You are on page 1of 57

)...( .GULF COBLA L.L.

Dredging and land reclamation Marine charter & Survey services

COMPANY PROFILE

.: 8075 : 2222088)4179+( - : 5924088 )4179+( P.O. Box 5708, Dubai, United Arab Emirates 5924088 )4179+( :Phone: (+9714) 8802222 Fax

ABCDEF
E-mail: gc-info@gulfcobla.com

.: 489 : 3313446 )2179+( - : 2463446 )2179+( P.O. Box 984, Abu Dhabi, United Arab Emirates 2463446 )2179+( :Phone: (+9712) 6443133 Fax

Company Mission
It is the mission of Gulf Cobla LLC to provide services of dredging & reclamation, surveys and charter of plant, equipment & personnel that consistently conform to stipulated specifications to meet the needs and expectations of our customers.

Joost Post General Manager

14/09/09 Date

Gulf Cobla L.L.C.

Page 2 of 57

V0909

Table of Contents

INTRODUCTION COMPANY PROFILE HISTORY ORGANISATION CODE OF CONDUCT CERTIFICATIONS MAJOR CLIENTS RESOURCES RESOURCES HUMAN RESOURCES - PLANT GENERAL TERMS AND CONDITIONS PROJECT EXECUTION QUALITY ASSURANCE HEALTH, SAFETY & ENVIRONMENT MEMBERSHIPS PROJECTS : BRIEF DESCRIPTION OF RECENT & KEY PROJECTS PROJECTS : LIST OF WORKS PROJECTS : TESTIMONIALS

Gulf Cobla L.L.C.

Page 3 of 57

V0909

INTRODUCTION
Gulf Cobla (Limited Liability Company) is specialized in dredging and reclamation works. Formed in 1977, it has undertaken numerous challenging ventures in the Middle East region. Our main scope of operations is to provide dredging and discharging services such as capital dredging, reclamation, stockpiling, maintenance dredging, trench dredging and backfilling activities. Other services that we provide are: survey activities (hydrographic and bathymetric), hire out of plant & equipment (long term as well as short term) and hire out of personnel.

Ownership of Gulf Cobla is as follows: Dubai Transport Company (DUTCO) L.L.C. (a founding member), a Dubai registered company wholly owned by U.A.E. nationals, holds 51 % of the share capital in the company. DUTCO group of companies offer a wide-range of services to the civil engineering, construction and engineering sectors. Saudi Bin Ladin Group - Dubai (SBG), holds the remaining 49 % share capital since 1990. This group of contractors is known for its established works in buildings and structures, roads and airfields, water and sewerage, electro-mechanical works, operation and maintenance and general works. Gulf Coblas offices have been established in the United Arab Emirates (Abu Dhabi, Dubai) and The Netherlands. The head office, as well as a support yard depot, is located at Jebel Ali Industrial area in Dubai. A services branch is maintained in the Netherlands. Gulf Cobla and its predecessor have, since 1965, played a key role as a contractor in some of the significant transformations at the land-water interfaces in the U.A.E. and other regional countries.

Gulf Cobla L.L.C.

Page 4 of 57

V0909

COMPANY SUMMARY
GULF COBLA L.L.C.
Dredging and land reclamation Marine charter and Survey services

P.O. Box 984 Abu Dhabi, United Arab Emirates Phone: + 971 2 6443133 + 971 2 6443642 Fax:

P.O. Box 5708 Dubai, United Arab Emirates Phone: + 971 4 8802222 + 971 4 8804295 Fax:

P.O. Box 230 Hillegom, the Netherlands Phone: +31 255 517870 +31 255 517907 Fax:

E-mail: Internet:

gc-info@gulfcobla.com www.gulfcobla.com

Gulf Cobla L.L.C.

Page 5 of 57

V0909

HISTORY
Gulf Cobla was formed in 1977 as a limited liability company by decree of His Highness, the Ruler of Dubai, with the objectives of carrying out dredging, reclamation and associated marine operations. The Founding Members, Costain British / Blankevoort - Dutch and Dubai Transport Company, had already been successfully associated in the joint execution of dredging and reclamation works within the emirate of Dubai since 1970 and on other regional urbanization projects since 1965. Gulf Coblas biggest project to date has been the dredging of Mina Jebel Ali Port in Dubai, United Arab Emirates, the largest man-made port in the world, on a contract awarded by the late His Highness Sheikh Rashid Al Maktoum then Ruler of Dubai. In the United Arab Emirates, numerous dredging works have been executed by Gulf Cobla to the satisfaction of its clients. Since its formation Gulf Cobla has been involved with dredging and related activities around 265,000,000 m3 in varying grades and consistencies of materials in various geographical locations like United Arab Emirates, Saudi Arabia, Bahrain, Oman, Iran, Libya, Seychelles, Yemen, Eritrea, Djibouti and Qatar.

Gulf Cobla L.L.C.

Page 6 of 57

V0909

ORGANISATION
Gulf Coblas organisation roots from its two capital shareholders, namely Dubai Transport Company (DUTCO) and Saudi Bin Ladin Group - Dubai (SBG). Within the company itself, a well-structured group of experienced personnel ensures quality controlled project execution. The senior management comprises of a well-established team of professionals, all having considerable experience with international dredging and other marine operations. Attached are flowcharts showing the Parental Tree and Directorate and Management Structure of Gulf Cobla. PARENTAL TREE OF GULF COBLA:

DUBAI TRANSPORT COMPANY

51%

49%

SAUDI BINLADIN GROUP - DUBAI

GULF COBLA MANAGEMENT

DIRECTORATE & MANAGEMENT STRUCTURE OF GULF COBLA

DUBAI TRANSPORT COMPANY Ahmed Baker Abdullah Saleh

SAUDI BIN LADIN GROUP - DUBAI Sheikh Omar M. Bin Ladin Abu Bakr Al Hamid

GULF COBLA MANAGEMENT General Manager Joost Post

Gulf Cobla L.L.C.

Page 7 of 57

V0909

Gulf Cobla L.L.C.

Page 8 of 57

V0909

CODE OF CONDUCT
Our corporate responsibilities Mission
Gulf Coblas mission is to remain a recognized professional player in its field of small to medium sized dredging companies, and thereby realize on a long-term basis a return on its invested capital higher than its cost of capital. In this way it aims to create value for its stakeholders and provide its shareholders Dubai Transport Company & Saudi Bin Ladin Group with a return on their investment commensurate with the risks involved, and so also to secure the continuity and independence of the corporation. Gulf Cobla distinguishes the following responsibilities to customers, employees, suppliers, society, and to the environment.

Responsibilities to customers
Customers rely on Gulf Cobla for the realization of their expectations. We therefore have the responsibility to: supply high quality survey and dredging related services; provide a competitive market price; meet the agreed delivery time; show respect for, and anticipate the wishes, interests, and ethical standards of customers, in all aspects of the transactions; inform customers properly and in good time

Responsibilities to employees
Employees make a considerable portion of their time, knowledge and expertise available to Gulf Cobla. We therefore have the responsibility to: adhere to the applicable national and international standards, such as not making use of child labor; pursue a personnel policy in which the best possible use is made of each persons skills, and personal development is encouraged; offer good and competitive terms of employment and safe and healthy working conditions; provide open framework for personal evaluation on a regular basis; prevent undesirable conduct such as discrimination, intimidation and abuse of authority; communicate in an honest and clear manner; be open to suggestions, ideas and criticism; strive for a good relationship with those who represent a portion of Gulf Cobla in a constructive manner; create a climate in which employees are encouraged to adhere to this code.

Gulf Cobla L.L.C.

Page 9 of 57

V0909

Responsibilities to suppliers
Suppliers provide Gulf Cobla with the products and services that Gulf Cobla uses. We therefore have the responsibility to: select suppliers on the basis of generally accepted market considerations; pay market prices and making reasonable demands; strive for long-term stability in the relationship, in exchange for value, quality, competitiveness and reliability; pay suppliers on time, according to the agreements made; be open and reliable in all activities; avoid doing business with suppliers who do not adhere to the applicable national and international standards; decline all invitations and favors that could affect the integrity of a business relationship.

Responsibilities to society
Society provides Gulf Cobla the social and physical infrastructure for entrepreneurship. We therefore have the responsibility to: decline doing business in countries subject to international and relevant national embargoes; respect human rights as formulated in the Universal Declaration of Human Rights; decline commercial activities in countries where it is made impossible, in our own activities, to adhere to this code; decline making payments to politicians and political parties; support initiatives that, within the framework of our possibilities and aims, contribute to the improvement of social welfare; strive for a constructive relationship with non-governmental organizations; strive for fair competition by respecting tangible and intellectual property rights of competitors and respecting the relevant competition laws.

Responsibilities to the environment


Gulf Cobla makes use of natural resources. We therefore have the responsibility to: at least comply with the applicable statutory environmental provisions and regulations and, where possible, going further than required; focus policy on the permanent prevention or limitation, as far as possible, of pollution of soil, water and air, noise, creation of waste products and use of dangerous materials; collect and processing waste separately, and using water and energy efficiently; translate policy into clear practical guidelines and, furthermore, ensuring that the policy and the guidelines are implemented in practice; permanently ensure that the environmental awareness and motivation of the employees and others who work on the premises of Gulf Cobla is such that environmental protection although primarily the Managements responsibility is everybodys concern.

Gulf Cobla L.L.C.

Page 10 of 57

V0909

Dilemmas
Because of the complex environment in which Gulf Cobla operates, the above-mentioned responsibilities could conflict with each other. This can create dilemmas, which will be reviewed and resolved carefully.

Accountability
Anybody who contacts Gulf Cobla, on the basis of actual involvement in and understanding of the activities and position of Gulf Cobla, can expect an open attitude from Gulf Cobla. Furthermore, where appropriate, Gulf Cobla. is actively accountable for compliance with this code. All sincere requests, suggestions and complaints will be taken seriously.

Gulf Cobla L.L.C.

Page 11 of 57

V0909

CERTIFICATIONS
Abu Dhabi : Trade License Commercial Registration Membership Certificate of Chamber of Commerce and Industry Dubai : Trade License Commercial Registration Membership Certificate of Chamber of Commerce and Industry Bank Reference Auditors Reference

Gulf Cobla L.L.C.

Page 12 of 57

V0909

Commercial License, Abu Dhabi, U.A.E.

Gulf Cobla L.L.C.

Page 13 of 57

V0909

Chamber of Commerce, Abu Dhabi, U.A.E.

Gulf Cobla L.L.C.

Page 14 of 57

V0909

Corporate Registration, Dubai, U.A.E.

Gulf Cobla L.L.C.

Page 15 of 57

V0909

Commercial License, Dubai, U.A.E.

Gulf Cobla L.L.C.

Page 16 of 57

V0909

Chamber of Commerce, Dubai, U.A.E.

Gulf Cobla L.L.C.

Page 17 of 57

V0909

Bank reference, National Bank of Dubai

Gulf Cobla L.L.C.

Page 18 of 57

V0909

Auditors reference

Gulf Cobla L.L.C.

Page 19 of 57

V0909

Gulf Cobla L.L.C.

Page 20 of 57

V0909

ISO Certification

Gulf Cobla L.L.C.

Page 21 of 57

V0909

MAJOR CLIENTS
Below is a list of our reputable major clients whom we have provided, as main contractor or as specialized dredging and survey subcontractor, our expertise and services over the years.

United Arab Emirates


H.H. The Ruler of Dubai, Dubai H.H. The Ruler of Sharjah, Sharjah Khorfakkan Municipality, Sharjah Ministry of Defence, Abu Dhabi Abu Dhabi Municipality, Abu Dhabi Port of Fujairah, Fujairah Works Department, Abu Dhabi Sharjah Port Authority, Sharjah Dubai Elec. & Water Authority, Dubai Dubai Municipality, Dubai

Abu Dhabi Ship Building, Abu Dhabi Al Ahmadiah Contracting Co, Dubai Al Futtaim Real Estate (P) Ltd., Dubai Al Naboodah Contracting Co., Dubai

Dutco Balfour Beatty LLC, UAE Various National Marine Dredging Co , Abu Dhabi Van Oord ACZ, Abu Dhabi / Fujairah / Dubai Boskalis Westminster, Abu Dhabi

Overseas Ast Co. LLC, UAE Various Belhasa Six Construct LLC, Dubai Dutco Hotels, Dubai China Harbour Engineering, Abu Dhabi Aldar, Abu Dhabi

Six Construct Co. Ltd., UAE Various Martin Mid East, Abu Dhabi Bin Suroor International Co, Abu Dhabi Nakheel, Dubai

Gulf Cobla L.L.C.

