Adjust Time to Current Crest Adjust Current Magnitude Adjust Total Lead Length Select Arrester Rating
60
2.0 uS
34 kA
1.25 ft
12 kV
40
30
20
10
0
-1 -10 Time in uS 1 3 5 7 9 11 13 15
From IEEE Guide for Improving the Lightning Performance of Overhead Distribution Lines ****IEEE 1410-1997 ****
Enter lightning stoke level in kA This is the probability of any given stroke being of at least this magnitude 30 53%
140
120
100
80
60
40
20
Start Page
Arrester Rating Recommendation Interactive Arrester Comparison New Features of this Edition
MOV AC Conduction
Power Systems
Page 4
4. System characteristics are change on the screen where they are used.
5. Metal Oxide Varistor conduction simulation. See how to measure resistive and capacitive currents and how they are affected by applied voltage. 6. Lightning simulation and the effects of lead length with examples of how to idenfity the lead length to count. 7. Calculate the probability of a lightning strike in your area of the country. 8. Use the stand alone margin of protection calculator.
Jon Woodworth 6-9-03 Additions to 2003.8.6 Added Station Arrester Rating Selection Added Station Arrester Energy Calculator Added Station Arrester data to Margin of Protection Calculator Added Probability of Line Flashover in a given area of the country and line geometry Add4ed Simple tables for arrester selection Added Rule of thumb clause in the line lead example section Added Terms and Definitions Added link for check of update
Optimizer FAQ's
Question Where to go and how to do it What arrester rating to The best way to do this is to use the section that recommends the arrester voltage rating based on system characteristics entered by the user. The key characteristics that need to use on my system? be entered are 1. Arrester class, 2. System voltage, 3. Regulation error, and 4. Maximum temporary overvoltage time. What is the easiest way to compare arresters? What is the easiest way to see what my energy losses are due to the material of the housing? The best way to do this is to use the section called interactive comparison. Arresters from Joslyn, OB and Cooper can be compared. For discharge voltage, two user entered arresters can be added In the interactive comparison section of the Optimizer, select the arresters to be compared, then select the Click for savings in dollars button to see the savings. While on that page, you can also change the arresters you are comparing and the region of the world you are doing the investigation for. The cost of energy is also entered on this page. This can also be done from the arrester selection page once the arresters have been selected, you can click on the losses button and it will show the losses of all the suggested arresters.
It selects arresters based on entered data. There is a page that goes into minute detail about the selection process. All manufacturers are selected the same way based on MCOV, TOV, System voltages and arrester class
How much does the line lead really effect the voltage stressed across the transformer?
You will be surprised when you use the line lead effect calculator. This is located on the interactive comparison page as well as a special page just for line lead calculations. On the interactive comparison page, the effect of the line lead is added into the Margin Of Protection graph.
From the Interactive Comparison page, there are two buttons that take the user to the How can I check the raw catalog data of the TOV and Discharge Voltage databases. In the discharge data base, additional arrester information can be added. Optimizer?
Why can I use lower rated VariGAP arresters on my three wire or delta system?
TOV, TOV, TOV. This is demonstrated by the rating selection page. For shorter TOV's the ungapped arrester can handle high TOV's, but for the longer TOV's the VariGAP is king. Try changing the TOV time after your arrester is selected. If it is on a solidly grounded system it will not make a difference, but for delta and three wire high impedance grounded system, the VariGAP can use lower ratings.
What is the difference between resistive current and capacitive current? How do I know the length of line lead to use in a line lead calculation?
On the MOV AC conduction page, you can raise and lower the voltage applied to a MOV disk. While doing this you can observe the changes in the current through the disk. The resistive current is the current in phase with the voltage and the capacitive current is 90 degrees out of phase with the voltage. Also check out the help buttons on that page. This is better explained graphically, so click on the Line Lead Identification button. A general rule of thumb is to sum up the length of the lead that is in parallel with the protected insulation and also in conduction during the surge.
Does the size of a line Just a bit. See the line lead calculator page for more detail. Adjust the size of the lead lead affect the voltage wire and it will show the change in inductance. In general .4uH/foot will work in these types of calculations. drop? What is TOV? What is MCOV? Question Not Here? TOV is the Temporary OverVoltage capability of an arrester MCOV is the maximum continuous operating voltage of an arrester Contact your Cooper Power Systems Sales Representative, and they will be able to answer your questions, or put you in touch with someone who will.
Sources of Data
All the data in this calculator is public and found in catalogs except the Watts Loss data which comes from lab tests.
Based on the Data Input Screen the Values are as shown below
Step 2 From the Rating/MCOV Table Find the MCOV rating of the arrester that exceeds the line to ground voltage of the system MCOV of the arrester must be greater than the Max L-G voltage long term
For a Cooper VariSTAR arrester based on the inputted data, this value is Rating = MCOV = 10 8.4
Step 3 From the TOV curves of the arrester type, determine the TOV capability of the arrester. This is also found in the Raw TOV data in the Optimizer
Step 4 Based on the Fault Factor as determined from the system type, calculate the voltage level attained across the arrester during a fault. Max L-G Voltage * Fault Factor = Expected temporary Overvoltage during a fault Fault Factors are shown to the right of the selected system type on Data Input Page For a Delta system, the fault factor is 1.73, so for a L-G voltage of 8.4kV, the TOV can go to 14.52kV for the duration of the clearing device. Step 5 Using the published TOV data, determine the necessary Arrester TOV rating that exceeds the maximum L-G voltage during a ground fault This is done by dividing the MCOV rating by the TOV factor on the TOV curve. Example: According the published data, the UltraSIL VariSTAR Arrester can withstand a TOV of 1.42 times its MCOV. This means for a 10kV (MCOV=8.4kV) arrester, it can withstand 14.2kV for 100 seconds before failure.
Page 10
Step 6 Determine the Arrester rating that has at least the TOV rating as determined in step 5 and this is the arrester rating that can be used for this system in question. Example: For a 100 second fault, the TOV rating of a 10kV UltraSIL arrester is 14.2kV but the voltage on the selected system can reach 14.52kV which is beyond the capability of this rateing of arrester. This means at least a 12kV arrester is needed for this application.
Step 7 The final step is to determine the larger of the two MCOV ratings as calculated in Step 2 and 6. The greater of these two is the minimum MCOV rating for this application.
