Introduction
The purpose of the project is to establish a strategy map linked to the business
objectives of Viker. Use this strategy map to then define a holistic metrics program
in the organization. The primary objectives of the metrics program are:
Scope
The overall objectives of the project will be accomplished using a phased approach.
A Balanced Score Card (BSC) approach will be used to define the strategy map and
respective metrics. Following is a brief of the phases, with the scope for Phase I
being more detailed than the remainder phases.
• Phase II – A strategy map will be defined and agreed upon by the GL.
At this stage any retrofit required to the metrics will be done. Also,
second level of metrics & dashboards will be defined for say SL leaders
within GSD.
This document details the requirements for Phase I. A step in completion of Phase I
will be to complete the requirements of phase II along with an implementation plan.
2. GL – Global Leadership
3. SL – Service Line
References
Overview
• A complete perspective on the project and the high level roadmap that has
been envisioned
• A detailed outlined of the expected system functions with the outputs and the
inputs specified
• Details on the users of the system. This also a subsection on the expected
outputs, viz. the metrics cards, for each user
• A detailed section on the user interface required with details on screen flows
and the content for each web-page/screen
Requirement Specifications
Project Perspective
Viker has defined its 2 year strategic focus depicted by the various elements of the
“House Model”. Metrics will be defined in order to measure success and progress in
achieving its strategic objectives. Each metric will have a target for Y2003 derived
from the strategic objectives for Viker.
The aim of this project is to institutionalize metrics within the organization and have
a fully functional MIS (Management Information System) system. This integrated
system would depict the performance against defined metrics for each user and
would also show the relevant management reports and information useful towards
measuring those metrics. The detailed requirements on these metrics and the MIS
are presented later in the document.
This system would have a web-based, GUI driven front-end. At the back end, this
system would talk to the Oracle database and other data-bases within Viker, to
collect raw data. The system would have an analytic middleware that would do
organize the data, do appropriate analysis and present information in a graphical
format. The detailed requirements on these are presented later in the document.
The figures below give a diagrammatic representation of the high level system.
The road-map for the entire system is described below. In the interest of
implementing this system rapidly and in a better fashion, the entire activity has
been broken down into three phases/versions. Each subsequent version builds on
the previous version, has increasing sophistication built into it and also has more
users accessing the system. Each subsequent version would also need to have a
more integrated database at the back-end, from the distributed ‘databases’ in the
earlier version. The project would also need to address this aspect of database
integration.
Version 1: Metrics and MIS at the Global Leadership level. Primary users would be
the Global Leadership. At the back end, the system would talk to Oracle and other
databases in the organization, based on MS Excel, etc.
Version 2: Metrics and MIS at the SL/IP leadership and equivalent levels in the
functions – Global Leadership direct reports. These metrics flow from the GL level
metrics. At the back end, some of the MS Excel based and other distributed
databases need to be migrated onto Oracle or a central database. The analytical
tool / engine in the middle would need to have increased capability to handle the
increase in the number of users and also the increased analysis requirement.
Version 3: Metrics and MIS at the Project Manager, non-core Account DM, and
equivalent levels in the functions – Global Leadership second level reports. At the
back end, most of the distributed databases need to be migrated onto the central
database. The analytical tool / engine in the middle would need to be a
sophisticated, high-end tool to handle the increase in the number of users and also
the increased complexity of analysis requirement.
