3.0 m. E.O.excavation in rock for items nos c-f m m m m m3 3500 9150 1800 70 174 260.00 330.00 390.00 520.00 2,600.00 910,000.00 3,019,500.00 702,000.00 36,400.00 452,400.00 PIPE AND FITTINGS h DN 150 mm steel pipe m 14520 2,585.00 37,534,200.00 BENDS 150 mm DN steel 11 0 Ditto 22 0 Ditto 45 0 Ditto 90 0 i j k l Nr Nr Nr Nr 36 25 6 0 4,780.00 4,780.00 6,480.00 7,960.00 172,080.00 119,500.00 38,880.00 TEES m 150 mm x 80 mm flanged steel tee for washouts, airvalves and branches Nr 19 5,400.00 102,600.00 Total carried to collected at the end of Bill No. 21 44,988,160.00

21/1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.21 DISTRIBUTION LINE JUNCTION TO KIMANGAO-KIMANGAO-KYUSO ITEM DESCRIPTION VALVES (INCLUDE CHAMBERS FITTINGS ETC) a 80 mm flanges double acting air relief valve PN10 capable of giving an inflow of 30 m / mm at a pressure of 0.2 bar eg Neptune Clenfield cat no. 1271 size 400 Nr 8 45,550.00 UNIT QUANTITY RATE SHS. 364,400.00 WASHOUTS b 80mm DN washout on 150 mm DN steel pipe Nr 9 5,400.00 48,600.00 MARKER POSTS c d e f Sluice valve marker post Washout marker post Pipeline marker post Airvalve marker posts Nr Nr Nr Nr 3 9 14 8 1,950.00 1,950.00 1,950.00 1,950.00 5,850.00 17,550.00 27,300.00 15,600.00 THRUST AND ANCHOR BLOCKS g Thrust and anchor blocks in grade 20 concrete, volume n.e 0.1 m3 h Ditto concrete volume 0.6 - 0.65 m3 Nr 6 13,000.00 Nr 25 3,900.00 97,500.00 78,000.00 ON LINE VALVES & FITTINGS i j DN 150 mm GI sluice valve DN 150 mm flanged adaptor c/w bolts, nuts, washers and assessories to make water tight joint Nr Nr 3 6 55,250.00 6,730.00 165,750.00 40,380.00 MANHOLES a Manhole with light duty manhole covers and frames, depth ne. 1.0 m b c d e Ditto depth 1.0 1.5 m Ditto depth 1.5 2.0 m Ditto depth 2.0 - 3.0 m Outfall for wastewater pipe Nr Nr Nr Nr 3 3 3 11 19,500.00 26,000.00 39,000.00 1,300.00 Nr 2 13,000.00 26,000.00 58,500.00 78,000.00 117,000.00 14,300.00 Total carried to collected at the end of Bill No. 21 1,154,730.00

21/2

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.21 DISTRIBUTION LINE JUNCTION TO KIMANGAO-KIMANGAO-KYUSO COLLECTION PAGE: 21/1 SHS. SHS. 44,988,160.00 21/2 1,154,730.00 Total carried to Grand Summary 46,142,890.00

21/3

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.22 100 m3 TANKS - KIMU AND KALATINE ITEM DESCRIPTION 100m3 CLEAR WATER TANK SITE CLEARANCE UNIT QUANTITY RATE SHS. a General bush clearance ha 0.06 130,000.00 7,800.00 b Trees and stumps girth n.e 320mm Nr 8 650.00 5,200.00 c Ditto but girth 320 - 500mm Nr 4 700.00 2,800.00 d Ditto but girth 500 - 1000mm Nr 1 800.00 800.00 FENCING e Specified concrete fence post Nr 48 2,600.00 124,800.00 f Bracing post Nr 8 2,600.00 20,800.00 g Gate post Nr 2 13,000.00 26,000.00 h 4m wide double leaf steel gate Nr 1 13,000.00 13,000.00 i Chain link fencing m 88 1,300.00 114,400.00 EARTHWORKS EXCAVATION j k 200mm top layer for disposal Excavation to foundation level as shown on the drawing depth n.e 2.5m l Trench excavation for pipes upto 225mm DN depth n.e 1.0m m n Ditto 1.0 - 1.5m Unlined 750mm earth drain side slopes n.e 1:1.5 depth n.e 1.0m m m 6 7 330.00 260.00 m 10 260.00 m3 m3 16 150 260.00 390.00 4,160.00 58,500.00 2,600.00 1,980.00 1,820.00 FILLING AND COMPACTION m2 o Compaction of excavated bottom 52 260.00 13,520.00 Total carried to collected at the end of Bill No. 22 398,180.00

22/1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.22 100 m3 TANKS - KIMU AND KALATINE ITEM a b DESCRIPTION 200mm well compacted hardcore Make up levels around the structure UNIT m3 Item QUANTITY 11 1 RATE 650.00 6,500.00 SHS. 7,150.00 6,500.00 CONCRETE TO BS 8110 Mass concrete c 50mm blinding concrete grade 15 plain concrete m3 3.5 7,800.00 27,300.00 Reinforced Concrete Grade 25 d e f In 150mm floor slab Ditto in 200mm floor slab Ditto in 200mm suspended roof slab m3 m3 m3 4 3 9 11,700.00 11,700.00 15,600.00 46,800.00 35,100.00 140,400.00 FORMWORK g Sawn formwork to edges of curved floor slab width n.e 0.2m h i Ditto but to edges of roof slab Ditto but to soffits of suspended roof slab height 3.5 - 5.0m j Allow for boxing out for manhole and air vent m2 Item 37 1 650.00 650.00 m2 6 650.00 m2 5 650.00 3,250.00 3,900.00 24,050.00 650.00 MASONRY m2 k 200mm solid concrete block in cement sand mortar mix 1:3 in circular wall 76 1,300.00 98,800.00 Reinforcement to BS 4449 l m Mild steel High tensile steel kg kg 828 569 130.00 130.00 107,640.00 73,970.00 -

Total carried to collected at the end of Bill No. 22 575,510.00

22/2

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.22 100 m3 TANKS - KIMU AND KALATINE ITEM DESCRIPTION SUNDRIES/FINISHES UNIT QUANTITY RATE SHS. a b c d Install 1 No. internal steel ladder Ditto but external steel ladder 50mm GS vent to tank Steel manhole cover and frame complete with padlock e Making good after installation of level indications etc f 10mm water proof plaster mix 1:2 in 2 layers to walls internally steel trowelled smooth g Ditto but in 20mm thick screed on concrete slab to falls h i 2 coats flintcote to floor slab Approved joint sealing compound 20 x 40mm groove to floor slab j k 2 layers roofing felt on top of wall 15mm rendering mix 1:3 floated smooth to walls externally l 20mm thick cement sand screed mix 1:3 steel floated smooth in falls to receive painting m2 41 390.00 m m2 4 76 390.00 390.00 m2 m 35 21 390.00 390.00 m2 35 390.00 m2 71 390.00 Item 1 6,500.00 Item Item Nr Nr 1 1 1 1 6,500.00 6,500.00 650.00 6,500.00 6,500.00 6,500.00 650.00 6,500.00 6,500.00 27,690.00 13,650.00 13,650.00 8,190.00 1,560.00 29,640.00 15,990.00 PAINTING m2 m Prepare and apply 2 coats of approved alkali resistant primes to root screed n Ditto but in alumina alkycl reflective paint o Prepare and apply 2 coats of approved emulsion paint to rendering m2 76 300.00 m2 41 300.00 41 300.00 12,300.00 12,300.00 22,800.00 Total carried to collected at the end of Bill No. 22 184,420.00

22/3

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.22 100 m3 TANKS - KIMU AND KALATINE ITEM DESCRIPTION PIPEWORKS UNIT QUANTITY RATE SHS. a b c d 80mm DN steel inlet 100mm DN steel outlet Ditto overflow 50mm DN GS scour Nr Nr Nr Nr 1 1 1 1 13,000.00 19,500.00 19,500.00 3,900.00 13,000.00 19,500.00 19,500.00 3,900.00 PIPEWORKS (EXTERNAL) e f 110mm uPVC 0.6MPa 100mm DN double flanged steel pipe with a 50mm GS welded on socket outlet app. 4m long g 100mm double flanged steel pipe 1.5m long in outfall h i Ditto 1.3m long in valve chambers 100mm DN double flanged pipe 1.0m long in valve chambers j 50mm DN socketed GS pipe to be cut in various sizes m 6 8,620.00 Nr Nr 2 2 5,850.00 3,900.00 Nr 1 5,850.00 m Nr 6 1 770.00 10,400.00 4,620.00 10,400.00 5,850.00 11,700.00 7,800.00 51,720.00 BENDS/ELBOWS k l m 110mm uPVC 90 degrees Ditto 45 degrees 50mm DN GS elbow 90 degrees Nr Nr Nr 1 1 1 1,040.00 1,300.00 640.00 1,040.00 1,300.00 640.00 TEES n 100 x 50mm DN steel socketed tee Nr 1 4,910.00 4,910.00 TAPER o 80 x 50 mm steel reducer Nr 1 1,950.00 1,950.00 Total carried to collected at the end of Bill No. 22 157,830.00

22/4

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.22 100 m3 TANKS - KIMU AND KALATINE ITEM DESCRIPTION OTHER FITTINGS UNIT QUANTITY RATE SHS. a b c d 100mm DN blank flange 50mm DN GS union Ditto nipples 63mm DN x 50mm DN uPVC/steel BSP threaded adaptor e 80mm DN one side flanged other side screwed 400mm steel pipe piece Nr 2 650 Nr Nr Nr Nr 1 2 2 2 1,300 650 130 330 1,300.00 1,300.00 260.00 660.00 1,300.00 VALVES f g h 100mm DN flanged CI sluice valve 80mm DN ditto 50mm DN socketed brass gate valve PN10 i 80mm DN flanged float PN10 valve angular type capacity not less than 20m3/hr Rate to include for 320mm long flanged spigot Nr 1 32,500 Nr Nr Nr 1 2 2 33,150 26,520 1,300 33,150.00 53,040.00 2,600.00 32,500.00 OVERFLOW/SCOUR OUTFALL j Outfall as per relevant drg. excluding pipe Nr 1 1,300 1,300.00 VALVE CHAMBERS k l m Type 2 depth n.e 1.0m Type 2 ditto 1.0 - 1.5 m Type 3 depth 1.5 - 2.0m Nr Nr Nr 2 1 1 13,000 19,500 26,000 26,000.00 19,500.00 26,000.00 MISCELLANEOUS n Proprietary water level indicators complete with scale graduated in Item 1 6,500 6,500.00 Total carried to collected at the end of Bill No. 22 205,410.00

22/5

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.22 100 m3 TANKS - KIMU AND KALATINE COLLECTION PAGE: 22/1 SHS. 398,180.00 22/2 575,510.00 22/3 184,420.00 22/4 157,830.00 22/5 205,410.00 -

Total carried to page 22/6b 1,521,350.00

22/6a

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.22 100 m3 TANKS - KIMU AND KALATINE Unit Tank 100 m3 Qty Rate SHS.

