Geregu II
KKS
Description
Coating System
Quantity
Subtotal in EUR
Remarks
Turbine, compressor rotor with common casing - pipes < 50 mm - supports i i INT/C3 INT/C3 10.0 3.0 m m linear m linear m
MBR
Exhaust gas system (stack) - pipes > 50 mm - pipes < 50 mm - supports i i i INT/C3 INT/C3 INT/C3 5.0 5.0 2.0 m m m
MBV
Lubricant supply system (Gas turbine plant) - tanks - pipes > 50 mm - pipes < 50 mm - supports - electric motors / apparatus i i i i i INT/C3 INT/C3 INT/C3 INT/C3 SER-INT/C3 210.0 270.0 360.0 90.0 105.0 m m m m m linear m
MBQ
Ignition fuel supply system - pipes > 50 mm - pipes < 50 mm - supports i i i INT/C3 INT/C3 INT/C3 20.0 65.0 2.0 m m m
Generator MKA Generator, complete, incl. Stator, rotor and all integral cooling equipment - generator gas turbine - pipes > 50 mm - pipes < 50 mm - supports MPR Forced cooling system - pipes > 50mm - pipes < 50mm - supports i i i INT/C3 INT/C3 INT/C3 450.0 430.0 310.0 m m m linear m i i i i INT/C3 INT/C3 INT/C3 INT/C3 750.0 300.0 100.0 180.0 m m m m linear m
Annex 1 Pos. 2
Page 1 of 17
Status: 2011-07-13
S
1. Work paid by measurement
Geregu II
KKS
Description
Coating System
Quantity
Subtotal in EUR
Remarks
Ancillary Systems
SCA Compressed air distribution system - pipes > 50 mm - pipes < 50 mm - pipes > 50 mm - pipes < 50 mm - supports - supports SGC Fire Fighting System - pipes > 50 mm - pipes < 50 mm - pipes > 50 mm - pipes < 50 mm - supports - supports o o i i i o EXT/C4 EXT/C4 INT/C3 INT/C3 INT/C3 EXT/C4 170.0 200.0 80.0 135.0 10.0 10.0 m m m m m m linear m linear m o o i i i o EXT/C4 EXT/C4 INT/C3 INT/C3 INT/C3 EXT/C4 80.0 135.0 80.0 135.0 10.0 10.0 m m m m m m linear m linear m
o o
1.0 1.0
m m
1.0
in case of need
Flanges will be measured to number of pieces (PC) as a flange-pair. The mean diameter is DN 250
scaffolding - scaffolding per m - scaffolding per m pipes > 50mm pipes < 50mm supports pipes > 50mm pipes < 50mm supports pipes > 50mm pipes < 50mm supports pipes > 50mm pipes < 50mm supports pipes > 50mm pipes < 50mm supports pipes > 50mm pipes < 50mm supports pipes > 50mm
1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
m m m m m m m m m m m m m m m m m m m m m
in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need linear
linear
linear
linear
linear
linear
Annex 1 Pos. 2
Page 2 of 17
Status: 2011-07-13
S
1. Work paid by measurement
Geregu II
KKS
Description
Coating System
Quantity
Subtotal in EUR
Remarks
pipes < 50mm supports pipes > 50mm pipes < 50mm supports pipes > 50mm pipes < 50mm supports pipes > 50mm pipes < 50mm supports pipes > 50mm pipes < 50mm supports pipes > 50mm pipes < 50mm supports components, tanks tanks tanks tanks tanks tanks tanks tanks pumps/compressors pumps/compressors pumps/compressors pumps/compressors pumps/compressors -skids -skids -skids -skids -skids - valves - valves - valves - valves - valves - valves - valves
IM-COND IM-COND IM-CHEM IM-CHEM IM-CHEM IM-W/Im2 IM-W/Im2 IM-W/Im2 IM-BUR/Im3 IM-BUR/Im3 IM-BUR/Im3 PP/PVC PP/PVC PP/PVC STAIN STAIN STAIN STAIN EXT/C4 INT/C3 SER-EXT/C4 SER-INT/C3 Oil IM-W IM-C EXT/C4 INT/C3 SER-EXT/C4 SER-INT/C3 Stain Stain INT/C3 EXT/C4 T1 T2 Stain INT/C3 EXT/C4 T1 T2 T3 T4
1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need in case of need
linear
linear
linear
linear
linear
linear
5,998.0 2,160.0
m m
Total
Remarks
6,322.0 m
The above mentioned Unit Prices shall be deemed as all inclusive rates (excluding VAT) and include therefore: coating material, labour, tools, accommodation of staff, wear and tear material, profit, overhead costs, hardship allowance, replacement of gratings, cleaning of delivered/provided and prime coated surfaces, removal of Contractor's surplus material and waste material etc.