Page 22 of 57

V0909

Kingdom of Saudi Arabia


Saudi Arabia Port Authority, Dhahran Costain International, Jubail Samaco, Jeddah Huta Hegerfeld, Jeddah / Huta Sete, Jeddah Jan de Nul, Manifa

Bahrain
Arabian Dredging Company, Manama Oil Marketing Corporation, Manama AA Nass Contracting, Manama Boskalis Westminster, Manama Ossis Property Developers, Manama Ministry of Works and Housing, Manama

Sultanate of Oman
Consolidated Contracting Company, Muscat Daewoo Corporation, Sohar Hochtief AG, Muscat Galfar, Muskat

Qatar
Ballast Nedam Dredging, Doha Interbeton, Doha

Iran
Broekhoven B.V., Qeshm Island Ballast Nedam Dredging, Ras Lavan

Others
Keangnam Enterprises for the United Nations, Eritrea AA Nass Contracting, India Boskalis Westminster, Seychelles

Gulf Cobla L.L.C.

Page 23 of 57

V0909

RESOURCES
It is important for any contracting company to be well equipped with apt resources and to be able to meet the challenges of diverse projects. Subject to client requirements, site conditions and other project factors, the allocated and available resources, be it human or equipment, should enable the contractor to execute his/her project with time and cost effective means. Arising from the successful execution of a number of major dredging and reclamation projects, interspersed with numerous minor works, Gulf Cobla enjoys substantial resources - Human and Plant (equipment), in its own right. In addition, its two capital shareholders, place considerable opportunity and resources at its disposal. Backed by these resources, Gulf Cobla is well established to execute projects whenever and wherever required. Gulf Cobla owns dredgers and associated equipment. The existing dredgers have recently been upgraded to include modern guidance and monitoring equipment. The Company is proud that in addition to the existing fleet, a new dredger Khaleej Bay was constructed and commissioned in the first quarter of 2004 to expand core business and increase market opportunities. Furthermore new marine support equipment has been added to their fleet.

Gulf Cobla L.L.C.

Page 24 of 57

V0909

RESOURCES - HUMAN
Gulf cobles key personnel is backed by an experienced operational workforce. Several senior personnel have been with the company since its inception. Additional personnel are acquired as needed and in accordance with contract circumstances and any special requirements of the client. It has been common for such additional personnel to rejoin the company on several occasions. All of our operation employees have received appropriate discipline orientated training towards maintenance and improvement of our Quality Management System. We are very proud that all operational divisions within the organization are included and satisfactory maintained in our ISO-9001 scope. All employees are equipped with appropriate physical and mental tools for their respective trade, such as: Personnel Health and Safety Equipment, First Aid Training, Safety Awareness Training. Our key technical staff (main yard and on site) is undergoing regular engineering training and advice from manufacturers in our ongoing process towards achieving optimum technical efficiency, and to improve maintenance effectiveness. Furthermore, a majority of our marine oriented employees have been trained and satisfactory examined to international STCW examination standards. We are constantly in the process of maintaining and super seeding all ministerial endorsements and other administrative requirements for all relevant crewmembers. Gulf Cobla is tracking on an individual basis the training requirements and results by means of yearly evaluation of all personnel. The deployed (limited) multitasking approach allows employees to acquire first hand experience and experience and appreciation in various disciplines. The United Arab Emirates have, as first GCC-country, recently been included in the white list for the STCW regulations and we are very pleased to state that all our registration and licenses for both crew and plant are fully compliant with this international standard. To achieve effective utilization of the plant our marine crew is trained specifically for our plant by internationally accepted training institutes. In addition to externally supplied training, Gulf Cobla has a vast library of internal course material and training subjects. Training requirements and achievements for all personnel are recorded and appropriate training subjects are presented to the individuals when appropriate. By ongoing training at all levels of the organization the self-sufficiency, and therefore the ability to provide a better quality product, of each discipline within the organization will improve.

Gulf Cobla L.L.C.

Page 25 of 57

V0909

Following are brief details of Gulf Coblas key personnel assets :

Gulf Cobla L.L.C.

Page 26 of 57

V0909

________________________

Jan Joost Post

______________________

Personal details : Position in firm General Manager Contact e-mail jjp@gulfcobla.com Date of Birth 4th April 1959 Marital Status Married Nationality Dutch Years in dredging industry since 1980 Part of the firm since 2008 Education : 1977- 1980 Other qualifications : 1996 Languages : Dutch : English : German : French: Business Experience : 2008 present GULF COBLA (L.L.C.), DUBAI, U.A.E. General Manager Overall responsible for Gulf Cobla, as part of the DTC / SBG group BALLAST NEDAM DREDGING, THE NETHERLANDS General Manager at Ballast van Oord grondstoffen vof Overall responsible for the dredging & reclamation operations Overall responsible for the sand classification plants Responsible for the commercial aspects of the projects Responsible for the architectural aspects of the projects BALLAST NEDAM DREDGING, VARIOUS LOCATIONS Project Manager on various international dredging projects First contact with Gulf Cobla as a Intermediate Hired Project Manager during the dredging of Jebel Dhana Port and Container terminals on Qeshm Island, Iran DUTCH SHIP BUILDING CONTRACTOR Operations Manager and Commercial Manager BALLAST NEDAM DREDGING, VARIOUS LOCATIONS Project Manager on various international dredging projects International Project Engineer at the Dutch Head Office BALLAST NEDAM DREDGING, MALAYSIA Surveyor on a LNG terminal project Mother tongue Fluent moderate Basic knowledge Intermediate Vocational Dredging Education, Delfzijl , The Netherlands Certification of Safety Awareness for Operational Executives (VCA)

1992 - 2008

1990 - 1992

1988 - 1990 1982 - 1987

1980 - 1981

Gulf Cobla L.L.C.

Page 27 of 57

V0909

________________________

Barry van der Meulen

_____________________

Personal Details : Position in firm Plant Manager Contact e-mail bme@gulfcobla.com Date of Birth 20th December 1972 Marital Status Married Nationality Dutch Years in dredging industry since 1997 Years with firm since 2008 __________________________________________________________________________ Education : 1992 - 1996 B.Sc. Mechanical Engineering, Higher Institute of Technology, Haarlem, The Netherlands __________________________________________________________________________ Other Qualifications : Turbocharger Ex, Hydraulics and Pneumatics, Dredge pumps Working with contaminated dredge sludge; Certification of Safety Awareness for Operational Executives VCA Project Management Training __________________________________________________________________________ Languages : Dutch: Mother tongue English: Fluent Arabic: Basic knowledge Polish: Basic knowledge __________________________________________________________________________ Business Experience: 2008 - present GULF COBLA (L.L.C.), DUBAI, U.A.E. Plant Manager Responsible for company plant, equipment and its usage, maintenance and charter services. VAN OORD ACZ / BALLAST NEDAM DREDGING Technical Superintendent (Equipment Department) As a Technical Superintendent overall in charge of Hopper and Cutter dredgers on various projects in Dubai, Qatar, Lebanon, Egypt, Poland & Denmark. BK INGENIEURS & MILIEU ADVIESBUREAU BV IN VELSERBROEK Technical advisor NIJMAN ENGINEERING PROJECT AutoCad Engineer FIGEE CRANE CONSTRUCTION CO, HAARLEM Trainee VAN SEUMEREN HEAVY LIFTING Trainee

1997 - 2008

1996 - 1996 1995 - 1995 1994 - 1994 1993 - 1993 1987 - 1992

TRUCK TRANSPORT CO., OVERDORP, IJMUIDEN Part time job __________________________________________________________________________

Gulf Cobla L.L.C.

Page 28 of 57

V0909

__________________________

Marco Mul

_______________________

Personal details : Position in firm Deputy General Manager Contact e-mail mjm@gulfcobla.com Date of Birth 28th December 1969 Marital Status Married Nationality Dutch Years in dredging industry since 1992 Years with firm since 1992 _________________________________________________________________________ Education : 1988 - 1992 B.Sc. Civil Engineering. Higher Institute of Technology, Alkmaar, The Netherlands Other qualifications : Languages : Dutch : English : German: Business Experience : 2009 Present GULF COBLA (L.L.C.), DUBAI, U.A.E. Deputy General Manager Provide assistance to General Manager in day to day operations of the company. Responsible for companys dredging operations, contracts and tendering. Operations Manager Responsible for companys dredging operations, contracts and tendering. Quality, Safety and Environmental Systems representative. Projects Manager Responsible for all dredging and survey projects. Estimating potential dredging projects and tenders. Company QMS system representative Site Superintendent / Site Manager Site supervision of dredging projects in the U.A.E. and Saudi Arabia Investigating future dredging projects and executing surveys using specialized software, CAD programs, spreadsheets, etc. Field Engineer VOLKER STEVIN CONSTRUCTION INTERNATIONAL, SINT MAARTEN, NETHERLANDS ANTILLES Assistant Supervisor (Traineeship) KWS SCHIPHOL AIRPORT, AMSTERDAM, THE NETHERLANDS Assistant Supervisor (Traineeship) Mother tongue Fluent Basic knowledge Certification Survey Training Courses by Thales Geo Solutions Certification of various QMS courses (ISO 9001) by Lloyds Certification of Safety Awareness for Operational Executives

2006 2009

1999 2005

1994 - 1999

1992 - 1994 1991 - 1991

1990 - 1991

Gulf Cobla L.L.C.

Page 29 of 57

V0909

Name

Job Title

With Company

Experience* [yrs]

Operations:

Project Operations Wim Palte Tareq Alobied Project Manager Project Manager since 2001 since 2001 17 8

Project Control Bram Boot Project Control Engineer since 2005 4

Survey & Reclamation Akram Butt Abdul Samad Chief Surveyor Disposal Master since 1975 since 1974 34 35

Technical Support:

Kees Langeveld Jan Honkoop Jan Adam Kuc

Ass. Plant Manager Plant Engineer Plant Engineer

since 1999 since 1974 since 2000

18 40 9

* relates to experience in the dredging industry (updated 14/09/09).

Gulf Cobla L.L.C.

Page 30 of 57

V0909

The table below shows the total strength of Gulf Coblas human resources and their categories of specialization.

Category of Specialization Engineers Draughtsman Surveyors Office Staff Disposal Master/Foremen Maintenance/Construction Foremen Electricians Dredger Captains Dredger Operators Dredger Mechanics Foremen Chainman Plant Operators Deckhands Launch Drivers / Tug Captains Welders Greasers Labourers Drivers Turner Total (14/09/2009)

Numbers 15 1 3 13 4 2 3 3 10 14 3 2 6 15 2 10 11 14 6 1 138

Above are the full time employed personnel. For special and / or additional requirements Gulf Cobla has access to further hired personnel to ensure that adequate prepared personnel is available to meet work force requirements.

Gulf Cobla L.L.C.

Page 31 of 57

V0909

RESOURCES - PLANT
Being a dredging company, much of Gulf Coblas plant consists of dredgers, barges, tugboats, launches and floating pipeline for its water borne operations and dozers, shovels and pipeline for shore based operations, and other related equipment. Our major plant maintenance support facility is located at Jebel Ali Industrial area 2, in Dubai. This facility, in addition to being our depot, contains a fully equipped workshop (welding, mechanical, machining, carpentry), which tends for much of the maintenance of our floating plant and onshore equipment. In addition to this we have fully equipped mobile workshops set-up at every project site. This facilitates immediate on the spot repairs and allows for execution of preventive maintenance. Gulf Cobla is self proficient with respect to equipment & instrumentation related to hydrographic and land surveys, which also include latest RTK Differential Global Positioning Systems, high precision echo sounders and multi beam systems. Efficient and effective availability of machinery and equipment is very important to maintain a high level of timely completed projects. Maintenance of machinery and equipment, and direct related logistic activities are therefore part and partial of our Quality Management System. Our plant (both land based and floating) is appropriately registered with the Ministry of Communication in the United Arab Emirates. Floating plant is (annually) inspected as per the applicable internationally accepted standards. Scheduled dry-docking and controlled maintenance operations do ensure that the equipment is maintained at a high state of operational readiness. During the recent few years the main dredgers have been, especially technically, upgraded and are equipped with modern technology for positioning (RTK DGPS), control (dredge automation) and monitoring of the full range of dredging activities. Following is a brief outline of the plant resources, which Gulf Cobla enjoys in its own right. Pending specific project requirements this spread of plant and equipment can be supplemented by utilizing the plant and equipment pools of our shareholders Dubai Transport Company and/or Saudi Bin Ladin Group of Companies.