Nr

1,521,350.00

3,042,700.00

Total carried to grand summary

3,042,700.00

22/6b

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.23 200m3 STORAGE TANKS ITEM DESCRIPTION 200 m3 STORAGE TANK EARTHWORKS UNIT QUANTITY RATE SHS. Excavation m2 m3 m3 m3 a 200mm top soil 93 260.00 24,180.00 b Further excavation 0.2 - 1.0m 73 330.00 24,090.00 c Ditto 1.0 - 2.0mm 20 390.00 7,800.00 d 150 mm hardcore 15 650.00 9,750.00 e Making up levels around the structure m3 Item 1 3,900.00 3,900.00 f Prepare sloping surface to wall footing 15 390.00 5,850.00 CONCRETE TO BS 8110 Mass Concrete m3 g 50mm blinding in grade 10 7 7,800.00 54,600.00 Reinforced concrete grade 25 m3 m3 m3 h In 150 mm floor slab 14 11,700.00 163,800.00 i Ditto in 200 mm slab 6 11,700.00 70,200.00 j Ditto 200 mm suspended roof slab 23 15,600.00 358,800.00 Total carried to collected at the end of Bill No. 23 722,970.00

23/1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.23 200m3 STORAGE TANKS ITEM DESCRIPTION Reinforcement UNIT QUANTITY RATE SHS. a b Mild tensile High tensile steel kg kg 325 2004 130.00 130.00 42,250.00 260,520.00 Formwork m2 m2 m2 Item c Sawn formwork to edge of curve floor slab width ne. 0.2 m d e f Ditto to edges of roof slab Ditto to soffit of suspended roof slab Allow for boxing out for mahole and air vent 8 7 1 650.00 650.00 650.00 8 650.00 5,200.00 5,200.00 4,550.00 650.00 BLOCK WORK g 230 mm solid block circular wall in 1.3 cement sand mortar m2 136 1,690.00 229,840.00 SUNDRIES/FINISHES h Install 1No. internal steel ladder Item 1 6,500.00 6,500.00 i Ditto but external steel ladder Item 1 6,500.00 6,500.00 j 50 mm G.S. air vent to tank Nr 2 1,950.00 3,900.00 k Steel manhole cover frame complete with padlock m2 Nr 2 6,500.00 13,000.00 l 10 mm water proof plaster 1:2 in 2 layers to walls internally steel trowelled smooth m2 115 390.00 44,850.00 m Ditto but in 20 mm thick screed on concrete floor slab 79 390.00 30,810.00 Total carried to collected at the end of Bill No. 23 653,770.00

23/2

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.23 200m3 STORAGE TANKS ITEM a DESCRIPTION Min 20 mm screed mix 1:3 laid on roof slab steel trowel finish m2 UNIT m2 QUANTITY 90 RATE 390.00 SHS. 35,100.00 b 15 mm rendering mix 1:3 floated smooth to wall externally m2 m2 102 390.00 39,780.00 c 2 ply roofing felt on top of wall 7 390.00 2,730.00 d 2 coats flinkote to floor slab 7 390.00 2,730.00 PAINTING e Prepare and apply 2 coats of approved alkali resistant primes to roof screed m2 m2 90 300.00 27,000.00 f Ditto but in aluminium alkycl reflective paint m2 90 300.00 27,000.00 g Prepare and apply 2 coats of approved emulsion paint to rendering walls externally 102 300.00 30,600.00 PIPEWORKS h 320mm DN steel inlet Nr 1 65,000.00 65,000.00 i 320mm DN steel outlet Nr 1 65,000.00 65,000.00 j 320mm DN steel overflow Nr 1 65,000.00 65,000.00 k 50mm DN scour Nr 1 3,900.00 3,900.00 l 320mm GI sluice valve Nr 1 265,200.00 265,200.00 m 50mm brass gate valve Nr 1 1,300.00 1,300.00 Total carried to collected at the end of Bill No. 23 630,340.00

23/3

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.23 200m3 STORAGE TANKS COLLECTION PAGE: 23/1 SHS. SHS. 722,970.00 23/2 653,770.00

23/3

630,340.00 -

Total carried to page 23/4 b

2,007,080.00

23/4 a

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.23 200m3 STORAGE TANKS ITEM DESCRIPTION UNIT QUANTITY RATE SHS.

200m3 STORAGE TANKS

Nr

10

2,007,080.00

20,070,800.00

Total carried to grand summary

20,070,800.00

23/4 b

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.24 400m3 STORAGE TANKS AT TREATMENT WORKS ITEM DESCRIPTION 400 m3 STORAGE TANK EARTHWORKS UNIT QUANTITY RATE SHS. Excavation a 200mm top soil m2 m3 m3 37 260.00 9,620.00 b Further excavation 0.2 - 1.0m 148 330.00 48,840.00 c Ditto 1.0 - 2.0mm 40 390.00 15,600.00 FILLING AND COMPACTION d 150 mm hardcore m3 28 650.00 18,200.00 e Making up levels around the structure Item 1 6,500.00 6,500.00 ANCILLARIES f Prepare sloping surface to for column and wall footing m3 8 390.00 3,120.00 CONCRETE TO BS 8110 Mass Concrete m3 g 50mm blinding in grade 10 35 7,800.00 273,000.00 Reinforced concrete grade 25 m3 m3 m3 m3 m3 m3 h In 150 mm floor slab, column base and wall footing i j k l m Column Ditto in 200 mm wall slab Ring beams Beams Ditto 200 mm suspended roof slab 0.5 35 3 3 40 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 35 11,700.00 409,500.00 7,800.00 9,750.00 46,800.00 46,800.00 624,000.00 Total carried to collected at the end of Bill No. 24 1,519,530.00

24/1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.24 400m3 STORAGE TANKS AT TREATMENT WORKS ITEM DESCRIPTION Reinforcement a High tensile steel to BS 4461 kg 12,500 130.00 UNIT QUANTITY RATE SHS. 1,625,000.00 Rough finish cylindrical formwork m2 b Ground floor slab sides 320mm thick 15 650.00 9,750.00 FAIR FACED PLANE FORMWORK m3 m3 c Beams (soffit and sides) 26 650.00 16,900.00 d Columns 5 650.00 3,250.00 FAIR FACED CYLINDRICAL FORMWORK e Ring beam m2 m2 m2 23 650.00 14,950.00 f Roof slab soffit 163 650.00 105,950.00 g Wall 287 650.00 186,550.00 h 20mm drip below roof slab m 47 650.00 30,550.00 JOINTS i Vertical formed cylindrical joint in 150/320mm slab m2 m2 13 390.00 5,070.00 j Vertical formed plane joint in 150/320mm ground floor slab 4 390.00 1,560.00 k Plastic water Bar 150mm thick in ground floor m 71 390.00 27,690.00 l Water bar in 250 mm wall m 176 390.00 68,640.00 Total carried to collected at the end of Bill No. 24 2,095,860.00

24/2

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.24 400m3 STORAGE TANKS AT TREATMENT WORKS ITEM a DESCRIPTION 2 layers roofing felt in horizontal joint 250mm wall roof slab UNIT m2 QUANTITY 46 RATE 390.00 SHS. 17,940.00 ANCILLARIES m2 b Key surface of construction vertical joints in ground floor slab m2 17 260.00 4,420.00 c Ditto surface of horizontal joint ground floor - wall m2 m2 12 260.00 3,120.00 d Ditto horizontal joint in wall 12 260.00 3,120.00 e Steel trowel finish to top surface of ground floor slab m2 163 390.00 63,570.00 f Ditto walls (external and internal) 287 390.00 111,930.00 g 50mm diameter air vent to roof Nr 1 1,950.00 1,950.00 h manhole covers on roof slab (4mm chequered plate, galvanised) i Internal ladder Item 1 6,500.00 6,500.00 j External ladder Item 1 6,500.00 6,500.00 FINISHES m2 k Min 20mm screed mix 1:3 laid on roof slab steel trowel finish 180 390.00 70,200.00 Total carried to collected at the end of Bill No. 24 295,250.00 Nr 2 3,000.00 6,000.00 -

24/3

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.24 400m3 STORAGE TANKS AT TREATMENT WORKS ITEM DESCRIPTION PAINTING m2 UNIT QUANTITY RATE SHS. a 3 coats emulsion paint to all visible external concrete surface (exclude top surface of roof) m2 145 300 43,500.00 b 2 coats alkali resistant primer followed by 2 coats aluminia alkyd paint to roof 169 300 50,700.00 PIPEWORKS c 320mm DN steel inlet Nr 1 65,000 65,000.00 d 320mm DN steel outlet Nr 1 65,000 65,000.00 e 320mm DN steel overflow Nr 1 65,000 65,000.00 f 50mm DN scour Nr 1 3,900 3,900.00 g 320mm GI sluice valve Nr 2 265,200 530,400.00 h 50mm brass gate valve Nr 1 1,300 1,300.00 Total carried to collected at the end of Bill No. 24 824,800.00

24/4

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.24 400m3 STORAGE TANKS AT TREATMENT WORKS COLLECTION PAGE: 24/1 SHS. SHS. 1,519,530.00 24/2 2,095,860.00 24/3 295,250.00 24/4 824,800.00 Total carried to page 24/5 b 4,735,440.00

24/5 a

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.24 400m3 STORAGE TANKS AT TREATMENT WORKS Description Unit Qty Rate SHS.

