Sec02_FieldDevelopmentPlanning_All.ppt
Sec02_FieldDevelopmentPlanning_All.ppt
Definitions
n n n n n n n n n
ABB Lummus Global Inc. - 3
TLP Mini-TLP ETLP SPAR DDCV SCF Semi-sub FPS FPSO GBS Tendon
Tension Leg Platform Mini Tension Leg Platform (Atlantia, Modec) Extended Tension Leg Platform Cylindrical Floating Vessels Deep Draft Caisson Vessel Single Column Floater (SPAR Shape) Semi-submersible Floater Floating Production System Floating Production Storage and Offloading Concrete Gravity Based Structure TLP Station Keeping Method
n n
Sec02_FieldDevelopmentPlanning_All.ppt
Definitions
n n n n n n n n
ABB Lummus Global Inc. - 4
Kilo Pounds (Thousand Pounds) Single Point Mooring Catenary Anchor Leg Mooring Steel Catenary Riser Vortex Induced Vibration Remotely Operated Vehicle Mobile Offshore Drilling Unit American Bureau of Shipping Det Norske Veritas
Sec02_FieldDevelopmentPlanning_All.ppt
Constructibility Program
Preliminary Engineering
Added Value by moving constructability forward with EPCI contractor performing screening and concept development
Detailed Design
n n n
ABB Lummus Global Inc. - 6
Identify Development Option Perform Feasibility Studies Establish Field Development Plan Produce Conceptual Design
Construction
Installation
Lowest Start
First Oil
Project Duration
Finish
Sec02_FieldDevelopmentPlanning_All.ppt
Define Interfaces
n n n n n n
Downhole / Subsea / Hull Fluid Flow / Connections / Treatment Electrical / Hydraulic Subsea / Topsides Maintenance Intervention
n
ABB Lummus Global Inc. - 7
Prepare Specifications
n n n
Sec02_FieldDevelopmentPlanning_All.ppt
System Design
n n n n n
Future Considerations
n n
Sec02_FieldDevelopmentPlanning_All.ppt
Feed
Sec02_FieldDevelopmentPlanning_All.ppt
STAGE 2
SCREENING
"Do we have the right solution"
STAGE 3
DEFINITIVE PLANNING
"Are the bases really firm?"
STAGE 4
PROCESS DESIGN
"Any changes? Ready to go?
EMPHASIS
IDENTIFY OPPORTUNITY SCOPE ECONOMICS ID CRITICAL ISSUES STRATEGIC ALIGNMENT
EMPHASIS
EVALUATE OPTIONS RISK ANALYSIS REFINE BUSINESS CASE RESOLVE CRITICAL ISSUES RESOURCING NEXT PHASE
EMPHASIS
REFINE BUSINESS CASE REFINE FACILITIES BASIS RESOURCING NEXT PHASE
EMPHASIS
FINAL BUSINESS CASE TECHNICAL DEFINITION RESOURCING THRU S/U
DELIVERABLES
PRELIMINARY BUSINESS CASE (BC) VENTURE PHILOSOPHY (VP)
DELIVERABLES
UPDATED BC & VP RISK & DECISION ANALYSIS VENTURE BASES TECHNOLOGY BUSINESS & MARKETING MANUFACTURING
DELIVERABLES
VENTURE MANAGER NAME TEAM IN PLACE UPDATED VENTURE BASES UPDATED COST ESTIAMTE
DELIVERABLES
FINAL BASIS / APPRO DOC. PROCESS DESIGN / HAZOP +/- 10% COST ESTIAMTE
TECHNICAL BASIS
SUFFICIENT FOR TECHNICAL FEASIBILITY
TECHNICAL BASIS
SUFFICIENT FOR +/- 20-30% COST ESTIMATE
TECHNICAL BASIS
SUFFICIENT DETAIL TO ENABLE PROCESS DESIGNA ND PERMITTING
TECHNICAL BASIS
SUFFICIENT TO ENABLE +/- 10% COST ESTIAMTE DETAILED ENGINEERING SAFETY REVIEWS
Solution Selection
FEED Studies
EPCI
Open Architecture
Sec02_FieldDevelopmentPlanning_All.ppt
Estimate Definition
Type
Definitive
Accuracy
+/- 5%
Class
II
Timing
14-20 wks
Capital Cost
+/- 10-20%
II, IV
5-12
wks
Appropriation Feasibility
ABB Lummus Global Inc. - 11
+/- 20-25%
VA,VB
2-5 wks
+/- 25-35%
VI, VII
days
Times for Definitive and Capital Cost Estimates are from completion of basic and process engineering.
Sec02_FieldDevelopmentPlanning_All.ppt
8 Months
9 to 10 Months
Sec02_FieldDevelopmentPlanning_All.ppt
Key Objectives
n
Key Philosophies
n
Flexibility
n n n n
production
n
from reservoir to processing host without shutdown and with least disruption to other equipment
Sec02_FieldDevelopmentPlanning_All.ppt
Configuration simplicity consistent with Meeting Functional Objectives Reliability in Equipment/Systems (Low Maintenance Intensity) Operations/Maintenance and Supply Base Organization Strategy Drilling and Well Intervention Strategies Shuttle Tanker Cycles fully optimized with Facilities Production Objectives Procurement Strategies consistent with Field Life Expectations and Development Schedule Supply Logistics
Sec02_FieldDevelopmentPlanning_All.ppt
Value Added
n
Provide an early definition of project front end requirements. Greatest potential to improve project timeline and cost curve. Early planning can define and control project risk. Reality based cost estimate for prospect screening economics. Ability to expand study detail for each higher level of project funding approval.
n
ABB Lummus Global Inc. - 16
Sec02_FieldDevelopmentPlanning_All.ppt
Concept Optimization
MUSD/WELL
PROJECTS
Tommeliten
Tordis
Vigdis
Tordis st
Balder
Cost per well is defined as the equipment necessary at the wellhead excluding drilling, installation and flowlines
Sec02_FieldDevelopmentPlanning_All.ppt
Engineering Fabrication
19,000
35,700
Engineering Fabrication
15,000
21,345
Engineering Fabrication
16,000
21,071
Engineering Fabrication
30,000
37,087
Engineering Fabrication
8,500
9,085
Sec02_FieldDevelopmentPlanning_All.ppt
QUESTIONS ?