Version 1: Schematic
20,000
18,000
16,000
50.00%
49.00%
Oracl
14,000 48.00%
GM
12,000 Project costs
47.00% 42%
Revenue 48%
10,000
GM%
46.00%
8,000
6,000 45.00% SL OH costs
GSD mgmt costs 6%
4,000 4%
44.00%
2,000
20,000 50.00%
- 43.00%
SL1 SL2 SL3 SL4 SL5 SL6 18,000 SL7
49.00%
16,000
14,000 48.00%
GM
12,000 Project costs
47.00% 42%
Revenue 48%
10,000
GM%
46.00%
8,000
6,000 45.00% SL OH costs
GSD mgmt costs 6%
4,000 4%
44.00%
2,000
- 43.00%
SL1 SL2 SL3 SL4 SL5 SL6 SL7
Analytical Excel – DB
tool / engine 1
Global Leadership
Version 2: Schematic
Oracle /
20,000
18,000
16,000
14,000
50.00%
49.00%
48.00%
GM
Central
DB
12,000 Project costs
47.00% 42%
Revenue 48%
10,000
GM%
46.00%
8,000
6,000 45.00% SL OH costs
GSD mgmt costs 6%
4,000 4%
44.00%
2,000
20,000 50.00%
- 43.00%
SL1 SL2 SL3 SL4 SL5 SL6 18,000 SL7
49.00%
16,000
14,000 48.00%
GM
12,000 Project costs
47.00% 42%
Revenue 48%
10,000
GM%
46.00%
8,000
6,000 45.00% SL OH costs
GSD mgmt costs 6%
4,000 4%
44.00%
2,000
Excel – DB
- 43.00%
SL1 SL2 SL3 SL4 SL5 SL6 SL7
Analytical
tool / engine 1
Version 3: Schematic
20,000 50.00%
18,000
49.00%
16,000
14,000 48.00%
GM
12,000 Project costs
47.00% 42%
Revenue
Oracle /
48%
10,000
GM%
46.00%
8,000
6,000 45.00% SL OH costs
GSD mgmt costs 6%
4,000 4%
44.00%
2,000
20,000 50.00%
- 43.00%
SL1 SL2 SL3 SL4 SL5 SL6 18,000 SL7
49.00%
16,000
Central
14,000 48.00%
GM
12,000 Project costs
47.00% 42%
Revenue 48%
10,000
GM%
46.00%
8,000
6,000 45.00% SL OH costs
GSD mgmt costs 6%
4,000 4%
44.00%
2,000
DB
- 43.00%
SL1 SL2 SL3 SL4 SL5 SL6 SL7
Sophisticate
d Analytical
tool / engine Excel – DB
1
Web based GUI, on
KNET Excel – DB
2
System Functions
Outputs: The output of the system would be a web-based, GUI driven front-end
that presents the performance against each metric for each user and also the
supporting information required as part of the metrics for the user. All this
information would be analyzed information and would be presented in a graphical /
visual format. This would be a series of web pages that are predefined for each user.
Any user’s metrics shall be accessible only to the user, the user’s manager and the
system administrator. For version 1, the web-pages can be static web pages with
minimal user interactivity allowed. For subsequent versions, the web pages need to
by dynamic web pages with high user interactivity allowed (e.g. users may be
allowed to define the views for their charts or deeper analysis)
Inputs: The inputs to the system would be from the Oracle database and other
databases maintained in different functional units in the organization which are
primarily in the form of spreadsheets, in version 1. In subsequent versions, these
distributed spreadsheet databases would need to be moved onto a central database
and integrated with the Oracle database.
System processing: Most of the processing would be done by the analytical tool /
engine that resides in the middle. This engine would be responsible for organizing
the raw data collected from the database, organizing the data into graphs and
charts according to the rules specified, evaluating the performance of the metric
against target, etc. For version 1, this processing would be once a month activity.
For subsequent versions, this would need to be on a real-time basis.
User Details
Administrator: The following users would have admin rights to the system: Aparna
Katre, Nick Bennett and Rahul Lanjewar. These users would have full access to the
entire system – super user rights. The administrator would also approve any new
users to the system.
The other users for the system depend on the version of the system being
developed. Below are outlined the users for version 1.
Version 1 users: The users for version 1 would be the Global Leadership team.
Following are the details of the users with their access rights:
Identification of modules
Since a BSC approach will be used to define the metrics, each metric will belong to
one or more of the following perspectives:
• Financial
• Customer
• Internal process
• Organizational learning
The metrics for Phase I are defined in Appendix A. This document also states the
definition of each metric, the target for Y2003, supporting metrics for analysis as
well as the analysis technique.
