You are on page 1of 6

oeAL

r;YSiEMS
CHOANG " LONG
JOINT OPERATING COMPANY
HOANG LONG JOINT OPERATING COMPANY
TGT FIELD DEVELOPMENT
Document Title:
GPS Document No.:
Client Document No.:
UPS SIZING CALCULATION
S0442-GPS-E-H01-CA-0003
-
CLIENT:
Hoang Long Joint Operating Company
o 04-Jan-10
C 26-Mar-09
B 18-Mar-09
A 30-Jan-09
REV DATE
Issued for Purchase
Approved for Design
Issued for Approval
Issued for IDC
DESCRIPTION

,
\'l'rCG
RS / IVM
SLd"l-

RS IVM JM
RS IVM JM
MGC IVM JM
BY CHECKED APPROVED CLIENT
CLIENT REF:
CONTRACTOR:
Global Process Systems Pte Ltd
UPS SIZING CALCULATION (S0442-GPS-E-H01-CA-0003-REV 0)
GPS REF:
S0442
Global Process Systems Pte Ltd
UPS SIZING CALCULATION
Document No : S0442-GPS-E-H01-CA-0003
Revision : 0
Page : 2 of 4
TABLE OF CONTENTS
1.0 INTRODUCTION 3
2.0 CALCULATION ASSUMPTION 3
3.0 CALCULATION 4
3.1 AC Uninterruptible Power Supplying Calculation 4
3.2 DC Supply System 4
3.3 Battery Sizing 4
Global Process Systems Pte Ltd
UPS SIZING CALCULATION
Document No : S0442-GPS-E-H01-CA-0003
Revision : 0
Page :30f4
1.0 INTRODUCTION
The purpose of this calculation is to determine the ratings of the AC Uninterruptible Power supply
(UPS) and Batteries required to successfully supply the vital load of the plant during normal
operation and a short power interruption for the Wellhead Platform (H01-WHP) of the Te Giac Trang
Field, located offshore Vietnam about 100 km southeast of Vung Tau.
The following terms as used in this specification assume the meanings given below:
Company:
Contractor:
Purchaser:
Vendor:
Hoang Long Joint Operating Company (HLJOC).
The company or consortium which is awarded any or all of the engineering,
procurement, construction for the "TGT Field Development" project
The party which places the order or signs the contract. This may be the Company
or the Contractor at all times or the Company followed by the Contractor if the
purchase order is novated
The Company on which the purchase order or contract for supply of the goods or
services is placed
2.0 CALCULATION ASSUMPTION
a) UPS system(s) shall provide power to the following consumers as a minimum:

~ .

ICSS system
PCS Power Consumption
ESS Power Consumption
MPFM Panel
Monitoring Equipment
Communication Equipment
Control Gear
Helideck Lighting, Helideck Floodlight, Perimeter Light, Conformed Gas Landing Light,
Crane Aviation Light
PMS system
Pig signallers
Micro turbine
Hydraulic Powerpack
Chemical Injection Pump
b) Load nature is assumed to be an ohmic load.
c) Ambient Temperature & Altitude correction factors are not considered in this calculation.
d) The calculation result is a guide to the minimum requirements only.
e) The UPS system(s) shall incorporate either fully dual redundant units or parallel redundant
units depending on UPS application. (Refer to DC Battery and UPS system back-up table)
The battery system for the UPS shall be sized to support the required loads for a minimum
duration provided in the attachment and shall consist of 100 % rated batteries (one on each
of the redundant UPS units) for 50!c> of the time.
f) Calculations include complete load list, load profiles (current vs. time).
Global Process Systems Pte Ltd
UPS SIZING CALCULATION
Document No : S0442GPSEH01CA0003
Revision : 0
Page : 4of4
3.0 CALCULATION
3.1 AC Uninterruptible Power Supplying Calculation - see attachment
3.2 DC Supply System - see attachment
3.3 Battery Sizing - (By UPS Vendor to meet the load profile attached)