Page 11
Page 12
Page 13
Page 14
Page 15
Page 16
Page 17
Page 18
kV kV Arrester Rating MCOV kV kV 3.0 2.55 6.0 5.10 9.0 7.65 10.0 8.40 12.0 10.2 15.0 12.7 18.0 15.3 21.0 17.0 24.0 19.5 27.0 22.0 30.0 24.4 33.0 27.5 36.0 29.0
Page 19
Page 20
Page 21
Page 22
Page 23
Page 24
Page 25
Page 26
Page 27
Page 28
Page 29
Page 30
Page 31
Page 32
Page 33
Page 34
Page 35
Page 36
OB Riser Pole
10k 10k 10k 10k 10k 10k 10k 10k 10k 10k 10k 10k 10k 10k 10k 10k 10k 10k 10k 10k 500 500 500 500 500 500 5kA 500 500 500 A 500 A A A A A A A A A A A A A A A A A A A A A A A A A 1/10 A A A 8/20 1/10 8/20 1/10 8/20 1/10 8/20 1/10 8/20 1/10 8/20 1/10 8/20 8/20 1/10 8/20 1/10 8/20 1/10 8/20 11 8.7 12 11 8.4 12 9.9 7.9 20 10 7.6 19 10 7.8 10 9.4 7.1 18 9.2 7 14 12 8.5 11 9.9 7.6 9.9 9.1 6.6 0 0 23 17 25 22 17 23 20 16 23 20 15 24 20 16 21 19 14 23 18 14 28 25 17 21 20 15 20 18 13 0 0 33 25 27 24 19 33 30 23 32 24 18 30 23 17 30 27 21 29 20 16 37 33 23 31 29 22 27 25 18 30 31 34 26 28 26 19 34 32 24 32 25 19 32 23 18 31 28 21 31 21 16 41 36 24 34 32 24 30 27 20 33 34 43 33 39 35 27 43 40 30 52 32 24 36 32 25 39 35 27 35 29 22 56 49 31 40 38 29 36 33 24 0 0 54 41 43 39 29 54 48 37 55 39 29 42 35 27 49 44 34 41 32 24 65 58 40 51 48 37 44 41 29 0 0 64 49 52 47 36 65 60 45 65 48 36 48 43 33 58 53 40 47 39 30 75 66 46 61 56 44 53 49 36 60 61 68 52 55 50 38 69 63 48 65 51 38 54 46 35 62 56 43 53 42 32 83 73 51 68 64 49 61 56 40 0 0 80 60 69 63 48 80 73 56 88 59 44 59 57 43 72 66 50 58 52 40 103 91 63 82 76 59 71 65 47 0 0 90 68 78 71 54 91 85 63 97 68 51 65 65 49 81 74 56 64 59 45 112 99 71 92 86 66 79 72 52 0 0 100 76 82 75 57 101 92 70 117 74 55 71 69 52 91 83 63 70 62 47 123 108 78 101 94 73 89 81 59 0 0 112 85 91 83 63 113 105 78 120 84 63 77 76 57 100 91 69 76 69 52 0 0 0 0 0 0 0 0 0 0 0 120 91 96 88 67 121 111 84 130 89 66 82 80 61 108 98 74 81 73 55 150 132 92 121 113 87 105 96 70 0 0
10k 10k 10k 10k 10k 10k 10k 10k 500 500 500 500 Ratin A A A A A A A A A A A A g 1/10 8/20 1/10 8/20 1/10 8/20 1/10 8/20 0 10 10 8 9 9 6.2 0 0 0 0 0 0 3 0 21 21 16 17 19 12 0 0 0 0 0 0 6 24 31 30 23 26 25 19 0 0 0 0 0 0 9 26 35 32 26 29 27 21 0 0 0 22 20 14 10 0 41 39 31 34 33 25 0 0 0 0 0 0 12 0 52 48 39 43 41 31 0 0 0 0 0 0 15 47 62 58 47 51 49 37 0 0 0 0 0 0 18 0 72 62 54 60 56 44 0 0 0 0 0 0 21 0 83 78 62 68 66 50 0 0 0 0 0 0 24 0 93 87 70 77 73 56 0 0 0 0 0 0 27 0 103 97 78 86 82 62 0 0 0 0 0 0 30 0 0 0 0 0 0 0 0 0 0 0 33 0 124 116 93 103 97 75 114 96 75 0 0 0 36
TOV Data
All TOV calculations in the Optimizer are based on this database. To change the data, just chang
UltraSIL HeavyNormal Duty Arrester
OB Normal Duty
2 2 2 2 2 2 1.72 1.5
2 2 2 2 2 2 1.72 1.5
2 2 2 2 2 2 1.72 1.5
Calculator
3 6 9 10 12 15 18 21 24 27 30 33 36
UNS 733.33% 318.50% 189.63% 178.59% 121.45% 77.24% 47.74% 39.30% 19.35% 5.44% -5.00% -15.18% -20.83%
UNG 755.86% 326.01% 289.34% 272.55% 168.36% 145.48% 101.70% 90.00% 52.00% 34.37% 26.67% 15.15% 8.20%
UHS 859.60% 379.80% 218.79% 200.63% 139.29% 97.92% 59.40% 50.32% 29.96% 11.90% 2.81% -9.52% -14.41%
URT
831.37% 367.98% 299.16% 274.02% 198.74% 146.75% 98.74% 87.75% 62.12% 39.71% 28.38% 13.10% 6.74%
UHG 831.37% 365.69% 322.22% 307.73% 194.12% 168.36% 120.42% 107.42% 66.08% 46.83% 38.48% 25.83% 18.60%
URS 910.64% 408.02% 251.85% 238.08% 168.36% 115.42% 79.58% 69.04% 45.04% 28.73% 15.15% 4.51% -2.66%
URG 932.61% 416.30% 365.69% 348.11% 223.13% 195.03% 142.35% 128.37% 82.69% 61.56% 52.24% 38.48% 30.49%
Normal Duty 10 kV 12 kV
12 kV
10 kV
MOP
Joslyn ZNP NDB PDV-65 ND O UltraSIL ND VariSTAR ND VariGAP OB Optima UltraSIL HD VariSTAR UltraSIL Joslyn ZHP HD 180.24% 93.88% 121.45% 272.55% 195.95% 152.66% 139.29% 10 kV 12 kV 12 kV 10 kV 10 kV 12 kV 12 kV
DV
Joslyn ZNP NDB PDV-65 ND O UltraSIL ND VariSTAR ND VariGAP OB Optima UltraSIL HD VariSTAR UltraSIL Joslyn ZHP HD 33.9 49.0 42.9 25.5 32.1 37.6 39.7 Rating UltraSIL Normal duty VariSTAR UltraSIL Normal Duty VariGAPEvolution URT Arrester Duty VariGAP VariSTAR VariGAP UltraSIL Heavy Duty VariSTAR Heavy UltraSIL UltraSIL Riser Pole Riser Pole UltraSIL 3 11.4 11.1 9.9 10.2 10.2 9.4 9.2 6 22.7 22.3 19.8 20.3 20.4 18.7 18.4 9 32.8 24.4 29.8 23.8 22.5 27 20.4 10 34.1 25.5 31.6 25.4 23.3 28.1 21.2 12 42.9 35.4 39.7 31.8 32.3 35.4 29.4
Page 179
Calculator
15 18 21 24 27 30 33 36
Input Options for Arrester Type This is the source data for comparative drop down list UltraSIL ND VariSTAR UltraSIL ND VariGAP Evolution URT Arrester UltraSIL HD VariSTAR UltraSIL HD VariGAP UltraSIL RP VariSTAR UltraSIL RP VariGAP OB PDV-65 ND OB Optima OB PVR RP Joslyn ZNP ND Joslyn ZHP HD Joslyn ZRP Normal Duty Heavy Duty Riser Pole
1 2 3 4 5 6 7 8 9 10 11 12 13
This is the kv to add to the dis voltage from the lead leng
Four Wire Multi-Grounded Spacer Cable Three Wire Low Impedance Grou Three Wire High Impedance Gro Delta 5
This is the logic and selection table for the competitive comparison calcu