Gulf Cobla L.L.C.

Page 32 of 57

V0909

Equipment Type

Type DREDGING

Purpose

Cutter suction dredger Khaleej Bay Cutter suction dredger Garhoud Bay Cutter suction dredger Deira Bay Suction pump dredge unit 600 Hp Booster station 2800 Hp Split hopper barge Barges Launches / work boats Lifthooks Crane barge Multicat Multicats Professional survey vessels Survey & speed boats

6170 Hp/550 mm 3500 Hp/550 mm 3500 Hp/550 mm 300 mm 550 mm 350 m various 500/380/190 Hp 12 Ton 35 Ton 250 Hp 1000 Hp

dredging in soft & hard materials dredging in soft & hard materials dredging in soft & hard materials dredging sediments pumping material over longer distances for offshore dumping/ ancillary purposes offshore transport/ storage of equipment Towage/ ancillary purposes Towage/ lifting/ ancillary purposes Lifting/ ancillary purposes Lifting/ ancillary purposes Towage/ lifting/ ancillary purposes hydrographic survey purposes hydrographic surveys/ ancillary purposes

RECLAMATION WORKS Dozers Shovels Excavators Crane D6 950 F 320 B 20 ton SURVEY Global positioning systems Differential positioning systems (RTK) Total positioning stations Level instruments Echo sounders Echo sounders Electronic tide gauge sets hydrographic surveys/ vessel positioning hydrographic surveys/ dredger positioning land surveys land surveys (leveling) Single & dual frequency Multi beam Tidal monitoring earthmoving works earthmoving works & ancillary purposes earthmoving works/ ancillary purposes ancillary purposes

Gulf Cobla L.L.C.

Page 33 of 57

V0909

OTHERS: Various minor related plant and equipment are readily available such as: - welding machines (diesel and electric) - trucks and transport facilities - specialized machinery / welding / engineering workshop - Winch platforms - Hydraulic power packs & generators HEAD OFFICE SUPPORT: Design & engineering office for technical support Research and development (internal & external)

Gulf Cobla L.L.C.

Page 34 of 57

V0909

GENERAL TERMS AND CONDITIONS FOR BUSINESS TRANSACTIONS

Gulf Cobla L.L.C.

Page 35 of 57

V0909

1. COMPANY TITLE AND CAPABILITY Gulf Cobla (L.L.C.) is a Limited Liability Company registered in Dubai, whose shareholders are Dubai Transport Company L.L.C. and the Saudi-Binladin Group, Dubai. Its registered office and chosen address is PO Box 5708, Jebel Ali Industrial area 2, Dubai, United Arab Emirates. Gulf Cobla (L.L.C.) (GC) is an International Technical Services Contractor with primary capabilities in dredging, reclamation and surveying, together with associated marine and marine engineering operations. One or more elements of these capabilities (the Services) may be provided to individuals, Organisations or Public Bodies (hereinafter referred to as Employer(s)), through the medium of a Contract, Subcontract or Technical Services Agreement. 2. CONTRACTUAL PRECEDENCE The residual Terms and Conditions herein are subordinate to similar Terms and Conditions that may be activated and applied within the text body of a Contract, Subcontract or Technical Agreement. However, where such documents are silent on particular issues, and in the absence of any written undertaking to the contrary between GC and an Employer, relevant and apposite Terms and Conditions hereunder shall apply. 3. EDITORIALS AND PUBLICITY Should Employers wish to publicise the association with GC for the certification of Services rendered as a result of an Agreement (where an Agreement would arise from the signature, by both Parties, of a Proposal prepared by GC or a Contract/Subcontract prepared by Employers), GC shall agree to this condition, only by prior arrangement of review and approval of the Employers publication. 4. LIMITATION OF LIABILITY GCs total executive liability, whether in contract, in tort, in derelict or otherwise, shall not exceed the fees paid for GC Services. In the event of GC being held liable to any extent beyond a fee limit, for financial obligations or otherwise, either due to its carrying out of contractual obligations, or for any act or omission by Employers, their agents, employees, contractors or subcontractors, including the supervision (by others) of work carried out by GC, such Employers hereby indemnify GC from all such events, including any breach of contractual or statutory obligations. 5. PROPOSAL VALIDITY PERIOD The costs and the resources detailed in GCs Proposals shall remain fixed, firm and valid for acceptance, for a period of 30 (thirty) days from issue. The prices quoted, unless otherwise agreed in writing, are subject to the particular Services being allowed to commence within one month of Employers written acceptance of Proposals, where such commercial protocol is observed. 6. VARIATIONS Employers and GC acknowledge that any variation of the terms and conditions of extant Proposals and Agreements, unless expressed in writing and signed by both Parties, shall be of no force or effect. 7. FORCE MAJEURE GC shall not be liable for its failure to perform its obligations arising from a specific Agreement, in the event that any such failure or failures result from acts of God, fire, floods, explosion, riots, war, hostilities, revolution, rebellion, civil condition, sabotage, military operations, adverse weather conditions, prolonged power failure, or other causes beyond GCs control.

Gulf Cobla L.L.C.

Page 36 of 57

V0909

8. PAYMENT i) Unless specifically agreed in writing to the contrary, Employers shall pay GC the amount set out in particular Agreements for predefined Services performed, including all incidental costs directly related to the Services, within 30 (thirty) days from specific invoices. If payment is not made as per the invoice, interest will be payable on a daily basis at a rate of 2 percent per annum above the bank base lending rate. Payment should be made to the National Bank of Dubai, Main Office, PO Box 777, Dubai. Account Name: Account Number: ii) Gulf Cobla (L.L.C.) 01-50-01384-0 AED Current Account

Employers may not withhold or reduce any sum payable to GC under any Agreement, either by reason of claims or alleged claims against GC, or in respect of bank charges of any source and description.

iii) If Employers dispute the amount included for payment in any invoice, a written notice must be served on GC by such Employers before the final date for payment. If no notice is given, the amount due shall be the amount stated in the invoice. iv) If any item or any part of an item of any invoice for any Agreement is disputed or subject to question by Employers, the payment by Employers of the undisputed remainder of that account shall not be withheld on those grounds. 9. PROPOSAL AMENDMENTS, PERIOD CHANGE AND DELAYS If a time has been fixed for the carrying out of any Services and Employers then suggest a change of time, or if the Employers are not ready for the Services or hinder in their execution, GC shall be entitled to reimbursement of all extra costs incurred, and such reimbursement shall be made within 30 (thirty) days of the date of any invoices rendered by GC in respect thereof. Where delays by Employers cause any Services to be extended beyond their specified time frames, the cost of such Services to Employers may be increased. Any necessary issue of project documentation shall be completed upon full payment of issued invoices. All monies owed by Employers to GC in respect of Services performed, or expenses incurred as previously stated, or upon the frustration of any Agreement due to causes outside of the control of GC, or upon the termination of an Agreement for any reason whatsoever, shall become due and payable, as per relevant Agreement clauses. 10. TERMINATION The termination of an Agreement shall be subject to 1 (one) months written notice by GC, or one months written notice by the relevant Employer, or written notice of 25% of the Agreement duration by either Party, whichever is the shorter. Agreements shall be terminated by GC in the event of any default, misconduct, breach or non-observance of any of the conditions therein, by Employers or their agent(s), contractor(s) or subcontractor(s). 11. WARRANTY Employers hereby warrant their due compliance with all of the required statutory obligations, and indemnify GC against any and all claims that may be brought against GC as a result of a failure so to do. 12. JURISDICTION Agreements shall be governed by the applicable laws of Dubai, and all disputes arising in connection thereby, shall be resolved in the courts of Dubai. The Parties, by their signature to specific Agreements, hereby consent to the jurisdiction of the above mentioned courts. 13. CONTRACT FEEDBACK Should you have, during the course of the contract, any suggestions/complaints/feedback on the services that GC provides, we invite you to forward them to us via the contract correspondence or by e-mail to: gc-info@gulfcobla.com.

Gulf Cobla L.L.C.

Page 37 of 57

V0909

PROJECT EXECUTION
Prior to commencement of works on any project site, a detailed Method Statement is discussed, agreed and formalized with the Client/Contractor. This Method Statement summarizes Gulf Coblas procedures of project execution. Proposed dredge and fill plans, pipeline routes, storage facilities, discharge routes, surveying and reporting methodology, safety and quality assurance routines, etc., are outlined and described so that the concerned authorities are aware of our activities well ahead of the actual commencement of these works. Thus, by mutual co-operation amongst the various parties, we endeavor to avoid conflicts, which would hinder timely project execution. This also minimizes unexpected delays and costs that could occur during the works. By means of monitoring the progress, reporting to the Client and subsequent discussions and meetings we receive feedback, which improves knowledge about the needs, expectations and deliverables. Actual progress on all elements of the project is carefully monitored and compared with original planning and schedule. By means of daily, weekly and monthly reporting the Client is informed and feedback from the Client on methods and quality of the produced works is actively promoted. Feedback, both positive and negative, is reviewed carefully and is used in for our internal review of procedures and methods op operation. This process of testing of appropriateness of our internal procedures and working methods versus Client requirements and preferences promotes an improved level of quality and Client satisfaction without an increased requirement for rework by ourselves.

With regard to site management, the related project tasks are pre-planned and discussed with the concerned personnel to maximize project efficiency. From the preliminary drawings and mobilization, project execution, to the final demobilization and clearing of site, teamwork and subsequent coordination between all involved is emphasized. The method statements, meetings, progress reporting, project correspondence in combination with Gulf Coblas quality management system and its procedures, provide a frame work of information allowing for trace-ability of project elements as well as feedback for further guidance and customer focus.

Gulf Cobla L.L.C.

Page 38 of 57

V0909

QUALITY ASSURANCE
Gulf Cobla has been certified to the International Quality Standard ISO since May 2000. In May 2009, the latest certification standard ISO 9001 : 2008 was obtained. We are part of the dredging companies in the Middle East to have achieved such certification for its complete range of operations, including maintenance of plant & equipment.

QUALITY POLICY
It is the policy of Gulf Cobla LLC to provide services of dredging & reclamation, surveys and charter of (marine) plant, equipment & personnel that consistently conform to stipulated specifications to meet the needs and expectations of our customers.

PLANT & EQUIPMENT


Certificates pertaining to equipment quality, safety on board, hull afloat are issued periodically from the appropriate companies. These ensure that our plant and equipment meet the Clients requirements and specifications. Maintenance is also carried out regularly to maintain a high and efficient level of operation.

PROJECT EXECUTION
Method Statements, standard hydrographic and land survey procedures, daily, weekly, monthly reports, valuations and control checks are part of our internal quality assurance controls during project execution and management. Manufacturer provided calibrations of appropriate instrumentation are maintained to ensure accuracy of results. All of the above can be adapted to suit specific Project or Clients requirements.

Gulf Cobla L.L.C.

Page 39 of 57

V0909

HEALTH, SAFETY & ENVIRONMENT


HEALTH & SAFETY
Being a marine works related company, safety is of primary importance. Currently, Gulf Cobla uses Safety Instructions of VBKO (Dutch Association of Contractors in Dredging and Shore & Bank Protection) combined with STCW95 requirements, as a minimum guidance for safety requirements for its on-site operations, and standard Dutch safety norm required for executives (VCA). All floating plant are equipped with adequate safety appliances such as fire extinguishers, life buoys, life rafts, life vests & life jackets, communication means, which are periodically checked to ensure apt working conditions. All employees received recorded health, safety related training such as: Personnel Health and Safety Equipment requirement and usage, First Aid Training, Safety Awareness Training. Furthermore, recently the majority of our marine oriented employees have been trained and satisfactory examined to international STCW examination standards. This training is focused on awareness for marine operations and has been adapted to suit our working environment. In addition to this, and to promote safety awareness communication throughout all levels of the organization, our Department Managers are certified per the standard Dutch safety norm required for executives. Such training has been conducted via a recognized Dutch training institute (VCA). Toolbox talks are mandatory for all personnel, from time to time on the utilization and usage of Personal Protective and Life Saving Equipment and their individual day to day activities.

