Professional Documents
Culture Documents
S E A R CH
News
Opinions
Sports
Entertainment/Life
Blogs
Video
Classifieds
Advertise
Real Estate
Loudoun Business
0
Leesburg Town Council decided during its July 26 meeting to bid on the house at 1 County Club Drive during a foreclosure auction in order to move forward on the access road planned for the Linden Hill subdivision. The project, which would be an addition to the South King Street widening project set to start in the spring of 2012, would add a one-way access road between the residential developments of Linden Hill and Leesburg Country Club. The one set-back is the access road would require the demolition of the house at 1 Country Club Drive. The council has placed a price cap for the town to purchase the house at $375,000, which has proved to be not enough. The 36 house development of Linden Hill has had its residents petition council numerous times in the past to get the access road approved and set up for design and construction. The problem Linden Hill residents are facing is that if the widening project is completed without the access road, they will have to turn right on South King Street, then make a u-turn if they want to go into the town of Leesburg. I do support the widening of South King Street, Mayor Kristen Umstattd said. Because of the widening project and cutting off Linden Hill from their long standing access to King Street and not making a left they are at a disadvantage. This gives the town the option to resell the home, should we be able to acquire it. I think we will make back the majority of what we will spend. The proposed plan is to add two left-hand turn lanes on Country Club Drive at the South King Street intersection, along with the access road connecting the two developments. Vice Mayor Kevin Wright wasnt on board with the town to bid on the house. I dont think this is a wise use of taxpayers dollars, Wright said. The cost of this will continue to move up as we move along. According to town staff, the design for the access road was to be finished by June 1. At almost two months behind schedule, it now moves the project back to the fall of 2012. Town Attorney Jeanette Irby, or someone from her staff will bid on the house Aug. 8.
Most Popular in News
Saturday, Jul. 23 | 13251 views Tuesday, Jul. 26 | 8579 views
Ham radio saves mans life State agency investigates Trump tree removal
Monday, Jul. 25 | 8233 views
Comments
Stay Connected
Comments express only the views of the author and do not necessarily reflect the views of this website or any associated person or entity. Any user who believes a message is objectionable can contact us at moderator@timespapers.com.
Post a comment
Anyone can post a comment. Registration is not required. By submitting a comment, you agree to our Terms of Service. Like Us on Facebook News & Sports
Name (required):
E-mail (required):
Remember my personal information Please enter the word you see in the image below: Join Our Email List Sign up for weekly updates
Submit
is an interactive, digital replica of the printed newspaper. Open the e-edition now.
Taste of Loudoun
Bridal Guide
Summer Camps
Health Resolutions
Future Leaders
Coming Soon
By using this site, you agree to the Terms of Service. News | Opinions | Sports | Entertainment | Blogs | Video | Classifieds | Contact Us | Work for Us | Virginia News | Copyright 2010 Loudoun Times-Mirror, a Times Community News newspaper.