You are on page 1of 8

Khaja zamiruddin

Objective: To secure a challenging position within Instrumentation field engineer, SAP planning engineer, & automation engineer which will provide an opportunity where past experience and personal motivations will make a substantial and valuable contribution to the organization. Educational Qualification:

Bachelor of Engineering (B.E) specialization with Electronics and Instrumentation Rural Engineering College Gulbarga University India
Experience Worked Since January 2008 to Dec 2010, as Instrument Planning Engineer through SAP R/3 4.7C/ECC 6.0 PM module in Marafiq, Power and Water Utility Company for Yanbu and Jubail. Al-Jubail, Saudi Arabia. Roles and Responsibilities: Supervisor of planning persons within Marafiq Planning jobs in Jubail. Process analysis for WMS either manual or SAP o Notification Conversion to work order, Work Orders assigned with correct Revision week, Work Orders planned on timely manner for approval, Daily Confirmation of work orders (CNF). Daily work orders closure after CNF with Notification closing. (TECO, NOCO). Cause code, Damage Code entry check. Equipments downtime analysis, Work Order backlogs analysis, Overdue work order analysis, Regularity of Task List updates, Manpower capacity utilization, Schedule breaker analysis, Shifted Jobs analysis. Experiences on SAP MM modules such as o Purchase Requisition, o Purchase Order, o Service Entry Sheet, o Creating of new SAP material no o Checking status of material like goods movement, reservation and etc SAP PM master data administration this ensuring data integrity and security, such as creation/amendment of o Functional Location. o Equipment, o Bill of Materials (BOM), o PM Tags, o Standard Text, o Task List Group,

o Maintenance Items, o Maintenance Plan, o Preventive Maintenance Scheduling, o Capacity management through IR02,CM07, o Maintenance Work Center, o Planner Group. Budget Monitoring through SAP BI and SAP R/3. SAP experience

o Creating of emergency notification o After getting approval from operation converting notification in to the work order. o Creating sub work order if required to the mother/superior work order for the support services from the other work center o Making an initial assessment (man power, recourses and support service) of the work order. o After execution of work making accomplishment in the notification long test, assigning damage code and cause code. o Making CNF (conformation) of the work order. o Changing work order SAP status from CRTD (created mode) to theTECHO (Technically completed) mode. o Checking the availability of material o Update Correction of material description o Creating new SAP material no. o Review BCD(Bid closing date ) and DD (Delivery date ) of PR(purchase request)or PO(purchase order ) for material and follow-up with material department. o Creation of Bill of Material (BOM) for all plant systems and equipments which are related to Instrumentation. o Identifying and uploading of Functional Locations for the various plant equipments and systems for the SAP system so as to get proper history of the systems and equipment from the functional locations. o Extracting KPI from BI Production Worked Since January 2006 to November 2008, as Instrument Engineer at Marafiq, Power and Water Utility Company for Yanbu and Jubail. At Jubail branch As a instrumentation engineer Responsibilities: Maintenance of all field instruments for measurement and control of pressure, temp, level and flow etc. Prepare schedule and execution of preventive maintenance jobs. Supervise the instrument foreman, technicians Analyze, Troubleshoot and resolve the problems

Technical evaluations of materials files, inspections of delivered material as per our corrective maintenance job requirements. Supporting planning persons for initial assessment of the job like man hours, material, and other resources. Preparation of GPM (general preventive maintenance) task list, assigning of man power, frequency of GPM for the year, to prevent for corrective maintenance. Preparation of budget plan for five and ten years Preparation of scope of work for the external services for OPEX and CAPEX by coordination with engineering deportment. Evaluation of proposal from the vendors for external service jobs, and conducting meetings with the vendors for clarification and for conducting presentation from vendor for their proposal. Inspection of materials supplied by the vendor for the projects, accepting and rejection of materials as per the marafiq standards. Co-ordination with the vendor and support vendors to complete their project as per our requirement. Checking the quality of work and monitoring the time sequence to complete the work within the dead line. Updating the project status with percentage to the higher management. Attending the commissioning and pre commissioning of the project. Preparing the punch list and submitting to the vendor, after clearing the punch list making re inspection Record maintenance for IMS audit. Involves in the IMS internal & external audit, personal reporting to the manager. Preparation of risk assessment. Preparation and up gradating MARAFIQ IMS RISK ANALYSIS (MIRA) Preparation and following of OCP & OTP Worked at OFFTAS (OIL FIELD FOR TRADING AND SERVICES) Abqiaq K.S.A Responsibility Attend the bid meeting with the client , reviewing the scope of work , attending the site visits Preparing the proposal for the scope Procuring the material Calibration of instrument, like pressure gauge, pressure switch, pressure transmitter, Differential transmitter, flow transmitters, flow meters, PH, DO analyzer, level transmitter Installation of instrument like pressure gauge, pressure switch, pressure transmitter, flow meters, analyzers, control valves, actuators, positioned, level transmitter, level controller. Supervising the foreman, technician, Testing and commissioning of the project

Worked at YASTRONICS, Riyadh. As a automation engineer Responsibilities: Projects handle Up gradation of Manfa water plant Riyadh Manufacturing of bottling company Molding of bricks Manufacturing of water tanks Programming of PLC'S of Siemens 200 and 300 series ,Allen Bradley

S500, Modicon (Schneider electrical ) Estimation of material for the project as per the no of IOs Testing and commission of auto control system
Advance fault finding on PLCs and Electronic systems. Design and modification of SCADA (wonder wear in touch) wireless

and linking of SCADA system. Trouble shooting of SCADA system.