400m3 STORAGE TANKS

Nr

4,735,440.00

9,470,880.00

Total carried to grand summary

9,470,880.00

24/4b

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.25 800m3 STEEL STORAGE TANK AT KYOEA HILL Description EXCAVATION a 200 mm top soil m2 m3 169 260.00 43,940.00 b Further excavation 0.2 - 1.0 m 140 330.00 46,200.00 FILLING AND COMPACTION c 150 mm hardcore m3 135 650.00 87,750.00 d Making up levels around the structure Sum 1 6,500.00 6,500.00 e ANCILLARIES Prepare sloping surface to wall footing m2 16 390.00 6,240.00 CONCRETE TO BS 8110 Mass Concrete f 50mm blinding in grade 10 m2 85 7,800.00 663,000.00 Reinforced concrete grade 25 m3 g In 200 mm floor slab 40 11,700.00 468,000.00 h Provide and weld together Pressed steel section 6mm thick water storage tank volume 800 to BS 1564 Part II complete with 4mm thick roof cover, internal and external ladders, cheats, stays, manhole and vents m2 Sum 1 15,600,000.00 15,600,000.00 j Supply and paint the tank with two coats of Bituprime internally and aluminium paint externally 260 520.00 135,200.00 h Provide piping works related to above installation - steel pipes, max 320mm and fittings Total carried to grand summary Sum 1 1,300,000.00 1,300,000.00 18,356,830.00 Unit Qty Rate SHS.

25/1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.26 ITEM TOOLS, EQUIPMENT, CHEMICALS ETC DESCRIPTION TOOLS UNIT QUANTITY RATE SHS. a Supply and fix to concrete wall in basement 2440 long x 1220mm wide 16mm thick blockboard, painted with 3 coats of paint on both sides fitted with hooks etc. for hanging tools and with marked position for each piece of tool as listed below Item 1 26,000.00 26,000.00 SUPPLY b Pipe wrench (48") for pipe size 25 - 150mm DN c d e f g Ditto (36") for pipe size 10-80mm Ditto (24") for pipe size 10-65mm Ditto (18") for pipe size 10-50mm Ditto (14") for pipe size 10-40mm Chain spanner (48") for pipe size 40-150mm h Chain spanner (36") for pipe size 40-150mm i Adjustable spanner (18") size of bolts up to 60mm j Adjustable spanner (12") size of bolts up to 34mm k D/E open spanner (K350) from 6 50mm (14 nos. per set) l Stock and dies, Record or Presto type 15-50mm m n o Ditto 65-100mm Ditto 100-150mm Portable pipe vice No.92 with stand (for pipe size 8-50mm) Sets Sets Nr 1 1 2 78,000.00 91,000.00 19,500.00 Sets 1 65,000.00 Sets 2 5,850.00 Nr 2 1,300.00 Nr 2 12,350.00 Nr 2 37,700.00 Nr Nr Nr Nr Nr 3 3 3 5 2 11,700.00 7,800.00 5,200.00 4,550.00 57,300.00 Nr 2 19,500.00 39,000.00 35,100.00 23,400.00 15,600.00 22,750.00 114,600.00 75,400.00 24,700.00 2,600.00 11,700.00 65,000.00 78,000.00 91,000.00 39,000.00 Total carried to collected at the end of Bill No. 26 663,850.00

26/1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.26 ITEM a b c d e f g h i TOOLS, EQUIPMENT, CHEMICALS ETC DESCRIPTION Hacksaw frame Hacksaw blade (packet of 100) Screwdriver 9.5 x 200mm Screwdriver 6 x 100mm Screwdriver 4 x 75mm Screwdriver 6 x 100mm (star type) 0.5 litre oilcan Grease gun (standard) Medium coarse files (one of each 6" - 8" - 10" flat, one 6" round type) j k Engine hammer (1/2 Kg weight) Tool box (size 450mm trace) Nr Nr 1 2 200.00 1,950.00 UNIT Nr Nr Nr Nr Nr Nr Nr Nr Nr QUANTITY 2 1 1 1 1 2 2 2 4 RATE 200.00 1,300.00 220.00 220.00 220.00 220.00 390.00 980.00 720.00 SHS. 400.00 1,300.00 220.00 220.00 220.00 440.00 780.00 1,960.00 2,880.00 200.00 3,900.00

OFFICE AND STORE EQUIPMENT SUPPLY

1.50 x 0.90m office table with six (6) drawers (3 lockable)

Nr

7,800.00

15,600.00

m n o p q r s t u

Office chairs Wall clock (face diameter 200mm) 10 litre capacity bucket 20 litre capacity jerry can Garden rake (standard) with handle Shovel (standard) Pick (standard) with handle Panga Slasher for cutting grass

Nr Nr Nr Nr Nr Nr Nr Nr Nr

4 2 2 1 2 5 5 2 4

2,280.00 1,950.00 330.00 520.00 650.00 650.00 520.00 230.00 230.00

9,120.00 3,900.00 660.00 520.00 1,300.00 3,250.00 2,600.00 460.00 920.00

Total carried to collected at the end of Bill No. 26

50,850.00

26/2

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.26 ITEM a b c d TOOLS, EQUIPMENT, CHEMICALS ETC DESCRIPTION Stiff broom for external use Soft broom for internal use Floor cloth Hooks for rakes and brooms etc. inclusive of fixing to walls e Steel wheelbarrow with one rubber wheel, bucket size approx. 800mm x 500mm f Steel trolley with two rubber wheels for transporting bags with chemicals g Large scale for weighing chemicals Minimum capacity 100Kg. Scale to be floor-mounted (platform size approx. 450mm x 450mm) h i Bicycle of approved manufacture First aid kit, standard box no.2, suitable for 10 persons j Torch, size as for two (2) stndard batteries Nr 4 390.00 Nr Nr 4 3 13,000.00 13,000.00 Nr 1 78,000.00 Nr 2 6,500.00 Nr 1 4,550.00 UNIT Nr Nr Nr Nr QUANTITY 4 2 4 16 RATE 260.00 260.00 200.00 325.00 SHS. 1,040.00 520.00 800.00 5,200.00 4,550.00 13,000.00 78,000.00 52,000.00 39,000.00 1,560.00 LABORATORY APPARATUS Supply k Beaker 600cc plain (borosilicate hard glass) l Beaker, 400cc, plain (borosilicate hard glass) m n Burette, 50cc Winchester quart bottle (500ml) for Calcium Stability Test o Graduated glass measuring cylinder 25-250cc p q Conical flask, 250cc Plain glass funnel (for Whatman No.1 filter paper Nr Nr 6 3 260.00 650.00 Nr 4 1,560.00 Nr Nr 4 4 1,950.00 1,300.00 Nr 6 325.00 Nr 6 390.00 2,340.00 1,950.00 7,800.00 5,200.00 6,240.00 1,560.00 1,950.00 Total carried to collected at the end of Bill No. 26 222,710.00

26/3

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.26 ITEM a TOOLS, EQUIPMENT, CHEMICALS ETC DESCRIPTION Whatman's No.1 filter paper, 185mm (box of 100) b Specimen jar, cylindrical ground with stoppes, 500cc capacity for alum and soda ash solutions (Jar Tests) c d Pipette, gratuated 0.1cc to 1.0 cc 25cc pipette with one mark to deliver precise quantity e f Glass stirring rods, min. 20cm long Wooden double tripod stand for burette g Comparator and colourimetric determination block. Lovibond complete with indicator disc in leatherette h Test tubes 10cc (for residual chlorine test) i Disc Cresol red 7.2 to 8.8 (for ph test) j Disc Brom Thymol Blue 6.0 to 7.6 (for ph test) k l Thymol Blue 8.0 to 9.6 (for ph test) Disc chlorine o.1 to 4.0 ppm residual chlorine test) m Disc chlorine 0.2 to 4.0 ppm (residual chlorine test) n D.P.D. Tablet (box of 100, No. 1 for free residual chlorine) o D.P.D. Tablet (box of 1000, No. 4 for free total residual p q Dropping bottle, 60cc Sulphuric acid N/50 in 0.25 litre bottle Nr Nr 4 10 360.00 260.00 Nr 1 7,150.00 Nr 1 1,110.00 Nr 1 7,540.00 Nr Nr 1 1 7,540.00 7,540.00 Nr 1 7,540.00 Nr 1 7,540.00 Nr 12 340.00 Nr 1 12,740.00 Nr Nr Nr 4 4 2 590.00 150.00 2,860.00 Nr 1 290.00 Nr 4 650.00 UNIT Nr QUANTITY 10 RATE 980.00 SHS. 9,800.00 2,600.00 290.00 2,360.00 600.00 5,720.00 12,740.00 4,080.00 7,540.00 7,540.00 7,540.00 7,540.00 7,540.00 1,110.00 7,150.00 1,440.00 2,600.00 Total carried to collected at the end of Bill No. 26 88,190.00

26/4

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.26 ITEM a TOOLS, EQUIPMENT, CHEMICALS ETC DESCRIPTION Counter scale Avery C with weights measuring up to 15kg b Photographic scale complete with weights from 1 to 20g c d Turbidity rod Cresol Red indicator solution, 0.25 litre bottle e Brom Thymol Blue solution in 0.25 litre bottle f Thymol Blue solution in 0.25 litre bottle g Phenol Red solution in 0.25 litre bottle h Phenolphthalein solution in 0.25 litre bottles i j Distilled water (5 litre container) Stopwatch (for volumetric test) Nr Nr 1 1 290.00 7,480.00 Nr 2 290.00 Nr 2 290.00 Nr 2 290.00 Nr 2 290.00 Nr Nr 1 2 590.00 290.00 Nr 1 8,780.00 UNIT Nr QUANTITY 1 RATE 46,800.00 SHS. 46,800.00 8,780.00 590.00 580.00 580.00 580.00 580.00 580.00 290.00 7,480.00 CHEMICALS AND PAINT k Supply and store alumina sulphate (alum), packed in bags l m Ditto, soda ash, packed in bags Ditto, tropical chloride of lime, packed in drums n o Ditto, lead oxide paint, in tins Ditto, plastic emulsion paint, colour white as for ceilings p Ditto, plastic emulsion paint as for internal walls q Ditto, plastic emulsion paint as for external walls r Ditto, wood preservative (Sadolin Pinotex) as for external doors windows kg 4 650.00 kg 4 650.00 kg 4 650.00 kg kg 4 4 260.00 650.00 kg kg 7000 250 30.00 340.00 kg 7000 40.00 280,000.00 210,000.00 85,000.00 1,040.00 2,600.00 2,600.00 2,600.00 2,600.00 Total carried to collected at the end of Bill No. 26 653,280.00

26/5

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.26 ITEM a TOOLS, EQUIPMENT, CHEMICALS ETC DESCRIPTION Ditto, oil paint, colour dark grey as for internal door frames b Ditto, oil paint, colour broken white, as for internal doors c d e Ditto, oil paint, as for pipeworks Ditto, aluminia paint, as for gates Ditto, paint brushes, width 40mm and 100mm (2 each) kg kg Nr 4 4 4 720.00 720.00 1,950.00 kg 1 720.00 UNIT kg QUANTITY 1 RATE 720.00 SHS. 720.00 720.00 2,880.00 2,880.00 7,800.00 FIRE FIGHTING EQUIPMENT f Supply and install carbon dioxide fire extinguisher to B.S 3326 complete with approved brackets fitted to wall. Capacity 4.5Kg (10lbs) g Ditto dry powder type - 9 kg Nr 2 22,750.00 Nr 9 22,750.00 204,750.00 45,500.00 WATER METERS FOR INDIVIDUAL CONNECTIONS h Supply and store at treatment plant water meters 15mm DN for individual connections Nr 800 5,850.00 4,680,000.00 TESTING OF COMPLETE PLANT i Allow for test run of the entire treatment plant to the satisfaction of the Engineer, and for running the plant during handing over j Allow for all expenses incurred in running the plant for production of enough water to fill up with water the entire distribution system and all reservoirs Item 1 1,300,000.00 Item 1 1,300,000.00 1,300,000.00 1,300,000.00 Total carried to collected at the end of Bill No. 26 7,545,250.00

26/6

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.26 TOOLS, EQUIPMENT, CHEMICALS ETC SHS. SHS. 26/1 663,850.00 26/2 50,850.00 26/3 222,710.00 26/4 88,190.00 26/5 653,280.00 26/6 7,545,250.00 Total carried to Grand Summary 9,224,130.00

COLLECTION PAGE:

26/7

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.27 ITEM ACCESS ROADS DESCRIPTION CLEARANCE (ALL PROVISIONAL) m2 UNIT QUANTITY RATE SHS.