Arr 1
Arrester Type Drop down position selected and Type Name --------> Arrester Rating Drop down location and Rating ----------->
3 6 9 10 12 15 18
URT
Page 180
Calculator
21 24 27 30 33 36
18 kV 18 kV 18 kV 18 kV 18 kV UltraSIL RP VariSTAR Optima OB Evolution URT ArresterUltraSIL RP VariSTAR OB Optima 78.30% 67.31% 97.17% 52.9 56.4 ARR 1 Normal Duty Heavy Duty & URT
MOP DV ARR 2
Joslyn ZNP NDB PDV-65 ND O UltraSIL ND VariSTAR ND VariGAP OB Optima UltraSIL HD VariSTAR UltraSIL Joslyn ZHP HD FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE Normal Duty Heavy Duty & URT
MOP DV ARR 3
Joslyn ZNP NDB PDV-65 ND O UltraSIL ND VariSTAR ND VariGAP OB Optima UltraSIL HD VariSTAR UltraSIL Joslyn ZHP HD FALSE FALSE FALSE FALSE FALSE 67.31% FALSE FALSE FALSE FALSE FALSE FALSE 56.4 FALSE Normal Duty Heavy Duty & URT
Joslyn ZNP NDB PDV-65 ND O UltraSIL ND VariSTAR ND VariGAP OB Optima UltraSIL HD VariSTAR UltraSIL Joslyn ZHP HD
MOP DV
FALSE FALSE
FALSE FALSE
FALSE FALSE
FALSE FALSE
FALSE FALSE
FALSE FALSE
FALSE FALSE
Rating UltraSIL Normal duty VariSTAR UltraSIL Normal Duty VariGAPEvolution URT Arrester Duty VariGAP VariSTAR VariGAP UltraSIL Heavy Duty VariSTAR Heavy UltraSIL UltraSIL Riser Pole Riser Pole UltraSIL 3 11.4 11.1 9.9 10.2 10.2 9.4 9.2 6 22.7 22.3 19.8 20.3 20.4 18.7 18.4 9 32.8 24.4 29.8 23.8 22.5 27 20.4 10 34.1 25.5 31.6 25.4 23.3 28.1 21.2 12 42.9 35.4 39.7 31.8 32.3 35.4 29.4 15 53.6 38.7 48 38.5 35.4 44.1 32.2 18 64.3 47.1 59.6 47.8 43.1 52.9 39.2 21 68.2 50 63.2 50.6 45.8 56.2 41.6 24 79.6 62.5 73.1 58.6 57.2 65.5 52 27 90.1 70.7 84.9 68 64.7 73.8 58.8 30 100 75 92.4 74 68.6 82.5 62.4 33 112 82.5 105 84 75.5 90.9 68.6
Page 181
Calculator
36
120
87.8
111
89
80.1
97.6
72.8
TOV Data
This is the kv to add to the discharge voltage from the lead length 0.38 kV
Data for input screen 0.01 0.1 1 10 100 1000 10000 Infinite Output of above Inquire 3
TOV Data
0 UltraSIL Normal duty VariSTAR UltraSIL Normal Duty VariGAP Heavy- Normal Duty Arrester UltraSIL Riser Pole VariGAP UltraSIL Heavy Duty VariSTAR UltraSIL Evolution URT Arrester UltraSIL Riser Pole VariSTAR 0.01 1.78 2 1.78 2 1.78 1.69 2 0.1 1.68 2 1.68 2 1.78 1.6 2 1 1.59 2 1.59 2 1.78 1.51 2 10 1.5 2 1.5 2 1.78 1.43 2 100 1.42 2 1.42 2 1.78 1.35 2 1000 1.34 2 1.34 2 1.78 1.27 2 10000 1.34 1.72 1.34 1.72 1.78 1.27 1.72 1000000 1.26 1.5 1.26 1.5 1.78 1.2 1.5
Normal Duty
Joslyn ZNP NDB PDV-65 ND O UltraSIL ND VariSTAR ND VariGAP OB Optima UltraSIL HD VariSTAR UltraSIL Joslyn ZHP HD 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Normal Duty Heavy Duty & URT
Joslyn ZNP NDB PDV-65 ND O UltraSIL ND VariSTAR ND VariGAP OB Optima UltraSIL HD VariSTAR UltraSIL Joslyn ZHP HD 0.000 0.000 0.000 0.000 0.000 23.455 0.000 Normal Duty Heavy Duty & URT
Joslyn ZNP NDB PDV-65 ND O UltraSIL ND VariSTAR ND VariGAP OB Optima UltraSIL HD VariSTAR UltraSIL Joslyn ZHP HD 0.000 0.000 0.000 0.000 0.000 0.000 0.000 18 kV 18 kV 18 kV UltraSIL RP VariSTAR Optima OB Evolution URT Arrester 23.103 23.455 30.600 Normal Duty Heavy Duty & URT
Page 182
Calculator
10 kV
12 kV
12 kV
10 kV
10 kV
12 kV
12 kV
Joslyn ZNP NDB PDV-65 ND O UltraSIL ND VariSTAR ND VariGAP OB Optima UltraSIL HD VariSTAR UltraSIL Joslyn ZHP HD 13.524 16.116 16.218 16.800 13.692 15.637 16.218
Page 183
Calculator
OB PDV-65 OB PDV-100 672.36% 859.60% 287.76% 379.80% 187.88% 227.59% 163.89% 200.63% 93.88% 65.22% 43.94% 30.14% 4.97% -4.04% -12.04% #VALUE! -28.03% 152.66% 98.74% 68.44% 49.61% 24.67% 11.11% 1.06% #VALUE! -15.85%
OB PVR 943.96% 419.13% 287.76% 251.85% 192.31% 134.57% 94.27% 70.86% 46.38% 31.94% 17.28% #VALUE! -1.04%
Joslyn ZNP #VALUE! #VALUE! 211.48% 180.24% #VALUE! #VALUE! 55.74% #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Joslyn ZHP 831.37% 358.94% 220.95% 195.95% 146.75% 98.33% 63.79% 52.98% 22.27% 8.82% -1.96% #VALUE! -18.17%
Joslyn ZJP 932.61% 413.51% 283.06% 247.99% 187.01% 131.71% 92.70% 69.34% 45.04% 30.67% 16.14% #VALUE! -2.06%
10 kV
10 kV
Riser Pole 10 kV 12 kV
12 kV
10 kV
Evolution URT Arrester UltraSIL HD VariGAP RPOB PVR RPUltraSIL RP UltraSIL RP VariGAP Joslyn ZJP VariSTAR
274.02% 10 kV
307.73% 10 kV
247.99% 10 kV
192.31% 12 kV
168.36% 12 kV
348.11% 10 kV
UltraSIL EX UltraSIL HD VariGAP RPOB PVR RPUltraSIL RP UltraSIL RP VariGAP Joslyn ZJP VariSTAR 25.4 23.3 27.3 32.5 35.4 21.2 OB Normal Duty OB Heavy Duty Optima OB Riser Pole Normal Duty Heavy Duty Riser Pole Joslyn Joslyn Joslyn 12.3 9.9 9.1 10.2 9.2 24.5 19.8 18.3 20.7 18.5 33 29 24.5 30.5 29.6 24.8 36 31.6 27 33.9 32.1 27.3 49 37.6 32.5 38.5 33.1
Page 184
Calculator
61
Rating 3 6 9 10 12 15 18 21 24 27 30 33 36
MCOV 2.55 5.1 7.65 8.4 10.2 12.7 15.3 17 19.5 22 24.4 27.5 29
This is the kv to add to the discharge voltage from the lead length
0.0
1 2 3 4 5 6 7 8 9 10
