KAINGIN-DAMAGED IPO FOREST AND WATERSHED
RESERVATION.
(A Progress Assessment and Feedback Report)
Reference:
1 . DENR Special Order No. 466-2004 dated July 5, 2004 creating investigation
Team re: Ipo Watershed Usufruct and Kaingin Proliferation .
1 . Evaluation of the usufruct areas of the Ipo watershed which were granted and
issued by the DENR to its employees;
2. Determine the extent of damaged caused by kaingin;
3 . Survey and census of residents thereof; and
4. Other matters related thereto.
IPO Forest and watershed' reservation had sustained great damage to its forest due
to pervasive Kaingin activities . The Kaingin activities and other illegal cutting of trees in
the Ipo forest has proliferated because ofthe following:
d) Awards of lands within Ipo by NCIP (CART) and the invasion of CAMBASI
members having adverse claim on portion of the Ipo watershed.
II - RECOMMENDATIONS:
The DENR Usufruct program/project in the Ipo forest and watershed area must
be stopped. The 34 existing contracts of usufruct must be revoked and/or
cancelled;
The DENR and the MWSS must initiate moves for the cancellation and/or
revocation of the Certificate of Ancestral Domain Title No. R03-SJM-0204-020
(CART) covering ONE -THOUSAND EIGHT HUNDRED SEVENTEEN
(1,817) hectares, more or less, which were granted to the Dumagat on February
18, 2004, by the National Commission on Indigenous people pursuant to its
authority under RA 8371.
It is suggested that the area for the indigenous people of Dumagats be relocated
outside the Ipo watershed as the awarded CART area lies contiguous/adjoins the Ipo
river. The water run-offs will surely goes down the river because of its rolling terrain
should the area be developed or converted into a community. The land that will be
awarded should be outside the buffer zone of the watershed. The Ipo watershed and
reservation forms part of a sensitive class of protected areas in accordance with the
classification and standard prescribed by RA No. 7586, where the major supply of waters
for MWSS to its consumers in Metro Manila comes from .
The MWSS together with its Concessionaires, as the ultimate beneficiary of Ibo
waters of the Ipo watershed tributaries shall undertake the responsibility over the
protection, preservation, maintenance, rehabilitation and development of the Ipo
watershed . In connection with such plan of take-over, an organic office within the MWSS
should be created like that of the National Power corporation ( Napocor) to its supervised
and controlled watersheds i.e, Angat watershed reservation.
III - BRIEF HISTORICAL BACKGROUND
In 1919 Act No. 2832 created Metropolitan Water District (now the MWSS. The
MIND was invested the power and authority over the Angat watershed (with an area of
62,000 hectares, more or less) by virtue ofProclamation No. 71 dated March 10, 1927.
On April 30, 1968, Proclamation No. 391 was issued by then President Ferdinand
E. Marcos . Said proclamation reduced the area to 6,600 hectares, more or less, now
known as the Ipo Forest and Watershed Reservation . It further provides the joint
management of Ipo forest and watershed by the Director of Forestry and the General
Manager, NWSA .
Since then, MWSS as the forerunner of the defunct NWSA, tool; the active
supervision and control of the Ipo forest and watershed through its then WATER
SOURCES AND TREATMENT DEPARTMENT (WSTD) .
In 1995, Republic Act No. 8041 otherwise known as the "National Water Crisis
Act" took effect. Executive Orders Nos. 286 and 311 dated December 6, 1995 and
March 20, 1996, mandated MWSS to enter into arrangements with private sector in any
and all of the segments, operations and/or facilities of the MWSS . Hence, the operations
function of MWSS was transferred to the two (2) Concessionaires .
However, the obligations . of MWSS towards the management of Ipo forest and
watershed reservation were not spelled-out or defined much less delegated to any of the
Concessionaires under the Concession Agreement (CA) dated February 21, 1997 .
