Ref: CEL/VIT/11-12/330 Date: 06th Sep. 2011 To, Vishwaroop InfoTech Pvt.

Ltd Sector 30, Vashi Railway Station, Navi Mumbai Kind Attn: Mr. Vinod Nair Sub : SITC of Electrical Activities for 15th Floor Data Centre.

Dear Sir, This has reference to your requirement of above subject. In this regards we wish to submit our offer is us under: Scope of Work: - 1 Sn. 1 2 3 4 Description Supply and Laying of 3.5 C 150 Sq.mm Al. Arm. Cable Termination of 3.5 C 150 Sq.mm Al. Arm. Cable Removing termination of 3.5 C 150 Sq.mm Al. Arm. Cable Junction Box for Cable Termination of 3.5 C 150 Sq.mm Al. Arm. Cable Unit Mtrs. Mtrs. nos. Nos. Qty 210 6 2 1 Rate 677 1630 475 12643 Amount 142170.00 9780.00 950.00 12643.00 165543.00 13243.44 6820.37 0.19 185607.00

Total Vat 8% Service Tax 4.12% Round Off ( + ) Grand Total Rupees One Lacs Eighty Five Thousand Six Hundred and Seven Only

Page 1 of 5

Scope of Work: - 2 Sn. 1 2 3 Description Supply and Laying of 3.5 C 150 Sq.mm Al. Arm. Cable Termination of 3.5 C 150 Sq.mm Al. Arm. Cable SITC of 400A TPN MCCB ( Retrofitting ) Unit Mtrs. Mtrs. Nos. Qty 160 2 1 Rate 677 1630 Amount 108320.00 3260.00 34340.00 145920.00 11673.60 6011.90 0.50 163606.00

34340 Total Vat 8% Service Tax 4.12% Round Off ( + ) Grand Total Rupees One Lacs Sixty Three Thousand Six Hundred and Six Only

We hope this is in line with your expectations in case of any query feel free to contact us. Thanking you and assuring you of our best attention at all times, we remain. Yours truly, For, Kelvolt (India) Pvt. Ltd.

Co-ordinator

Santosh R. Vishwakarma Director 8108555003

Sanjiv R. Vishwakarma Sales Engg. 8108555021

Page 2 of 5

TERMS AND CONDITIONS 1. Scope & Prices: Scope of supply shall be as per our BOQ.

2.

Delivery: 2 -3 week on receipt of technically and commercially acceptable order. The period of delivery shall be reckoned from the date of receipt of agreed advance payment, and/or Letter of Credit and /or drawings whichever shall be later.

3.

Taxes & Duties Vat @ 8% Service Tax @ 4.12% Any statutory variation in the taxes & duties / new levies during the tenure of the contract shall to your account.

4.

Terms of Payment: 60% Advance of the Total Value, 20% against Delivery of the Materials & 20% against Testing and Commissioning. All the payments shall be released within 15 days of submission of the bill. Any delay in payment shall be levied interest of 24% per annum.

5. Variation & Scope of Work: If there are any additions or changes to the scope of work outlined in our proposal and its annexure, the value of the contract will enhanced accordingly and payment will be made in accordance with the terms of payment of our offer. All measurements will be carried out as per BIS Regulations.

6. Site Facilities The Customer will provide at his cost, adequate, acceptable, independent lockable storage facilities to us to storage of equipment, materials, tools and tackles etc. brought to the site from time to time during the execution of the contract. Facilities including water and power required for erection, testing and commissioning will be provided by you in time free of cost.

Page 3 of 5

7. Lien & Transfer of Property: Property in all equipment/materials/supplies etc. brought to the site in execution of the contract by us shall at all times lie with Kelvolt (India) Pvt. Ltd. (Notwithstanding the fact that the progress bill have been paid for). The right to transfer of property in the job executed by us shall get transferred to you only upon full payment of all the dues to Kelvolt (India) Pvt. Ltd and upon formally being handed over to the customer.

8. Completion of Work: The entire work will be completed within 1Week from the date of signing of the acceptance of the order, opening of L/C, on receipt of down payment and also receipt of all technical information/data from you/your Architects/ your Consultants, necessary to enable us to proceed with the job and handling over of clear site to us on drawing approval. However, the execution of the work and also completion date are subject to delays, if any, or your part in providing us with any material or services not included in the Contract, any default by sub-contractors or reasons beyond the control of ourselves including strike, lockout fire, accident at work site or during transit of materials to site, war and war-like operations, hostilities, civil commotion, capture, seizure, detention, blockage, labour disturbances, go slow tactics, work-to-rule, lay-off or otherwise and the consequences thereof and also any reason amounting to Force Majeure. In any event, a consequential damage for non-completion or delay in completion of work is excluded.

9. Suspension/Cancellation of Work: We shall be entitled to suspend/cancel the work on account of:a. Customers instruction/lack of instructions b. Non Payment of our bills If the work or part of the work is cancelled after customers acceptance, cancellation charges as levied by our suppliers/manufactures shall be borne by the customer. In addition the customer shall pay us compensation for cost and expenses incurred by us upto the date of cancellation plus ten percent. In the event of re-starting the work we shall charge extra for any increase in costs).

10. Material & Workmanship Warranty Subject to the terms of payment being punctually complied with and the equipment being operated properly, the equipment covered by the contract work is warranty by us against faulty materials and workmanship for a period of 12 months from the date of installation or for a period of 15 months from the date of delivery of machinery involved in the execution of the contract work whichever ends earlier, should the product prove to be defective due to faulty workmanship or otherwise, we will remedy the defect or replace the faulty parts or the whole product at our discretion, as soon as possible, free of cost. This Warranty: Page 4 of 5

a.

Is null and void If repairs and modifications are carried out without our approval in writing or Inefficient maintenance. does not cover supply of consumable items like refrigerant, oil, fuses, belts etc. does not cover deterioration or rusting due to atmospheric conditions. Does not extend to consequential damages or losses:

b. c. d.

11. Arbitration: Any dispute or difference whatsoever arising between the parties out of or relating to the construction, meaning or operation or effect of this agreement shall, unless resolved amicably, be settled by Arbitrators one to be appointed by each party and the third Arbitrator (who shall act as the presiding Arbitrator) to be appointed by the two Arbitrators. All proceedings under such Arbitration shall be held in Mumbai and would be in accordance with the provisions of the Arbitration and Conciliation Act, 1996 and any statutory modifications or reenactment thereof. It is agreed and understood that the Court having Jurisdiction over Mumbai alone shall be competent to entertain any Application or Petition pertaining to the Arbitration Agreement and/ or arbitral proceedings pursuant to this clause.

Annexure I Items Not Included

All other ancillary work explained in brief hereunder will have to be arranged for by you:

We have not included any masonry work such as foundation for the equipments, cutting away and making good of walls/slabs, scaffolding etc. Protected lockable storage space at site and license/ permission from concerned authority if required. We have strictly quoted as per the Bill of Quantities; any variation in the variable quantities shall be adjusted as per unit rate. Provision of power and water for erection, testing and commissioning of the plant. Any other item not specifically mentioned in Bill of Material.

For, Kelvolt (India) Pvt. Ltd. Page 5 of 5