System Fault Factor Selection Table (From input page) Fault Factor Four Wire Multi-Grounded 1 Spacer Cable 1.35 Three Wire Low Impedance Grounded 1.4 Three Wire High Impedance Grounded 1.73 1.73 1.73
OB PDV-65 OB PDV-100 649.09% 823.94% 281.80% 370.72% 184.58% 223.33% 161.12% 197.04% 92.38% 150.12% 64.13% 97.17% 43.11% 67.31%
Page 185
Calculator
FALSE FALSE
FALSE FALSE
FALSE FALSE
78.30% 52.9
FALSE FALSE
Evolution URT Arrester UltraSIL HD VariGAP RPOB PVR RPUltraSIL RP UltraSIL RP VariGAP Joslyn ZJP VariSTAR
FALSE FALSE
FALSE FALSE
FALSE FALSE
FALSE FALSE
FALSE FALSE
Evolution URT Arrester UltraSIL HD VariGAP RPOB PVR RPUltraSIL RP UltraSIL RP VariGAP Joslyn ZJP VariSTAR
97.17% 47.8
FALSE FALSE
FALSE FALSE
FALSE FALSE
FALSE FALSE
FALSE FALSE
OB Normal Duty OB Heavy Duty Optima OB Riser Pole Normal Duty Heavy Duty Riser Pole Joslyn Joslyn Joslyn 12.3 9.9 9.1 10.2 9.2 24.5 19.8 18.3 20.7 18.5 33 29 24.5 30.5 29.6 24.8 36 31.6 27 33.9 32.1 27.3 49 37.6 32.5 38.5 33.1 57.5 47.8 40.5 47.9 41 66 56.4 48.9 61 58 49.3 73 63.5 55.6 62.1 56.1 90.5 76.2 64.9 77.7 65.5 99 85.5 72 87.3 72.7 108 94 81 96.9 81.8 -
Page 186
Calculator
132
112.9
96
116.1
97
OB Normal Duty Duty Optima 9-10kV Pole Normal Duty Heavy Duty Riser Pole OB Heavy OB Riser Joslyn Joslyn Joslyn 1.62 1.705 1.46 1.7 1.72 1.46 1.62 1.622 1.46 1.7 1.72 1.46 1.58 1.533 1.46 1.61 1.63 1.4 1.5 1.5 1.39 1.52 1.54 1.31 1.42 1.45 1.33 1.47 1.47 1.26 1.33 1.45 1.29 1.42 1.43 1.22 1.2 1.45 1.16 1.3 1.3 1.18 1.2 1.45 1.2 1.2 1.2 1.2
Riser Pole
Evolution URT Arrester UltraSIL HD VariGAP RPOB PVR RPUltraSIL RP UltraSIL RP VariGAP Joslyn ZJP VariSTAR
0.000
0.000
0.000
23.103
0.000
Evolution URT Arrester UltraSIL HD VariGAP RPOB PVR RPUltraSIL RP UltraSIL RP VariGAP Joslyn ZJP VariSTAR
0.000
0.000
0.000
0.000
0.000
Evolution URT Arrester UltraSIL HD VariGAP RPOB PVR RPUltraSIL RP UltraSIL RP VariGAP Joslyn ZJP VariSTAR
30.600
0.000
0.000
0.000
0.000
0.000
Riser Pole
Page 187
Calculator
10 kV
10 kV
10 kV
12 kV
12 kV
10 kV
Evolution URT Arrester UltraSIL HD VariGAP RPOB PVR RPUltraSIL RP UltraSIL RP VariGAP Joslyn ZJP VariSTAR
16.800
14.952
11.760
14.892
15.402
16.800
Page 188
Calculator
3 6 9 10 12 15 18 21 24 27 30 33 36
UNS 566.67% 234.80% 131.71% 122.87% 77.16% 41.79% 18.20% 11.44% -4.52% -15.65% -24.00% -32.14% -36.67%
UNG 584.68% 240.81% 211.48% 198.04% 114.69% 96.38% 61.36% 52.00% 21.60% 7.50% 1.33% -7.88% -13.44%
UHS 667.68% 283.84% 155.03% 140.51% 91.44% 58.33% 27.52% 20.25% 3.97% -10.48% -17.75% -27.62% -31.53%
URT 645.10% 274.38% 219.33% 199.21% 138.99% 97.40% 59.00% 50.20% 29.69% 11.76% 2.70% -9.52% -14.61%
UHG 645.10% 272.55% 237.78% 226.18% 135.29% 114.69% 76.33% 65.94% 32.87% 17.47% 10.79% 0.66% -5.12%
URS 708.51% 306.42% 181.48% 170.46% 114.69% 72.34% 43.67% 35.23% 16.03% 2.98% -7.88% -16.39% -22.13%
URG 726.09% 313.04% 272.55% 258.49% 158.50% 136.02% 93.88% 82.69% 46.15% 29.25% 21.79% 10.79% 4.40%
OB PDV-65 517.89% 210.20% 130.30% 111.11% 55.10% 32.17% 15.15% 4.11% -16.02% -23.23% -29.63% #VALUE! -42.42%
Normal Duty 10 kV 12 kV
12 kV
10 kV
10 kV
Evolution URT Arrester Joslyn ZNP ND PDV-65UltraSIL ND VariSTARJoslyn ZHPOB Optima UltraSIL HD VariSTAR OB ND UltraSIL ND VariGAP HD
MOP
124.19% 10 kV
55.10% 12 kV
77.16% 12 kV
198.04% 10 kV
136.76% 10 kV
102.13% 12 kV
91.44% 12 kV
199.21% 10 kV
Evolution URT Arrester Joslyn ZNP ND PDV-65UltraSIL ND VariSTARJoslyn ZHPOB Optima UltraSIL HD VariSTAR OB ND UltraSIL ND VariGAP HD
DV
33.9
49.0
42.9
25.5
32.1
37.6
39.7
25.4
Rating Normal duty Normal Duty VariGAP VariSTAR Heavy Duty VariGAP VariSTAR UltraSIL UltraSIL VariSTAR Heavy Evolution URT Arrester UltraSIL Duty UltraSIL UltraSIL Riser UltraSIL Riser Pole OB Normal Duty Pole VariGAP 3 11.4 11.1 9.9 10.2 10.2 9.4 9.2 12.3 6 22.7 22.3 19.8 20.3 20.4 18.7 18.4 24.5 9 32.8 24.4 29.8 23.8 22.5 27 20.4 33 10 34.1 25.5 31.6 25.4 23.3 28.1 21.2 36 12 42.9 35.4 39.7 31.8 32.3 35.4 29.4 49
Page 189
Calculator
15 18 21 24 27 30 33 36
Used for watts loss calculations 1 0.17 Location % wet Florida 0.17 Coastal 0.16 South East US 0.13 North East US 0.1 Midwest US 0.05 Coastal Northwest 0.23 Tropic 0.26 Sub Tropic 0.22 Southeast Asia 0.26
This table is only used for loss calculations Internal Watts Loss (w/kv) Evolution URT Arrester 0.003 Joslyn ZRP 0.14 Joslyn ZNP ND 0.03 UltraSIL ND VariGAP 0.05 OB PDV-65 ND 0.01 OB PVR RP 0.02 OB Optima 0.02 UltraSIL HD VariGAP 0.06 UltraSIL HD VariSTAR Joslyn ZHP HD UltraSIL ND VariSTAR UltraSIL RP VariGAP UltraSIL RP VariSTAR 0.03 0.05 0.02 0.06 0.03
1
Results of selection -->
3 6 9 10 12 15 18
Page 190
Calculator
21 24 27 30 33 36
18 kV 18 kV 18 kV 18 kV 18 kV 18 kV UltraSIL RP VariSTAREvolution URT ArresterUltraSIL RP VariSTAR Optima OB Optima OB Evolution URT Arrester 42.64% 33.85% 57.74% 52.9 FALSE FALSE ARR 1 Normal Duty Heavy Duty & URT
Evolution URT Arrester Joslyn ZNP ND PDV-65UltraSIL ND VariSTARJoslyn ZHPOB PDV-100 HD HD VariSTAR OB ND UltraSIL ND VariGAP HD UltraSIL