General bush clearance

170,500

10.00

1,705,000.00

Extra over item (a) for uprooting trees and stumps. Girths not exceeding 320mm

Nr

1700

650.00

1,105,000.00

Ditto, but girths between 320 - 500mm

Nr

120

980.00

117,600.00

Ditto but girths over 500mm

Nr

40

800.00

32,000.00

EARTHWORKS

(ALL PROVISIONAL) m2

Excavate over site to remove top soil average 200mm deep

267700

130.00

34,801,000.00

Excavate over site to reduce levels

m3 m3

52900

260.00

13,754,000.00

Extra over excavation in rock in item (f) (provisional)

2600

2,600.00

6,760,000.00

Disposal of surplus excavated material from site

m3

12800

390.00

4,992,000.00

Filling in embankments in excavated material and compact in layers not exceeding 150mm as directed by the engineer

m3

42700

390.00

16,653,000.00 -

Total carried to collected at the end of Bill No. 27

79,919,600.00

27/1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.27 ITEM ACCESS ROADS DESCRIPTION DRAINAGE m3 UNIT QUANTITY RATE SHS. a Excavate for concrete pipes in soft material m3 1070 390.00 417,300.00 b Extra over excavation in rock in item (a) m3 43 2,600.00 111,800.00 c Provide, lay and joint 600mm diameter precast concrete pipe culvert m3 600 13,000.00 7,800,000.00 d Concrete grade 15 as beds, surrounds and launches. The rate to include all formwork m3 400 11,700.00 4,680,000.00 e Return, fill in and well ram selected material around culvert m3 400 390.00 156,000.00 f Spread and level excavated material where directed on site by the engineer m3 320 260.00 83,200.00 g Load and cart away surplus excavated material 450 260.00 117,000.00 h Provide all materials and construct headwalls in class 25 reinforced concrete. Rate to include filling around walls, building around concrete pipe culverts and formwork Nr 100 15,600.00 1,560,000.00 Total carried to collected at the end of Bill No. 27 14,925,300.00

27/2

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.27 ITEM ACCESS ROADS DESCRIPTION ROAD PAVEMENT m2 UNIT QUANTITY RATE SHS. a Compact 150mm below the formation to 100% BS compaction and grade to required falls and cambers to receive sub-base m2 163200 130 21,216,000.00 b Lay 150mm thick selected murram to required falls and cambers and compact to 100% BS to receive wearing course c Lay 150mm thick selected gravel wearing course to required falls and cambers and compact to 100% BS m2 163200 650 106,080,000.00 Total carried to collected at the end of Bill No. 27 233,376,000.00 163200 650 106,080,000.00 -

27/3

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.27 COLLECTION PAGE: 27/1 ACCESS ROADS SHS. AMOUNT 79,919,600.00 27/2 14,925,300.00 27/3 233,376,000.00 Total carried to Grand Summary 328,220,900.00

27/4

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY EXTENSION WORKS BILL NO.28 ITEM DESCRIPTION CLEARANCE MWINGI - NGUNI LINE UNIT QUANTITY RATE SHS.

General bush clearance of width 2.0m along pipeline route

34,118.00

130.00

4,435,340.00

Remove trees and stumps, girth n.e 300 mm.

Nr

50.00

650.00

32,500.00

TRENCH EXCAVATION c d e f g h Excavation of trench for DN 150 mm pipe from 0 - 1.0m Ditto but depth 1.0 - 1.5m Ditto but depth 1.5 - 2.0 m. Ditto but depth 2.0- 2.5 m. Ditto but depth 2.5- 3.0 m. E.O.excavation in rock for items nos c-g m m m m m m3 27,528.00 3,660.00 1,490.00 1,020.00 420.00 2,302.97 260.00 330.00 390.00 450.00 550.00 2,600.00 7,157,280.00 1,207,800.00 581,100.00 459,000.00 231,000.00 5,987,709.00

PIPE AND FITTINGS

i j k l m

Procure and deliver to site DN 150 mm steel series B pipe Ditto but PVC class B pipe Ditto but PVC class C pipe Ditto but PVC class D pipe Ditto but PVC class E pipe

m m m m m

19,568.00 2,540.00 4,010.00 4,300.00 3,700.00

3,320.00 500.00 800.00 900.00 1,150.00

64,965,760.00 1,270,000.00 3,208,000.00 3,870,000.00 4,255,000.00

BENDS

Supply and install 150 mm steel bend 11 0 Nr Nr Nr Nr Nr Nr Nr Nr 32.00 12.00 4.00 2.00 21.00 5.00 1.00 1.00 4,780.00 4,780.00 6,480.00 7,960.00 950.00 950.00 1,150.00 1,300.00 152,960.00 57,360.00 25,920.00 15,920.00 19,950.00 4,750.00 1,150.00 1,300.00 Ditto 22 0 Ditto 45 0 Ditto 90 0 Ditto but 150 mm diameter PVC bend 11 0 Ditto 22 0 Ditto 45 0 Ditto 90 0

o p q r s t u

TEES v Supply and install 150 mm x 80 mm flanged steel tee for washouts, airvalves and branches w Ditto but PVC Nr 18.00 1,100.00 19,800.00 Nr 36.00 5,400.00 194,400.00

Total carried to collected at the end of Bill No. 28

98,153,999.00

28\1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY EXTENSION WORKS BILL NO.28 ITEM DESCRIPTION VALVES (INCLUDE CHAMBERS FITTINGS ETC) a 80 mm flanges double acting air relief valve PN10 capable of giving an inflow of 30 m / mm at a pressure of 0.2 bar eg Neptune Clenfield cat no. 1271 size 400 Nr 16.00 45,550.00 728,800.00 MWINGI - NGUNI LINE UNIT QUANTITY RATE SHS.

WASHOUTS b 80mm DN washout on150 mm DN steel pipe c 80mm DN washout on150 mm DN PVC pipe Nr 12.00 1,100.00 13,200.00 Nr 16.00 5,400.00 86,400.00

MARKER POSTS d e f g Sluice valves maker post Washout maker post Pipeline maker post Airvalve marker posts Nr Nr Nr Nr 1.00 16.00 33.00 16.00 1,950.00 1,950.00 1,950.00 1,950.00 1,950.00 31,200.00 64,350.00 31,200.00

THRUST AND ANCHOR BLOCKS h Thrust and anchor blocks in grade 20 concrete, volume 0.1 - 0.65 m3 Nr 32.00 13,000.00 416,000.00

ON LINE VALVES & FITTINGS

i j

DN 150 mm GI sluice valve DN 150 mm flanged adaptor c/w bolts, nuts, washers and assessories to make water tight joint

Nr Nr

1.00 2.00

55,250.00 5,380.00

55,250.00 10,760.00

MANHOLES a Manhole with light duty manhole covers and frames, depth ne. 1.0 m b c d e f Ditto depth 1.0 1.5 m Ditto depth 1.5 2.0 m Ditto depth 2.0 - 2.5 m Ditto depth 2.5 - 3.0 m Outfall for wastewater pipe Nr Nr Nr Nr Nr 3.00 1.00 2.00 2.00 32.00 19,500.00 26,000.00 33,800.00 39,000.00 1,300.00 58,500.00 26,000.00 67,600.00 78,000.00 41,600.00 2,022,810.00 Nr 24.00 13,000.00 312,000.00

Total carried to collected at the end of Bill No. 28

28\2

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY EXTENSION WORKS BILL No.28 COLLECTION PAGE: 28\1 98,153,999.00 RISING MAIN SHS. SHS.

28\2

2,022,810.00

Total carried to Grand Summary

100,176,809.00

28\3

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY EXTENSION WORKS BILL No.29 ITEM KATSE - NTHANGANI LINE DESCRIPTION CLEARANCE UNIT QUANTITY RATE SHS.

General bush clearance of 2.0m width along pipeline route.

17,800.00

130.00

2,314,000.00

Remove trees and stumps, girth n.e 300 mm.

Nr

25.00

650.00

16,250.00

TRENCH EXCAVATION

c d e

Excavation of trench for DN100mm pipe from 0.0 - 1.0m Ditto but depth 1.0 - 1.5m Ditto but depth 1.5 - 2.0 m. Ditto but depth 2.0 - 2.5 m.

m m m

10,370.00 3,960.00 2,150.00 900.00

260.00 330.00 390.00 450.00 550.00 2,600.00

2,696,200.00 1,306,800.00 838,500.00 405,000.00 231,000.00 2,082,600.00

f g

Ditto but depth 2.5 - 3.0 m. E.O.excavation in rock for items nos c-f

m m3

420.00 801.00

PIPE AND FITTINGS

Procure and supply DN 100 mm steel pipes

17,800.00

1,860.00

33,108,000.00

BENDS

Supply and install 100 mm steel bend 11 0 Nr Nr Nr Nr 115.00 68.00 22.00 8.00 2,580.00 2,580.00 3,060.00 4,230.00 296,700.00 175,440.00 67,320.00 33,840.00 Ditto 22 0 Ditto 45 0 Ditto 90 0

j k l

TEES

Supply and install 100 mm x 80 mm flanged steel tee for washouts, airvalves and branches

Nr

51.00

4,910.00

250,410.00

Total carried to collected at the end of Bill No.29

43,822,060.00

29\1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY EXTENSION WORKS BILL No.29 ITEM KATSE - NTHANGANI LINE DESCRIPTION VALVES (INCLUDE CHAMBERS FITTINGS ETC) a 80 mm flanges double acting air relief valve PN10 capable of giving an inflow of 30 m / mm at a pressure of 0.2 bar eg Neptune Clenfield cat no. 1271 size 400 Nr 23.00 45,500.00 1,046,500.00 UNIT QUANTITY RATE SHS.