ENVIRONMENT
Gulf Cobla is actively becoming more aware of the concern and importance for the environmental issues and is in the process of integrating Environmental Impact Analysis into its Project Execution. Compliance to local and international environmental regulations, as applicable, is being looked into in order to attain better environmental and sustainable working practices. Already in practice are periodic collection and appropriate disposal system/procedures for sludge and general wastes from our floating plant, strict refueling procedures on the reclamation and floating plant to avoid spills. In case of emergency/accident, standard oil spillage control equipment is available on the floating plant for immediate action. Generally, publications of International Association of Dredging Companies (IADC), and Central Dredging Association (CEDA) are used for guidance regarding the environmental aspects of dredging.
Gulf Cobla L.L.C. Page 40 of 57 V0909

MEMBERSHIPS / GUIDANCE DOCUMENTS


Gulf Cobla is currently a member of the following international associations. International Association of Dredging Companies (IADC) http://www.iadc-dredging.com/ VBKO Association of Contractors in Dredging and Shore and Bank Protection. http://www.vbko.nl GC also has various subscriptions to dredging and marine operation related literature such as magazines, periodicals etc, to remain informed of the latest updates. For contractual and operational subjects, Gulf Cobla Management aims to maintain internationally accepted rules, guidance documents and methods, which are described in various documents such as, but not limited to: Fidic Form of Contract for Dredging and Reclamation Works Fidic - Conditons of Subcontract for Works of Civil Engineering Construction British Standard Maritime structures, BS 6349 : Part 5 : 1991, Code of practice for dredging and land reclamation. Part 1 : 1984, code of practice for Maritime structures. IHO Standards for Hydrographic Surveys 4th edition, April 1998, Special Publication No.44 British Standard EN ISO 9000:2008 Quality Management System: Fundamental and Vocabulary. Requirements. Guidance for performance improvements V.O.U.B. Advanced methodologies for dredging and disposal works S.T.C.W Standards on Training, Certification and Watch keeping Barecon 89 International standard charter agreement Supply Time 89 International standard charter agreement Various discipline related published research documents and publications

Gulf Cobla L.L.C.

Page 41 of 57

V0909

PROJECTS BRIEF DESCRIPTION OF RECENT & KEY PROJECTS

Gulf Cobla L.L.C.

Page 42 of 57

V0909

Manifa Project KSA Gulf Cobla has been working on this project under a charter contract by Jan de Nul, which is one of the biggest dredging contractors in the world. Jan de Nul reclaimed on their project 27 Islands, connected by a main causeway, at the Manifa oil field and Gulf Cobla spent over a year on this project to reshape island perimeter slopes. The deployment of Gulf Coblas dredger and experienced crew was well exceeding the quality expectations of the JDN Manifa project team. Yas Island Marina U.A.E Against a tight schedule Gulf Cobla has been requested to dredge the channel and turning basin adjacent the Yas island marina entrance for the first Formula 1 races in Abu Dhabi. Gulf Cobla managed to finalize contracted dredging works well within the set schedule allowing other contractors to finalize their scope of work. Contracted by Six Construct and Cebarco, Gulf Cobla has been dredging over 1,500,000 m3 for Aldar on and around Yas Island. Hamriya Inner Harbour U.A.E. Six Construct invited Gulf Cobla to undertake the dredging works for the ambitious further developments of the Hamriya Inner Harbor in Sharjah. The inner harbor project will adjoin Hamriya Port to Sharjahs Hamriya Free zone. The project will see the construction of a total wharfage length of 5.5 km, with a draft depth of 7 and 9 metres. Of importance is the drydocking facility capable of servicing small and medium sized vessels. Six Construct is the main contractor on this project with Halcrow appointed as the project consultant. Total dredging quantity involved for this project is 2,500,000 m3. Dredging works started in February 2008 and are planned for completion in December 2008. Al Khor Channel Qatar Gulf Cobla was requested by CECC to dredge the approach channel to the Al Khor Fishery harbor over a length of 5 km. This project was particularly challenging due to the soil characteristics encountered during execution. From the beginning of the project, September 2006, material was much harder than stated in the borehole reports, which caused delays in executing the works. Gulf Cobla was however able to dredge and complete the works in October 2007 with the Khaleej Bay and deliver a satisfying end result to the Main Contractor CECC who was working for the local entity Ashgall. Total dredged quantity almost 1,000,000 m3 of rock material. North East Muharraq Site 127 - Bahrain The ministry of Works and Housing in Bahrain awarded Gulf Cobla the execution of a 1,500,000 m3 reclamation project of a plot in the Qalali area. The Cutter Suction Dredger Deira Bay was used as the main plant for this project. Work was executed in the period March November 2007. Material was borrowed from the adjacent borrow area in front of the Amwaj Island.

Gulf Cobla L.L.C.

Page 43 of 57

V0909

Port of Arabia - U.A.E Gulf Cobla was involved in the dredging and reclamation works to create gentle sloped beaches forming bays between three entrance channels on the Port Arabia development in Ras Al Khaimah. The Main Contractor for this project was China Harbour Engineering. The involved quantity discharged for this project was 800,000 m3, which was mainly retrieved from an offshore borrow area as well as the three entrance channels. This project has been executed by our CSD Garhoud Bay and its auxiliary equipment, during the period July October 2007. Dolphin Energy Project at Taweelah U.A.E. Gulf Cobla LLC has been selected as the preferred dredging partner on this Dolphin Energy project for the shore approach at Taweelah (UAE). The work consisted of dredging a pipeline trench and creating sufficient floatation for the floating pipeline installation equipment, this element has been executed by the Cutter Suction Dredger Khaleej Bay. Upon installation of the pipeline both the trench and the floatation channel, with a total length of 5 km, have been hydraulically backfilled using our Cutter Suction Dredger Deira Bay. Both the dredging and backfilling scope of work have been executed on the strict HSE parameters of the project, as per guidelines of the international Oil and Gas companies represented by Qatar Petroleum Company. Amwaj Island Project - Bahrain This project was awarded on a subcontract basis by Arabian Dredging Company, Bahrain. It started in December 2001 and was completed in April 2003. Material arising from the dredging of lagoons and channels in and around Amwaj Island area was used to reclaim islands for future housing, tourist and commercial utilization. GC executed part of work; dredging of the inner lagoons and surrounding island channels and reclaimed 4 out of a total of 6 islands. Palm Jumeirah Tunnel Project U.A.E. Dredging of a tunnel trench from the spine to the crescent of Palm Jumeirah. Forming underwater bunds on either side of the trench, for further construction pit purposes. The Khaleej Bay and the Deira Bay were both involved with this project. Trench depths between -2.0 and -18.0m ACD were achieved, whereas dredged material was used to form underwater bunds between -2.0 and 20.0 m ACD. This project was awarded to us by Overseas AST-Interbeton JV. The involved quantity was 900,000 m3.

Gulf Cobla L.L.C.

Page 44 of 57

V0909

Fujairah Naval Port U.A.E. Sixco awarded this project to Gulf Cobla. This project was executed in 2 stages, 1st stage was executed by the dredger Deira Bay, which dredged up to (8.0 CD). The 2nd stage was done by our new dredger, the Khaleej Bay, which dredged up to the final level of (10.0 CD) in the Basin and (13.5 CD) in a trench. The dredged quantity was approximate 1,100,000 m3. Hamriya Offshore dredging Inner Harbour Dredging U.A.E. This project commenced in May 2002 and was completed in January 2003. Our dredger Deira Bay carried out dredging of two channels to a depth of -7.0 m / -3.5 m ACD and reclamed surrounding land areas. Dredging works were part of the construction of a new Freeport in Hamriya, Sharjah. Widening Channel at Agig Port / Bel Ghaylam Island U.A.E. Widening of an existing navigation channel by dredging with long pumping distances over 3 km and discharging into stockpiles. This project was awarded by Public Works Department of Abu Dhabi. The project was completed in 2001 and involved dredging of approx. 0.8 million m3. This was done by our 3,500 Hp dredger Garhoud Bay, partly with the assistance our 2,800 Hp booster station Masafi Bay and our 600 Hp suction dredger Rashidiya Bay, for the marina basin. The contract also included the removal, refurbishment and relocation of 25 nos. channel markers. Dredging at Qarin Al Aysh U.A.E. This capital dredging project, near Mirfa, commenced in August 1998, and involved the dredging of a 19 km channel to depths of -3.0/ 4.0 m ACD as required by the Public Works Department of Abu Dhabi, on behalf of H.H. Sheikh Sultan Bin Zayed Al Nahyan. The cutter suction dredger Garhoud Bay commenced the project and was replaced by the Deira Bay which completed the 4 year project. A total quantity of approx. 9.5 million m3 of sand, sandstone, rock etc. was dredged during that period. Dredged material was used to fill areas along the channel. The project also involved dredging of 2 fish farms to a depth of -8.00 m ACD. Touristic City Durat Al Arous II KSA Gulf Coblas cutter suction dredger Deira Bay was employed in 1997 / 1998 in Saudi Arabia, dredging channels and reclaiming island fingers at Durat Al Arous. The reclaimed fingers are used for the construction of residential houses, creating another residential / holiday resort development. A total of 3.5 million cubic meters, in various types of material, was dredged. Obhur Creek Development Project KSA Dredging for the Obhur Creek Development, Saudi Arabia consisted of the reclamation of two islands using dredged material. The challenging task in this project was to use suitable dredged material only for reclamation purposes, stockpile the unsuitable material and refill suitable material in dredged, unsuitable parts, of the channels. Such areas were subsequently re-dredged to attain the required design levels. The dredger Deira Bay completed the project within one year and dredged approx. 2.0 million m3.

Gulf Cobla L.L.C.

Page 45 of 57

V0909

PROJECTS LIST OF WORKS

Gulf Cobla L.L.C.

Page 46 of 57

V0909

Location
Abu Dhabi Shinas Wudam Abu Dhabi Wudam Abu Dhabi Abu Dhabi Ajman Fujairah Manifa Causeway Seeb Abu Dhabi Dubai Creek Jebel Ali

Country
U.A.E. Oman Oman U.A.E. Oman U.A.E. U.A.E. U.A.E. U.A.E. K.S.A. Oman U.A.E. U.A.E. U.A.E.

Client
Crown Prince Court

Description

Consulting Engineers

Start
/ / / / / / /

End
In progress In progress In progress In progress Aug-09 May-09 May-09

Quantity
60,000 400,000 215,000 400,000 210,000 3,250,000 65,000 300,000 1 week 1 year 400,000 200,000 2 months 5 months 39,539 1 year 39,539 39,508

Qarnayn Island Trench Dredging subcontract Dors Group Oct-09 to China Harbour Engg. Min. of Transport & Shinas Fishery Harbour Dredging WS Atkins International Sep-09 Communications subcontract to Masirah International Oman Tourism Dev Co Asian Beach Games Dredging subcontract WS Atkins International Aug-09 to Masirah International Aldar Access Channel Yas Island subcontract to Halcrow International Apr-09 Cebarco Abu Dhabi Partnership Min. of Defence New Jetty Construction at Wudam, Ibn Khaldun-Almadaen May-09 subcontract to Galfar Engg. & Cont. Co. Aldar Properties Raha Beach Dredging subcontract to Cansult Maunsell Apr-09 AST/Murray Robberts JV ALGECO Mina Zayed Basin dredging subcontract to Directorate of Military Apr-09 ALGECO Works TPM Const. Consultancy Ajman Marina Dredging, subcontract to Mouchel Middle East On hold China Harbour Engg. Co. Ltd M.U.C. Engineering Bathymetric survey done for MUC Engg. On Oct-08 behalf of Fujairah Port Jan De Nul Galfar Engg. Cont. LLC Overseas Ast LLC Six Construct Ltd Jan De Nul Dredger charter for Jan De Nul Fishery Harbour Seeb dredging subcontract to Galfar Engg. & Cont. Batheen Marina Development dredging subcontract to Overseas Ast LLC Garhoud Bridge Cofferdam dredging subcontract to Six Construct Ltd JDN Silt Dredging at Jebel Ali Consulting Engineering Services Halcrow International Partnership -

/ On hold / Oct-08 Sep-09 Feb-09 Oct-08 Sep-09 Sep-08

Sep-08 / Oct-08 / Aug-08 / Aug-08 / Apr-08 /

Dibba, Fujairah U.A.E. Dubai U.A.E.