Consequently, the DENR took the cudgels of taking over the management of the
Ipo watershed since the start of the privatization since 1997 to present.
t
The concept was to grant rights on tree farming within forestlands as well as to
provide support to food security program of government.
DENR Administrative Order No. 2000-1 dated May 24, 2004, declared and set
aside certain tract of forestlands for DENR employees in Region III, which includes a
THREE HUNDRED SIXTY (360 ) HECTARES of Ipo forest and watershed
reservation to be under the Usufruct Program/Project.
On the summer of 2001, it was alleged that the first kaingin happened where a
partner of a usufructuary who himself claimed was misled by his principal that they could
stay in the area under a tenured period under the Usufruct program. That is until the
planted fruit-bearing trees bear fruits .
IV- THE INVESTIGATION AND ASSESSMENT
After the termination of the aerial photography conducted on April 26, 2004, an
action was taken requesting the DENR to stop and cancel the usufruct program/project at
Ipo watershed due massive kaingin in the area.
In response to the move of MWSS, DENR issued Special Order No. 466-2004,
creating a team that will conduct the assessment of the usufruct areas within Ipo and the
proliferation of kaingin.
Hereunder are the following observations and findings gathered from 19 July
2004 to 20 August 2004, to wit: J
I
A1 Usufruct Areas
Usufruct areas were also devoted to farming. The "opened fields" were planted
with upland rice, corn, root crops, and other vegetable farming.
It is our conservative estimate on the active usufruct areas cultivated, that the
cultivator-partner have resorted to 80% kaingin to 20% open. That simply means 80%
were to be kaingined to open a space for plantation while the 20% constitute the original
pocket open spaces of the watershed.
i
The beneficiary's partner (steward) maintains a vegetable farm and root crops for t
their day-to-day needs since the DENR employee-beneficiary or the principal of the
usufruct, stays in DENR Offices and will only be seen twice or once a month by the
partner-cultivator .
B) Rehabilitation/Reforestation Projects
There were two (2) reforestation areas identified by Forester Abrasaldo, DENR
Tabang, Bulacan in Sapang Munti and in Sapang Catmon which were razed by fire
kaingin) . The area has been converted into a cornfield of about fifteen (15) hectares, more
or less.
We also found fresh that reforestation area at Mataas na Buhangin were damaged.
We discovered newly cut plantation of mahogany and gemelina of about 2 to 3 year old
seedlings . The area was cleared and planted with corn and upland rice .
Reforestation areas in San Isidro, San Jose del Moune Bulacan (adjoining the
Ipo's veterans village) was also razed by fire sometime in May (summer) of this year
according to residents of the area. Fire was initiated by settlers of the mount Balagbag
known as the veterans area.
The massive Kaingin activities in Ipo forest and watershed started allegedly
almost simultaneously with the implementation of the usufruct program of the DENR.
According to a resident of Sapang Munti, who withheld his identity for security reasons,
kaingin activities spread like wildfire in the forest of Ipo when that usufruct program
started sometime in 2002 . More kaingin were made in 2003 and this summer of 2004.
New settlers of the area were encouraged coming in from Quezon and Bicol regions.
These are the very people who are now cultivating the kaingin areas and converted the
same into cornfields, upland rice, root crops and vegetable farming.
Aerial and land photography over Ipo watershed will also show the damaged
areas of Ipo forest. Hardly hit by kaingin are the following:
It is estimated that the total damaged by kaingin could reach 35% ofthe total
6,600 hectares of Ipo watershed .
**Detailed presentation of data may be presented later as soon as the Final Comprehensive Report
will be completed by the Investigating Team.
D) Other Observations
On July 20 and 21, 2004, at about 12:00 midnight-2 :30 early dawn chain saw
were overheard running in the midst of a heavy down pour of rain in the areas of Baliwag
and Sapang Munti .