MOP DV ARR 2
FALSE FALSE
FALSE FALSE
FALSE FALSE
FALSE FALSE
FALSE FALSE
FALSE FALSE
FALSE FALSE
Evolution URT Arrester Joslyn ZNP ND PDV-65UltraSIL ND VariSTARJoslyn ZHPOB PDV-100 HD HD VariSTAR OB ND UltraSIL ND VariGAP HD UltraSIL
MOP DV
FALSE FALSE
FALSE FALSE
FALSE FALSE
FALSE FALSE
FALSE FALSE
33.85% 56.4
FALSE FALSE
FALSE FALSE
ARR 3
Normal Duty
Evolution URT Arrester Joslyn ZNP ND PDV-65UltraSIL ND VariSTARJoslyn ZHPOB PDV-100 HD HD VariSTAR OB ND UltraSIL ND VariGAP HD UltraSIL
MOP DV
FALSE FALSE
FALSE FALSE
FALSE FALSE
FALSE FALSE
FALSE FALSE
FALSE FALSE
FALSE FALSE
57.74% 47.8
Rating Normal duty Normal Duty VariGAP VariSTAR Heavy Duty VariGAP VariSTAR UltraSIL UltraSIL VariSTAR Heavy Evolution URT Arrester UltraSIL Duty UltraSIL UltraSIL Riser UltraSIL Riser Pole OB Normal Duty Pole VariGAP 3 11.4 11.1 9.9 10.2 10.2 9.4 9.2 12.3 6 22.7 22.3 19.8 20.3 20.4 18.7 18.4 24.5 9 32.8 24.4 29.8 23.8 22.5 27 20.4 33 10 34.1 25.5 31.6 25.4 23.3 28.1 21.2 36 12 42.9 35.4 39.7 31.8 32.3 35.4 29.4 49 15 53.6 38.7 48 38.5 35.4 44.1 32.2 57.5 18 64.3 47.1 59.6 47.8 43.1 52.9 39.2 66 21 68.2 50 63.2 50.6 45.8 56.2 41.6 73 24 79.6 62.5 73.1 58.6 57.2 65.5 52 90.5 27 90.1 70.7 84.9 68 64.7 73.8 58.8 99 30 100 75 92.4 74 68.6 82.5 62.4 108 33 112 82.5 105 84 75.5 90.9 68.6
Page 191
Calculator
36
120
87.8
111
89
80.1
97.6
72.8
132
Page 192
Calculator
Page 193
Calculator
Optima 667.68% 283.84% 162.07% 140.51% 102.13% 59.00% 34.75% 19.69% -0.26% -11.11% -19.15% #VALUE! -32.68%
OB PVR Joslyn ZNPJoslyn ZHPJoslyn ZJP 735.16% #VALUE! 645.10% 726.09% 315.30% #VALUE! 267.15% 310.81% 210.20% 149.18% 156.76% 206.45% 181.48% 124.19% 136.76% 178.39% 133.85% 87.65% 55.42% 36.69% 17.10% 5.56% -6.17% #VALUE! #VALUE! 24.59% #VALUE! #VALUE! #VALUE! #VALUE! 97.40% 58.66% 31.03% 22.38% -2.19% -12.94% -21.57% 129.61% 85.37% 54.16% 35.47% 16.03% 4.54% -7.09%
Arrester
Arrester Model
10 kV
Riser Pole 10 kV 12 kV
12 kV
10 kV
VariStar
UltraSIL HD VariGAP ZJP RP B PVR RP Joslyn O UltraSIL RPUltraSIL RP VariGAP VariSTAR 226.18% 178.39% 133.85% 114.69% 258.49% 10 kV 10 kV 12 kV 12 kV 10 kV
Evolution Joslyn OB
UltraSIL HD VariGAP ZJP RP B PVR RP Joslyn O UltraSIL RPUltraSIL RP VariGAP VariSTAR 23.3 27.3 32.5 35.4 21.2 OB Heavy Duty Optima OB RiserJoslyn Normal Duty Pole Joslyn Heavy Duty Riser Pole Joslyn 9.9 9.1 10.2 9.2 19.8 18.3 20.7 18.5 29 24.5 30.5 29.6 24.8 31.6 27 33.9 32.1 27.3 37.6 32.5 38.5 33.1 BIL Selection Table 1 70 2 95 3 125 4 150 5 200
Page 194
Calculator
61
300 2 95
loss calculations
0.2 2.25 1.75 0.2 1.75 2.5 2.5 0.2 0.2 2.5 0.2 0.2 0.2
OB PVR Joslyn ZNPJoslyn ZHPJoslyn ZJP 701.52% #VALUE! 618.20% 693.15% 306.81% #VALUE! 260.50% 302.50% 205.44% 146.10% 153.49% 201.80% 177.55% 121.69% 133.98% 174.55% 131.13% #VALUE! 95.46% 126.99% 85.90% #VALUE! 57.41% 83.65% 54.21% 23.81% 30.18% 52.97%
Page 195
Calculator
#VALUE! 21.64% 34.56% #VALUE! -2.67% 15.36% #VALUE! -13.32% 3.99% #VALUE! -21.88% -7.52% #VALUE! #VALUE! #VALUE! #VALUE! -34.75% -21.96%
Riser Pole
UltraSIL HD VariGAP ZJP RP B PVR RP Joslyn O UltraSIL RPUltraSIL RP VariGAP VariSTAR FALSE FALSE FALSE 42.64% FALSE FALSE FALSE FALSE 52.9 FALSE Riser Pole
UltraSIL HD VariGAP ZJP RP B PVR RP Joslyn O UltraSIL RPUltraSIL RP VariGAP VariSTAR FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE
Riser Pole
UltraSIL HD VariGAP ZJP RP B PVR RP Joslyn O UltraSIL RPUltraSIL RP VariGAP VariSTAR FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE
OB Heavy Duty Optima OB RiserJoslyn Normal Duty Pole Joslyn Heavy Duty Riser Pole Joslyn 9.9 9.1 10.2 9.2 19.8 18.3 20.7 18.5 29 24.5 30.5 29.6 24.8 31.6 27 33.9 32.1 27.3 37.6 32.5 38.5 33.1 47.8 40.5 47.9 41 56.4 48.9 61 58 49.3 63.5 55.6 62.1 56.1 76.2 64.9 77.7 65.5 85.5 72 87.3 72.7 94 81 96.9 81.8 -
Page 196
Calculator
112.9
96
116.1
97
Page 197
Calculator
Page 198
Calculator
7.91
12
12
10 10 10
10 10 12
10 10 12
Cross Reference table between MCOV and Rating Typical Arrester Ratings Rating MCOV 3 2.55 6 5.1
Page 199
Calculator
9 10 12 15 18 21 24 27 30 33 36
Page 200
Calculator
Page 201
Calculator
Page 202
Calculator
Page 203
Calculator
Page 204
Calculator
4.5 5 5.5 6 6.5 7 7.5 8 8.5 9 9.5 10 10.5 11 11.5 12 12.5 13 13.5 14 14.5 15 15.5 16 9 6
6.60 6.90 8.32 10.00 11.00 12.00 12.40 13.20 13.80 15.00 20.00 20.80 22.00 22.90 23.00 24.90 27.60 33.00 34.50 44.00 12 12.4
Page 205
Calculator
Page 206
Calculator
Page 207
Calculator
Page 208
Calculator
Page 209
Calculator
4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5 9.0 9.5 10.0 10.5 11.0 11.5 12.0 18 10.5
Page 210
Interactive Comparison
Arrester #2
Type of Arrester kV Rating
New Margin Of Protection (%) Aged Margin Of Protection (%)
Arrester #3
Type of Arrester kV Rating
TOV (kV RMS) Annual Losses (watts) Internal on Top
10
60.0
55.0 50.0 45.0 40.0 #1 #2 #3
40.0
30.0
60% 40%