3 .Worked at POWER PLANT 8(expansion project), Riyadh as a junior engineer Responsibilities: Installation, of instruments and other equipments as per P& ID and layout drawings. To verify the completion of the work in accordance with the drawings and specifications

Ensure the material receiving inspection of supplied equipment and materials and its effective management. Preparation of specifications and data sheets for all types of instruments used like Flow, Temperature, Pressure, and Level measurements. Loopcheckingofalltypesofinstrumentslikepressure,differentialpressure,flow, TemperatureTransmitter,switches,indicatorsandetc To impressive and carryout the erection of instruments. Responsible to verify the installation of the instruments by performing inspections as per the Inspection and Test Plan (ITP) and record InstallationofthePressuregauge,Leveltransmitter,Flowtransmitterinthefield. ConductingtheLoopcheckingfortheinstrument. Conductingthecontinuitytestforthecables. Conductingmeetingwiththeclientregardingtheproblemsinthefield.

Preparationofdailyactivityreports. WorkExperienceinIndia Company Blue Horizon Services

Position Application Engineer Duration 1 year Responsibilities Programming of PLC's

Develop design requirement and prepare plans and specifications for the purchase, installation and testing of control system, hardware and software. Estimation of material for the project as per the no of IOs Development of signal routing, wiring, diagrams and constructive details. Field survey of existing control system. Advance fault finding on PLCs and Electronic system. Remove and replace defective parts and installation of new parts. Testing and commission of auto control system. Design and modification of SCADA (wonder wear in touch) wireless and FOC architecture linking of SCADA system. Trouble shooting of SCADA system
Information Technology: Diploma in computer management from Vijay Sree Info. Tech. Software Institute (Recognized by Government of Andhra Pradesh India) Operating System Programming Applications : Windows NT/XP : C, Visual Basic : Word Processor (M.S. Word) & Spreadsheet (Excel)

Training Courses Undertaken: Certified In Post Graduation Diploma In Industrial Automation (PGDIA) Advanced Diploma In Process Automation (ADPA) SAP (System Application Products) PROJECT MANAGEMENT, SAP R/3 4.7C/ECC 6.0 OHSAS 18001:1999 Safety Training

SCADA (Supervisory Control And Data Acquisition): Wonder Ware In touch Intellution FIX 32 PLC (Programmable Logic Controller): ABB (Asea Brown Broveri) Siemens AB (Allen Bradley) :07CR41 (Digital), XMO6B5-Advent Control, AC1131 & Version 4.2 :S7 300 Microwin32, Semitic CPU222 & Version 6.3 :RX Logic 500/SLC500, Micro Logic, RS Logic. 1200 Series C, Version 5.50 : KV 40R-KV Ladder Builder. :Versa Max, IC 200UEX626-BVersapro & Version-2.02. :Sysmac CMP2A, CX Programmer & version 6.0. :Concept V2.6 : Software (Version 10.0 & 9.5). : Software (Version 7.2).

Keyence GE Fanuc OMRAN QUANTUM Schneider Elet VFD (Variable Frequency Drive):

Selection of VFD Based on load and application VFD Wiring to load Parameter Selection of VFD Programming and commissioning with ABB ACS 800 Series

P &FI (Pneumatic & Field Instruments) Pneumatics ON OFF Solenoid valves, position Displacement, Control Valves, Actuator and Flow meters IP Converter Level Transmitter Flow Transmitters RTD Thermo Couple

DCS (Distributed Control System):

ABB AC800M Controller: Software: PLC Controller Builder, Model : PM854 Controller Programming Base Core Processor & Node Addressing. Operator Interface (My Plant), MMI Designing (CP 554), Communication Protocols (Ethernet, Profibus, Optical Modbus.

HONEYWELL HC900 C50: Software: Hybrid Control Designer. Model :HC900-C50-Version -2.1X Controller Programming Processor I/O Addressing, Operator Interface (Experian Vista), MMI Programming (HCI Designer), Communication Protocols (Ethernet, Modbus, Modbus, Profibus, Optical Modbus)

HONEYWELL PAC (Programmable Automatic Controller): Hardware Configuration I/O Modules. Troubleshooting I/O Wiring Networking of Experion/ PAC/C50/HC Real Time Interface: Process Control 2-Axis Motion Control Servo Drive/Motor Encoder

Other trainings
PLC Programming and Application Industrial Sensors/Controllers/Recorders & their Applications Micro Process Application in Process Industry Under Govt. of INDIA (Ministry of Labor) Directorate General of Employment & Training. Advance Training Institute for Electronics & Instrumentation. YOKOGOWA DCS PRO SIMULATOR CS 3000 OPERATOR STATION Distillation Column Steam Generator Compressor Pump Heat Exchanger Gas Turbine Furnace Evaporator CSTR

Plug Flow Reactor Fixed Bed Reactor Cogeneration Boiler

Other trainings
(SAP (System Application Products) PROJECT MANAGEMENT, SAP R/3 4.7C/ECC 6.0 at MARAFIQ Training Center Al-Jubail, K.S.A. PLC programming and trouble shooting from Schneider SCADA programming and trouble shooting. (MARAFIQ) OHSAS 18001:1999 safety training(MARAFIQ) Personal Profile: Nationality Religion Marital Status Driving License : : : : Indian Islam Single. Holding Valid Saudi Driving License

Declaration: I consider my self-familiar with electronics, Instrumentation, Automation and SAP planning Engineering aspects, and confident of ability to work in a team. I here by declare that the information furnished above is the best of my knowledge.

You might also like