Scaffolding - The above mentioned unit rates shall include scaffolding/access up to 4m height (upper platform level), including but not limited to erection, dismantling and transportation. - Scaffolding over 4m height (upper platform level) will be paid extra based on the unit rates for scaffolding. - The unit rates for the tanks shall include all necessary scaffolding/access (internal and external) and foils including but not limited to erection, dismantling and transportation.
Process water, electricity are excluded. Process water and electricity are paid on basis of verifiable invoices, if not already provided free of charge.
Annex 1 Pos. 2
Page 3 of 17
Status: 2011-07-13
s
(incl. cost of materials)
GEREGU II
Hourly Wage Rates ("all inclusive rates" excl. travel cost) in EUR per hr for [.] hrs on [.] days
Description
Quantity
Remarks
Following activities are as well covered in the above mentioned hourly wage rates resp. unit rates: replacement of gradings, cleaning of delivered/provided and prime coated surfaces, removal of Contractor's surplus material and waste.
Equipment
Compressor 750 Cfm. - 21m Compressor 600 Cfm. - 17m Compressor 375 Cfm. High Pressure Washing machine / Steam Cleaner Airless spray machine including paint hose and spraygun Sandblasting Pot-200 litres incl. Blasting hose and nozzle Lifting equipment e.g. fork lift, cherrry picker Mobilisation / Transport (bidirectional) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 h h h h h h h m m m m m m All inclusive rates All inclusive rates
Scaffolding
Scaffolding up to 8m Scaffolding up to 8m Scaffolding over 8m Scaffolding over 8m Foils or similar equipment to protect the environment during blasting of tanks Foils or similar equipment to protect the environment during blasting of tanks Mobilisation / Transport (bidirectional)
Process water and electricity are paid on basis of verifiable invoices, if not already provided free of charge.
Annex ...
Page 4 of 17
Status: 2011-07-13
KKS
Description
Coating System
Quantity
Subtotal in EUR
Turbine, compressor rotor with common casing - pipes < 50 mm - supports i i INT/C3 INT/C3 10.0 3.0 m m
MBR
Exhaust gas system (stack) - pipes > 50 mm - pipes < 50 mm - supports i i i INT/C3 INT/C3 INT/C3 5.0 5.0 2.0 m m m
MBV
Lubricant supply system (Gas turbine plant) - tanks - pipes > 50 mm - pipes < 50 mm - supports i i i i INT/C3 INT/C3 INT/C3 INT/C3 210.0 270.0 360.0 90.0 m m m m
MBQ
Ignition fuel supply system - pipes > 50 mm - pipes < 50 mm - supports i i i INT/C3 INT/C3 INT/C3 20.0 65.0 2.0 m m m
Generator MKA Generator, complete, incl. Stator, rotor and all integral cooling equipment - generator gas turbine - pipes > 50 mm - pipes < 50 mm - supports MPR Forced cooling system - pipes > 50mm - pipes < 50mm - supports i i i INT/C3 INT/C3 INT/C3 450.0 430.0 310.0 m m m i i i i INT/C3 INT/C3 INT/C3 INT/C3 750.0 300.0 100.0 180.0 m m m m
Ancillary Systems
SCA Compressed air distribution system
- pipes > 50 mm - pipes < 50 mm - supports SGC Fire Fighting System - pipes > 50 mm - pipes < 50 mm - supports
i i i
m m m
i i i
m m m
3,777.0 1,295.0
m m
Total
Remarks
3,971.3 m
The above mentioned Unit Prices shall be deemed as all inclusive rates (excluding VAT) and include therefore: coating material, labour, tools, accommodation of staff, wear and tear material, profit, overhead costs, hardship allowance, replacement of gratings, cleaning of delivered/provided and prime coated surfaces, removal of Contractor's surplus material and waste material etc.
Scaffolding - The above mentioned unit rates shall include scaffolding/access up to 4m height (upper platform level), including but not limited to erection, dismantling and transportation. - Scaffolding over 4m height (upper platform level) will be paid extra based on the unit rates for scaffolding. - The unit rates for the tanks shall include all necessary scaffolding/access (internal and external) and foils including but not limited to erection, dismantling and transportation.
Process water, electricity are excluded. Process water and electricity are paid on basis of verifiable invoices, if not already provided free of charge.
Remarks
linear m linear m
linear m
linear m
linear m
linear m
linear m
linear m
and transportation.
ng and transportation.