Version 0.1, 02/Jul/2003 Draft/Issue Page 10
2001 Viker Incorporated Uncontrolled if Copy/Printed Ref. No: METMISUR1
Metrics and MIS User Requirement Report
Constraints
User name
Phone
number
Location
Comments
Functional Requirements
Refer to Appendix A for detailed definitions of each metric. Each metric requires supporting information
in order for the owner to be able to manage performance of the metric against the defined goal. For ex. to
be able to manage to GSD GM of say 45%, it is important to understand the GM at various levels
(Account, IP, SL, project etc.), utilization trend, project status R/Y/G, expense categories & trends. All
supporting metric for a defined metric will be identified. The dashboards will have graphical
representation of each metric, supporting metrics, trends in order to aid analysis.
A process to publish, review / analyze dashboards, determine action items and track
action items will be defined for each functional head and for the organization.
External Interfaces
User Interface
The system first authenticates the level of the user. The user interface is described
below for each individual user listed above. The flow of screen is described first. The
layout and content of the screens is described later in the Appendix.
User: CEO
After the CEO is authenticated and enters the system, the CEO sees a homepage,
Homepage_CEO.html. This homepage is the CEO dashboard which details the
metrics at his level. From this homepage, the user can go into any one of the other
functional homepages (e.g. Homepage_GSD.html, Homepage_GBD.html, etc.) or to
a higher level detail pages – Findetail_CEO.html, Custdetail_CEO.html,
Prodetail_CEO.html and Empdetail_CEO.html. The page layout and content for the
CEO User are described later in Appendix B.
Homepage_CEO.html
Homepage_GSD.html
Empdetail_SL_
Pro_Vol_GS Pro_Eff_GS GSD.html
D.html D.html
Findetail_SL Findetail_AC
_GSD.html _GSD.html
Pro_Stff_GS Pro_Qly_GS
D.html D.html
Fin_SL_hist_ Fin_AC_hist
GSD.html _GSD.html
Pro_Vol_SL
Pro_Vol_GS Pro_Eff_SL_
_GSD.html
D.html GSD.html
Pro_Vol_SL
_hist_GSD.ht
ml
After the Head GBD is authenticated, the user is directed to the GBD dashboard
homepage – Homepage_GBD.html. From this homepage, the user can select and go
to the following detail level pages – Findetail_GBD.html, Custdetail_GBD.html,
Prodetail_GBD.html and Empdetail_GBD.html. The page layout and content are
described later in Appendix D.
Homepage_GBD.html
Findetail_IL_ Prodetail_IL
GBD.html _GBD.html
Findetail_IL_ Findetail_IL_
AC_GBD.ht hist_GBD.ht
ml ml
Findetail_IL_A
C_hist_GBD.ht
ml
User: CFO
After the Head GFA is authenticated, the user is directed to the GFA dashboard
homepage – Homepage_GFA.html. From this homepage, the user can select and go
to the following detail level pages – Findetail_GFA.html, Custdetail_GFA.html,
Prodetail_GFA.html and Empdetail_GFA.html. The page layout and content are
described later in Appendix E.
Homepage_CFO.html
Findetail_SL Findetail_AC
_hist_CFO.ht _hist_CFO.ht
ml ml
Homepage_GPR.html
Homepage_GAP.html
After the Head GIT is authenticated, the user is directed to the GIT dashboard
homepage – Homepage_GIT.html. From this homepage, the user can select and go
to the following detail level pages – Findetail_GIT.html, Custdetail_GIT.html,
Prodetail_GIT.html and Empdetail_GIT.html. The page layout and content are
described later in Appendix H.
Homepage_GIT.html
Homepage_GBA.html
Hardware Interface
Software Interfaces
As described earlier in the document, currently data is distributed across multiple
databases across different functions in the company. Data in the company is usually
stored in the following forms of databases – Oracle, MS Excel spreadsheets and
occasionally in a word document. The functions involved in the data storage and
would currently be the sources of data are Global IT, Global Finance, GAP, Global
Process, GSD, GBD and GBA. The system has to interact with these ‘local’ databases
to collect data and then analyze and present the same. It is also expected that while
developing this system for version 1, a standardized data collection, presentation
and communication protocol is established the central database for the system and
these local databases. During Versions 2 and 3, a migration strategy also has to be
evolved for moving these local sources of data onto a central database. In cases
where data is currently not being captured, appropriate mechanisms for capturing
and storing data also have to be identified.