Dibba Municipality Van Oord Dutco Balfour Beatty Vopak Horizon Fujairah Ltd Hamriyah Free Zone Palm Deira - Nakheel Aldar Properties Nakheel Dutco Balfour Beatty

Sila, Abu Dhabi U.A.E. Fujairah Hamriyah Palm Deira Abu Dhabi Dubai Dubai Festival City Abu Dhabi Dubai Festival City U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. U.A.E.

Rull Dibba Sambreed, Bathymetric Apr-08 / Survey Hire of tug Snapper Bay for Deira Palm Apr-08 / Project in Dubai Buoy dropping survey done at Al Qaffay Apr-08 / Island Resort Development VHFL Phase V, Finger Pier, Berths 5 & 6 Mar-08 / Tidal Marine Survey Dredging & Reclamation subcontract to Halcrow International Feb-08 / Six Construct Limited Partnership Survey Services at Palm Deira Project Dredging South Marina at Yas Island: subcontract to Six Construct Dredging Deira Corniche Channel: subcontract to Van Oord FZE Survey Services at Dubai Festival City Project Hire of Multicat Tarpon Bay for a project in Abu Dhabi Survey Services at Dubai Festival City Prjoject Dredging Port of Arabia Project : subcontract to China Harbour Rock dredging subcontract to Galfar Cont. & Engg. LLC Hire of GC 125 for a project in Abu Dhabi Hire of Multicat Tarpon Bay for a project in Qatar Survey Services at Djibouty Intake maintenance dredging Marina dredging & stockpiling subcontract to Al-Futtaim Carillion Trench dredging & stockpiling subcontract to Belhasa Six Construct Hire of Kappa Bay for the project in Qatar Survey Services at Dubai Drydocks Safina Project Survey Services at Palm Jumeirah Monorail Survey Services at Sohar Harbour Project for Van Oord FZE Halcrow International Partnership Style Consultants -

Apr-08 Jan-09 Apr-08 Mar-08

Apr-09 1,473,000
In

Nov-07 / progress Nov-07 / Sep-07 / Sep-07 / May-08 Feb-08 Sep-07

3 years 280,000 800,000 1 week 3 months 1 week 600,000 125,000 5 months 3 months 1 week 30,000 80,000 90,000 3 months 1 week 1 week 1 week

LLC
Linden Shipping International Dutco Balfour Beatty LLC RAK Properties Government of Oman Linden Shipping International Linden Shipping International Al Boom Holdings Dubai Aluminium Co Dubai Festival City LLC Dubai Properties Linden Shipping International N.S.C.C. Palm Jumeirah Monorail Van Oord FZE

Sep-07 / present Sep-07 / Jul-07 / Nov-07 / Sep-07 Nov-07 Mar-08

Ras Al Khaimah U.A.E. Khasab Abu Dhabi Qatar Djibouty City Jebel Ali Dubai Creek Dubai Craeek Qatar Drydocks Safina Project Jumeirah, Dubai Oman U.A.E. Qatar Djibouty U.A.E. U.A.E. U.A.E. Qatar U.A.E. U.A.E.

Jul-07 / present Jul-07 / Jun-07 / May-07 / Aug-07 Jun-07 Sep-07 Nov-06 Dec-06 Jun-07 Sep-06 Aug-06 Jul-06

Mouchel Middle East Nov-06 / Halcrow International Nov-06 / Partnership Sep-06 / Sep-06 / Aug-06 / Jul-06 /

Sohar Harbour Oman

Gulf Cobla L.L.C.

Page 47 of 57

V0909

Location
Abu Dhabi Shinas Wudam Abu Dhabi Wudam Abu Dhabi Abu Dhabi Ajman Fujairah Manifa Causeway Seeb Abu Dhabi Dubai Creek Jebel Ali

Country
U.A.E. Oman Oman U.A.E. Oman U.A.E. U.A.E. U.A.E. U.A.E. K.S.A. Oman U.A.E. U.A.E. U.A.E.

Client
Crown Prince Court

Description

Consulting Engineers

Start
/ / / / / / /

End
In progress In progress In progress In progress Aug-09 May-09 May-09

Quantity
60,000 400,000 215,000 400,000 210,000 3,250,000 65,000 300,000 1 week 1 year 400,000 200,000 2 months 5 months 39,539 1 year 39,539 39,508

Qarnayn Island Trench Dredging subcontract Dors Group Oct-09 to China Harbour Engg. Min. of Transport & Shinas Fishery Harbour Dredging WS Atkins International Sep-09 Communications subcontract to Masirah International Oman Tourism Dev Co Asian Beach Games Dredging subcontract WS Atkins International Aug-09 to Masirah International Aldar Access Channel Yas Island subcontract to Halcrow International Apr-09 Cebarco Abu Dhabi Partnership Min. of Defence New Jetty Construction at Wudam, Ibn Khaldun-Almadaen May-09 subcontract to Galfar Engg. & Cont. Co. Aldar Properties Raha Beach Dredging subcontract to Cansult Maunsell Apr-09 AST/Murray Robberts JV ALGECO Mina Zayed Basin dredging subcontract to Directorate of Military Apr-09 ALGECO Works TPM Const. Consultancy Ajman Marina Dredging, subcontract to Mouchel Middle East On hold China Harbour Engg. Co. Ltd M.U.C. Engineering Bathymetric survey done for MUC Engg. On Oct-08 behalf of Fujairah Port Jan De Nul Galfar Engg. Cont. LLC Overseas Ast LLC Six Construct Ltd Jan De Nul Dredger charter for Jan De Nul Fishery Harbour Seeb dredging subcontract to Galfar Engg. & Cont. Batheen Marina Development dredging subcontract to Overseas Ast LLC Garhoud Bridge Cofferdam dredging subcontract to Six Construct Ltd JDN Silt Dredging at Jebel Ali Consulting Engineering Services Halcrow International Partnership -

/ On hold / Oct-08 Sep-09 Feb-09 Oct-08 Sep-09 Sep-08

Sep-08 / Oct-08 / Aug-08 / Aug-08 / Apr-08 /

Dibba, Fujairah U.A.E. Dubai U.A.E.

Dibba Municipality Van Oord Dutco Balfour Beatty Vopak Horizon Fujairah Ltd Hamriyah Free Zone Palm Deira - Nakheel Aldar Properties Nakheel Dutco Balfour Beatty

Sila, Abu Dhabi U.A.E. Fujairah Hamriyah Palm Deira Abu Dhabi Dubai Dubai Festival City Abu Dhabi Dubai Festival City U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. U.A.E.

Rull Dibba Sambreed, Bathymetric Apr-08 / Survey Hire of tug Snapper Bay for Deira Palm Apr-08 / Project in Dubai Buoy dropping survey done at Al Qaffay Apr-08 / Island Resort Development VHFL Phase V, Finger Pier, Berths 5 & 6 Mar-08 / Tidal Marine Survey Dredging & Reclamation subcontract to Halcrow International Feb-08 / Six Construct Limited Partnership Survey Services at Palm Deira Project Dredging South Marina at Yas Island: subcontract to Six Construct Dredging Deira Corniche Channel: subcontract to Van Oord FZE Survey Services at Dubai Festival City Project Hire of Multicat Tarpon Bay for a project in Abu Dhabi Survey Services at Dubai Festival City Prjoject Dredging Port of Arabia Project : subcontract to China Harbour Rock dredging subcontract to Galfar Cont. & Engg. LLC Hire of GC 125 for a project in Abu Dhabi Hire of Multicat Tarpon Bay for a project in Qatar Survey Services at Djibouty Intake maintenance dredging Marina dredging & stockpiling subcontract to Al-Futtaim Carillion Trench dredging & stockpiling subcontract to Belhasa Six Construct Hire of Kappa Bay for the project in Qatar Survey Services at Dubai Drydocks Safina Project Survey Services at Palm Jumeirah Monorail Survey Services at Sohar Harbour Project for Van Oord FZE Halcrow International Partnership Style Consultants -

Apr-08 Jan-09 Apr-08 Mar-08

Apr-09 1,473,000
In

Nov-07 / progress Nov-07 / Sep-07 / Sep-07 / May-08 Feb-08 Sep-07

3 years 280,000 800,000 1 week 3 months 1 week 600,000 125,000 5 months 3 months 1 week 30,000 80,000 90,000 3 months 1 week 1 week 1 week

LLC
Linden Shipping International Dutco Balfour Beatty LLC RAK Properties Government of Oman Linden Shipping International Linden Shipping International Al Boom Holdings Dubai Aluminium Co Dubai Festival City LLC Dubai Properties Linden Shipping International N.S.C.C. Palm Jumeirah Monorail Van Oord FZE

Sep-07 / present Sep-07 / Jul-07 / Nov-07 / Sep-07 Nov-07 Mar-08

Ras Al Khaimah U.A.E. Khasab Abu Dhabi Qatar Djibouty City Jebel Ali Dubai Creek Dubai Craeek Qatar Drydocks Safina Project Jumeirah, Dubai Oman U.A.E. Qatar Djibouty U.A.E. U.A.E. U.A.E. Qatar U.A.E. U.A.E.

Jul-07 / present Jul-07 / Jun-07 / May-07 / Aug-07 Jun-07 Sep-07 Nov-06 Dec-06 Jun-07 Sep-06 Aug-06 Jul-06

Mouchel Middle East Nov-06 / Halcrow International Nov-06 / Partnership Sep-06 / Sep-06 / Aug-06 / Jul-06 /

Sohar Harbour Oman

Gulf Cobla L.L.C.

Page 48 of 57

V0909

Drydocks Safina Project Crew for HAM 219 dredger Al Qaffay, Abu Dhabi Dolphin Project, Taweelah Dubai Marina Project Dolphin Project, Taweelah Maritime City Proj, Dubai Fujairah Amwaj Island Qatar

U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. Bahrain Qatar

Taweelah, Abu U.A.E. Dhabi Dubai U.A.E.