KKS
Description
Coating System
Quantity
Subtotal in EUR
Main Machine Sets Additional Steam-, Water-, Gas- and Fuel Oil Pipes
EKG & Piping system for supply of gaseous fuels EKT - pipes > 50 mm - pipes < 50 mm - supports o o o EXT/C4 EXT/C4 EXT/C4 340.0 530.0 200.0 m m m
Ancillary Systems
SCA Compressed air distribution system - pipes > 50 mm - pipes < 50 mm - supports SGC Fire Fighting System - pipes > 50 mm - pipes < 50 mm - supports o o o EXT/C4 EXT/C4 EXT/C4 170.0 200.0 10.0 m m m o o o EXT/C4 EXT/C4 EXT/C4 80.0 135.0 10.0 m m m
1,446.0 865.0
m m
Total
Remarks
1,575.8 m
The above mentioned Unit Prices shall be deemed as all inclusive rates (excluding VAT) and include therefore: coating material, labour, tools, accommodation of staff, wear and tear material, profit, overhead costs, hardship allowance, replacement of gratings, cleaning of delivered/provided and prime coated surfaces, removal of Contractor's surplus material and waste material etc.
Scaffolding - The above mentioned unit rates shall include scaffolding/access up to 4m height (upper platform level), including but not limited to erection, dismantling and transportation. - Scaffolding over 4m height (upper platform level) will be paid extra based on the unit rates for scaffolding. - The unit rates for the tanks shall include all necessary scaffolding/access (internal and external) and foils including but not limited to erection, dismantling and transportation.
Process water, electricity are excluded. Process water and electricity are paid on basis of verifiable invoices, if not already provided free of charge.
Remarks
linear m
linear m
linear m
and transportation.
ng and transportation.
KKS
Description
Coating System
Quantity
Subtotal in EUR
670.0 0.0
m m
Total
Remarks
670.0
The above mentioned Unit Prices shall be deemed as all inclusive rates (excluding VAT) and include therefore: coating material, labour, tools, accommodation of staff, wear and tear material, profit, overhead costs, hardship allowance, replacement of gratings, cleaning of delivered/provided and prime coated surfaces, removal of Contractor's surplus material and waste material etc.
Scaffolding - The above mentioned unit rates shall include scaffolding/access up to 4m height (upper platform level), including but not limited to erection, dismantling and transportation. - Scaffolding over 4m height (upper platform level) will be paid extra based on the unit rates for scaffolding. - The unit rates for the tanks shall include all necessary scaffolding/access (internal and external) and foils including but not limited to erection, dismantling and transportation.
Process water, electricity are excluded. Process water and electricity are paid on basis of verifiable invoices, if not already provided free of charge.
Remarks
including blasting
and transportation.
ng and transportation.
KKS
Description
Coating System
Quantity
Subtotal in EUR
105.0 0.0
m m
Total
Remarks
105.0
The above mentioned Unit Prices shall be deemed as all inclusive rates (excluding VAT) and include therefore: coating material, labour, tools, accommodation of staff, wear and tear material, profit, overhead costs, hardship allowance, replacement of gratings, cleaning of delivered/provided and prime coated surfaces, removal of Contractor's surplus material and waste material etc.
Scaffolding - The above mentioned unit rates shall include scaffolding/access up to 4m height (upper platform level), including but not limited to erection, dismantling and transportation. - Scaffolding over 4m height (upper platform level) will be paid extra based on the unit rates for scaffolding. - The unit rates for the tanks shall include all necessary scaffolding/access (internal and external) and foils including but not limited to erection, dismantling and transportation.
Process water, electricity are excluded. Process water and electricity are paid on basis of verifiable invoices, if not already provided free of charge.
Remarks
and transportation.
ng and transportation.
INT C3 spread m2/litre spread for Actual Thickness expected expected spread microns thickness thickness total sq m 6.56 4.92 125 80 4.92 4000
Paint Interseal 670HS Top coat EXT C4 Intergard 475 Interthane 990 IM W Interline 850
6.4 11.4
4.8 8.55
125 50
110 50
4.8 8.55
1600 1600
Top coat
6.1
4.58
125
300
1.53
700
6.56
4.92
125
100
4.92
110
NB: Paint mark up 40% loss factor 25% thinner estimate: 30% of paint
670
1340
thinner cost of cost per total cost cost of paint thinner with total vol cost per litre total cost thinner vol litre thinner with mark up mark up 813.01 4,176.00 3,395,121.95 243.9 2137.6 521,365.85 4,753,170.73 729,912.20
333.33 187.13
100 56.14
2137.6 2137.6
213,760.00 120,005.61
1,461,973.33 1,330,900.58
299,264.00 168,007.86
459.02
4,688.00 2,151,868.85
137.7
2137.6
294,358.03
3,012,616.39
412,101.25
22.36
4,176.00
93,365.85
6.71
2137.6
14,337.56
130,712.20
20,072.59
7,635,266.60
1422600
labour cost