20% #1 #2 #3 0% #1 #2 #3
20.0
10.0 0.0 #1 #2 #3
#1
#2
#3
Suggest
Page 211
Recommendations
Preferred Arrester Class System Voltage System Type Gnd Fault Factor Regulation Error in % Max Fault Clearing Time (sec)
Arrester Model
Arrester Selection Logic and Calculations Sep 3 Step 4 Step 5 TOV Maximum line Calculate The Maximum Line to Ignoring TOV, Capabilities to ground Minimum MCOV Select the ground voltage of @ the voltage the rating of an Minimum the system based Selected unfalulted arrester of this type Arrester Rating on regulation time above phase will that could that has an error (pu MCOV) reach during a withstand a fault for MCOV above (kV) single line to the given clearing the line to ground fault on time. ground voltage in step 1 tnother phase (kV) Step 1:
Step 2: (kV)
Step 6 Select the Arrester MCOV rating of this type arrester that can withstand the stated TOV time and amplitude
Step 7 Select the arrester rating that meets both the worst case TOV and the long term line to ground voltage
Help 10 10 10 10
Help 10 12 12 10
Help 10 12 12 10
Page 212
0.003 0.03
0.050 0.60
0.050 0.60
0.050 0.50
0.003 0.03
0.00
0.05
0.05
0.04
0.00
$
$
$
$
0.27
534
$
$
0.22
445
0.18
$ 362.66
Losses = time wet * cost of energy * losses when wet ($$$$) = hours * $$/kWh * kW
Cost/kWh in cents
Losses over Annual losses Annual losses 20 years of of the selected of the selected the selected EPDM housed Silicone rubber EPDM housed arrester housed arrester arrester ($) ($) ($) 4.02 3.78 3.07 2.37 1.18 5.44 6.15 5.20 6.15
Data Source
Florida Coastal South East US North East US Midwest US Coastal Northwest Tropic Sub Tropic Southeast Asia
Losses over 20 years of the selected Silicone rubber housed arrester ($) 6.43 6.05 4.92 3.78 1.89 8.70 9.84 8.33 9.84
Present Value 20 Year of this Savings Savings at the specified from using cost of money Silicone (%) housed arrester ($) ($) 73.98 50.27 69.63 47.32 56.58 38.44 43.52 29.57 21.76 14.79 100.10 68.02 113.15 76.89 95.74 65.06 113.15 76.89
UltraSIL RP VariSTAR
OB Optima
Data Source
0.32
4.02
0.32
0.030 0.54
0.020 0.36
0.003 0.054
0.05
0.03
0.00
0.37
4.05 1000
0.33
368.97
$ 4,052.38
326.40
Manual DV Comparison
52.0
18 kV UltraSIL RP VariSTAR
50.0
48.0
46.0
44.0
42.0
Page 221
Manual DV Comparison
18 kV UltraSIL RP VariSTAR
18 kV OB Optima
Page 222
Recommended ND DV
50.0
40.0
10 kV Joslyn ZNP ND 12 kV OB PDV-65 ND
30.0
20.0
10.0
0.0
Page 223
Recommended ND DV
UltraSIL ND VariSTAR
UltraSIL ND VariGAP
Page 224
Recommended HD DV
Page 225
Recommended HD DV
aSIL HD VariSTAR
aSIL HD VariGAP
Page 226
Recommended RP DV
35.0
25.0
20.0
15.0
10.0
5.0
0.0
Page 227
Manual MOP
MARGIN OF PROTECTION BASED UPON NEW EQUIPMENT BIL, LEAD LENGTHS AND SELECTED ARRESTER
120.00% 20% is the minimum recommended Margin of Protection Higher Margin of Protection is Better 100.00% System BIL
% Margin of Protection
80.00%
18 kV UltraSIL RP VariSTAR
60.00%
40.00%
20.00%
0.00%
Page 228
Manual MOP
UltraSIL RP VariSTAR
Page 229
MARGIN OF PROTECTION BASED ON AGED EQUIPMENT BIL, LEAD LENGTHS AND SELECTED ARRESTER
70% Min of 20% Recommended 60% Higher Margin of Protection is Better Modify Aged BIL as a % of original
40%
30%
20%
10%
0%
Page 230
aSIL RP VariSTAR
Page 231
Recommended ND MOP
MARGIN OF PROTECTION FOR NEW EQUIPMENT USING RECOMMENDED NORMAL DUTY ARRESTERS
300.00% System BIL 250.00% Modify Aged BIL as a % of original % Margin of Protection 200.00%
10 kV Joslyn ZNP ND 12 kV OB PDV-65 ND
150.00%
100.00%
50.00%
0.00%
Page 232
Recommended ND MOP
UltraSIL ND VariSTAR
UltraSIL ND VariGAP
Page 233
MARGIN OF PROTECTION FOR AGED EQUIPMENT USING RECOMMENDED NORMAL DUTY ARRESTERS
250.00% System BIL Modify Aged BIL as a % of original
200.00%
% Margin of Protection
150.00%
100.00%
10 kV UltraSIL ND VariGAP
50.00%
0.00%
Page 234
ltraSIL ND VariSTAR
ltraSIL ND VariGAP
Page 235
Recommended HD MOP
MARGIN OF PROTECTION FOR NEW EQUIPMENT USING RECOMMENDED HEAVY DUTY ARRESTERS
350.00%
300.00%
200.00%
150.00%
100.00%
50.00%
0.00%
Page 236
Recommended HD MOP
aSIL HD VariSTAR
aSIL HD VariGAP
Page 237
MARGIN OF PROTECTION FOR AGED EQUIPMENT USING RECOMMENDED HEAVY DUTY ARRESTERS
250.00%
200.00%
% Margin of Protection
150.00%
100.00%
10 kV UltraSIL HD VariGAP
50.00%
0.00%
Page 238
aSIL HD VariSTAR
aSIL HD VariGAP
Page 239
Recommended RP MOP
MARGIN OF PROTECTION FOR NEW EQUIPMENT USING RECOMMENDED RISER POLE ARRESTERS
400.00% Min of 20% Recommended 350.00%
250.00%
200.00%
150.00%
100.00%
50.00%
0.00%
Page 240
MARGIN OF PROTECTION FOR AGED EQUIPMENT USING RECOMMENDED RISER POLE ARRESTERS
300.00% Min of 20% Recommended
250.00%
% Margin of Protection
200.00%
10 kV Joslyn ZJP RP 12 kV OB PVR RP
150.00%
100.00%
50.00%
0.00%
Page 241
Manual TOV
TOV WITHSTAND ABILITY FOR SELECTED ARRESTERS AND FAULT CLEARING TIME
35.00
20.00
15.00
10.00
5.00
0.00
Page 242
Manual TOV
UltraSIL RP VariSTAR
Page 243