On July 22, 2004 at about 8 :00-8 :30 AM, while team A (Mr. Baclayon & DENR)
was in Mataas na Buhangin, a chain saw was heard running at the Sapang Munti or
somewhere in Paco area. It went off later. Team B ( Narciso De la Cruz with DENR)
discovered logs and timbers along the Sapang Anginan concealed along the river banks
ready for transport. The Team tried to haul the tablons but the boatman refused to
carry/load the logs fearing reprisal from the unknown owner/s . Early morning at about
6:OOAM the Team rushed to the site to retrieve the tablons and the logs ( 16 pcs of 8 x 4 x
12 tablons and 2 pcs of felled timber 10 ft. long x half meter diameter), it was found
nowhere. Searching in and around the immediate vicinities proves futile. It may have
been transported or relocated . Verification of any apprehensions at the Ipo gate and Dam
areas found negative.
1 . Only four (4) personnel from DENR Tabang, Malolos, Bulacan, are guarding
the 6,600 hectares of watershed land.
4. No permanent Checkpoint;
8
He further lamented that their efforts of apprehending illegal loggers is hampered
due to lack of equipment i.e., radio communication, limited mobility due to lack of motor
vehicle, motorized banca of their own, inadequate number of personnel conducting the
routine forest patrol and his alleged non-cooperation of MWCI and MWSI personnel at
Ipo Dam whom he feels, may be involved in facilitating the transport of,illegally cut trees
during night time .
F) CENSUS/SURVEY OF RESIDENTS
Informal Settlers/Cultivators
1. Dumagat - 39 Families
2. New settlers - 103
3. Off-site cultivators - 105
Means of Transportation
Moreover there are 25 motorized and 26 . not motorized boats (banca) plying the
rivers of the Ipo watershed. These boats are owned by the settlers residing inside the
forest which also serves as carrier of illegally cut trees and unauthorized fishing in the
rivers of Ipo watershed.
Portion of Ipo watershed consisting of 1,000 hectares, more or less, has been
included in the award by the National Commission on Indigenous People (NCIP) to the
Dumagats as the latter's relocation site and area of farm cultivation. This portion lies in
mount Balagbag and mount Balacbac where the Ipo rivers lies immediately at the
footstep of said mountains.
Since it was awarded, a group of settlers invaded mount Balagbag and Balacbac
who established settlement in the area allegedly composed of retired and in the active
service of the military. Aerial photo taken at the site shows the settlers' kaingin in the
area . Today there are 150 to 200 families residing in the area .
V- PROPOSED ACTION PLAN
For indigenous people i.e., Dumagats they may be resettled to the place allocated
for them at the buffer zone area of the Ipo watershed under CART in San Isidro San Jose
Del Monte Bulacan;
a) All banca and motorized boats will be destroyed except those that will
be left to ferry bonafide resident i.e., indigenous people/natives
pending relocation ;
b) Enforcement of I.D. System at the Ipo Dam Main Gate for indigenous
people pending relocation and evacuation to their allocated area of the
Ipo watershed.
a) Campaign/info
dissemination to
evacuate from Ipo
watershed
i) Enforce search of
things ferried inside
Ipo particularly
gasoline for chain saw.
Phase III
g) Intensification of
forest protection &
preservation by forest
patrolling.
3. Representatives
per diem for LGU, 10 500.00 15 75,000.00
DENR & CI-ftt . working
days
Miscellaneous :
a) For any transportation of belongings of evicted families especially for I.Ps.
b) Contingent and other incidental expenses .
EXPECTED OUTPUT:
12
VI - ACTIONS REQUESTED FROM MWSS MANAGEMENT .
Submitted by:
CISO DE LA CRUZ
R.O.W Assistant
Annexes
a) Photo taken during the field investigation (to be shown on the presentation)
b) Photo taken during aerial inspection (to be shown on the presentation)
c) Proposed Executive Order for the transfer of Ipo jurisdiction to MWSS ;
d) Proclamation No. 391 dated April 30, 1968;
e) DENR Special Order No. 2004-466 dated July 5, 2004;
f) Office Order No. 04-94
13