Professional Documents
Culture Documents
rd
Feb 2009
(O)I)O OI +T1) ()1I1(/ O11)
Tc.cnvion ,
/}/ 1+)/
.Iv.v, T^1,
Controls of Super Critical 3
rd
Feb 2009
Boiler Turbine Control
Controls of Super Critical 3
rd
Feb 2009
Boiler ollowing Mode
Controls of Super Critical 3
rd
Feb 2009
%:rbine ollowing Mode
Controls of Super Critical 3
rd
Feb 2009
Coordinate Mode Control
Controls of Super Critical 3
rd
Feb 2009
Coordinate Mode Control
Controls of Super Critical 3
rd
Feb 2009
rum and OT Control Comparison
Controls of Super Critical 3
rd
Feb 2009
rum and OT Control Comparison
Controls of Super Critical 3
rd
Feb 2009
OT Control Overview
Controls of Super Critical 3
rd
Feb 2009
Cycle of S:5ercritical Power Plant
Controls of Super Critical 3
rd
Feb 2009
Controls of Super Critical 3
rd
Feb 2009
S:5ercritical Power Plant
Controls of Super Critical 3
rd
Feb 2009
OT Control Overview
Controls of Super Critical 3
rd
Feb 2009
OT Start up Control mode
Controls of Super Critical 3
rd
Feb 2009
Super Critical Units Controls Mode
Controls of Super Critical 3
rd
Feb 2009
lushing Mode
Controls of Super Critical 3
rd
Feb 2009
lushing Mode
Controls of Super Critical 3
rd
Feb 2009
Start-Up System with Recirculation
HPH
BFP
Deaerator
WW
ECO
To Condenser
HWL
SH
Start-Up System
Recirculation Pump in Main Bypass Line
S
e
p
a
r
a
t
o
r
F
I
a
s
h
T
a
n
k
Controls of Super Critical 3
rd
Feb 2009
Start UP System
Controls of Super Critical 3
rd
Feb 2009
START-UP
1 the water system o1 the boiler is empty (economizer, 1urnace walls,
separators), then the system is 1illed with approximately 10 TMCR
1eed water 1low.
When the level in the separator reaches set-point, the WR valve will
begin to open.
When the WR valve reaches ~30 open 1or approximately one minute,
then increase 1eed water 1low set-point to 30 TMCR. As the 1low
increases, WR valve will reach 1ull open and ZR valve will begin to
open.
The water system is considered 1ull when:
The separator water level remains stable 1or two(2) minutes
and
The WR valve is 1ully opened and ZR valve is ~15 open 1or two(2)
minutes.
Controls of Super Critical 3
rd
Feb 2009
Controls of Super Critical 3
rd
Feb 2009
SEPARA1OR S1ORACE 1AAK LEJEL
COA1ROL
W Se5arator level is maintained by the combined action of a se5arator storage
tank level feed water demand and the 5ositioning of WR and ZR drain
valves.
W eed water demand is develo5ed in res5onse to se5arator storage tank level
error and total f:el flow so as to 5revent tank level from dro55ing too low.
W %he WR and ZR valves are controlled in a s5lit range manner to maintain
the liq:id level once the level reaches a high limit.
W %he WR valve will res5ond first and then the ZR when the WR exceeds its
linear o5erating range.
W %ank geometry is s:ch that fl:ct:ations in tank level are very dynamic, for
this reason, only 5ro5ortional control action established thro:gh the WR/ZR
f:nction c:rves is :sed to 5osition these valves in res5onse to level error.
Controls of Super Critical 3
rd
Feb 2009
&C JALJE COA1ROL
Control objective:
Maintain minimum economizer inlet 1low.
Control action:
W The boiler circulating pump is started 1ollowing the start o1 a
turbine-driven 1eed water pump and the 1inal clean-up cycle. This
pump circulates 1eed water 1rom the evaporator outlet back to the
economizer inlet.
W ocated at the outlet o1 this pump is the UG valve which
controls economizer inlet 1low during the start-up phase o1 operation.
emand 1or this recirculation control valve is established based on
measured economizer inlet 1low compared to a minimum boiler
1low set point.
Controls of Super Critical 3
rd
Feb 2009
Separator water circuit o1 Super Critical
Controls of Super Critical 3
rd
Feb 2009
EEDWA1ER COA1ROL LOOP
Control objective:
W evelop total unit 1eed water demand as required to support unit
load.
W Adjust 1eed water demand to maintain desired separator outlet
temperature.
W Adjust separator outlet temperature set point as required to maintain
acceptable platen superheat spray control range.
W ncorporate separator storage tank level (wet mode) 1eed water
demand.
W Maintain minimum required economizer inlet 1low.
.
Controls of Super Critical 3
rd
Feb 2009
eedwater Control
aturaI circuIation boiIer Once-through boiIer
eedwater
control
Level
eedwater
Steam flow
m
Eva Eco
T
T
Enthalpy
eedwater
control
eedwater
T P
Eco
Eva
Controls of Super Critical 3
rd
Feb 2009
eed water 1iring rate ratio control
Controls of Super Critical 3
rd
Feb 2009
eed water 1iring rate ratio control
Controls of Super Critical 3
rd
Feb 2009
Process Set5oint
eed
orward
1(x)
K
d
dt
P
+/-
C
-/+
C
+/-
P
+/-
%
MO
K
d
dt
P
+/-
C
-/+
C
+/-
P
+/-
1(x)
PROCESS
K
d
dt
P
+/-
C
-/+
1(x)
%
C
+/-
P
+/-
eed orward
Controls of Super Critical 3
rd
Feb 2009
tsec]
0 60 120
C
180 240 300
Water wall %em5erat:re
MW
_