Professional Experience: - 41 Years 2 Months in M/s Hindustan Areonautics Limited as under:From 1-07-2004 to 31-01-2009:- Senior Manager (HR) HAL Accessories Division, Lucknow. Was responsible for Recruitment and Promotion, establishment section, HR section, Industrial Relations and other sections of Personnel and Administration Department of the Division having more than 2300 workmen and 800 officers. I also acted as Chairman of various committees in the Division. From 1-05-1998 to 30-06-2004:- Manager (P&A), HAL Managing Director office (Head of P&A Dept. of Accessories Complex) During this period I was Head of P & A Department of the Complex Office. I was reporting to the Managing Director ( Accessories Complex). and was looking after four Division of the Complex having approx. 6500 employees and 2000 officers. From 1-12-1967 to 30-04-1998:-Worked as Dy. Manager (P&A)/ Personal officer/Asstt. Personnel officer, Asstt. Supervisor, Senior Clerk, Clerk in Personnel and Administration Departments of Lucknow., Korwa and Kanpur Divisions. Educational Qualifications: Higher Secondary from Punjab University Chandigarh in 1965. BA from Kanpur University in 1983 , Post Graduate Diplma (PM & IR) from Awadh University Faizabad in 1985, LL. B. from Lucknow University, Lucknow in 1990. Date of Birth : - 07-01-1949
Last Pay Drawn: - Pay Scale Rs.2910054500/-(increment 3% of BP) Basic Pay Rs.41560/- P.P. Rs. 500/- D.A. Rs. 6899/Total Rs.48959/ Plus other perks i.e. HRA, conveyance re- imbursement free medical etc. Pay expected : As per guidelines of the institute. (MOHAN SINGH)
Ms. Aastha
Jain(MBA)has always been a fascinating subject from the academicis true in case of Company like N.T.P.C
where large.T.P.C one of the largest electricity generating organization.as needed to complete this
report. It was a work in which, Irector & Facultyingrauli Super Thermal Power Station (SSTPS) a unit
Capital Management of the company during June21, 2010NTPC (Introduction) Page No.vision
8mission
Working Capital Management (Title) 70Determining the Size of W.C. 71of W.C. 74of W.C.
76s 77capital management in N.T.P.C (Sample) 78of Study 82t assets 85ry
88les 91and advances 94t liability 95tive and Speedspeedily implement power
projects using state-of-the-art technologies.espon sible corporate entity with thrust on environmental protection, ason,
the following are
distribution-for the interest of the customer.and organizational needs and develop business leaders bycreate a culture
energyand
Development:adopt
proprietary technologies.(the best category) every year since the MOU system becamether implementation
time cycles alongnstalled capacity of NTPC is 24,249 MW through it`s 14 coal baseded 50% equity of the
SAIL Power Supply Corporation Ltd.(SPSCL).This JV company3% stake in Ratnagiri Gas & Power
840(Gas)
413(Gas) 652(Gas) 817abad (Gas) 430Western Region 6653(Gas) 645Gandhar (Gas) 648Eastern Region 5900 Kaniha
(Gas) 350(A+B+C+D+E)
=
24435)Units(BU) -
an increase of 10.41 % over theted 28.50 % of the total electricity generated in the
country during 2007-08 withlion during the year 2007-08, an increase of 15.57%.lion during 2008-09 as
against Rs.200607 as against Rs 287,530 million for the year 200708,illion during 2006-07.300 million
(approximately Rs 13.15 billion) with ADB - first loanexpenditure of on-going projects.to part finance on-going
capacity addition programmes.W from JVs6-07. Total value of contracts awarded duringesh for implementation of
two hydrohajjar for a JV Company with Singareni Collieries Company Ltd. (SCCL)into manufacturing -
JV with Transformers and ElectricalsW (2 X 250 MW) coal based thermal power n the previous year
earning a provisional unedited netnal and nationalVillages in UP, Rajasthan andin 2008-09.est
Practices in Human Resource Management.Units ng 2008-09..75%), Simhadri (92.10%),for the year 2007-08
schemes isprevious year 2007-08, capital expenditure incurred wasce of Rs. 134.10. Theof as on 31st
March, 2009 for its capacity addition programmes.20 equal half yearlyhave been utilized to finance
the capitalbeen placed with LIC. Part-A of 8.05% Series XIV Secured Non-S schemes is 7.25%7.50%-7.75% for a
deposit of periodpansion of existing stations, joint venture and takeover of being continuously exploredear 200809 is as follows:-
MW) - 1000 MW(1x210 MW) - 210 MWPhase-I (2x500 MW) - 500 MWoint Venture (RGPPL, Dabhol) - 740 MWX Plan
(2002-07):-
plants. TheW capacity to meet the traction and non-traction power requirementsstatio ns with an operating capacity
of generation of power2833Internationalo re than 18.2 Million trees till March-07 including morend
Nepal from NTPC- housewith the Corporate Social Responsibility Community Development
(CSRCD)of experiences with the representatives of the world.ple, Puri.displaced for execution of its projects andaking
efforts to improve the Socio economic status of Project Affectedawarded for ChattiBariyatu,
Systems) certification. NTPCfor the year 2007-08 (excluding employees in JVs &anagement
Institute (PMI), NTPCs apex Training and DevelopmentSthe potential of the human resource the sole
differentiatingWar tsila Mantosh Sondhi Award for outstandingthat was,until then,characterized largely by lack of
investment,sufferi ng from crippling power black-outs, the government of India,the erection of the first steam generator had
commissioned. Inant was reached with thefirst ended. In Jan.83, work on theW, only the second of its size in India.