WASHOUTS b 80mm DN washout on 100 mm DN steel pipe Nr 23.00 4,910.00 112,930.00

MARKER POSTS c d e f Sluice valve maker post Washout maker post Pipeline maker post Airvalve marker posts Nr Nr Nr Nr 1.00 28.00 18.00 23.00 1,950.00 1,950.00 1,950.00 1,950.00 1,950.00 54,600.00 35,100.00 44,850.00

THRUST AND ANCHOR BLOCKS g Thrust and anchor blocks in grade 20 concrete, volume 0.1 - 0.65 m3 Nr 54.00 13,000.00 702,000.00

ON LINE VALVES & FITTINGS h i DN 100 mm GI sluice valve DN 100 mm flanged adaptor c/w bolts, nuts, washers and assessories to make water tight joint Nr Nr 1.00 1.00 33,150.00 4,720.00 33,150.00 4,720.00

MANHOLES a Manhole with light duty manhole covers and frames, depth ne. 1.0 m b c d e f Ditto depth 1.0 1.5 m Ditto depth 1.5 2.0 m Ditto depth 2.0 - 2.5m Ditto depth 2.5 - 3.0 m Outfall for wastewater pipe Nr Nr Nr Nr Nr 10.00 3.00 4.00 1.00 46.00 19,500.00 26,000.00 33,800.00 39,000.00 1,300.00 195,000.00 78,000.00 135,200.00 39,000.00 59,800.00 Nr 28.00 13,000.00 364,000.00

Total carried to collected at the end of Bill No.29

2,906,800.00

29\2

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY EXTENSION WORKS BILL No.29 KATSE - NTHANGANI LINE KShs. PAGE: 29\1 43,822,060.00 SHS.

29\2

2,906,800.00

Total carried to Grand Summary

46,728,860.00

29\3

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY EXTENSION WORKS BILL No.30 ITEM MWINGI - MIGWANI LINE DESCRIPTION CLEARANCE UNIT QUANTITY RATE SHS.

General bush clearance of 2.0m width along pipeline route

25,450.00

130.00

3,308,500.00

Remove trees and stumps, girth n.e 300 mm.

Nr

40.00

650.00

26,000.00

TRENCH EXCAVATION

c d e f g h

Excavation of trench for DN 200 mm Ditto but depth 1.0 - 1.5m Ditto but depth 1.5 - 2.0 m. Ditto but depth 2.0 - 2.5 m. Ditto but depth 2.5 - 3.0 m. E.O.excavation in rock for items nos c-f

m m m m m m3

18,790.00 4,493.00 1,900.00 227.00 40.00 2,290.50

260.00 330.00 390.00 450.00 550.00 2,600.00

4,885,400.00 1,482,690.00 741,000.00 102,150.00 22,000.00 5,955,300.00

PIPE AND FITTINGS

DN 200 mm steel pipe

23,360.00

2,950.00

68,912,000.00

BENDS DN 200 mm steel 11 0 Ditto 22 0 Ditto 45 0 Ditto 90 0

j k l m

Nr Nr Nr Nr

103.00 52.00 9.00 3.00

7,870.00 7,870.00 9,300.00 12,130.00

810,610.00 409,240.00 83,700.00 36,390.00

PIPE AND FITTINGS n o DN 150 mm PVC pipe Class B DN 150 mm PVC pipe Class B m m 1,000.00 1,090.00 500.00 500.00 500,000.00 545,000.00

BENDS DN 150 mm PVC 11 0 Ditto 22 0 Ditto 45 0

o p q

Nr Nr Nr

15.00 7.00 1.00

950.00 950.00 1,150.00

14,250.00 6,650.00 1,150.00

TEES

200 mm x 80 mm flanged steel tee for washouts, airvalves and branches

Nr

41.00

8,660.00

355,060.00

150 mm x 80 mm PVC tee for washouts, airvalves and branches

Nr

5.00

1,100.00

5,500.00

Total carried to collected at the end of Bill No. 30

88,202,590.00

30\1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY EXTENSION WORKS BILL No.30 ITEM MWINGI - MIGWANI LINE DESCRIPTION VALVES (INCLUDE CHAMBERS FITTINGS ETC) a 80 mm flanges double acting air relief valve PN10 capable of giving an inflow of 30 m / mm at a pressure of 0.2 bar eg Neptune Clenfield cat no. 1271 size 400 Nr 46.00 45,500.00 2,093,000.00 UNIT QUANTITY RATE SHS.

WASHOUTS b 80mm DN washout on 200 mm DN steel pipe b 80mm DN washout on150 mm DN PVC pipe Nr 3.00 1,100.00 3,300.00 Nr 24.00 8,660.00 207,840.00

MARKER POSTS c d e f Sluice valve maker post Washout maker post Pipeline maker post Airvalve marker posts Nr Nr Nr Nr 1.00 22.00 25.00 19.00 1,950.00 1,950.00 1,950.00 1,950.00 1,950.00 42,900.00 48,750.00 37,050.00

THRUST AND ANCHOR BLOCKS g Thrust and anchor blocks in grade 20 concrete, volume 0.1 - 0.65 m3 Nr 25.00 13,000.00 325,000.00

ON LINE VALVES & FITTINGS h i DN 200 mm GI sluice valve DN 200 mm flanged adaptor c/w bolts, nuts, washers and assessories to make water tight joint Nr Nr 1.00 2.00 132,600.00 10,550.00 132,600.00 21,100.00

MANHOLES a Manhole with light duty manhole covers and frames, depth ne. 1.0 m b c d e Ditto depth 1.0 1.5 m Ditto depth 1.5 2.0 m Ditto depth 2.0 - 2.5 m Outfall for wastewater pipe Nr Nr Nr Nr 10.00 3.00 2.00 46.00 19,500.00 26,000.00 33,800.00 1,300.00 195,000.00 78,000.00 67,600.00 59,800.00 Nr 31.00 13,000.00 403,000.00

Total carried to collected at the end of Bill No. 30

3,716,890.00

30\2

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY EXTENSION WORKS BILL No.30 COLLECTION PAGE: 30\1 88,202,590.00 MWINGI - MIGWANI LINE SHS.

30\2

3,716,890.00

Total carried to Grand Summary

91,919,480.00

30/3

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY EXTENSION WORKS BILL No.31 BOOSTER STATION AT MWINGI - MIGWANI LINE ITEM DESCRIPTION CLEARANCE m2 UNIT QUANTITY RATE SHS.

General bush clearance

2,880.00

130.00

374,400.00

Remove trees and stumps girth n.e 300 mm (Provisional)

Nr

2.00

650.00

1,300.00

Ditto girth 300 - 500 mm

Nr

1.00

700.00

700.00

EXCAVATION m2 m3 m3 m3

200mm top soil

40.00

260.00

10,400.00

Further excavation

5.00

260.00

1,300.00

Trench excavation

18.00

260.00

4,680.00

Ditto 1.0-2.0

9.00

330.00

2,970.00

Filling and Compaction m2 m3

Compaction of final surface below hardcore

49.00

390.00

19,110.00

150mm hardcore

7.00

650.00

4,550.00

CONCRETE TO BS 8110 j Mass concrete m3 m3

50mm grade 10 blinding

3.00

7,800.00

23,400.00

Grade 15 concrete in footing

3.00

11,700.00

35,100.00

Reinforced concrete grade 25 m To ground floor slab m3 m3 m3 m2 7.00 15,600.00 109,200.00

Ditto to walls,top and bottom slab of sump

9.00

15,600.00

140,400.00

Ditto to ring beams

2.00

15,600.00

31,200.00

20mm screed to flloor slab

43.00

15,600.00

670,800.00

Total carried to collected at the end of Bill No.31

1,429,510.00

31\1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY EXTENSION WORKS BILL No.31 BOOSTER STATION AT MWINGI - MIGWANI LINE ITEM DESCRIPTION UNIT QUANTITY RATE SHS.

Formwork m2 m2 m2

Sawn formwork to side of foundation

12.00

650.00

7,800.00

Ditto to sides of walls and soffit of slab

14.00

650.00

9,100.00

Ditto to beams

18.00

650.00

11,700.00

Reinforcements to BS4449 a b Mild steel High tensile steel kg kg 800.00 70.00 130.00 130.00 104,000.00 9,100.00

BLOCKWORK a 200mm concrete blockwork m2 190.00 1,560.00 296,400.00

Bitumen damp proof course 200mm wide

m m2

30.00

260.00

7,800.00

12mm cement saand 1:3 rendering on walls to smooth finish

95.00

1,300.00

123,500.00

3 coats emulsion paint

m2 m2

95.00

390.00

37,050.00

Ditto supeer glass on windows

11.00

390.00

4,290.00

ROOF

Fix trusses

Nr

9.00

13,000.00

117,000.00

Ditto purlins

m m2

59.00

650.00

38,350.00

Ditto super seven sheets allowing for laps

55.00

1,300.00

71,500.00

Ditto close fittings ridge

10.00

390.00

3,900.00

Ditto 175x 25 fascia board

31.00

650.00

20,150.00

Ditto GS Gutter

19.00

650.00

12,350.00 873,990.00

Total carried to collected at the end of Bill No.31

31\2

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY EXTENSION WORKS BILL No.31 BOOSTER STATION AT MWINGI - MIGWANI LINE ITEM DESCRIPTION UNIT QUANTITY RATE SHS.

Ditto 100mm DN GS standpipes for gutter

2.00

650.00

1,300.00

FIXTURES a Double leaf 1500mm wide by 2200mm high, allow 300mm ,R16 metal grills Nr 1.00 13,000.00 13,000.00

Approved padlock,Yale or similar for double leaf door

Nr

1.00

1,500.00

1,500.00

1200mm wide ,2200mm high T & G door

Nr

1.00

15,000.00

15,000.00

Approaved padlock,Yale or similar for the T & G door

Nr

1.00

1,500.00

1,500.00

1200x1200mm windows and allow for burglar proofing

Nr

4.00

7,800.00

31,200.00

600x600mm manhole cover for sealant

Nr

1.00

6,500.00

6,500.00

25mm vertical joint filler,polyesterine or Bondex

Nr

10.00

390.00

3,900.00

Approved joint sealant

Nr

10.00

390.00

3,900.00

WHB 450x300

Nr

1.00

13,000.00

13,000.00

SUNDRIES a 600mm, 152x89x17kg steel joists fixed to the ring beam Item 6,500.00 6,500.00

PIPEWORK Inlet to pump sump

80mm DN double flanged steel pipe approximately 1220mm long.

