city arch river 2015

september 2011

Michael Van Valkenburgh associates, inc.

10 competition goals
create an iconic place for the international icon, the Gateway Arch. catalyze increased vitality in the st. Louis region. honor the character defining elements of the National Historic Landmark. Weave connections and transitions from the City and the Arch grounds to the river. embrace the mississippi river and the east bank in Illinois as an integral part of the National park. reinvigorate the mission to tell the story of st. Louis as the gateway to national expansion. create attractors to promote extended visitation to the Arch, the City and the river. mitigate the impact of transportation systems. Develop a sustainable future. enhance the visitor experience and create a welcoming and accessible environment.

COMPETITION MANUAL
12.08.2009
v.5 - 7 April 2010

Michael Van Valkenburgh associates, inc.

eDge = program FiRST 100 FeeT THe

Competition study model


FRAMiNG A MoDeRN MASTeRPieCe: THe CiTy + THe ARCH + THe RiVeR

There is no given site for this projectall sites had to be earned through a demonstration of benefits to all adjacent jurisdictional interests

Michael Van Valkenburgh associates, inc.

four core JurisDictions

I-70 + memorIAL drIve

MODOT

JNem ArCH GrouNds, oLd CourtHouse, ANd LutHer eLy smItH squAre

NPS

CITY

kIeNer pLAzA + CIty/stAte ImprovmeNts

USACE

rIverfroNt + CrossING to eAst st. LouIs

Michael Van Valkenburgh associates, inc.

contractability Within a broaD approvals netWorK


fIre depArtmeNt fHwA poLICe + emerGeNCy svCs. Idot

bI-stAte ArCHdIoCese Nps oversIGHt wAsHINGtoN dC Nps pLANNING omAHA Nps CoNtrACtING deNver JpNA sHpo

MODOT

GrG CIty pLANNING CIty streets boArd of pubLIC servICe

NPS

CITY

offICe oN tHe dIsAbLed port AutHorIty CIty pArks

USACE

sLdC msd

CoAst GuArd brIdGe offICe CoAst GuArd trrA epA dNr meprd

fIsHerIes + wILdLIfe AmereN

Michael Van Valkenburgh associates, inc.

the negotiation of JurisDictional interests is the meDium of invention


fIrE dEPArTMEnT fHwA POLIcE + EMErGEncY SVcS. IdOT

bI-STATE ArcHdIOcESE nPS OVErSIGHT wASHInGTOn dc nPS PLAnnInG OMAHA nPS cOnTrAcTInG dEnVEr jPnA SHPO

MODOT

GrG cITY PLAnnInG cITY STrEETS bOArd Of PubLIc SErVIcE

NPS

CITY

OffIcE On THE dISAbLEd POrT AuTHOrITY cITY PArKS

USACE

SLdc MSd

cOAST GuArd brIdGE OffIcE cOAST GuArd TrrA EPA dnr MEPrd

fISHErIES + wILdLIfE AMErEn

Michael Van Valkenburgh associates, inc.

DoWntoWn st. louis is alreaDy changing

changes to the DoWntoWn that may be realizeD before 2015:


bikeway initiatives (GrG and City of st. Louis) eastern washington Avenue (mercantile exchange, National blues museum) Lumire place Casino phase 2 development the New mississippi river bridge

Michael Van Valkenburgh associates, inc.

the north enD Will become the center


todd waelterMann, director of streets, city of st. louis

I-

MRB DISTRICT

NORTH END

DOWNTOWN

the new Mississippi riVer bridge


/I-

Michael Van Valkenburgh associates, inc.

I-

relieve congestion at memorial Drive anD utilize the griD


i ipp iss e ss g Mi rid w b ne iVer r pi sip is ss ge Mi rid w b ne iVer r

tucker blVd. extension

MeMorial driVe

MeMorial driVe

tucker blVd. extension

2011

exIstING CoNdItIoNs

2014

wItH tHe New mIssIssIppI rIver brIdGe

2015

CIty ArCH rIver

Michael Van Valkenburgh associates, inc.

MeMorial driVe

reconnect vehicular arrival experience With city streets


walnut street washington aVenue

3rd street

2 3

1 Repurpose Existing Exit to Downtown Core/Walnut Street 2 Close One Block of Memorial Drive/Deck over I-70 3 New Ramps to North End/Washington Avenue
Michael Van Valkenburgh associates, inc.

aggregate an entry lanDscape


walnut street washington aVenue

3rd street

2 3
Jnem

1 Reclaim Memorial Drive Area as NPS Land 2 Reconfigure Luther Ely Smith Square and Renew Front Door to the Arch 3 Connect below-grade JNEM to the New Entry Landscape
Michael Van Valkenburgh associates, inc.

animate a connection to the gateWay mall


walnut street washington aVenue

1 2 3
3rd street

Jnem

1 Attract Pedestrian Activity at Kiener Plaza 2 Improve Access to Old Courthouse 3 Improve Visitor Drop-off and Orientation at Luther Ely Smith Square (at Market and Chestnut)
Michael Van Valkenburgh associates, inc.

utilize the capacity of the city griD


2

broadway

1
4th street

Jnem

1 Broadway and 4th Street replace Memorial as a Wayfinding Corridor 2 Improved Level of Service at all Intersections

Michael Van Valkenburgh associates, inc.

moat of transportation

orIA

pedestrIAN C
Iv e

rossING

L dr

Ive

ArCH

me

mo

rI

AL

dr

I-4

4/I

-7 0

mem

dowNtowN

Michael Van Valkenburgh associates, inc.

proposeD lanD briDge connection to gateWay mall

oLd CourtHouse

4tH st.