Mid way throughof schedule. TheW)Mine and Singrauli Coal fields.Reservior (200 cusecs
system)Date:
(Actual/ Anticipated)nt
order for air and water pollution obtained:ation threw its Statelineit to
corporate office then corporate office finalize thisthese things done with the& Statutory audit:mainly done by the
outsources accountants. It isAuditor general of India auditThis audit done by controllers attorneyis the audit
of balance sheets.ngin fiveyear.cost audit. It handles the cash.-t. It makes oil and coalunder valuatio n is done in every
month. There are some tools for y new assets if life of assets is end.loan up-to 9000 for NonExecutives, 15000
for Assistantto the Basic pay.nooptions for its business development.Reno vation & Modernisation of
power stations inundertake project construction, erection and supervisiontrade, import, export and
purchase power from identifiedsupply power to the Bhilai, Durgapur and Rourkela Steelset up a 1000
MW coal based power station at Ennore intake over Muzaffarpur Thermal Power Stationset up a coal-based power
station of 1500MW capacityset up power stations to meet traction and non-promote one or more Joint
Venture Companiesmainte nance and sellingAcquisition serves both NTPC's own commercial
interest asof the Indian economy.STATIO NS TAKEN OVER YEAR ORIGINAL OWNERState
for the years 200405 and 200506(2002-07), the country achieved its highest ever GDP growthnation' through a five pronged
strategy:and High
Quality Integrated GrowthOperating PerformanceFocus and Market AgilityPerformanc e Team Work and
Building a Strong Team of Power ProfessionalsChan ge Management.nstre amthefinancial years 2005-06 and
2006-07, your Companysto be passed through to the customer, your Company isc actions to ensure adequate fuel
supply at optimum price..g 2006-07.ia benefiting from the proven project implementation competence
of anplants, etc.a number of highly prestigious surveys. The HR Vision of ncing empowerment, especially at the
regional level. It is revisiting theopment.deavour of nation building, your Company is not only a partner inistry of
Power to improve the performance of f 2,833 million units in the NTPC assisted stations corresponds tobeyond include
manpower development and traininglability of skilledng contribution, for their performance that has createdfor
mitigation of environmentnviron ment management policy and sound environment practicesf power plants and
preservingnorms, various state-ofthe-art pollution control systems /, NOx emissions are controlled by provision of Low-
NOxt and use.provided at all coal based stations except Dadri where Dry Ashclarifier sludge, used resin,
used photochemicals, asbestos packing, e-waste, metaler hazardous wastesing) Rules. The seggregated
bio-medical wastes arebio-medical waste disposal pits. The treated bio-medical waste iscm thick soil in bio-medical waste
disposal pits.pecial emphasis on land use and Biodiversity by way of post operational stages of the project.undertaken
to establish the socio-economicicy guidelines on ash utilization.cement (FAPPC) in most of its construction activities.ced / Eco-
friendly looking
ahead for higher technologie s such asommercial scale demonstration power plantivate
sector in partnership with other social actors canthe SecretaryGenerals vision: a more sustainable
and inclusive globalgh Commissioner for Human Rights;Labour Organization;ndust rial Development
Organization; andpromote greater environmental responsibility;and community leader in the power sector
was also invitedof GC are regularly communicated to all employeesyear 2003. Further, NTPC as founder member of Global
CompactCompact and its commitment to the principles of GCmagazines, internal training programmes and
posters.Uttarakhan d, NTPC is committed to provide support for setting up a technicalKerala, NTPC has
committed to provide support to Allapuzha medical CollegeOrissa, NTPC has taken up Developmental works for Car
parking, Water tanksin the field of Health, NTPC has committed to provide support to Hyderabadhas also committed support
to Centre of the Study of Values, Udaipur for and participated in the "Ability Mela" organized by Business
&nternational standards like SA8000 and OHSAS18001.e already accredited in thei have been recertified under
OHSAS 18001.ent: Principle 7-9ISO14001 and all itsstations have obtained accreditation for
taken concerning a sampling unit before selectingt is following;-Sw:Financial Reports.agazine of NTPC.of NTPC
(SSTPS).Sandesh Magazine.of NTPC.annual Reports(Title)of funds necessary to cover the cost of operating thents of
and components of work indebtors:- It comprises credit sales to customers.by the firm to other firm
for ais surplus funds invested in the governmentBank balances:- Assets represents cash in hand and at
bankBILITIES :by the firms from bank and other ED GOODSbusinesse same line of business activity may haveCycle: -
the situation of the upward and downward swings.policy: affects the requirements of W.C
follows:-/ Regular
/ Permanent W.C.:-
term funds should be used to financeshould be appropriately financed with short termC.A. S.T. financingC.A.
