List of Major Permits and License Required During Construction Sl. Clearance No 1 Right of way for all .

corridors to the Facility. 2 Consent for the . development of Project site 3 Boiler & other pressure . part pipes & valves within purview of IBR 4 Electrical Plant and . Equipment installation (pre & post) 5 Pre & Post installation . approval for buildings, pipe racks layout, cable routes racks, acid and other chemical storage 6 Fire Fighting/ Protection . system/Electrical system 7 Chlorine storage . 8 Fuel oil storage tank . 9 Approval of stack air . emission levels (excluding ground concentration) 1 No Objection Certificate 0 (NOC) for Storm Water . drainage, from concerned authorities 1 Collection, storage & 1 disposal of waste, . effluent 1 Site clearances, Safety 2 Report and Safety Audit . Agency Sate Government / Concerned Agency Local Panchayet Agency Required to obtained by Project Company Required to obtained by Project Company Will be obtained by Contractor(s) Will be obtained by Contractor(s) Will be obtained by Contractor(s)

The Chief Inspector of Boilers The Chief of Electrical Inspector, Sate Govt. The Chief Inspector of Factory, local municipality/ Concern Authorities. Tariff Advisory Committee / Loss Prevention Association (LPA) Chief Controller of Explosive, Nagpur Chief Controller of Explosive, Nagpur State Pollution Control Board, Inspector of Chimney Municipal Corporation: Executive Water drainage Design State Pollution Control Board

Will be obtained by Contractor(s)

Will be obtained by Contractor(s) Not Required

Required to obtained by Project Company

Will be obtained by Contractor(s)

Required to obtained by Project Company

State Pollution Control Board

Required to obtained by Project Company

Sl. Clearance No 1 Switchyard 3 . 1 Lift & Cranes 4 . 1 Use of wireless set and 5 allocation of frequency . of wireless 1 Clearance for Stack 6 Obstruction Light . 1 Permission for Hook up 7 with GPS of Master . clock system 1 License for construction 8 labour pursuant to . Contract Labour (Regulation & Abolition) Act 1970 1 Registration of workers 9 required pursuant to . section 2A of Employee State Insurance Act 1984 2 Consent of Collector of 0 Explosives to the . possession and use of explosives for the purpose of blasting. 2 Approval of temporary 1 construction power . lines within plant area 2 Road/ Rail permit for 2 transpiration of . material to Facility site 2 Use of Minerals and 3 natural aggregates for . civil works

Agency State Electricity Board/ CEA/ CEIG

Agency Will be obtained by Contractor(s)

Lift Inspector

Will be obtained by Contractor(s)

Concerned Authorities, Wireless advisor to Govt. of India Directorate of Civil Aviation

Will be obtained by Contractor(s)

Will be obtained by Contractor(s)

Relevant Authorities

Will be obtained by Contractor(s)

Labour Commissioner, State Govt.

Will be obtained by Contractor(s)

Labour Commissioner, State Govt.

Will be obtained by Contractor(s)

Home Department, State Govt.

Not Required

Electrical Inspectorate, State Govt. Concerned Authorities

Required to obtained by Project Company

Required to obtained by Project Company

Dept. of Mines & Geology, Sate Govt.

Not Required

Sl. No

Clearance

Agency

Agency

2 Permission for labour 4 camp . 2 Work permit for 5 expatriate personnel .

Concerned Authorities

Will be obtained by Contractor(s)

Concerned Authorities

Will be obtained by Contractor(s)