Taweelah, Abu U.A.E. Dhabi Hamriyah, U.A.E. Sharjah Drydocks U.A.E. Safina Project Dubai Fujairah Sohar Fujairah Fujairah Port Terminal Amwaj Island Drydocks Safina Project Al Qaffay, Abu Dhabi Dibba Port, Fujairah Dibba, Khorfakkan Abu Dhabi Abu Dhabi Abu Dhabi Near Amwaj Island Al Qaffay, Abu Dhabi Bandar Seef U.A.E. U.A.E. Oman U.A.E. U.A.E. Bahrain U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. Bahrain U.A.E. Bahrain

Survey Services at Dubai Drydocks Safina Project Supply of total crew members for their Van Oord FZE dredger HAM 219 for Jebel Ali Project Hire of DOP Pump & Auxiliary items for Dutco Balfour Beatty DBB at Al Qaffay Island Ballast Ham Dredging Hire of Lifthook XIV for Ballast at Dolphin BV Project, Taweelah Hire of DOP Pump & Auxiliary items for Dutco Balfour Beatty Dubai Marina Project Ballast Ham Dredging Hire of Lifthook XIV for Ballast at Dolphin BV Project, Taweelah Supply of disposal foreman services for Van Oord ACZ their Maritime City Project Survey Services from Al Ygalat Fishing Port of Fujairah Harbour to Fujaira Marina Club Dredging & Reclamation - subcontract to Arabian Dredging Co. Arabian Dredging Company Dredging & Reclamation - subcontract to Public Works Dept. Technital Consolidated Engg. Const. Co. Dredging & Reclamation - subcontract to Van Oord ACZ Dolphin Energy Van Oord ACZ Dredging & Reclamation - subcontract to Dutco Balfour Beatty Mouchel Middle East Dutco Balfour Beatty Ballast - Ham Hire of Kappa Bay for the project in Dredging Taweelah, Abu Dhabi Linden Shipping Hire of GC-429 for a project in Hamriyah, International Sharjah Survey Services at Dubai Drydocks N.S.C.C. Safina Project Sunrise Ship Hire of GC-428 for a project in Al Jadaf, International Dubai Survey Services at Fujairah Port Naval Port of Fujairah Base Linden Shipping Hire of GC-429 for a project in Sohar, International Oman Survey Services at Fujairah Port Port of Fujairah Terminal Survey Services at Fujairah Port Vopak Vopak Horizon Limited Services Terminal Dredging & Reclamation - subcontract to Arabian Dredging Co. OASSIS Arabian Dredging Company Survey Services at Dubai Drydocks N.S.C.C. Safina Project Hire of DOP Pump & Auxiliary items for Dutco Balfour Beatty Dubai Municipality DBB at Al Qaffay Island N.S.C.C. Port of Fujairah Sharjah Electricity & Water Authority Van Oord, Dubai Multigroup, Dubai Multigroup, Dubai Arabian Dredging Co. Dutco Balfour Beatty Wade Adams (Dubai) Action International Majid Al Futtaim Six Construct-Getco Khorfakkan Port Authorities Khorfakkan Port Authorities Survey Services at Dibba Port, Fujairah -

Jun-06 / Jul-06 / Jun-06 / Jun-06 / Jun-06 / May-06 / Apr-06 / Feb-06 / May-06 /

Jun-06 Nov-06 Feb-07 Jul-06 Jun-06 Jun-06 Jun-06 Feb-06 Jul-06

1 week 2 months 9 months 1 month 3 weeks 2 months 3 months 1 week 300,000 800,000 800,000 175,000 6 months 2 months 1 week 6 months 1 week 3 months 1 week 1 week 375,000 1 week 1 week 20,000 -

Jun-06 / Ongoing Feb-06 / Jan-06 / Feb-06 / Jan-06 / Dec-05 / Nov-05 / Oct-05 / Nov-06 May-06 Aug-06 Apr-06 Dec-05 Nov-06 Nov-05

Oct-05 / Dec-05 Oct-05 / Oct-05 / Oct-05 / Sep-05 / Aug-05 / Aug-05 / Jul-05 / Jul-05 / May-05 / May-05 / May-05 / Mar-05 / May-05 / Apr-05 / / / / / Oct-05 Oct-05 Dec-05 Sep-05 May-06 Aug-05 Sep-05 Nov-05 Nov-05 Nov-05

Dredging & Reclamation - subcontract to Halcrow International Six Construct Ltd Partnership Charter Kappa Bay for Van Oord Charter GC-429 to Multigroup Charter Snapper Bay to Multigroup Dredging & Reclamation - subcontract to Arabian Dredging Company Dredging & Reclamation - subcontract to Dutco Balfour Beatty Dredging & Reclamation - subcontract to Wade Adams (Dubai) Charter to Palm Jumeira Tunnel DALA Dubai Municipality -

Oct-05 1,800,000 Mar-05 6,000

Apr-06 1,500,000 Jul-05 Jul-05 Jan-05 Feb-06 45,000 dayworks 371,000

Jebel Ali, Dubai U.A.E. Umm Al Quwain Musandam, Khasab Khorfakkan, Sharjah Khorfakkan, Sharjah U.A.E. Oman U.A.E. U.A.E.

Dredging & Reclamation for :Majid Apr-05 Alfuttaim Investments Dredging & Reclamation - subcontract to Jan-05 Six Construct Ltd Dredging & Reclamation - subcontract to Halcrow International Sep-05 Athena SA Partnership Dredging & Reclamation - subcontract to Halcrow International Dec-04 Athena SA Partnership

Jan-05 11,000,000

Gulf Cobla L.L.C.

Page 49 of 57

V0909

Jebel Ali, Dubai U.A.E. Muharraq Dubai Dubai Dubai Bahrain U.A.E. U.A.E. U.A.E.

Jebel Ali Hotel Arabian Dredging Co Nakheel / Taisai Corporation Dutco Balfour Beatty Dutco Balfour Beatty

Dredging & Reclamation works

Dec-04 /

May-05

15,000 900,000 700,000 2 months 1 week 60,000 725,000 1 week dayworks 65,000 1 week 2 years 1 week 95,000 700,000 1 week 1 week 200,000 1 week 7 months 1 week 60,000 1 week 35,000 20,000 700,000

Dredging & Reclamation - subcontract to Ansari Engineering Nov-04 / May-05 Arabian Dredging Company Co. Dredging & Reclamation - subcontract to Parsons Brinckerhoff Dec-04 / May-05 Overseas Ast Co Charter to Dutco Balfour Beatty Nov-04 / / / / / Dec-04 Oct-04 Nov-04 Aug-06 Sep-04 Aug-04 Sep-04 Aug-04 Mar-06 Jun-04 Aug-04 Aug-04 May-04 May-04 Jul-04 Apr-04 Jan-05 Dec-04 Mar-04 Dec-03 Mar-04 Dec-03 Jan-04

Jebel Ali, Dubai U.A.E. Sila, Abu Dhabi U.A.E. Sur Abu Dhabi Dubai DUBAL, Dubai Dubai Ajman Oman U.A.E. U.A.E. U.A.E. U.A.E. U.A.E.

Survey Services at Dubai Festival City Mouchel Middle East Oct-04 Project Dubai Electricity & Dredging & Reclamation - subcontract to Lahmeyer Oct-04 Water Authority Overseas Ast Company International Dredging & Reclamation - subcontract to Halcrow International Abu Dhabi Municipality Oct-04 China Harbour (in 2 phases) Partnership Survey Services Waterfront Marine Interbeton - Oman Sep-04 Facilities Project (Oman) Private Office Festival City - Al Futtaim Group Duik Combinatie Nederland Rederij Waterweg BV Leema Marine Engg. Sharjah Port Authorities Sharjah Public Works Bathymetric Survey Overseas Ast Port of Fujairah Dubai Aluminium Co. Ltd Interbeton - Oman Dharti Dredging & Const. Ltd Works Department N.S.C.C. Dubai Marina Land Development Government of Fujairah Charter to Target Marine Dredging & Reclamation works subcontract to Dutco Balfour Beatty Topographic Survey at Dubal Project -

Aug-04 /

Mounsell Consultancy Aug-04 / Services Aug-04 / / / / /

Hamriyah, U.A.E. Sharjah Dibba Harbour, U.A.E. Sharjah Abu Dhabi Jumeirah, Dubai Fujairah Dubal, Dubai Sur Khasab Jebel Dhana, Abu Dhabi MIS Project, Sharjah Dubai Marina Fujairah Manama Khasab U.A.E. U.A.E. U.A.E. U.A.E. Oman Oman U.A.E. U.A.E. U.A.E. U.A.E. Bahrain Oman

Technical services provides for their 4 Jul-04 vessels in UAE Waters Survey at Ajman Free Zone Area near Jun-04 AHI dry dock Dredging & Reclamation works Halcrow International Jul-04 subcontract to Six Construct Ltd. Partnership Dredging & Reclamation works Halcrow International May-05 subcontract to China Harbour Engg.Co. Partnership Hyder Consulting Middle East Survey work for Overseas Ast Dredging & Reclamation works subcontract to Six Construct Ltd. Bathymetric Survey Work Charater to Intbeton, Oman Valuation Survey Dredging & Reclamation works subcontract to Six Construct Ltd. Provided Survey related services -

May-04 / May-04 /

Mott MacDonald May-04 / Consulting Engineers Halcrow International Apr-04 / Partnership Halcrow International Partnership Halcrow International Partnership Hyder Consulting Middle East Mott MacDonald Consulting Engineers Mar-04 / Feb-04 / Feb-04 / Dec-03 / Dec-03 / Nov-03 / Nov-03 / Nov-03 / Aug-03 / Sep-03 / Oct-03 / Aug-03 / May-03 / May-03 / Mar-03 / May-03 / May-03 /

Mussafah, Abu U.A.E. Dhabi Amwaj Bahrain

Jumeirah, U.A.E. Dubai Mussafah, Abu U.A.E. Dhabi Musnouah, Abu U.A.E. Dhabi Sharjah U.A.E.

Mussafah, Abu U.A.E. Dhabi Abu Dhabi Abu Dhabi U.A.E. U.A.E.

Dredging & Reclamation works subcontract to Dutco Construction Dredging & Reclamation works subcontract to Dutco Balfour Beatty Dredging & Reclamation works ASRY subcontract to Arabian Dredging Co. Ministry of Transport & Khasab Port Dev. Project - subcontract WS Atkins Communications to Dharti Dredging / Galfar Engg. International & Co. Setting out survey at Mina Musafah, Abu Halcrow Consulting Arab Contractors Dhabi Engineers Amwaj School Island dredging works Amwaj Education OSSIS subcontract to Arabian Dredging Co. Dredging & Reclamation - subcontract to Mehdi Al Tajir Overseas Ast Company Hydrographic Survey at Mussafah Hyder Consulting Hyder Consulting Bridge, Abu Dhabi Hydrographic Survey off Musnouah Hyder Consulting Hyder Consulting Island, Abu Dhabi Dredging & Reclamation - subcontract to Halcrow International M.I.S., Sharjah N.S.C.C. Partnership Halcrow International Bin Suroor Int'l Cont. Bin Suroor Survey, Mussafah Partnership Dredging & Reclamation - subcontract Halcrow International Dubai Municipality Dutco Balfour Beatty Partnership Dredging & Reclamation - subcontract to Abu Dhabi Municipality Gibb Ltd. Al Hamed Dev. & Construction .

Feb-04 1,000,000 Aug-03 Nov-03 Dec-03 Aug-03 May-03 Oct-03 Apr-03 May-03 1 week 650,000 25,000 1 week 1 week 650,000 2 weeks 35,000

Dec-04 2,100,000

Gulf Cobla L.L.C.

Page 50 of 57

V0909

GC Yard, Dubai U.A.E. Shuweihat, Abu U.A.E. Dhabi Fujairah Fujairah Dubai U.A.E. U.A.E. U.A.E.

Sila, Abu Dhabi U.A.E. Abu Dhabi Fujairah Dubai Fujairah U.A.E. U.A.E. U.A.E. U.A.E.

Services provided for installation & outfitting works of the restaurant vessel Mafraq Bay charter to Van Oord ACZ for Power Station Project at Shuweihat Dredging & Reclamation - subcontract to Mouchel International Six Construct Ltd Six Construct Co. Ltd Consultants Survey at Fujairah Port (similar to Port of Fujairah previous survey) Madinat Jumeirah Resort Dredging Al Burj Engineering Belhasa Six Construct subcontract to Belhasa Six Consultants Halcrow International Dutco Balfour Beatty Al Yasat Aali Island Survey, Sila Partnership Dredging - subcontract to Martin Mid Martin Mid East Turner International East at Conference Palace Dubai Transport Co. Port of Fujairah Arab Contractors / Dubai Municipality Directorate of Military Works Jebel Ali Hotel / Dutcon Al Shahama Palace OSSIS Property Developers China Harbour Engg. Co Van Oord ACZ Van Oord ACZ Interbeton, Qatar Six-CCC Joint Venture Mafraq & Kappa Bay charter Six Construct Ltd. Dutco Balfour Beatty Dutco Balfour Beatty Dutco Balfour Beatty Ballast Nedam United Nations Port of Fujairah Six Construct Ltd. Dutco Balfour Beatty Emaar OSSIS Property Developers Boskalis Westminster Abu Dhabi Six Construct Co. Ltd. China Harbour Engg.Co. Abu Dhabi Water & Electricity Authority Public Works Department - Abu Linden Shipping International Survey at Fujairah Port -

Apr-03 / Mar-03 / Mar-03 / Feb-03 / Feb-03 / Jan-03 / Dec-02 / Dec-02 /

Nov-03 May-03 Apr-03 Feb-03 Feb-03 Jan-03 Apr-03 Dec-02

2 months 75,000 1 week 25,000 1 week 3 months 1 week

Jebel Ali, Dubai U.A.E. Abu Dhabi U.A.E.