UPS SIZING CALCULATION


ACUPS H01-79-UPS-OO1/002
Owner: IHOANG LONG JOC IJob Code: IS0422 DC SYSTEM H01-79-UPS-003/004
~ : .
Project: I ~ G T FIELD IDocument No. : IS0442-GPS-E-H01-CA-0003 BATTERY H01-79-BAT-001 & 002
DEVELOPMENT 1Rev .: 0 1Page: 1 OF 2
Total Running
Total Running Total Running Load
Tag No. CASE Load (Amps) 24V (Amps) 400V AC Single Back uptime Remarks
Load (W)
DC Phase UPS
24V DC Load Summary
ICSS
H01-PC-9801 Server cabinet (with operator station PC) 4000 6.08 24 HRS BACKUP 230VAC Rev. 0
Printers 200 0.30 24 HRS BACKUP 230VAC Rev. 0
Engg PC 100 0.15 24 HRS BACKUP 230VAC Rev. 0
Other misc control system equipment 100 0.15 24 HRS BACKUP 230VAC Rev. 0
H01-PMS-9601 PMS System 100 0.15 24 HRS BACKUP 230VAC Rev. 0
PCS POWER CONSUMPTION
H01-PCS-9601 LER 200 8.33 0.30 24 HRS BACKUP
H01-ICSS-9606 M1-RIO 350 14.58 0.53 24 HRS BACKUP
H01-ICSS-9607 M2-RIO 350 14.58 0.53 24 HRS BACKUP
H01-ICSS-9604 WHCP-RIO 100 4.17 0.15 24 HRS BACKUP
H01-ICSS-9605 HPU-RIO 100 4.17 0.15 24 HRS BACKUP
H01-ICSS-9608 DR-RIO 180 7.50 0.27 24 HRS BACKUP
H01-ICSS-9603 CI-RIO 100 4.17 0.15 24 HRS BACKUP
ESS POWER CONSUMPTION
H01-SIS-9501 LER 700 29.17 1.06 24 HRS BACKUP
H01-ICSS-9606 Manifold1-RIO 150 6.25 0.23 24 HRS BACKUP
H01-ICSS-9607 M2-RIO 150 6.25 0.23 24 HRS BACKUP
H01-ICSS-9604 WHCP-RIO 1000 41.67 1.52 24 HRS BACKUP
HO1-ICSS-9605 HPU-RIO 180 7.50 0.27 24 HRS BACKUP
H01-ICSS-9608 DR-RIO 180 7.50 0.27 24 HRS BACKUP
H01-ICSS-9603 CI-RIO 100 4.17 0.15 24 HRS BACKUP
I=IQ1 less 9lQ2 M9-RIG 24 HRS BACKUP Rev 0
OTHERS
H01-LCP-0120 Down hole monitoring Equipment 300 12.50 0.46 24 HRS BACKUP
H01-LCP-0110 MPFM Panel 300 12.50 0.46 24 HRS BACKUP
Communications Equipment 3000 125.00 4.56 24 HRS BACKUP
Pig Signaller 10 0.42 0.02 1 HR BACKUP Rev 0
Control Gear 80 3.33 0.12 24 HRS BACKUP
Control Gear 280 11.67 0.43
1.5 MIN. BACKUP
(INSTANTANEOUS)
LIGHTING I OTHERS
Helideck Floodlight 340 1 HRBACKUP
Either Helideck Floodlight I
Perimeter Light or Conformed
Perimeter Light 880 1 HR BACKUP
Gas Landing Light shall be ON at
a time
Confirmed Gas Landing Light 2400 4.08 15 MIN BACKUP
Rev. a
NAV Aids System 200 0.30 1 HRBACKUP
Rev 0
Boat Landing Light 1200 1.82 24 HR BACKUP
Rev 0
Crane Aviation Light 400 0.61 24 HR BACKUP
Rev 0
Gas Engine Turbine Generator UCP aux 300 12.50 0.46 24 HRS BACKUP
Diesel Engine Generator UCP aux 300 12.50 0.46 24 HRS BACKUP
Crane Engine UCP 300 12.50 0.46 24 HRS BACKUP
FUTURE (25%) 4657.5 194.06 7.08 24 HRS BACKUP
400V AC Load Summary
Microturbine 7500 11.40 5 MIN BACKUP
Hydraulic Powerpack 5500 8.36 5MIN BACKUP
Chemical Injection Pump 11380 17.29 5MIN BACKUP
Fuel Gas Conditioning 8000 12.16 5MIN BACKUP
TOTAL (WITH 25% SPARE) 55667.50 556.98 83.16
-=
UPS SIZING CALCULATION
ACUPS H01-79-UPS-001/002
I
Owner: !HOANG LONG JClJob Code: IS0422 DC SYSTEM H01-79-UPS-003/004
Project: I ~ G T FIELD IDocument No. : IS0442-GPS-E-H01-CA-0003 BATTERY H01-79-BAT-0001 & 002
I
DEVELOPMENT IRev. : 0 IPage: 2 OF 2
SUMMARY OF LOADS
LOAD Time A
Sum of Load 1 24h 29.15
Sum of Load 2 1h 29.47
Sum of Load 3 15m 33.55
Sum of Load 4 5m 82.75
Sum of Load 5 1.5m 83.17
Batteries: Batteries shall be designed for 2 x 100% load with back up time of 2 x 50%. Hence, the battery load duty cycle is tabularised as below:
LOAD CYCLE OF H01-79-BAT-001
LOAD Duration Time (HH:MM:SS) Current (Amp)
Sum of Load 1 12 hour 00.00.00 to 11.30.00 29.15
Sum of Load 2 30 min 11.30.00 to 11.52.30 29.47
Sum of Load 3 7.5 min 11.52.30 to 11.57.30 33.55
Sum of Load 4 2.5 min 11.57.30 to 11.59.15 82.75
Sum of Load 5 45 sec 11.59.15 to 12.00.00 83.17
LOAD CYCLE OF H01-79-BAT002
LOAD Duration Time(HH:MM:SS) Current (Amp)
Sum of Load 1 12 hour 00.00.00 to 11.30.00 29.15
Sum of Load 2 30 min 11.30.00 to 11.52.30 29.47
Sum of Load 3 7.5 min 11.52.30 to 11.57.30 33.55
Sum of Load 4 2.5 min 11.57.30 to 11.59.15 82.75
Sum of Load 5 45 sec 11.59.15 to 12.00.00 83.17
Load Duty Cycle for H01-79-BAT-0001& 002
(2 X 100%Capacity, 2X50% Back-up Time)
83.17 A
82.75A
33.ssJ
29.47 A
29.15A
Rev. 0
Rev. 0
Rev. 0
Rev. 0
400V AC UPS CAPACITY
24V DC SYSTEM CAPACITY
.j3. 40083.17 0.95
1000
54739.85
1000
54.74
24600
1000
14400
1000
14.40
= 60 KVA (3-Phase)
=20 KVA
11.52.30