Nr

1.00

13,000.00

13,000.00

Ditto 800mm long

Nr

1.00

13,000.00

13,000.00

80mm DN double flanged steel pipe 500mm long with a GS water seal 150mm from one end.

Nr

1.00

13,000.00

13,000.00

50mm DN flanged steel pipe spigot 300mm long

Nr

1.00

6,500.00

6,500.00

Total carried to collected at the end of Bill No.31

142,800.00

31\3

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY EXTENSION WORKS BILL No.31 BOOSTER STATION AT MWINGI - MIGWANI LINE ITEM DESCRIPTION 80mm DN flanged short radius steel bend, 90o UNIT QUANTITY RATE SHS.

Nr

2.00

24,000.00

48,000.00

90mm DN ex80mm DN PVC/ steel flange adoptor

Nr

1.00

4,720.00

4,720.00

50mm DN angular pattern equilibrium flanged float valve, PN 10

Nr

1.00

32,500.00

32,500.00

80mmx50mm flanged steel taper

Nr

1.00

19,500.00

19,500.00

SUCTION

80mm DN double flanged steel pipe 1100mm long 80mm DN double flanged steel long radius bend, 45o 80mm DN double flanged steel long radius bend, 90o

Nr

2.00

13,000.00

26,000.00

Nr

2.00

19,500.00

39,000.00

Nr

2.00

19,500.00

39,000.00

50mm DN ditto

Nr

2.00

16,000.00

32,000.00

80/50 mm DN flanged steeel taper

Nr

2.00

14,000.00

28,000.00

50mm DN sluice valve, PN 10

Nr

2.00

23,000.00

46,000.00

DELIVERY

80mm DN double flanged steel pipe2085mm long

Nr

1.00

16,500.00

16,500.00

Ditto 1855mm long

Nr

1.00

16,500.00

16,500.00

Ditto 1100mm long

Nr

4.00

13,000.00

52,000.00

40mm DN double flanged steel pipe 200mm long 80mm DN double flanged steel long radius bend, 90o Ditto 45o

Nr

2.00

9,400.00

18,800.00

Nr

3.00

24,000.00

72,000.00

Nr

1.00

1,950.00

1,950.00 492,470.00

Total carried to collected at the end of Bill No.31

31\4

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY EXTENSION WORKS BILL No.31 BOOSTER STATION AT MWINGI - MIGWANI LINE ITEM DESCRIPTION UNIT QUANTITY RATE SHS.

40mm DN ditto

Nr

2.00

6,500.00

13,000.00

80x80mm DN all flanged steel tee

Nr

1.00

19,500.00

19,500.00

90mm DN x80mm DN PVC/steel flange adaptor

Nr

1.00

6,500.00

6,500.00

80x40mm DN flanged steel taper

Nr

2.00

14,000.00

28,000.00

40mm DN socketed gate valve .PN10 with 2NO single flanged short pipe pieces with threaded end screwed onto the valve.

Nr

2.00

9,400.00

18,800.00

40mm DN socketed non-return vallve ditto.

Nr

2.00

19,500.00

39,000.00

OVERFLOW AND SCOUR a 100mm DN double flanged steel pipe 3000mm long with a GS water seal 240mm from one end. Nr 1.00 21,500.00 21,500.00

Ditto 2100mm long

Nr

1.00

19,500.00

19,500.00

Ditto 980mm long

Nr

1.00

16,000.00

16,000.00

Ditto 650mm long

Nr

1.00

16,000.00

16,000.00

Ditto single flanged steel pipe 1800mm long with a GS water seal 100mm from plain end.

Nr

1.00

16,000.00

16,000.00

Ditto with 1300mm long with coffee tray wire fitted on the plain eend.

Nr

1.00

16,000.00

16,000.00

100x100mm DN all flanged steel tee

Nr

1.00

19,500.00

19,500.00

100mm DN flanged bell-mouth

Nr

1.00

19,500.00

19,500.00

Total carried to collected at the end of Bill No.31

268,800.00

31\5

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY EXTENSION WORKS BILL No.31 BOOSTER STATION AT MWINGI - MIGWANI LINE ITEM DESCRIPTION 100mm DN flanged steelshort radius bend, 90o UNIT QUANTITY RATE SHS.

Nr

1.00

19,500.00

19,500.00

100mm DN CI flanged sluice valve, PN 10

Nr

1.00

19,500.00

19,500.00

SEWERAGE PIPES AND MANHOLES

Excavation of trenches for pipes n.e 160mm Dne, depth n.e 1.0m

25.00

260.00

6,500.00

Dito depth 1.0-1.5m

m m3

5.00

330.00

1,650.00

E.O item (a,b) for excavaation in the rock

2.00

2,600.00

5,200.00

110mm DNe PVC pipe -golden brownn

17.00

500.00

8,500.00

160mm DNe ditto

13.00

1,200.00

15,600.00

Manhole , depth n.e 1.0m with ligth duty cover and frame

3.00

13,000.00

39,000.00

Ditto depth 1.0-1.5m

2.00

19,500.00

39,000.00

SEPTIC TANK m3 m3

Excavation for septic tank

14.00

390.00

5,460.00

E.O item a-h for excavation in rock

1.00

2,600.00

2,600.00

CONCRETE a 50mm thick grade 7 concrete blinding m2 m2 8.00 7,800.00 62,400.00

150mm thick grade 20 concrete in floor slab, steel trowel finish

8.00

11,700.00

93,600.00

Ditto in roof slab, steel trowel finish

m2

5.50

15,600.00

85,800.00

Total carried to collected at the end of Bill No.31

404,310.00

31\6

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY EXTENSION WORKS BILL No.31 BOOSTER STATION AT MWINGI - MIGWANI LINE ITEM DESCRIPTION UNIT QUANTITY RATE SHS.

Ditto in 150x250mm deep support beam for baffle wall

1.60

1,950.00

3,120.00

FORMWORK m2 m2 m2 m2

Sawn formwork to the soffit of the roof slab

5.00

650.00

3,250.00

Ditto at external edges of roof slab

2.00

650.00

1,300.00

Ditto at soffit of baffle wall support beam

0.20

650.00

130.00

Ditto at sides of baffle wall support beam

0.80

650.00

520.00

E.O formworkk at boxing out for manhole opening.

Nr

5.00

330.00

1,650.00

REINFORCEMENT m2

Mesh reinforcement A142 in floor slab

8.00

390.00

3,120.00

Mild steel reinforcement in roof slab

Kg

120.00

130.00

15,600.00

BLOCKWORK m2

200mm solid concrete blockwork with hoop iron in every second course

35.00

1,560.00

54,600.00

150mm DN ditto

m2

3.00

1,300.00

3,900.00

FINISHES a 1:3 cement /sand renderinng to internal and external blockwork walls m2 76.00 390.00 29,640.00

MISCELLANEOUS b 150mm ddiameter cast iron tee and spigot as per Drg. No. at septic tank inlet Nr 1.00 6,500.00 6,500.00

Ditto at septic tank outlet

Nr

1.00

6,500.00

6,500.00

Total carried to collected at the end of Bill No.31

129,830.00

31\7

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY EXTENSION WORKS BILL No.31 BOOSTER STATION AT MWINGI - MIGWANI LINE ITEM DESCRIPTION UNIT QUANTITY RATE SHS.

Light duty manhole cover and frame at manholes

Nr

5.00

6,500.00

32,500.00

SEEPAGE BENDS m3 m2 m2 m2

Excavation of 2.0m wide trenches for seepage beds

60.00

260.00

15,600.00

100mm thick loose sand layer at bottom of trench

60.00

130.00

7,800.00

300mm aggregate size 16-25mm

60.00

1,040.00

62,400.00

500 gauge polythene sheet on top of aggregate

60.00

130.00

7,800.00

110mm DN PVC pipe -goldenn brown perforated

30.00

520.00

15,600.00

110mm DN PVC end caps

Nr

3.00

130.00

390.00

WATER SUPPLY AND WASTE WATER DRAINAGE

80mm DN x 20mm DN GS saddle champ

Nr

1.00

900.00

900.00

32mm DN PVC pipe class D

42.00

150.00

6,300.00

20mm DN GS pipe

6.00

390.00

2,340.00

White vitrreous China Wash hand basin size approximately 400x300mm complete with concealed wall brackets, plug, 40mm DN chromium plated waste water pipe, bottle trap and connection to waste water gulley chamber

Nr

1.00

19,500.00

19,500.00

20mm DN brass gate valve

Nr

3.00

520.00

1,560.00

Valve chamber type 1, depth n.e 800mm

Nr

1.00

13,000.00

13,000.00

Total carried to collected at the end of Bill No.31

185,690.00

31\8

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY EXTENSION WORKS BILL No.31 BOOSTER STATION AT MWINGI - MIGWANI LINE ITEM DESCRIPTION UNIT QUANTITY RATE SHS.

ROADS AND STORMWATER DRAINAGE ROADS m3

Excavate for roads and stormwater drains, average depth 200mm

90.00

260.00

23,400.00

E.O item for excavation in rock

m3 m2

9.00

2,600.00

23,400.00

Graade to correct shape, camber and gradient as specified and compact to 100% BS compaction

300.00

390.00

117,000.00

150mm handpacked stone blinded with apprroved stone dust

m2

90.00

390.00

35,100.00

40mm thick bituuminous premix

m2 m2

90.00

520.00

46,800.00

150mm approved gravel compacted to 100% BS compaction

184.00

390.00

71,760.00

125x250mm half battered precast cconcrete kerb (grade 20 concrete ) bedded on grade 15 concrete bed and haunch

23.00

260.00

5,980.00

100x125mm channel ditto

16.00

260.00

4,160.00

STORMWATER DRAINAGE m3

Excavate to form stormwater drain and trenches for culverts

30.00

260.00

7,800.00

100mm thick solid concrete blockwork lining to drains

m2

25.00

1,300.00

32,500.00

Headwall as for 460mm diameter concrete pipe

Nr

4.00

13,000.00

52,000.00

Total carried to collected at the end of Bill No.31

419,900.00

31\9

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY EXTENSION WORKS BILL No.31 BOOSTER STATION AT MWINGI - MIGWANI LINE ITEM DESCRIPTION UNIT QUANTITY RATE SHS.