Bathymetric & Topographic Survey at Al Mounsell Consultancy Dec-02 / Dec-02 1 week Mamzar Lagoon Services Limited Dredging & Reclamation - subcontract to Mouchel International Jan-03 / May-04 1,300,000 Six Construct Co. Ltd Consultants Maintenance dredging works at Jebel Ali Nov-02 / Dec-02 1 month Hotel Marina Survey at Al Shahama Palace Dredging & Reclamation at Amwaj Theme Park Survey at NMDC Basin at Mussafah Plant/Equipment tank charter to Van Oord, Palm Island I - Phase I Personnel charter to Van Oord, Palm Island I - Phase I Rashidiya Bay time charter to Interbeton Survey Shuweihat Power Station Charter to Van Oord ACZ Development of Al Samaliah Island Survey at Al Yasat Island Survey of Port Khalid Hamriyah Offshore Inner Harbour Dredging Fuel barge, crane barge, tugboat charter Hydrographic Survey for Rehabilitation of Port of Massawa Bathymetric Survey South of Port of Fujairah Bathymetric Survey Umm Al Nar Gredeco Conseco Oct-02 / Sep-02 / Oct-02 Apr-03 Sep-02 Aug-03 Nov-02 Mar-03 Jul-02 Sep-02 Jul-02 May-02 Apr-02 1 week 900,000 1 week 1 year 4 months 8 months 1 week 2 months 200,000 1 week 1 week

Qalali, Manama Bahrain Abu Dhabi U.A.E.

Frederic R. Harris Inc. Sep-02 / Krupp Uhde Lahmeyer International Conseco International Ltd. Halcrow International Partnership Halcrow International Partnership Halcrow International Partnership Keangham Enterprises Ltd. Rendel Palmer & Tritton Aug-02 / Aug-02 / Aug-02 / Jul-02 / Jul-02 / Jun-02 / May-02 / Apr-02 / Mar-02 / Mar-02 / Feb-02 / Feb-02 / Jan-02 / Dec-01 / Nov-01 / Dec-01 / Sep-01 /

Jebel Ali, Dubai U.A.E. Jebel Ali, Dubai U.A.E. Doha Abu Dhabi Fujairah Abu Dhabi Abu Dhabi Sharjah Hamriyah, Sharjah Doha Massawa Fujairah Umm Al Nar, Abu Dhabi Qatar U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. Qatar Eritrea U.A.E. U.A.E.

Jan-03 1,250,000 Feb-03 11 months May-02 Feb-02 Jan-02 Jan-02 Dec-01 2 weeks 1 week 1 week 32,000 63,000

Jebel Ali, Dubai U.A.E. Jebel Ali, Dubai U.A.E. Qalali, Manama Bahrain South Pars Gas Iran Field Abu Dhabi U.A.E

Dredging maintenance at Jebel Ali Hotel Marina Dredging & Stockpiling - subcontract to Halcrow International Overseas AST Co. Partnership Dredging & Reclamation - subcontract to Gredeco Conseco Boskalis Westminster at Amwaj Island Mafraq Bay Charter for South Pars Gas Field Dev. Phase 1 Dredging for Extension Dhow Harbour Halcrow International (very hard, execution in 3 phases) Partnership Hydrographic Survey

Sep-02 1,800,000 Nov-01 380,000 1 week 420,000 914,000 -

Jun-01 / June-02 May-01 Jun-01 Oct-01 Apr-01

Mussafah, Abu U.A.E Dhabi Suweihat, Abu U.A.E. Dhabi Shahama, Abu U.A.E. Dhabi Dubai,Yemen Yemen

Frederic R. Harris Inc. May-01 /

Dredging of outfall channel - subcontract Lahmeyer Apr-01 / to Six-CCC Joint Venture International Widening & deepening existing Bel Halcrow International Apr-01 / Ghaylam Channel by dredging Partnership Ramp Barge Charter for Dubai-Yemen Mar-01 / V.V.

Gulf Cobla L.L.C.

Page 51 of 57

V0909

Manama Umm Al Nar, Abu Dhabi Umm Al Nar, Abu Dhabi Sharjah

Bahrain U.A.E. U.A.E U.A.E

Oil Marketing Corporation Six Construct Co. Ltd Abnormal Load Engineering Halcrow International Partnership Public Works Department - Abu Dutco Balfour Beatty Six Construct L.L.C. Overseas AST Co. L.L.C. Square General Public Works Department - Abu Dutco Balfour Beatty (L.L.C.) Public Works Department - Abu ADCO Ministry of Defence Ballast Nedam The Arab Contractors

Dredging entrance channel & reclamation Dredging at Umm Al Nar Desalination Plant area Hydrographic Survey Hydrographic Survey Fish Hides - Hydrographic Survey Dredging very hard material along existing quaywall Dredging immediately adjacent sheetpile

Oil Marketing Corporation Abnormal Load Engineering Halcrow International Partnership Halcrow International Partnership Halcrow International Partnership Posford Duvivier

Feb-01 / Jan-01 / Jan-01 / Jan-01 / Dec-00 / Nov-00 / Nov-00 /

Apr-01 Feb-01 Jan-01 Jan-01 Jan-01 Dec-00 Nov-00 Sep-00 Jun-00 Jun-00 Jun-00 Aug-00 Jul-00 Oct-00 Jul-00 Apr-00 May-00 Apr-01 Feb-00 Dec-99 Sep-99 Nov-99 Aug-99 Aug-99 Jul-99 Jul-99 Oct-99 Apr-99 Apr-99 Jan-99 Jan-99 Apr-99 Aug-98

510,000 300,000 1 week 1 week 6 weeks 10,000 16,000 1 week 1 week 2 weeks 240,000 500,000 500,000 100,000 24,000 650,000 12,000 100,000 900,000 1 week 1 month 1 week 4 months 2 weeks

Qarin Al U.A.E Aysh,Abu Dhabi Sharjah Ajman Dubai Al Taweelah,Abu U.A.E. U.A.E. U.A.E. U.A.E

Detailed survey at Al Seef & Al Shamal Maunsell Consultancy Sep-00 / in Dubai Creek Services Hydrographic Survey at Taweelah Fish Hides - Hydrographic Survey Barge Hire Jun-00 /

Qarin Al U.A.E Aysh,Abu Dhabi Dubai Abu Dhabi Sitra Umm Al Nar, Abu Dhabi Kangan Al Mamzar, Dubai Abu Dhabi Muscat U.A.E U.A.E Bahrain U.A.E Iran U.A.E. U.A.E. Oman

Halcrow International Jun-00 / Partnership Jun-00 /

Dredging Channel and Basin for H.H. Halcrow International Jun-00 / Sh. Eisa (Phase 1) Partnership Dredging, Reclamation and stockpiling Jun-00 / (Phase 1) Dredging basin along installed sheetpile Directorate of Military May-00 / Works & Halcrow Int'l (in 2 phases) Mafraq Bay Charter Detailed hydrographic survey of lagoon Apr-00 /

Mussaffah, Abu U.A.E. Dhabi Sharjah U.A.E.

Jebel Ali, Dubai U.A.E. Khussifa, Abu Dhabi Abu Dhabi Mussafah, Abu Dhabi Bateen, Abu Dhabi Mussaffah, Abu Dhabi Umm Al Quwain Dubai Umm Al Nar, Abu Dhabi Dubai Seychelles U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. U.A.E.

Maunsell Consultancy Apr-00 / Services Abu Dhabi Electricity & Target Engg. Co., dredging and islands Lahmeyer Apr-00 / Water Dept. formation International Circle Freight Kappa Bay Charter for Sohar Project Jan-00 / International Abu Dhabi Ship Ship Yard Extension Dredging & Halcrow International Jan-00 / Building stockpiling works Partnership Halcrow International Dutco Balfour Beatty Mafraq Bay Charter Nov-99 / Partnership Dubai Transport Maintenance dredging entrance of Jebel Sep-99 / Company Ali Hotel Public Works Dredging of an entrance channel Halcrow International Aug-99 / Department Subcontracted to HAM Dredging Partnership Federal Directorate of Al Suwwah Island Bridge - Dredging Waagner Biro Bin Aug-99 / Military Works works Butti Eng. Co. Ltd. Boskalis Westminster H.H. Sheikh Sultan Bin Zayed Al Nahyan Boskalis Westminster H.H. Sh. Hamdan Bin Rashid Dubai Municipality Boskalis Westminster Overseas AST Co. L.L.C. Kappa Bay Hire, Mussaffah Channel Marina dredging works in Private Residential Complex at Bateen Mercator Bay Charter - Mussaffah Cansult Ltd. Jul-99 /

Dewan-Architects & Jun-99 / Halcrow International Cansult Ltd. Jun-99 /

Arif Bintoak Dredging Entrance Channel & shallow May-99 / Consulting Architects draught lagoons Narrow Trench Dredging of Dubai Creek Maunsell Consultancy Apr-99 / Al Seef Corner Project Services Mafraq Bay Charter - Umm al Nar Apr-99 /

Detailed survey at Al Seef & Al Shamal Maunsell Consultancy Jan-99 / in Dubai Creek Services Mafraq Bay charter Oct-98 /

Seychelles Boskalis Westminster Dubai Aluminium Co. Ltd Subcontract to Overseas AST Public Works Department - Abu Dubai Transport Co. . Al Futtaim Real Estate

Jebel Ali, Dubai U.A.E. Abu Dhabi Qarin Al Aysh, Abu Dhabi U.A.E. U.A.E.

Jebel Ali, Dubai U.A.E. Umm Al Quwain U.A.E.

Maintenance dredging at Intake Sep-98 / Structure Dredging Residential Complex at Al Jarf Aug-98 / Marina Dredging Channels and fish nurseries; Halcrow International Aug-98 / Reclaim land; Bridge construction Partnership Jebel Ali Hotel Marina maintenance Jul-98 / dredging Survey Al Futtaim Beach Palace Copenhagen Group Mar-98 /

Jan-02 9,500,000 Jul-98 Mar-98 35,000 -

Gulf Cobla L.L.C.

Page 52 of 57

V0909

Sharjah Fujairah Dabiya, Abu Dhabi Dubai Abu Dhabi

U.A.E. U.A.E. U.A.E. U.A.E. U.A.E.

Dutco Balfour Beatty Dutco Balfour Beatty ADCO - Subcontract to Balfour Beatty L.L.C. Chicago Beach Resort Strabag Abu Dhbai Dubai Transport Company Al Futtaim Real Estate (P) Ltd Huta Hegerfeld Huta Hegerfeld Abu Dhabi Municipality Al Ahmadiah Contracting Government of Sharjah Consolidated Contracting Co Dubai Municipality Six Construct Co. Ltd. Dutco Balfour Beatty Project Management & Development Co Huta Hegerfeld Dubai Transport Co. Dutco Balfour Beatty Dubai Municipality Dutco Balfour Beatty Dutco Balfour Beatty SAMACO SAMACO Dutco Balfour Beatty Dubai Municipality Dutco Balfour Beatty National Marine Dredging Co Costain International Dubai Transport Company Al Naboodah Contracting Co Al Naboodah Contracting Co Costain International Costain International Dubai Municipality

Seabed Survey Hamriya (Sharjah) Port Survey Mina Dibba Dredging Channel & Jetty Basin for oilfield supplies Sedimentation Beach Survey Study Dredging and Reclamation for Military Basin Maintenace Dredging of Marina Entrance Jebel Ali Hotel Dredging of Access Channel Dredging and Reclamation Touristic City Durat Al Arous II Coastal Dredging Dredging New Outfall Channel for Taweelah Power Station

Halcrow International Mar-98 / Partnership Feb-98 /

Mar-98 Feb-98 Aug-98 Mar-98 Mar-98 Nov-97 Nov-97 Nov-98 Oct-97 Oct-97 Aug-97 Aug-97 Aug-96 Oct-96 Feb-96 Dec-95 Oct-96 Sep-95 Jun-95 Apr-95 Apr-95 Feb-95 Jan-95 Jun-95 Dec-94 Sep-94 Dec-93 Nov-93 Oct-93 Sep-93 Jul-93 Jun-93 Jan-93 Dec-92 Oct-92 Jul-93

600,000 245,000 20,000 130,000 3,500,000 100,000 700,000 450,000 1,750,000 120,000 1,000,000 85,000 110,000 2,000,000 75,000 71,000 30,000 30,000 73,000 100,000 1,950,000 150,000 10,000 100,000 70,000 330,000 75,000 24,150 26,000 95,000 26,000 5,600,000

Halcrow International Apr-98 / Partnership W.S. Atkins & Jan-98 / Partners Overseas Federal Directorate of Jan-98 / Military Works Copen Hagen Group Oct-97 / Oct-97 / Nov-97 / Sep-97 /

Jebel Ali, Dubai U.A.E. Umm Al Quwain Jeddah Tuwwal U.A.E. K.S.A. K.S.A.

