You are on page 1of 1

ORIGIN EVENTS

PLANT & PORT OF IMPORT ORIGIN YARDS


Arrival InGate Purificatio n

STORAGE, UPFITTERS & HOMOLOGATION

VIN Scheduled VON Assignment Customer Preference Options PreBay Work Scheduled Unload ETA Established ETA to Port Inspection Work in Process Vehicle Complete Vehicle Repair Advanced Shipping Notice

End of Line Inspection Customs (Import) Vehicle Move Work Complete

Monroney Generation

Vessel Arrival Location Monroney Generation Unload from Vessel Inspection Available Shipping Priority

Shippable Ship to Processing Vehicle PickUp First Point of Rest Vehicle PickUp Rail Rail Truck Vessel Truck Custome r Build Load Rail Build Load Truck

Not Shippable Ship to Storage

From Customer From Yard Departure OutGate Shipped Notification

From Storage

From Upfitter

TRANSIT EVENTS
TRUCK
Conveyance Type PreBay Truck Notification Unload Railcar Placed Inspection Load Rail Load Acceptance Arrival InGate Ship Request Ship Approved Conveyance Type

IN TRANSIT YARDS

RAIL

Truck Arrival Inspection Customs (Import) Customs (Export) Advanced Shipping Notice

Release Notification (BoL)

Truck Departure Vehicle Move Customs (Import) Location CLM Truck in Transit Monroney Generation Inspection ETA Update Rail in Transit Arrival Constructiv e Placed Unload Rail Inspection Available Rail in Transit Depart Rail Arrival (1, 2, 3...) Customs (Export) Rail Interchange (1, 2, 3...) Marshalling Yard Rail Departure (1, 2, 3...) ETA Update Shipped Notification

Inspection Build Load Rail Railcar Exception Delay Vehicle PickUp

Build Load Truck

Railcar Out of Service / Bad Order

Destination Override

Diversion or Reconsignment Vessel

Hold Response

Diversion Response

Rail

Truck

Departure OutGate

Shipped Notification

Rail Switchout

Railcar Released from Consignee

DESTINATION EVENTS
DEALER
Inspection Conveyance Type

EXPORT VESSEL
Hold Request / Notification Plant Quality or Other

EXCEPTIONS
Miscellaneous Administrative Finance

Ship Request

Damage Mechanical

Vessel Manifest

Railcar Out of Service Bad Order Derailment Sublet Repair Customs (Export) Cannot Locate Stolen Inventory Control Vessel Departure New Dealer Launch Misshipped Dealer or Zone Shipped Notification Sales Storage Carrier Administrative Shortage, BoL, Manifest Errors

VIN Refused

Vessel in Transit

Shipped Air, Recovered, Show, Test or Vessel Sailed AllOther Hold Codes Not Included Above ETA Update Hold Release Notification

Damage Notification

Carrier Damage Marine Damage Port / Yard / Show Damage Hail Damage Disclosure Repair Date Damage Classification

You might also like