August 15 2011

Site Activities: Concrete pouring Installation of table form at ply out Installation of shoring Preparation of pile cap(Forum Works) Preparation of conventional slab (3rd flr) Xl-y3-X4 Preparation of pre cast (ground floor) Installation of pre cast(3rd flr ) CHB laying (super market) Retouching of beam and slab (ground floor) Form works and conventional column (3rd flr) Column form stripping (3rd flr) Installation of casting bed at ground floor Fabricate column form De watering pile cap Chipping& stripping Hauling &housekeeping of materials

August 16, 2011 Concrete pouring Installation of table form- ply out Installation of casting bed Preparation of S O G (ground floor) CHB laying stairs at supermarket ground floor Re touching of beam and column Preparation of file cap Preparation of precast Form works of conventional slab and column ground floor Xl Yl X2 Y2 Conventional slab (3rd floor) X1 Y4 Y5 Additional beam (3rd floor) Installation of pre cast (3rd floor) Shoring installation (3rd floor) Chipping and shipping, delivery pile cap Hauling and housekeeping of materials

August 17, 2011 Concrete pouring Installation of casting bed Installation of table form at plyout Showing installation Preparation of pile cap CHB laying of stairs and ramp Formworks of slab and conventional column (3rd floor) X1 Y1 X2Y2 Form works of pile cap Preparation of pre cast and installation (ground floor and 3rd floor) Retouching of beam slabs ground floor S O G preparation (ground floor) Fabricate column forms Column form stripping 3rd floor De watering of pile cap Stripping and shipping Hauling and housekeeping of materials

August 18, 2011 Concrete Pouring Re beam at supermarket CHB Laying Showing installation Chipping of excess concrete Retouching of beam and column ground floor Formworks and beam ground floor Installation of scaffolding at bottom beam Preparation of S O G Ply out at installation table form Preparation of pile cap Formworks of slab beam and column 3rd floor Preparation of slab 3rd floor Installation of precast 3rd floor Preparation of conventional slab X1Y4Y5Y6 Installation of casting bed Installation of buttom beam Stripping, hauling of materials

19 August 2011

Concrete pouring Installation of casting bed Installation of shoring CHB laying started Retouching of beam and column at ground floor Installation of scaffolding buttom beam Preparation of conventional slab Formworks at beam ground floor Preparation of precast Installation of pre cast (3rd floor) Ru con supermarket Shipping of c excess oncrete Shipping and hauling of materials housekeeping