Each primary metric defined in Appendix A has levels of supporting metrics. These
supporting metrics represent the drill down and the MIS component. All the
supporting metrics with their definitions are outlined in Appendix A-1. ALL the
metrics and supporting metrics have a data requirement behind them. In most
cases, the data to be pulled out from the database would be the metric itself.
However, in some cases, each metric may have multiple data requirements behind
it. All these data requirements, data sources and functions involved in the local
databases are outlined in detail in Appendix A-2.
Communication Interfaces
Performance Requirements
The entire system and all the user screens should be available 24*7. The user
should be able to access this system from any location. Do we want only VPN
access?
For version 1, the system should be able to support and exhibit expected
performance criteria for 50 simultaneous users accessing the system. For version 3,
this number would go up to 300 simultaneous users.
100% of the homepage should be uploaded on the user’s screen in less than 1 sec.
100% of the first level of drill down should be uploaded on the user’s screen in less
than 1 sec. 98% of the level 2 drill down should be uploaded on the user’s screen in
less than equal to 2 sec from clicking. 95% of level 3 drill down, wherever
applicable, should be uploaded in less than equal to 2 seconds.
Other Requirements
The outputs have to be generated once a month. However, these may be required
to be generated on any given day of the month and will require the system to
perform online. In version I, agreed upon level of drill down as outlined earlier will
have to be available at any point in time. One must be able to view the dashboards
through KNET.
Timelines:
• CEO and functional head dashboards should be in production by Jan 2004.
Each of the dashboards should be more than 85% complete.
Project Benefits
Project Dependencies
Acceptance Criteria
GSD and functional heads will be provided previews of the dashboards, drill downs
as well as the GUI. Teams will be notified of formal UAT of their respective
dashboards. Since currently none are being generated, a formal functional testing of
the dashboard contents will be performed as a part of the UAT.
Appendices
This appendix gives the metrics cards for the different users described earlier.
These metrics cards are for version 1 and are hence restricted to the Global
Leadership.
CEO Annual revenue growth (Revenue current period this FY)/(Revenue for same
period last FY) – 1
Profitability Net profit/Revenue for current period %
% projects meeting quality (No. of projects meeting the quality goals / Total no. of
goals projects)%
A project is a unit (project or a BU for an ongoing
engagement) for which project plan can be created and
quality goals can be defined
Organization retention Need to get definition from Ashish
Backlog for following year Total sales for the current FY – Total revenue for the
current FY
Annuity revenue Need to get the definition
% of new clients New client is defined as a client that we have not done
Should we have No. of new business with in the last 12 months
clients instead of %
% revenue from existing (revenue from existing clients in current measurement
clients period / total revenue in current measurement
period)%
Existing client is defined as client who has been with
us for the last twelve months
Sold margin % Average GM% calculated in pricing sheets during
selling phase for new projects/deals closed during
measurement period
Cost of sales Need to get from finance / GBD
Delivery Support - Uptime (Total available time – Total time LAN / WAN / GA
of systems, LAN, WAN were down) / Total available time for each of LAN /
WAN / GA during measurement period
SG&A (IT actual expenses – IT planned expenses) / IT
planned expenses for the measurement period
Internal transaction costs Refer to IT steering committee report for per associate
costs
Intergroup SLA's Needs to be defined
Ageing
Cost of funds
ROCE
ROE
Forecasting accuracy –
Revenues and margins
Timeliness of book closing
and reporting
Costs (budget vs. actual)
for F&A dept
Infrastructure management
Facilities management
Rentals
Global Revenue from process Revenue from formal process consulting assignment
Process consulting during the measurement period
Managem
ent
% offerings with adequate (No. of offerings with adequate methodology
methodology definitions definitions in KGM) / Total no. of offerings that need a
formal methodology in KGM
Adequacy will be based on sign-off from GBD &
GSD on process in KGM for a specific offering
Library of re-usable Need to define a measure
artifacts
% QLs billable No. of billable QLs / Total no. of QLs during the
measurement period
% of projects in R / Y that Projects in R or Y that also have issues identified by
can be traced to QL status QLs / Total no. of projects
Project is defined as a unit that can have a project plan
Planned PIs to improve Savings from specific PIs during the measurement
PCBs - $ saved from PIs period
% of projects meeting their (No. of projects meeting the quality goals / Total no. of
quality goals (should this be projects)%
a shared metric between A project is a unit (project or a BU for an ongoing
delivery & process) engagement) for which project plan can be created and
quality goals can be defined
SG&A (Actual process group expenses – planned PG
expenses) / planned PG expenses for the measurement
period
Inter-group SLAs Need to be defined
% projects at CMM L5 No. of Projects fulfilling L5 requirements / Total no.