460mm diameter concrete culvert including 150mm grade 15 concrete surround.

10.00

10,400.00

104,000.00

FENCING The rate for the fence posts and gate posts shall include for excavation and concrete surround

Concrete fence post

Nr

57.00

2,600.00

148,200.00

Ditto for bracings at corners and gateposts and intermediate bracings

Nr

2.00

13,000.00

26,000.00

Ditto for gateposts

18.00

2,600.00

46,800.00

Chain link fencing fitted to fence posts

131.00

1,300.00

170,300.00

4 m wide double leaf steel gate

Nr

1.00

52,000.00

52,000.00

OPERATORS HOUSES

Double grade 9 house, type A (uplands) all in accordance with Ministry of Water Development's standard drawings Nos.H4/12, H4/13 and H4/14

Nr

1.00

3,900,000.00

3,900,000.00

SITE FINISHES m2

Spread top soil where directed, rake and plant approved grass seedlings at 150mm c/c

500.00

390.00

195,000.00

Total carried to collected at the end of Bill No.31

4,642,300.00

31\10

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY EXTENSION WORKS BILL No.31 BOOSTER STATION AT MWINGI - MIGWANI LINE ITEM DESCRIPTION 1.00 b 600 X 600 X 75mm thick grade 20 concrete precast paving slabs laid and pointed in mortar mix 1:3 on 50mm thick sand bedding m2 68.00 2,600.00 176,800.00 UNIT QUANTITY RATE SHS.

PUMP a Supply and instal electrical high lift pump set 33 l/s, against 248 m head at provided printh. Nr 2.00 600,000.00 1,200,000.00

Supply and install apriopriate swith gear and control system, fittings and assessories

Nr

1.00

200,000.00

200,000.00

ProvideKshs.6,500,000 for power supply to the booster station.Rates includes all necessary assecories and specials

Nr

1.00

4,000,000.00

4,000,000.00

Total carried to collected at the end of Bill No.31

5,576,800.00

31\11

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY EXTENSION WORKS BILL No.31 BOOSTER STATION AT MWINGI - MIGWANI LINE ITEM PAGE 1,429,510.00 31\1 873,990.00 31\2 142,800.00 31\3 COLLECTION SHS.

31\4

492,470.00

31\5

268,800.00

31\6

404,310.00

31\7

129,830.00

31\8

185,690.00

31\9

419,900.00

31\10

4,642,300.00

31\11 5,576,800.00

Total carried to Grand Summary

14,566,400.00

31\12

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY EXTENSION WORKS BILL No.32 100 m3 TANKS ON MWINGI - NGUNI, KATSE - NTHANGANI LINES ITEM DESCRIPTION 100m3 CLEAR WATER TANK SITE CLEARANCE UNIT QUANTITY RATE AMOUNT

General bush clearance

ha

0.06

130,000.00

7,800.00

Trees and stumps girth n.e 300mm - Provisional

Nr

8.00

650.00

5,200.00

Ditto but girth 300 - 500mm - Provisional

Nr

4.00

700.00

2,800.00

Ditto but girth 500 - 1000mm - Provisional

Nr

1.00

800.00

800.00

FENCING e Specified concrete fence post Nr 48.00 2,600.00 124,800.00

Bracing post

Nr

8.00

2,600.00

20,800.00

Gate post

Nr

2.00

13,000.00

26,000.00

4m wide double leaf steel gate

Nr

1.00

13,000.00

13,000.00

Chain link fencing

88.00

1,300.00

114,400.00

EARTHWORKS EXCAVATION j k 200mm top layer for disposal Excavation to foundation level as shown on the drawing depth n.e 2.5m l Trench excavation for pipes upto 225mm DN depth n.e 1.0m m n Ditto 1.0 - 1.5m Unlined 750mm earth drain side slopes n.e 1:1.5 depth n.e 1.0m m m 6.00 7.00 330.00 260.00 1,980.00 1,820.00 m 10.00 260.00 2,600.00 m3 m3 16.00 150.00 260.00 390.00 4,160.00 58,500.00

FILLING AND COMPACTION m2

Compaction of excavated bottom

52.00

260.00

13,520.00

Total carried to collected at the end of Bill No. 32

398,180.00

32\1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY EXTENSION WORKS BILL No.32 100 m3 TANKS ON MWINGI - NGUNI, KATSE - NTHANGANI LINES ITEM a b DESCRIPTION 200mm well compacted hardcore Make up levels around the structure UNIT m3 Item QUANTITY 11.00 1.00 RATE 650.00 6,500.00 SHS. 7,150.00 6,500.00

CONCRETE TO BS 8110 Mass concrete c 50mm blinding concrete grade 15 plain concrete m3 3.50 7,800.00 27,300.00

Reinforced Concrete Grade 25 d e f In 150mm floor slab Ditto in 200mm floor slab Ditto in 200mm suspended roof slab m3 m3 m3 4.00 3.00 9.00 11,700.00 11,700.00 15,600.00 46,800.00 35,100.00 140,400.00

FORMWORK g Sawn formwork to edges of curved floor slab width n.e 0.2m h i Ditto but to edges of roof slab Ditto but to soffits of suspended roof slab height 3.5 - 5.0m j Allow for boxing out for manhole and air vent m2 Item 37.00 1.00 650.00 650.00 24,050.00 650.00 m2 6.00 650.00 3,900.00 m2 5.00 650.00 3,250.00

MASONRY m2

200mm solid concrete block in cement sand mortar mix 1:3 in circular wall

76.00

1,300.00

98,800.00

Reinforcement to BS 4449

l m

Mild steel High tensile steel

kg kg

828.00 569.00

130.00 130.00

107,640.00 73,970.00

Total carried to collected at the end of Bill No. 32

575,510.00

32\2

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY EXTENSION WORKS BILL No.32 100 m3 TANKS ON MWINGI - NGUNI, KATSE - NTHANGANI LINES ITEM DESCRIPTION SUNDRIES/FINISHES UNIT QUANTITY RATE SHS.

a b c d

Install 1 No. internal steel ladder Ditto but external steel ladder 50mm GS vent to tank Steel manhole cover and frame complete with padlock

Item Item Nr Nr

1.00 1.00 1.00 1.00

6,500.00 6,500.00 650.00 6,500.00

6,500.00 6,500.00 650.00 6,500.00

Making good after installation of level indications etc

Item m2

1.00

6,500.00

6,500.00

10mm water proof plaster mix 1:2 in 2 layers to walls internally steel trowelled smooth

71.00

390.00

27,690.00

Ditto but in 20mm thick screed on concrete slab to falls

m2

35.00

390.00

13,650.00

h i

2 coats flintcote to floor slab Approved joint sealing compound 20 x 40mm groove to floor slab

Item m

35.00 21.00

390.00 390.00

13,650.00 8,190.00

j k

2 layers roofing felt on top of wall 15mm rendering mix 1:3 floated smooth to walls externally

m m2 m2

4.00 76.00

390.00 390.00

1,560.00 29,640.00

20mm thick cement sand screed mix 1:3 steel floated smooth in falls to receive painting

41.00

390.00

15,990.00

PAINTING m2

Prepare and apply 2 coats of approved alkali resistant primes to root screed

41.00

300.00

12,300.00

Ditto but in alumina alkyd reflective paint

m2

41.00

300.00

12,300.00

Prepare and apply 2 coats of approved emulsion paint to rendering m2 76.00 300.00 22,800.00

Total carried to collected at the end of Bill No. 32

184,420.00

32\3

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY EXTENSION WORKS BILL No.32 100 m3 TANKS ON MWINGI - NGUNI, KATSE - NTHANGANI LINES ITEM DESCRIPTION PIPEWORKS UNIT QUANTITY RATE SHS.

a b c d

80mm DN steel inlet 100mm DN steel outlet Ditto overflow 50mm DN GS scour

Item Item Item Item

1.00 1.00 1.00 1.00

13,000.00 19,500.00 19,500.00 3,900.00

13,000.00 19,500.00 19,500.00 3,900.00

PIPEWORKS (EXTERNAL)

e f

110mm uPVC 0.6MPa 100mm DN double flanged steel pipe with a 50mm GS welded on socket outlet app. 4m long

m Nr

6.00 1.00

770.00 10,400.00

4,620.00 10,400.00

100mm double flanged steel pipe 1.5m long in outfall

Nr

1.00

5,850.00

5,850.00

h i

Ditto 1.3m long in valve chambers 100mm DN double flanged pipe 1.0m long in valve chambers

Nr Nr

2.00 2.00

5,850.00 3,900.00

11,700.00 7,800.00

50mm DN socketed GS pipe to be cut in various sizes

6.00

8,620.00

51,720.00

BENDS/ELBOWS

k l m

110mm uPVC 90 degrees Ditto 45 degrees 50mm DN GS elbow 90 degrees

Nr Nr Nr

1.00 1.00 1.00

1,040.00 1,300.00 650.00

1,040.00 1,300.00 650.00

TEES

100 x 50mm DN steel socketed tee

Nr

1.00

4,910.00

4,910.00

TAPER

80 x 50 mm steel reducer

Nr

1.00

1,950.00

1,950.00

Total carried to collected at the end of Bill No. 32

157,840.00

32\4

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY EXTENSION WORKS BILL No.32 100 m3 TANKS ON MWINGI - NGUNI, KATSE - NTHANGANI LINES ITEM DESCRIPTION OTHER FITTINGS UNIT QUANTITY RATE SHS.

a b c d

100mm DN blank flange 50mm DN GS union Ditto nipples 63mm DN x 50mm DN uPVC/steel BSP threaded adaptor

Nr Nr Nr Nr

1.00 2.00 2.00 2.00

1,300 650 130 330

1,300.00 1,300.00 260.00 660.00

80mm DN one side flanged other side screwed 400mm steel pipe piece

Nr

2.00

650

1,300.00

VALVES

f g h

100mm DN flanged CI sluice valve 80mm DN ditto 50mm DN socketed brass gate valve PN10

Nr Nr Nr

1.00 2.00 2.00

33,150 26,520 1,300

33,150.00 53,040.00 2,600.00

80mm DN flanged float PN10 valve angular type capacity not less than 20m3/hr Rate to include for 300mm long flanged spigot

Nr

1.00

32,500

32,500.00

OVERFLOW/SCOUR OUTFALL

Outfall as per relevant drg. excluding pipe

Nr

1.00

1,300

1,300.00

VALVE CHAMBERS

k l m

Type 2 depth n.e 1.0m Type 3 ditto Type 3 depth 1.0 - 1.5m Nr Nr Nr MISCELLANEOUS 2.00 1.00 1.00

13,000 19,500 26,000 39,000.00 26,000.00

Proprietary water level indicators complete with scale graduated in

Item

1.00

6,500

6,500.00

Total carried to collected at the end of Bill No. 32

198,910.00

32\5

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY EXTENSION WORKS BILL No.32 100 m3 TANKS ON MWINGI - NGUNI, KATSE - NTHANGANI LINES COLLECTION PAGE: 32\1 398,180.00 SHS. SHS.

