You are on page 1of 7

PMS-F404-02

SMCC (Thailand) CO., LTD.


The New Siam GS Battery Factory Progress Photos M&E Material On Site

Month : 21 May -20 June 11

EXPLANATION :

21 May-20 June 11 Date: Storage media - MEP.

21 May-20 June 11 EXPLANATION : Date: Equipment - pipes into the sanitary system

EXPLANATION :

21 May-20 June 11 Storage media - MEP.

Date:

EXPLANATION :

Date:

21 May-20 June 11

Storage media - MEP.

EXPLANATION :

21 May-20 June 11 Date: Equipment - pipes into the sanitary system.

EXPLANATION :

21 May-20 June 11 Date: A gate to spares inventory control.

FR-CON-013Rev.0

EFFECTIVE DATE : 15/02/2010

PMS-F404-02

SMCC (Thailand) CO., LTD.


The New Siam GS Battery Factory Progress Photos M&E Material On Site

Month : 21 May -20 June 11

EXPLANATION :

21 May-20 June 11 Date: Cover the pond water treatment units are cast into the job

EXPLANATION :

Date:

21 May-20 June 11

The septic tank of oxygen Super Sats SS-4 / [G Line 18-20]

EXPLANATION :

21 May-20 June 11 The septic tank of o gen for F A [G Line 4 6] oxygen F-A 4-6]

Date:

EXPLANATION :

Date:
Super S t SS 3 Sats SS-3 S

21 May-20 June 11

FR-CON-013Rev.0

EFFECTIVE DATE : 15/02/2010

PMS-F404-02

SMCC (Thailand) CO., LTD.


The New Siam GS Battery Factory Progress Photos SAFETY WORK

Month : 21 May -20 June 11

EXPLANATION :

Date:

21 May-20 June 11

EXPLANATION :

Date:

21 May-20 June 11

Under Safety Policy

Basic safety training before operation

EXPLANATION :

21 May-20 June 11 Date: Basic safety training before operation

EXPLANATION :

Date:

21 May-20 June 11

Basic safety training before operation

EXPLANATION :

Date:

21 May-20 June 11

EXPLANATION :

Date:

21 May-20 June 11

Basic f t t i i b f B i safety training before operation ti

S Security t lk in the morning it talks i th i

FR-CON-013Rev.0

EFFECTIVE DATE : 15/02/2010

PMS-F404-02

SMCC (Thailand) CO., LTD.


The New Siam GS Battery Factory Progress Photos SAFETY WORK Month : 21 May -20 June 11

EXPLANATION :

Date:

21 May-20 June 11

EXPLANATION :

Date:

21 May-20 June 11

Security talks in the morning

Security talks in the morning

EXPLANATION :

21 May-20 June 11 Date: Security talks in the morning

EXPLANATION :

Date:

21 May-20 June 11

Security talks in the morning

EXPLANATION :

Date:

21 May-20 June 11 May 20

EXPLANATION :

Date:

21 May-20 June 11 May 20

Security talks in the morning

Security talks in the morning

FR-CON-013Rev.0

EFFECTIVE DATE : 15/02/2010

PMS-F404-02

SMCC (Thailand) CO., LTD.


The New Siam GS Battery Factory Progress Photos ELECTRICAL SYSTEM HV Incoming System [ Power station A.] Month : 21 May -20 June 11

1 High-voltage system pauses for excavation of the pond 2 Adjustment and the high voltage wiring 3 Hight-voltage incomming Factory A 5000 kVA By MEA 4 Hight-voltage incomming Factory B 7750 kVA By Old Factory

FR-CON-013Rev.0

EFFECTIVE DATE : 15/02/2010

PMS-F404-02

SMCC (Thailand) CO., LTD. CO LTD


The New Siam GS Battery Factory Progress Photos Month : 21 May -20 June 11 Wet Scrubber System Monitoring the progress of the production. At the manufacturer Wet Scrubber System

EXPLANATION :

9 June 11 Date: Auditorium to the installation.

EXPLANATION :

9 June 11 Date: Auditorium to the installation.

EXPLANATION :

Date:

9 June 11

EXPLANATION :

Date:
Production monitoring

9 June 11

Progress reports and answer technical questions

EXPLANATION :

Date:

9 June 11

EXPLANATION :

Date:
Check the manufacturer.

9 June 11

Check the manufacturer.

FR-CON-013Rev.0

EFFECTIVE DATE : 15/02/2010

PMS-F404-02

SMCC (Thailand) CO., LTD. CO LTD


The New Siam GS Battery Factory Progress Photos Sanitary and Fire Protection System

Month : 21 May -20 June 11

EXPLANATION :

21 May-20 June 11 Date: Temp. Field work shop Sanitary and Fire Protection

EXPLANATION :

Date:

21 May-20 June 11

The picture shows the cutting of steel to be formed

EXPLANATION :

Date:

y 21 May-20 June 11

EXPLANATION :

Date:

y 21 May-20 June 11

The figure shows the grinding of iron store the support

The figure shows the forming of steel the support

EXPLANATION :

Date:

21 May-20 June 11

EXPLANATION :

Date:

21 May-20 June 11

The figure shows the forming of steel the support

The figure shows the forming of steel the support

FR-CON-013Rev.0

EFFECTIVE DATE : 15/02/2010