of projects
A project is a unit (project or a BU for an ongoing
engagement) for which Project Plan can be created
% Reduction in post (PDD for current measurement period – PDD for prior
delivery defect density measurement period) / PDD for prior measurement
period %
This should be by life-cycle type
% improvement in (Productivity for current measurement period – that
productivity for prior measurement period) / that for prior
measurement period %
This should be by life-cycle type
GAP
GBA
This appendix gives the key supporting metrics where extra definitions are required
for the different users described in Appendix A. ALL the supporting metrics for all
the users come out in a logical flow in the screen content and layouts described in
Appendices B – I.
Onsite billing rate Onsite billing rate charged to clients for onsite
resources in USD/hr
Offshore billing rate Offshore billing rate charged to clients for offshore
resources in USD/hr
Blended billing rate Weighted average of onsite and offshore billing rates
weighted with the proportion of resources onsite and
offshore for that project. In USD/hr
CFO Avg. hourly cost per Total cost incurred during the period divided by the
associate average total no. of associates during that period
divided by the corresponding available hours during
that period
This appendix describes the screen content and layouts for all the screens
mentioned for CEO earlier in the document. For the overall screens organization and
screen flow, please refer the section on Specific Requirements / Needs analysis –
External Interfaces – User Interface earlier in the document.
User: CEO
Hyperlink CEO 2
Hyperlink CEO 3
Hyperlink CEO 4
Go to dashboards
Description of hyperlinks
Description of objects
Need to
define
50.00% 1,400
20,000
1,200
40.00%
Go to detail
15,000 1,000
Revenue
30.00% 800
GM%
Volume
10,000
600
20.00%
400
- 0.00% -
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Hyperlink CEO 2
CEO F1 CEO F2
Hyperlink CEO 3
1,400
1,200
1,000 GM
42% Project costs
800 48%
Volume
600
400 SL OH costs
GSD mgmt costs 6%
200 4%
-
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
CEO F3 CEO F4
Volume
1,400
1,200
1,000
800
Volume
600
400
200
-
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
CEO F5
Description of hyperlinks
Description of objects
CEO F1 Revenue Column and multiple X-Axis – Months (Jan till current
Version 0.1, 02/Jul/2003 Draft/Issue Page 31
2001 Viker Incorporated Uncontrolled if Copy/Printed Ref. No: METMISUR1
Metrics and MIS User Requirement Report
1,400 50.00%
20,000
1,200
40.00%
15,000
Go to detail
1,000
Revenue
30.00%
800 GM%
Volume 10,000
600 20.00%
400
Hyperlink CEO 1
5,000
10.00%
200
- - 0.00%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Hyperlink CEO 2
CEO C1 CEO C2
Hyperlink CEO 3
50.00%
20,000
40.00%
15,000
Revenue
30.00%
GM%
10,000
20.00%
5,000
10.00%
- 0.00%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
CEO C3
Description of hyperlinks
Description of objects
CEO C2 Active Column and line chart X-Axis – Months (Jan till current
Version 0.1, 02/Jul/2003 Draft/Issue Page 33
2001 Viker Incorporated Uncontrolled if Copy/Printed Ref. No: METMISUR1
Metrics and MIS User Requirement Report
CEO C3 Client Column and line chart X-Axis – Months (Jan till current
retention representing monthly month in curr FY)
and repeat client retention and
business repeat business rates Primary Y-axis – Client retention
rate plotted as columns
50.00% 50.00%
20,000 20,000
40.00% 40.00%
15,000 15,000
Go to detail
Revenue Revenue
30.00% 30.00%
GM% GM%
