: DNTH WELLGROW
Location
:
Revision 0
QUOTATION
Quotation :No.SKT 080928
TOTAL 36,708.00
VAT 7% 2,569.56
FINAL AMOUNT 39,277.56
We hope that our confirmation will meet with your requirement and look forward to receiving your valuable or
Your Faithfully,
SUMMARY OF QUOTATION
1 Direct Cost
1.1 Main Power Supply For Transfer Mold Machine 1 lot 27,420.00
1.2 0 1 lot -
Subtotal 1 27,420.00
2 Indirect Cost
2.1 Site Staff and Supervisor 1 lot -
2.2 Transportation 1 lot 3,000.00
2.3 Rent House 1 lot
2.4 Tool and consumption 1 lot 1,500.00
2.5 Site Expense 1 lot -
1 Temporary Facilities
2 Small Construction Supplies
3 Utility Supply Costs
Subtotal 2 4,500.00
- WIRE AND CABLE CV3C-50 SQ.MM. (R,S,T) 1 Lot Existing From Injection M/C 11
- WIRE AND CABLE THW 1-16 SQ.MM. (G) 1 Lot Existing From Injection M/C 11
- WIRE AND CABLE CV4C-6 SQ.MM. (R,S,T,G) 1 Lot Existing From Injection M/C 11