LutHer eLy smItH sq.

I-70 overbuILd

proposed JNem west eNtry

Michael Van Valkenburgh associates, inc.

erase the experience of the i-70 trench

vIew eAst from LutHer eLy smItH squAre

linK visitor experience of Jnem anD olD courthouse

vIew west from New JNem eNtrANCe towArd oLd CourtHouse

urban plaza

union square north, new york, ny

places for people

bailey plazacornell uniVersity, ithaca, ny

builD connections through parKing

exIstING GArAGe bLoCks ALL otHer poteNtIAL CoNNeCtIoNs

existing

proposeD (2015)

Michael Van Valkenburgh associates, inc.

builD connections through parKing

1 Existing Parking Garages, Lots, and Open Sites 2 Existing JNEM Parking Garage to be Removed

Michael Van Valkenburgh associates, inc.

utilize the parK as a circulation hub

2 1

1 Accessible Park Circulation Loop (Pedestrian, Bikes, and Potential Seasonal Circulator) 2 Key Interface Points with Park Interior

Michael Van Valkenburgh associates, inc.

repurpose the terminus of Washington avenue

washington aVenue

1 Incorporate End of Washington Avenue into the Park 2 Accessible Pedestrian Links through Eads Bridge Portals 3 Prioritize Welcoming Landscape to Address Washington Avenue and Safe Pedestrian Crossing
Michael Van Valkenburgh associates, inc.

create a neW front Door for a riverfront District

washington aVenue

3 2 1

i-70

1 Conversion of 5-leg Intersection (Flashing Red) to 4-leg Intersection (Signaled) New Front Door for JNEM 2 3rd Street Punch-through at MLK Approach New Front Door for Lacledes Landing 3 Carr Street Link/Biddle Street Ramp Provides Convenient Event Management Device New Front Door to Casino 4 Internal Circulation Loop and Park Drop-off
Michael Van Valkenburgh associates, inc.

existing obstacles to a riverfront District

CoNveNtIoN CeNter/ edwArd JoNes dome I-70

CAsINo

mLk brId Ge

circulation Knot wAsHINGtoN AveNue LACLedes LANdING dowNtowN st. LouIs I-70 5-leg intersection/ flashing reD memorIAL drIve

eAds brIdGe

Michael Van Valkenburgh associates, inc.

thirD street punch-through

CoNveNtIoN CeNter/ edwArd JoNes dome I-70

CAsINo

mLk brId Ge

normalize intersection wAsHINGtoN AveNue LACLedes LANdING dowNtowN st. LouIs I-70 signalizeD intersection memorIAL drIve

eAds brIdGe

Michael Van Valkenburgh associates, inc.

anchoring a connection to Washington avenue

wAsHINGtoN AveNue CorrIdor

CoNveNtIoN CeNter/ edwArd JoNes dome

dowNtowN st. LouIs

I-70 ACCessIbLe pedestrIAN ANd bIkewAy CoNNeCtIoN NortH GAtewAy LANdsCApe


ranger station

tHIrd street

2Nd street
orientation laWn

1st street
explorers garDen

eAds brIdGe

LACLedes LANdING

Lks bLvd/rIverfroNt

Michael Van Valkenburgh associates, inc.

public space anchor

brooKlyn-queens expressWay

Development parcels

brooKlyn briDge parK pier 6 playgrounD

atlantic avenue

Waterfront

orientation / event laWn

hudson riVer park segMent 5, new york, ny

brooklyn bridge park, brooklyn, ny

play space/ explorers garDen

teardrop park, new york, ny

brooklyn bridge park, brooklyn, ny

the central riverfront


flood occurrences that just overtop lKs are far more frequent than the larger catastrophic flood events that necessitate floodgate closure. these higher-frequency occurrences typically last up to 2 weeks each accounting for 10-20% of the peak revenue-generating period (memorial Day to labor Day).

based on the pattern of flooding since 1950, the proposed elevated boulevard design would eliminate more than half of the flood occurrences which would impact business at the riverfront.