Recommended ND TOV
TOV WITHSTAND ABILITY OF RECOMMENDED NORMAL DUTY ARRESTERS BASED ON INPUT SYSTEM CONDITIONS
18.00 16.00 14.00 12.00
10 kV Joslyn ZNP ND
Page 244
Recommended ND TOV
OB PDV-65 ND
UltraSIL ND VariSTAR
UltraSIL ND VariGAP
Page 245
Recommended HD TOV
TOV WITHSTAND ABILITY OF RECOMMENDED HEAVY DUTY ARRESTERS BASED ON INPUT SYSTEM CONDITIONS
18.000 16.000 14.000 12.000 TOV Withstand (kV)
10 kV Joslyn ZHP HD
Page 246
Recommended HD TOV
raSIL HD VariSTAR
raSIL HD VariGAP
Page 247
Recommended RP TOV
TOV WITHSTAND ABILITY OF RECOMMENDED RISER POLE ARRESTERS BASED ON INPUT SYSTEM CONDITIONS
18.00 16.00 14.00 12.00 TOV Withstand (kV)
10 kV Joslyn ZJP RP
Page 248
DirectStrikeCalc Direct Strike Calculator Enter structure height (h) in meters Enter Structure width (b) in meters Enter ground flash density flashes/km2/yr Flash Collection Rate (n) is calculated --> N=Ng((28hexp.6 + b)/10) 11 1 4 47.6 0.057 17.5 meters meters flashes/km2/yr flashes/100km/yr flashes/span(120m)/year years/flash/span(120)
Page 249
MOPCalculator
160
70 70
Select Current Level to Evaluate Margin (kA) 10 10 Default Value
140
120 Voltage in kV
FP Margin % -43
Arrester Front of Wave Protection Arrester = 121.00 Lead = 13.33 Total = 134.33 Front of Wave % -43
)Adjust Lead Length (ft
Arrester Lightning Protection Level 111.00 2.50 113.50 Lightning Impulse % -38
5
Page 250
MOPCalculator
Overhead and Power Transformer Margin of Protection Calculator 150 Transformer BIL 165 Transformer CWW 135 Transformer BSL
80 Arrester LPL (Discharge Voltage at coordinating current) 90 Arrester FPL (Discharge voltage at fast rising time) 1-2 uS to crest of the current 72 Arrester SPL (Switching discharge voltage at 500 A
MOPCalculator
8.7 17.3 24.9 25.9 32.6 40.7 48.9 51.8 60.5 68.5 76.0 85.1 91.2 4
12.2 24.5 26.8 28.0 38.9 42.5 51.8 54.9 68.7 77.7 82.4 90.7 96.5 5
11.1 22.3 24.4 25.5 35.4 38.7 47.1 50.0 62.5 70.7 75.0 82.5 87.8 6
8.4 16.9 18.5 19.4 26.9 29.4 35.8 38.0 47.5 53.7 57.0 62.7 66.7 7
11.5 23.0 33.1 34.4 43.3 54.1 64.9 68.9 80.3 90.9 101.0 113.0 121.0 8
9.9 19.8 29.8 31.6 39.7 48.0 59.6 63.2 73.1 84.9 92.4 105.0 111.0 9
7.9 15.9 22.9 23.8 29.9 37.4 44.8 47.6 55.5 62.8 70.0 77.8 83.9 10
Arrester to use in the calculation 1 UltraSIL Normal Duty VariSTAR 2 UltraSIL Normal Duty VariGAP 3 4 5 6 UltraSIL Heavy Duty VariSTAR UltraSIL EX Arrester UltraSIL Heavy Duty VariGAP UltraSIL Riser Pole VariSTAR
Rating 3 6 9 10 12 15 18 21 24 27 30 33 36 36 36
70 70
7 UltraSIL Riser Pole VariGAP 8 OB Normal Duty 9 OB Heavy Duty # # # # # OB Riser Pole Joslyn Normal Duty Joslyn Heavy Duty Joslyn Riser Pole User Entered Arrester 1
Page 252
MOPCalculator
10
121.00
111.00
83.90
1 2 3 5 6 7 Fast 4 Front V10kA Switching k= kV/kV Discharge Voltage Table Look Column Column Column rating up Key Joslyn Heavy Duty 35 36 37 2.29 Joslyn Normal Duty 32 33 34 2.21 Joslyn Riser Pole 38 39 40 1.91 OB Heavy Duty 26 27 28 1.98 OB Normal Duty 23 24 25 1.89 OB Riser Pole 29 30 31 1.64 UltraSIL EX Arrester 11 12 13 UltraSIL Heavy Duty VariGAP 14 15 16 UltraSIL Heavy Duty VariSTAR 8 9 10 2.31 UltraSIL Normal Duty VariGAP 5 6 7 UltraSIL Normal Duty VariSTAR 2 3 4 2.28 UltraSIL Riser Pole VariGAP 20 21 21 1.57 UltraSIL Riser Pole VariSTAR 17 18 19 2.09 User Entered Arrester 1 41 42 43 User Entered Arrester 2 44 45 46
8 n 0.158 0.187 0.146 0.219 0.285 0.219 0.204 0.159 0.159 0.204 0.204 0.158 0.158 0.2 0.2
The value of voltages used in the MOP calculations other than at 10kA is calculated using the generally accepted relationship
E=ki^n
The values of k and n are determined from the published data for that product.
kV kA kV kA kV kV kV/kV rated
Calculate the arrester voltage at (8/20) other currents based on n and V1 of the selected arrester Page 253
MOPCalculator product. Calculate the arrester voltage at (8/20) other currents based on n and V1 of the selected arrester V1 111 kV I1 10 kA I2 10 kA N 0.159 Results 111.0 kV
Page 254
MOPCalculator
SP Margin %
Arrester + Lead
Arrester + Lead
-31
Page 255
MOPCalculator
0.912621
MOPCalculator
UltraSIL EX Arrester
500A
20.0 23.0 32.4 32.4 52.4 55.4 64.8 64.8 87.8 97.2 117.2 120.2 129.6 11
10.2 20.3 23.8 25.4 31.8 38.5 47.8 50.6 58.6 68.0 74.0 84.0 89.0 12
7.6 15.2 17.8 19.0 23.8 28.8 35.7 37.8 43.8 50.8 55.3 62.8 66.4 13
18.5 24.0 30.0 32.0 36.0 42.0 47.5 53.5 59.0 65.0 70.5 76.5 82.0 14
10.2 20.4 22.5 23.3 32.3 35.4 43.1 45.8 57.2 64.7 68.6 75.5 80.1 15
7.8 15.5 17.1 17.7 24.5 26.9 32.8 34.8 43.5 49.2 52.1 57.4 60.9 16
10.3 20.7 29.8 31.0 39.1 48.7 58.4 62.0 72.3 81.4 91.0 100.0 108.0 17
9.4 18.7 27.0 28.1 35.4 44.1 52.9 56.2 65.5 73.8 82.5 90.9 97.6 18
7.1 14.2 20.5 21.4 26.9 33.5 40.2 42.7 49.8 56.1 62.7 69.1 74.2 19
-43
Page 257
MOPCalculator
These values are derived from using k and n. K and n were both derived from V10kA and V40kA of published data and the power relationship.