Taweelah, Abu U.A.E. Dhabi Jebel Ali, Dubai U.A.E. Al Khan, Sharjah Shinas Ajman Abu Dhabi Dubai Jeddah Obhur Creek, Jeddah U.A.E. Oman U.A.E. U.A.E. U.A.E. K.S.A. K.S.A.

Halcrow International Aug-97 / Partnership

Dredging and Reclamation for Harbour Federal Directorate of May-97 / Basin Military Works Lagoon dredging and Islands Halcrow International Dec-96 / Reclamation Works Partnership Dredging of Fishery Harbour Dredging of Khor Ajman Beach Replenishment at Ladies Beach Dredging of Marina for Chicago Beach Hotel Obhur Creek Project Dredging and Reclamation for Touristic Site Dredging of private basin in hard coral Dredging of marina & silt trap Dredging of channel to jetty Dredging for Island Reclamation Deepening of existing marina Sogreah Ajman Municipality Jul-96 / Apr-96 /

Halcrow International Jan-96 / Partnership W.S. Atkins & Nov-95 / Partners Overseas Halcrow International Sep-95 / Partnership Nedeco Aug-95 / May-95 / Apr-95 / Mar-95 /

Jebel Ali, Dubai U.A.E. Al Hayl, Abu Dhabi Umm Suqeim, Dubai Mina Seyaha, Dubai Chicago Beach, Dubai Tuwwal, Jeddah Tuwwal, Jeddah Dubai Drydock, Dubai Umm Suqeim, Dubai Dubai Drydocks, U.A.E. U.A.E. U.A.E. U.A.E. K.S.A. K.S.A. U.A.E. U.A.E. U.A.E.

Halcrow International Feb-95 / Partnership Dredging of toe trench & placing of fill for W.S. Atkins & Dec-94 / offshore island Partners Overseas Work stopped by Dredging of Channel for Touristic Village Dec-94 / Client Dredging of marina entrance of Dr. Bakr Cleaning dredging of drydock foundation Dredging for Island Reclamation Dredging for Floating Dock Pit W.S. Atkins & Partners Overseas Nedeco Nov-94 / Aug-94 / Nov-93 /

Zubayyah, Abu U.A.E. Dhabi Jubail K.S.A.

W.S. Atkins & Nov-93 / Partners Overseas Halcrow International Hire of Booster Stations Jul-93 / Partnership Dredging for new Facilities in King Abdul Halcrow International Jul-93 / Aziz Naval Base Partnership Dredging of Marina & Silt Trap Dredging Jumairah Beach Palace Dredging of Clubhouse Foundations H.H. Sheikh Mohammed's Office H.H. Sheikh Mohammed's Office Jun-93 / Jun-93 / Dec-92 /

Jebel Ali, Dubai U.A.E. Umm Suqeim, Dubai Creek, Dubai U.A.E. U.A.E.

Jebel Ali, Dubai U.A.E. Jebel Ali, Dubai U.A.E. Al Mamzar, Dubai U.A.E.

Dredging and Backfilling of trench for Ewbank International Nov-92 / water intake Dredging of trench for water intake - on Ewbank International Sep-92 / shore part Lagoon Dredging Entrance Training Halcrow International Jun-92 / Walls, land reclamation Partnership

Gulf Cobla L.L.C.

Page 53 of 57

V0909

Jebel Ali, Dubai U.A.E. Dubai Sharjah Dubai U.A.E. U.A.E. U.A.E.

Dubai Electricity Company Kier International Overseas AST Overseas AST Dubai Transport Company Al Naboodah Contracting Co Broekhoven B.V. Public Works Department - Abu H.H. Sh. Ahmed bin Rashid Al Maktoum Public Works Department - Abu Dubai Municipality Dubai Municipality H.H. Sh. Ahmed bin Rashid Al Maktoum H.H. Sh. Ahmed bin Rashid Al Maktoum Shell Markets (M.E.) Ltd H.H. The Ruler of Sharjah Public Works Department - Abu Public Works Department - Abu Khor Fakkan Municipality Khor Fakkan Municipality H.E. Mehdi Al Tajir H.H. The Ruler of Sharjah Hochtief, AG. Costain Blankevoort (UK) Dredging Co. Ltd. H.H. The Ruler of Sharjah Public Works Department - Abu H.H. The Ruler of Sharjah H.H. The Ruler of Sharjah H.H. The Ruler of Sharjah S.A. Port Authority Riyadh Public Works Department - Abu Sharjah Port Authority H.H. The Ruler of Dubai Dubai Electricity Co. H.H. The Ruler of Dubai Ministry of Public Works & Housing

Trench Dredging and Backfilling Dredging for Dubai Ship Docking Yard Dredging trench for Sharjah Creek Crossing Dredging for Dubai Creek Leisure Complex Dredging of marina Dredging of Marina at Golf Course Hire of Cutter Suction Dredger

Ewbank International Mar-92 / Halcrow International Feb-92 / Partnership Halcrow International Dec-91 / Partnership Halcrow International Oct-91 / Partnership H.H. Sheikh Mohammed's Office P.S.O. - Iran Jul-91 / Apr-91 / Oct-90 /

Apr-92 Feb-92 Dec-91 Nov-91 Aug-91 Mar-91 Mar-91 Aug-90 Oct-89 Dec-89 Sep-89 Mar-89 May-88 Mar-88 Jul-87 Jan-87 Jul-86 Oct-87 Apr-86 Jan-86 Nov-85 Oct-85 Sep-85 Jul-85 Jul-84 Nov-83 Feb-84 Jun-83 Dec-82 Nov-82 Aug-83 Jan-83 Mar-82 Mar-82

450,000 35,000 65,000 1,000,000 22,000 1,200,000 192,000 18,000 24,500 40,800 25,400 260,000 600,000 19,000 94,000 54,000 23,000 40,000 160,000 4,000,000 3,000,000 260,000 2,000,000 1,300,000 2,700,000 100,000 110,000 2,200,000 850,000

Jebel Ali, Dubai U.A.E. Dubai Creek Qeshm Island Sir Bani Yas, Abu Dhabi Dubai Abu Dhabi Mina Seyaha, Dubai Umm Suqeim, Dubai Dubai Dubai Dubai Hamriyah, Sharjah Al Taweelah, Abu Dhabi Abu Dhabi Khor Fakkan Dibba U.A.E. Iran U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. U.A.E.

Dredging and Reclamation Sir Bani Yas Halcrow International Mar-90 / to Mugharaq Channel Partnership Beach Protection Works Dredging and Reclamation Mainland to Umm Al Barak Channel Dredging and Reclamation Beach Protection Works Beach Protection Works Yacht Harbour Dredging Oct-89 /

Halcrow International Sep-89 / Partnership Halcrow International Aug-89 / Partnership Mar-89 / May-88 / Feb-88 /

Aviation Fuel Oil Pipeline Trench Across Ewbank International Jun-87 / Dubai Creek Consultants Halcrow International Hamriyah Creek Dredging - Stage II Nov-86 / Partnership Al Taweelah Power Station Intake Lahmeyer May-86 / Channel International Gmbh Hire of Booster Stations Khor Fakkan Fishing Harbour Dredging Dibba Fishing Harbour Extension Marina at Jumeira Beach Dredging at Hamriyah Town Wharf Garhoud Bay Charter Jebel Ali Bay Charter Deepening of Fishing Harbour Dredging Shoal in front of the Tourist Club Ajman Creek Development - Stage VI Cansult Ltd May-86 /

Halcrow International Apr-86 / Partnership Halcrow International Dec-85 / Partnership Halcrow International Partnership Halcrow International Partnership Cansult Nov-85 / Oct-85 / Mar-85 / Jan-85 / Jul-84 / Sep-83 /

Jumeira, Dubai U.A.E. Hamriyah, Sharjah Muscat Alicante Dibba Abu Dhabi Ajman Hamriyah, Sharjah Sharjah Farasan Abu Dhabi Sharjah Kalba U.A.E. Oman Libya U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. K.S.A. U.A.E. U.A.E. U.A.E.

Jebel Ali, Dubai U.A.E. Dubai Creek Khor Kalba U.A.E. U.A.E.

Halcrow International Jul-83 / Partnership Halcrow International Creek Development - Stage I Nov-82 / Partnership Halcrow International Beach Protection Dec-82 / Partnership International Dredging Approach Channel & Harbour Jul-82 / Hydraulique Basin & Reclamtion for new berth Dredging Fishing Channels & Hilton Cansult Jun-82 / Beach Reclamation Dredging Approach Channel & Basin & Halcrow International Apr-82 / Reclamation Port Khalid Partnership Halcrow International Dredging Fishing Harbour Mar-82 / Partnership Kennedy & Donkin, Jebel Ali Steam Power Station Cooling Mar-82 / Halcrow Int. Water Intake Dredging Lagoon for stockpile

Halcrow International Sep-81 / May-82 Partnership Dredging Creek & Reclamation for Dhow Allot & Lomax (M.E.) Jul-81 / Nov-81 Harbour Ltd

Gulf Cobla L.L.C.

Page 54 of 57

V0909

Lulayyah Mina Hassah Dibbah Murbah Abu Dhabi Rams, Ras Al Khaimah Ajman Ruwais, Abu Dhabi Hamra, Ras Al Khaimah Mina Sulman Port Rashid, Dubai Ajman Creek Mina Jebel Ali, Dubai

U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. U.A.E. Bahrain U.A.E. U.A.E. U.A.E.

H.H. The Ruler of Dubai H.H. The Ruler of Dubai H.H. The Ruler of Dubai H.H. The Ruler of Dubai Public Works Department - Abu

Dredging Fishing Harbour Marine Dredging Fishing Harbour - Phase I Dredging Fishing Harbour Widening South Peripheral Channel

Halcrow International Partnership Halcrow International Partnership Halcrow International Partnership Halcrow International Partnership Cansult

Jun-81 / Jun-81 / Mar-81 / Jan-81 / Jan-81 /

Mar-82 Nov-81 Jun-81 Mar-81

120,000 440,000 360,000 110,000

Mar-83 44,000,000 May-81 Nov-80 Jan-80 May-81 Jul-77 Nov-78 Apr-77 2,100,000 2,850,000 135,000 5,300,000 1,300,000 9,500,000 1,700,000

Hamriya, Dubai U.A.E. Sulman Port Bahrain

H.H. The Ruler of Creek Development, Phase II Dubai H.H. The Ruler of Ajman Creek Development & Dubai Reclamation Stage V Subcontract to Dredging floatation trench through Overseas AST foreshore reef H.H. The Ruler of Reclamation for town development Dubai Subcontract to DodinSand supply for quay construction Bouygues Offshore H.H. The Ruler of Deepening till -11.5 m of existing Dubai harbour & extension The Ministry of Public Dredging and Reclamation of New Works Harbour H.H. The Ruler of Dredging of basins & approach channel Dubai for new harbour H.H. The Ruler of Extension Harbour Dubai Ministry of Dredging small craft harbour, turning Development & Engg. basin & approach channel

Halcrow International Jul-80 / Partnership Halcrow International Mar-80 / Partnership Halcrow International Partnership Rendel Palmer & Tritton Sir William Halcrow & Partners Sir William Halcrow & Partners Halcrow Middle East Ltd Sir William Halcrow & Partners Rendel, Palmer & Tritton Dec-79 / Sep-79 / Feb-77 / Oct-76 / Jun-76 / Jun-76 / Mar-76 / Mar-76 /

Feb-82 ######### Dec-77 Oct-77 1,200,000 5,500,000

Gulf Cobla L.L.C.

Page 55 of 57

V0909

PROJECTS TESTIMONIALS

Gulf Cobla L.L.C.

Page 56 of 57

V0909

Gulf Cobla L.L.C.

Page 57 of 57

V0909

You might also like