Michael Van Valkenburgh associates, inc.

raise the elevation of leonor K. sullivan boulevarD

+0

+2.4

+2.0

+2.53.0

+2.0

+2.7

+0

Proposed Elevations May Eliminate 60-70% of High-frequency Low Flood Stage Events that Overtop the Existing Roadway

Michael Van Valkenburgh associates, inc.

reinforce lKs boulevarD as an anchor for riverfront activity

chouteau aVenue

carr street

2 1

3
1 Connection to Chouteau Avenue Bikeway Link between GRG and City Bike Trails, and Anchor for Future GRG

South RIverfront Trail

2 Connection to Carr Street Critical Link to GRG Confluence Greenway 3 New Linkages Animated by Bikeway, Lighting, and Pedestrian Improvements
Michael Van Valkenburgh associates, inc.

accommoDate neW Desire line movements

chouteau aVenue

1 3 2
aerial lift to east bank park

4 2
Metro light-rail

1 Access to JNEM Museum (at Arch Legs) 2 Riverfront Access Ramp and Integrated Security Barrier 3 Access to Elevated Platform for Aerial Tram 4 Access to Metro and Lacledes Landing
Michael Van Valkenburgh associates, inc.

carr street

engage the Jnem lanDscape

aVen ue

chou

teau

1 Incorporate 10.5 Acres of Underutilized Park Area into Visitor Experience 2 Realize Kileys Planting Design Intent to Reinforce Vistas

Michael Van Valkenburgh associates, inc.

carr st

reet

choreograph neW approaches to the river

trainspotting

long vieWs of the river

ACCessIbLe rAmp CoNNeCtIoN to wAterfroNt, LookING NortH

engagement With the river

allegheny riVerfront park, pittsburgh, pa

interfaces With the Waters eDge

brooklyn bridge park, brooklyn ny

builD a cohesive urban environment

city

arch

river

Michael Van Valkenburgh associates, inc.

NHL LaNdscape

Michael Van Valkenburgh associates, inc.

acKnoWleDge hyDrological systems + Water quality issues

1 2

1 3 2

1 Reflecting Pond Features are in fact Massive Drainage Structures 2 Force Mains at End of System are the First to Overflow into River During Rain Events 3 North Pond System Not Tied to City Storm System and Empties Directly into River
Michael Van Valkenburgh associates, inc.

aDapt the grounDplane lanDscape

Reduce Water Velocity to Ponds Reduce Water Volume to Ponds Improve Water Quality through Adjustments in Topography and Planting Reduce Water Consumption (Irrigation System)
Michael Van Valkenburgh associates, inc.

interconnect neW + existing parK experiences

Secondary Path and Bio-swale System

Michael Van Valkenburgh associates, inc.

expanD the experiential potential of the arch grounDs

vIew of soutH refLeCtING poNds

east banK parK

Development priorities for east banK parK

Key priorities:
1) Assemble land negotiations necessary to aggregate land into a single new Nps park unit 2) build multi-modal loop between the two sides of the river so that the new park can be integrated with the existing JNem 3) Continue collaboration with Nps, meprd, Idot, usACe, trrA, Cargil, Casino queen in order to expedite this process

Michael Van Valkenburgh associates, inc.

builD the loop vehicular improvements With the mrb


ey inl ck idge M r b

ro u

te

b Mr re ge tu fu brid

I-

tucker blVd. extension

Mlk bridge eads bridge


front st.

washington aVe.

JNem
I-

poplar st. bridge


-

I-

/I-

/I-

I-

exIstING meprd pArk

/I-

/I-

II-

I/I -

I-

I-

Michael Van Valkenburgh associates, inc.

builD the loop aerial lift + light rail


ey inl ck idge M r b

ro u

te

b Mr re ge tu fu brid

I-

tucker blVd. extension

I-

Mlk bridge eads bridge

washington aVe.

JNem
I-

AssembLe poteNtIAL LANd for New eAst bANk pArk

poplar st. bridge


I
-

I-

/I-

AerIAL LIft
Michael Van Valkenburgh associates, inc.

/I-

/I-

pAtHwAy CoNNeCtIoN from exIstING LIGHt rAIL stop

/I-

II-

I/I -

I-

I-

builD the loop biKe trail netWorK


CoNfLueNCe GreeNwAy
ey inl ck idge M r b

rAILroAd trestLe over I-70


I-

ro u

te

b Mr re ge tu fu brid

I-

tucker blVd. extension

I-

Mlk bridge eads bridge

washington aVe.

JNem
I-

proposed eAst bANk pArk

CoNNeCtIoN to CIty bIke trAILs

poplar st. bridge


-

I-

/I-

/I-

meprd Levee trAIL


Michael Van Valkenburgh associates, inc.

/I-

pAtHwAy CoNNeCtIoN from exIstING LIGHt rAIL stop

/I-

I-

I/I -

I-

I-

builD the loop route 3 extension as parK entry


ey inl ck idge M r b

ro u

te

b Mr re ge tu fu brid

I-

tucker blVd. extension

Mlk bridge eads bridge

washington aVe.

JNem
I-

poplar st. bridge


-

I-

/I-

/I-

I-

proposed eAst bANk pArk route 3 exteNsIoN

/I-

/I-

II-

I/I -

I-

I-

Michael Van Valkenburgh associates, inc.

aerial lift crossing of the mississippi

Figure 19 Diagram Showing Tall Tower Relative to Poplar Street Bridge

view from south overlook

view from poplar street bridge

proposed AerIAL LIft


Figure 20 View of Option 4T.1 from Drivers Perspective looking West
Michael Van Valkenburgh associates, inc.