depend on the effective working capital management.is necessary for taking decision regarding long te
rm investment.about loans & advances ,cash and debtors of the companyhelpful in minimize cost and
expenses.of Tata Power Company Limited.problems faced in Supply Chain.fit ratio & other prof itability ratio, understand
the profitability of thes performance relating to financial statement analysis.the utility of financial ratio in credit analysis &
determining the financialty of the firmWORTHFUN DSchange32,077 47%11 18%44,407 29%100%term loans
87,821 75,339 17%126,471 14%170,878 18%annualASSETSacc ount of ng incurred on various ongoing projects
theblock 460,396 431,062 7%block 230,895 223,148 3%work-inprogress 103,999 67,063 55%fixed assets 367,235
Amount15% 17,819 14% 5,586 31%debtors 8,678 6% 13,747 11% 5,069 -f Delhi Vidyut Board into loan under the
one-timesettlement. The government of Delhi pays us 8.5% tax-free interest on these Bonds. The
other LIABILITIE Spayable to the customers since we are billing our customers for 2008 Changeassets Amount %of
currentcurrent80% 52,306 78% -3,204 -6%20% 15,161 22% -2,861 19%FLOWSaturit y of certain investments during
the year.200515 19not an end in itself. Different people may interpretencounter ed while preparing this project::lii
T rnover ratiolii l
. . lii . . . . . lii . . . . . lilitiiti . . .
. . . tself sufficient liquid funds to meet any kind of cashelations problem.of projects. A
minimum risk factor. Bestintegrated projectprofits.An early starter-more than 30 yearskers and officers- no
PPUR
U
N
I
T
IES:
RE
S:
Huge competition from SEBs, Reliance Energy, Tata power and other PrivateDevelopme nt.
Huge competition from SEBs, Reliance Energy, Tata power and other PrivateDevelopme nt.
98
CONCLUSIO N
Summarizing the overall project work done during these 45 Days, it can be said that theproject was a
good learning experience. Through it, I got an opportunity to communicatewith entire staff of Finance
department as well as MIS department. The entire st aff of finance department was very cooperative
and they helped me in all the phases of myproject. I also got the opportunity to learn about inventory
management at the same timeproblems faced by the Singarauli Super Thermal Power Station
(NTPC). These 45 Days has given me an opportunity to conceptualize and implement a newinitiative. I learned how to
interpret working capital and ratio analysis with the help of guidance given by Mr. P. Ghosh Head of Accounts
Department. There were lot of difficulties in the beginning of the project but slowly it got the gripon
99
SUGGESTIONS
Considering the Liquidity part, both the companies have the current and the quickratioswell above the
generally accepted norm. Both are financially stable to meetthe short termobligations.
Under Asset Management, NTPC needs to improve the days sales outstanding ratio. Alarge part of its working
capital is blocked by debtors. NTPC needs to revise its credit policyand improve its collection mechanism.
Efforts are needed to be taken to increase the operating profit a nd the net profit byreducing
operating expenses. Hedging can be tried as an option against rising fuel price.This might help to control the
operating expenses.
way to get better returns. Regular maintenan ce, replacing the old obsolete assets with new assets will facilitate
optimumutilization .
O
thers Suggestions
1) It can be said that overall
financial position of the company is normal but it is required tobe improved from the point of view of profitability.2) Net
operating cycle is increasing that means there is a need to make improvements inreceivables/debt ors management.3)
Company should stretch the credit period given by the suppliers.4) Company should not rely on Longterm debts.5)
Company should try to increase Volume based sales so as to stand in the competition.
100
BIBLIYOGR APHY (
DATA COLLECTIO N
)
observes by investigator. This dataare not present in the organization in the form of documents and secondary data.
Allprimary data are the most valuable things to the researcher and researcher must carefulunder finding the
primary data.Because this is the root of main findings of the report and they represent the allwhole
Under doing the research on incentive scheme I collect the following things:
y
Editionii. 27
th
Editioniii. 28
th
Editioniv. 29
th
Editionv. 30
th
Edition
Reports of NTPC.
101
TH AN
KY OU
Vidya Sagar
p.
p.
p.
2.
p.
p.
p.
3.
p.
p.
p.
4.
p.
p.
p.
5.
p.
p.
p.
6.
p.
p.
p.
7.
p.
p.
p.
8.
p.
p.
p.
101 p.
Add a Comment
370de8aae931f5
Submit
Characters: 400
document_comme
4gen
Send me the Scribd Newsletter, and occasional account related communications. Discover and connect with people of similar interests.
Email address:
Submit Upload a Document
Search Boo
Search Documents
Follow Us! scribd.com/scribd twitter.com/scribd facebook.com/scribd About Press Blog Partners Scribd 101 Web Stuff Support