32\2

575,510.00

32\3

184,420.00

32\4

157,840.00

32\5

198,910.00

Amount per tank Kshs. Total Number of Tanks Total amount Kshs. 2.00

1,514,860.00

3,029,720.00

Total carried to Grand Summary

3,029,720.00

32\6

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY EXTENSION WORKS BILL No.33 ITEM 200m3 STORAGE TANKS AT MWINGI -MIGWANI LINES DESCRIPTION 200 m3 STORAGE TANK EARTHWORKS UNIT QUANTITY RATE SHS.

Excavation m2 m3 m3 m3

200mm top soil

93

260.00

24,180.00 -

Further excavation 0.2 - 1.0m

73

330.00

24,090.00 -

Ditto 1.0 - 2.0mm

20

390.00

7,800.00 -

150 mm hardcore

15

650.00

9,750.00 -

Making up levels around the structure

Item

3,900.00

3,900.00 -

Prepare sloping surface to wall footing

m3

15

390.00

5,850.00 -

CONCRETE TO BS 8110 Mass Concrete m3

50mm blinding in grade 10

7,800.00

54,600.00 -

Reinforced concrete grade 25 m3 m3 m3

In 150 mm floor slab

14

11,700.00

163,800.00 -

Ditto in 200 mm slab

11,700.00

70,200.00 -

Ditto 200 mm suspended roof slab

23

15,600.00

358,800.00 -

Total carried to collected at the end of Bill No. 33

722,970.00

33/1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY EXTENSION WORKS BILL No.33 ITEM 200m3 STORAGE TANKS AT MWINGI -MIGWANI LINES DESCRIPTION Reinforcement UNIT QUANTITY RATE SHS.

a b

Mild tensile High tensile steel

kg kg

325 2004

130.00 130.00

42,250.00 260,520.00 -

Formwork m2 m2 m2 Item

Sawn formwork to edge of curve floor slab width ne. 0.2 m

650.00

5,200.00 -

d e f

Ditto to edges of roof slab Ditto to soffit of suspended roof slab Allow for boxing out for mahole and air vent

8 7 1

650.00 650.00 650.00

5,200.00 4,550.00 650.00 -

BLOCK WORK g 230 mm solid block circular wall in 1.3 cement sand mortar m2 136 1,690.00

229,840.00 -

SUNDRIES/FINISHES

Install 1No. internal steel ladder

Item

6,500.00

6,500.00 -

Ditto but external steel ladder

Item

6,500.00

6,500.00 -

50 mm G.S. air vent to tank

Nr

1,950.00

3,900.00 -

Steel manhole cover frame complete with padlock

Nr

6,500.00

13,000.00 -

10 mm water proof plaster 1:2 in 2 layers to walls internally steel trowelled smooth

m2

115

390.00

44,850.00 -

Ditto but in 20 mm thick screed on concrete floor slab

m2

79

390.00

30,810.00 -

Total carried to collected at the end of Bill No. 33

653,770.00

33\2

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY EXTENSION WORKS BILL No.33 ITEM a 200m3 STORAGE TANKS AT MWINGI -MIGWANI LINES DESCRIPTION Min 20 mm screed mix 1:3 laid on roof slab steel trowel finish m2 UNIT m2 QUANTITY 90 RATE 390.00 SHS. 35,100.00 b 15 mm rendering mix 1:3 floated smooth to wall externally m2 m2 102 390.00 39,780.00 c 2 ply roofing felt on top of wall 7 390.00 2,730.00 d 2 coats flinkote to floor slab 7 390.00 2,730.00 PAINTING e Prepare and apply 2 coats of approved alkali resistant primes to roof screed m2 m2 90 300.00 27,000.00 f Ditto but in aluminium alkycl reflective paint m2 90 300.00 27,000.00 g Prepare and apply 2 coats of approved emulsion paint to rendering walls externally 102 300.00 30,600.00 PIPEWORKS h 300mm DN steel inlet Nr 1 65,000.00 65,000.00 i 300mm DN steel outlet Nr 1 65,000.00 65,000.00 j 300mm DN steel overflow Nr 1 65,000.00 65,000.00 k 50mm DN scour Nr 1 3,900.00 3,900.00 l 300mm GI sluice valve Nr 1 265,200.00 265,200.00 m 50mm brass gate valve Nr 1 1,300.00 1,300.00 Total carried to collected at the end of Bill No. 33 630,340.00

33/3

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY EXTENSION WORKS BILL No.33 COLLECTION PAGE: 33/1 200m3 STORAGE TANKS AT MWINGI -MIGWANI LINES SHS. SHS. 722,970.00 33/2 653,770.00

33/3

630,340.00 -

Total carried to Grand Summary

2,007,080.00

33\4

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.34 ITEM SCHEDULE OF DAYWORKS DESCRIPTION All items contained herein are intended to provide means of ascertaining the cost of any extra work ordered by the engineer under the item of Contigencies. UNIT QUANTITY RATE SHS. The rates inserted in the schedule shall include for all expenses of supervision, agents, timekeepers, plant operators, drivers, transport, tools of any kind, office expenses maintenance fuel, oil, lubricants, overheads aand profits. Labour a b c d Foreman Artisan Labourer Driver Hours Hours Hours Hours 120 250 700 120 90.00 80.00 70.00 80.00 10,800.00 20,000.00 49,000.00 9,600.00 Plant: e f g h i j k Grader cat. 120 or similar Buildozer cat. D6 or similar Trencher Track shovel Vibrator Concrete mixer 10/7 capacity De-watering Centrifugal Pump with 75mm inlet and outlet complete with hoses l m Lorry, 7-ton tipper lorry, 7-ton flatbend Hours Hours 50 50 1,040.00 1,040.00 Hours Hours Hours Hours Hours Hours Hours 20 80 80 50 80 50 50 2,600.00 3,900.00 3,250.00 3,250.00 200.00 650.00 330.00 52,000.00 312,000.00 260,000.00 162,500.00 16,000.00 32,500.00 16,500.00 52,000.00 52,000.00 Total carried to collected at the end of Bill No.34 1,044,900.00

34/1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.34 ITEM SCHEDULE OF DAYWORKS DESCRIPTION UNIT QUANTITY RATE SHS. Materials Rates to include for delivery to site a Portland Cement Bags (50Kg) tons 50 780.00 39,000.00 b Fine aggregate tons 15 1,300.00 19,500.00 c Course aggregate tons 20 1,300.00 26,000.00 d Hardcore tons 20 1,040.00 20,800.00 e Murram tons 20 1,040.00 20,800.00 f Mild Steel reinforcement bars tons 2 13,000.00 26,000.00 g High Tensile reinforcement bars tons 2 13,000.00 26,000.00 h Supply other kinds of materials than above, and ordered by the Engineer Prime Cost 1 65,000.00 65,000.00 i Extra over item l for contractors overhead costs, profit and handling charges as percentage of prime cost item above. % 0 65,000.00 16,250.00 -

Total carried to collected at the end of Bill No. 34

259,350.00

34/2

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II BILL No.34 SCHEDULE OF DAYWORKS SHS.

COLLECTION PAGE: 34/1.

1,044,900.00

34/2.

259,350.00

Total carried to Grand Summary

1,304,250.00

34/3

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II SUMMARY OF BILLS 1 General Items SHS. SHS. 80,188,750.00

Intake Weir

17,797,000.00

Raw Water Main

2,973,044.00

Treatment Works - External Works & Staff Houses

34,550,440.00

Treatment Works - Chemical Building

3,340,220.00

Treatment works - Inlet Chamber and Flocculation Tanks

5,067,780.00

Treatment Works - Sedimentation tanks

7,178,710.00

Treatment Works - Plant building and filters

13,166,080.00

Treatment Works - Clear water and backwash water tanks

4,330,520.00

10

Treatment works - Electrical and Mechanical works

19,350,230.00

11

Existing Treatment plant - Augmentation

127,400,000.00

12

Rising Main

65,436,520.00

13

Distribution Line Kyoea - Kyandoo

81,859,730.00

14

Distribution Line Kyandoo - Kandwia

14,915,090.00

15

Distribution Line Kandwia - Gai - Mivukoni

138,339,300.00

16

Distribution Line Mivukoni - Tseikuru

31,800,085.00

17

Distribution Line Kandwia - Kanzeru

7,855,180.00

18

Distribution Line Kanzeru - Kimu

8,277,190.00

19

Distribution Line Kanzeru - Junction to Kimangao

25,297,770.00

SUB TOTAL

35/1

BILL OF QUANTITIES: KIAMBERE MWINGI WATER SUPPLY PROJECT PHASE II SUMMARY OF BILLS 20 Distribution Line Junction to Kimangao - Katse RATE SHS. SHS. 13,366,520.00

21

Distribution line Junction to Kimangao - KimangaoKyuso

46,142,890.00

22

100 m Tanks - Kimu and Kalatine 200 m3 Storage tanks (10 No.) 400m3 Storage tanks at Treatment works (2 No.) 800m3 storage tank at Kyoea Hill

3,042,700.00

23

20,070,800.00

24

9,470,880.00

25

18,356,830.00

26

Tools, Equipment, Chemicals etc.

9,224,130.00

27

Access roads

328,220,900.00

28

Distribution Line Mwingi - Nguni

100,176,809.00

29

Distribution Line Katse - Nthangani

46,728,860.00

30

Distribution Line Mwingi - Migwani

91,919,480.00

31

Booster station at Mwingi-Migwani line

14,566,400.00

32

100 m Tanks Mwingi - Nguni, Katse- Nthangani lines

3,029,720.00

33

200 m3 Tank at Mwingi-Migwani line

2,007,080.00

34

Schedule of Dayworks

1,304,250.00

Sub-Total Allow for contigengencies at 10 % of sub - total to be expended in whole or part or deleted entirely at the discretion of the engineer. TOTAL 10%

1,396,751,888.00 139,675,188.80

1,536,427,076.80