250x250 SHS (Pin) T1

Page 1

TRUSS SUPPORT CONNECTION DESIGN From S-Frame Analysis: Critical Design Load: Compression, C Tension, T BASEPLATE DESIGN Concrete Strength, fcu = = = x = 40 16 C / Pc 300 90000 N/mm2 N/mm2 = 5000 mm2 Axial force Shear force KN Fx (KN) Fy (KN) 80 0 0 70 94 2.1 5.4

Pc = 0.4fcu

Required Baseplate Area, A Provide 300

Base plate mm2 > 5000 mm2

Provided Baseplate Area, Ap

Plate Thickness: t = 2.5w pyp (a2-0.3b2)


1/2

where

pyp a b w

= = = = = x

265 48.4 48.2 C / Ap 3.7 300

N/mm2 mm mm = mm x 0.89 20

(Assume t 40 mm)

N/mm2 20 mm mm > T=11

Provide baseplate

t 300

thick M.S. Plate

250x250 SHS (Pin) T1 WELD DESIGN ON BASE PLATE Ultimate axial load (tension) Resultant shear force = = ( = 94 KN 2.1 2 + 5.79 KN D= B= 2D + 2B 0.313 0.019 0 150 = kN/mm kN/mm

Page 2

5.4 2)0.5 KN

Weld all around the support member,

mm mm 300 mm

Weld Length Tension per weld length, T Shear load on CHS weld, SF Max. resultant load on weld

= = = = = mm =

( T2 + SF2)1/2 0.314 kN/mm fillet weld all around ( Pw = 0.45 kN/mm 215 > N/mm2 ) 0.31 kN/mm

Provide Weld Strength

HOLDING DOWN BOLT DESIGN Provide Properties : At, tensile stress area As, single shear pt, tension strength ps, shear strength Pbb, Bearing strength of bolt Pbs, bearing strength of plate = = = = = = 157 mm2 157 mm2 560 N/mm2 375 N/mm2 1000 N/mm2 275 N/mm2 4 No's M 16 gr. 8.8 bolts

Tension per bolt Shear per bolt

= = = = = = = =

23.5 1.4 0.8ptAt 70.34 psAs 58.88 Fs Ps 0.36

kN kN

Tension Capacity per bolt, Pt

kN

>

23.5

kN

Shear capacity per bolt, Ps

kN + < Ft Pt 1.4

>

1.4 1.4

kN

Combined Shear and Tension

PASSED!

250x250 SHS (Pin) T1

Page 3

Minimum spacing Maximum spacing Minimum edge distance Maximum edge distance

= = = =

2.5d 14t 1.40D 11t

= = = =

40 280 25 224

mm mm mm mm (D = d + 2) ( = (275 / p

Bolt spacing:

Max Min Max Min

= = = =

250 250 25 25

< > <

280 40 224 25

mm mm mm mm

PASSED! PASSED! PASSED! PASSED!

Edge distance:

Bearing Capacity, Pb Capacity of bolt, Pbb Capacity of plate, Pbs Pbs Pb = = = = dtpPbb dtpPbs 68.75 68.75 KN KN > 1.4 KN PASSED! ( Resultant Shear per bolt) = = 320 88 KN KN > 1/2etpPbs 68.75

ULTIMATE ANCHORAGE BOND STRESS Total Tension per bolt = 94 4 23.5 BFcu1/2 0.50 x 40 1/2 3.16 F3 D 23500 50.27 N/mm2 X 1 L 1 L KN

= fbu = = = fb =

3.16

147.8 mm

Provide embedded length = 150 mm

250x250 SHS (Pin) T1

Page 4

PASSED!

250x250 SHS (Pin) T1

Page 5

PASSED!

PASSED!

PASSED!

250x250 SHS (Pin) T1

Page 6

(D = d + 2) ( = (275 / pyp)1/2)

PASSED! PASSED! PASSED! PASSED!

1/2etpPbs KN

PASSED! nt Shear per bolt)