Release 2.8
Copyright
Copyright 2010 ERESOURCE. All rights reserved. No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of eresource Infotech P. Ltd. The information contained herein may be changed without prior notice. Microsoft, WINDOWS, NT, EXCEL, Word, PowerPoint and SQL Server are registered trademarks of Microsoft Corporation. HTML, DHTML, XML, XHTML are trademarks or registered trademarks of W3C, World Wide Web Consortium, eresource, eresource Logo. Eresourceerp.com are trademarks or registered trademarks of eresource Infotech in India and several other countries all over the world. All other products mentioned are trademarks or registered trademarks of their respective companies
Table of Contents
Master Production Schedule ........................................................................................................................ 5 The Production Process definition in eresource. .......................................................................................... 6 Product and Material Definition in eresource .............................................................................................. 7 Forecasts Consumed by orders ..................................................................................................................... 8 Linkage to other Company Activities .......................................................................................................... 10 Master Production Scheduling in MPC system ........................................................................................... 10 Capacity Planning and Daily Route Availability ........................................................................................... 11
Make-to-stock
Capacity
On the basis of the parameters defined here, the system computes the duration of individual operation of the product.
Product BOM (Bill of Material) : More advanced products would include BOM kits that are made up of other products (referred to as BOM components) IPQC and FGQC process : IPQC refers to In-process-Quality-Check and FGQC to Finished Quality Check. Here the parameters of IPQC and FGQC is defined with the acceptable tolerance.
Product Business Partner: This describes additional information used when product Is manufactured and purchased. Product Replenishment: This describes the rules of how a product would be replenished. This would, for instance, include minimum and maximum quantities to hold in stock.
eresource ERP provides you the provision to create Master Production scheduling on the bases of Sales order, Forecast or Both. For a particular time period you are allow to do Production Scheduling. All finish material requirement get filtered out on the click of Consolidated Requirement Item Name Wise. A Mfg Order No. which is system generated gets populated which is customer specific and its sales order no. In eresource ERP you have provision to schedule a plan Qty and system will auto generate the pending Qty. System will tell the start and end date of each and every particular Mfg Order No.
Resource Planning
Master Production Scheduling ( MPS ) Front end Engine Detailed Material planning ( MRP )
10
Demand Management
In eresource ERP sales and operations planning the forecasts from demand management will be consolidated and incorporated into sales and operations plan.
Eresource ERP Master Production Scheduling system quickly and accurately schedules all item requirements for each manufacturing facility.
11
Some of the benefits of using Master Production Schedule module are it helps last minute scheduling, shortage avoidance, efficient allocations of resources and cost control. It gives the customer timely information on what they need and when they need. Eresource ERP's MPS module organizes what the customer need to do and when efficiently. The schedule can be re-calculated easily when a process fails, for example, the situations like a material shortage or manpower absence.
12