Calculated Lightning Protective Level at the entered Current (8/20)
83.90
0.00
Switched these 3 index numbers with the HD Star numbers. This corrected the issue of incorrect lookup of the values compared to the catalog section JJW 3-10-06
Calculate the arrester voltage at (1/10) other currents based on n and V1 of the selected arrester Page 258
MOPCalculator Calculate the arrester voltage at (1/10) other currents based on n and V1 of the selected arrester 121 V1 at 1/10 of selected Arrester 1.00 8/20 Ratio of V1 to V2 of Selected Arrester V2 of the selected 121.00 arrester based on V1 and Ration
Page 259
MOPCalculator
Results
Results
Page 260
MOPCalculator
Page 261
MOPCalculator
OB Normal Duty
OB Heavy Duty
500 A
500A
17.5 23.0 29.0 31.0 35.0 41.0 46.5 52.5 58.0 64.0 69.5 75.5 81.0 20
9.2 18.4 20.4 21.2 29.4 32.2 39.2 41.6 52.0 58.8 62.4 68.6 72.8 21
7.0 14.0 15.5 16.1 22.3 24.5 29.8 31.6 39.5 44.7 47.4 52.1 55.3 22
14.0 27.8 37.5 40.9 55.7 65.3 75.0 82.9 102.8 112.5 122.7 0.0 150.0 23
12.3 24.5 33.0 36.0 49.0 57.5 66.0 73.0 90.5 99.0 108.0 0.0 132.0 24
8.5 17.0 23.0 24.0 31.3 39.9 46.4 50.5 62.7 71.2 77.7 0.0 92.0 25
10.6 21.3 31.2 34.0 40.4 51.4 60.6 68.3 81.9 91.9 101.1 0.0 121.4 26
9.9 19.8 29.0 31.6 37.6 47.8 56.4 63.5 76.2 85.5 94.0 0.0 112.9 27
7.6 15.3 22.4 24.4 29.0 36.9 43.5 49.0 58.8 65.9 72.5 0.0 87.0 28
-43
Page 262
MOPCalculator
Page 263
MOPCalculator
Page 264
MOPCalculator
Time to Crest 1 2 3 4 5 6 7 8 9 10 1
Page 265
MOPCalculator
Page 266
MOPCalculator
OB Riser Pole
500 A
500 A
500 A
9.9 20.0 26.8 29.5 35.5 44.2 53.4 60.7 70.9 78.6 88.5 0.0 105.0 29
9.1 18.3 24.5 27.0 32.5 40.5 48.9 55.6 64.9 72.0 81.0 0.0 96.0 30
6.6 13.3 17.8 19.6 23.6 29.4 35.5 40.3 47.1 52.2 58.7 0.0 69.7 31
0.0 0.0 29.9 32.9 0.0 0.0 59.7 0.0 0.0 0.0 0.0 0.0 0.0 32
0.0 0.0 30.5 33.9 0.0 0.0 61.0 0.0 0.0 0.0 0.0 0.0 0.0 33
0.0 0.0 23.7 26.3 0.0 0.0 47.4 0.0 0.0 0.0 0.0 0.0 0.0 34
10.4 20.7 31.0 34.5 41.3 51.7 62.0 72.3 82.6 92.9 103.3 0.0 124.0 35
10.2 20.7 29.6 32.1 38.5 47.9 58.0 62.1 77.7 87.3 96.9 116.1 36
7.8 15.5 23.3 25.9 31.0 38.8 46.5 54.3 62.1 69.9 77.6 0.0 93.1 37
Page 267
MOPCalculator
Page 268
MOPCalculator
Page 269
MOPCalculator
Page 270
MOPCalculator
Page 271
MOPCalculator
500 A
500 A
500 A
8.6 17.1 25.7 28.5 34.2 42.8 51.3 59.9 68.4 77.0 85.5 0.0 102.6 38
9.2 18.5 24.8 27.3 33.1 41.0 49.3 56.1 65.5 72.7 81.8 97.0 39
6.2 12.4 18.6 20.7 24.8 31.1 37.3 43.5 49.7 55.9 62.1 0.0 74.5 40
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 114.0 41
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 95.9 42
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 75.2 43
0.0 0.0 0.0 22.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 44
0.0 0.0 0.0 20.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 45
0.0 0.0 0.0 14.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 46
Page 272
English units
Input lead length (L) in feet > Select Wire Gauge (AWG) Lead radius (r) in Inches Total Inductance in uH uH/foot Suggested Values
Metric Equivalent
Lead length in centimeters 30.77
1 2/0
Secondly find the voltage drop across the lead length selected above
V= Inductance * (di/dt) V= total voltage (kV) , Inductance= total inductance (uH) di = crest current (kA) , and dt = time to crest in us
Enter Crest Current in kA ---- 3 -> Enter Time to Crest of the 2 current in uS Total lead voltage in kV
3 2
0.4
Surge
Surge Fuse
Surge
Surge Fuse
Surge
How to tell which lines are part of the line lead calculation: The best rule of thumb is to trace the surge current path and use the lead that is in parallel with the protected insulation.
IEEE Guide for Improving the Lightning Performance of Overhead Distribution Lines ****IEEE 1410-1997 ****
Basic Assumptions in the text are as follows 1. 1.5 times CFO will result in flashover of the system 2. Arrester discharge voltage is taken at V10kA 3. Zs is the system impedance and us usually 400 ohms
35000 350000 40
Interpretation This means that with the variables entered above, there is a Pmid probability of flashover of the unprotected pole when a stroke hits the midspan between protected and unprotected poles
Probability of Flashover from a direct strike one span away from a protected
The probability of flashover is a strong function of the CFO of the unprotected pole and the ground resistance of the protected pole. Input below Vir (kV at 10kA) (volts) Unprotected Structure CFO (volts) Arrester Pole Gnd Resistance Rg (Low current gnd) ohms Output below Io at the flashover site (amps) Probability of Flashover of unprotected pole 40000 350000 10 48500 24%
Interpretation This means that since 98% of all strokes are above 7.4kA which is the current needed to reach 1.5* CFO on the unprotected pole there is a 98% probability of a flashover when struck one span away from an arrester protected pole.
Semi Constants
vo v Zo Velocity of light in space (m/s) --> velocity of return stroke (m/s) Lightning impedance (ohms) -------> Input Variables y Io h shortest distance to line---> lightning current (kA) -------> height of line (meters) -------> 60 40 11 300,000,000 150,000,000 30
303
Interpretation It is assumed that there is a 100% probability of flashover of an insulator if the voltage across that insulator is 1.5 times its stated CFO. Therefore if the above voltage is more than 1.5 times the insulators used on the line then there will be a flashover.
Values Crest Voltage (kV) is Peak Capacitive Current (mA) is Peak Resistive Current (mA) is Peak Total Current (mA) is Losses (watts)
Disk Characteristics MCOV = 1.45 kV rms Rated = 1.66 kV rms Vref = 2.58 kV rms
4 3 2 1 0 -1 -2 -3 -4
Resistive Current
1.5
Resistive Current
1
-0.5
-1
-1.5
0.5