Professional Documents
Culture Documents
4. PROCESS 5.
1. NUMBER
2. PAGE NO.
3. NO. OF PGS
1
SUMMARY b. PRESENT ACTIONS OPERATIONS NO. TIME a.
1
c. PROPOSED NO. TIME
2
d. DIFFERENCE NO. TIME
7. CHART BEGINS
8. CHART ENDS
TRANSPORTATIONS INSPECTIONS
9. CHARTED BY
10. DATE
Group 10
11. ORGANIZATION
9/8/2011
Al-Ghad Newspaper
12a. b. TRANSPORT INSPECTION OPERATION c. d. e.
f. ANALYSIS WHY?
g.
QUANTITY
DISTANCE IN FEET
STORAGE
DETAILS OF
PRESENT
PROPOSED METHOD
1.
DELAY
TIME
2.
3.
4.
5.
X
X
6.
7.
operator walking to inspection desk inspection of any spelling or grammer mistakes final copy is produced and saved on computer
8.
eliminate operator and send data via e-mail combine the inspection with the editing
9.
10.
11.
12.
13.
eliminate operator and send data via e-mail combine inspection with the making of the layout design
14.
15.
final copy of layout design is produced and saved on computer waiting operator walking assembling of data and layout design together and a copy is printed operator walking
16.
17.
18.
19.
20.
21.
Reset
ANALYSIS WHY? TRANSPORT INSPECTION OPERATION QUANTITY DISTANCE IN FEET STORAGE DETAILS OF PRESENT PROPOSED METHOD WHAT? WHERE? WHEN? WHO? HOW? NOTES
DELAY
22.
23.
TIME
24.
25.
transporting the bent plates to the pre-press room installing the bent plates into the pre-press 27. printers assembling the paper and the plates in the 28. printers printing thousands of copies of Al-Ghad 29. newspapers
26. 30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
Reset