10,000 10,000
20.00% 20.00%
Hyperlink CEO 1
5,000 5,000
10.00% 10.00%
- 0.00% - 0.00%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Hyperlink CEO 2
CEO IP1 CEO IP2
Hyperlink CEO 3
1,400 1,400
1,200 1,200
1,000 1,000
800 800
Volume Volume
600 600
400 400
200 200
- -
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Description of hyperlinks
Description of objects
CEO IP1 Billing rates Column and line chart X-Axis – Months (Jan till current
representing monthly month in curr FY)
billing rates
Primary Y-axis – Average
offshore billing rates in USD/hr
plotted as columns
CEO IP2 Utilization Column and line chart X-Axis – Months (Jan till current
and representing monthly month in curr FY)
leverage utilization and
ratio leverage ratio in GSD Primary Y-axis – Overall GSD
utilization plotted as columns
CEO IP3 Average Column chart X-Axis – Months (Jan till current
cost per representing monthly month in curr FY)
associate average cost per
associate Primary Y-axis – Average cost
per associate per hour plotted
as columns
CEO IP4 Projects at Column chart X-Axis – Months (Jan till current
CMM level representing monthly month in current FY)
5 no. of projects at CMM
L5 Primary Y-axis – Percentage of
projects at CMM L5 plotted as
columns
50.00% 50.00%
20,000 20,000
40.00% 40.00%
15,000 15,000
Go to detail
Revenue Revenue
30.00% 30.00%
GM% GM%
10,000 10,000
20.00% 20.00%
Hyperlink CEO 1
5,000 5,000
10.00% 10.00%
- 0.00% - 0.00%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Hyperlink CEO 2
CEO OL1 CEO OL2
Hyperlink CEO 3
Hyperlink CEO 4
Description of hyperlinks
Description of objects
CEO OL1 No. of Column and line chart X-Axis – Months (Jan till current
associates representing monthly month in curr FY)
and no. of associates and
retention retention rates Primary Y-axis – No. of
rates associates plotted as columns
This appendix describes the screen content and layouts for all the screens
mentioned for GSD earlier in the document. For the overall screens organization and
screen flow, please refer the section on Specific Requirements / Needs analysis –
External Interfaces – User Interface earlier in the document.
50.00% 50.00%
20,000 20,000
40.00% 40.00%
Go to detail
15,000 15,000
Revenue Revenue
30.00% 30.00%
GM% GM%
10,000 10,000
20.00% 20.00%
- 0.00% - 0.00%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Hyperlink GSD 2
GSD O1 GSD O2
Hyperlink GSD 3
50.00%
20,000
40.00% GM
15,000 42% Project costs
Revenue 48%
30.00%
GM%
10,000
20.00%
SL OH costs
GSD mgmt costs 6%
5,000
10.00% 4%
- 0.00%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
GSD O3 GSD O4
Description of hyperlinks
detail
Description of objects
GSD O1 Revenue Column and line chart X-Axis – Months (Jan till current
and GM representing monthly month in curr FY)
revenue and GM for
GSD Primary Y-axis – Revenue in ‘000
USD plotted as columns
Secondary Y-axis – GM in %
plotted as a line
GSD O2 Employee Column and line chart X-Axis – Months (Jan till current
HC and representing monthly month in curr FY)
utilization employee HC and
utilization for GSD Primary Y-axis – Employee HC
plotted as columns
50.00% 50.00%
20,000 20,000
40.00% 40.00%
15,000 15,000
Revenue Revenue
Go to detail
30.00%
30.00% GM%
GM%
10,000
10,000
20.00%
20.00%
5,000
5,000 10.00%
10.00%
Hyperlink GSD 1
- 0.00%
- 0.00%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Hyperlink GSD 3
This month’s performance
Hyperlink GSD 4 25,000 60.00%
50.00%
20,000
40.00%
15,000 GM
42% Project costs
Revenue
30.00% 48%
GM%
10,000
20.00%
SL OH costs
5,000 GSD mgmt costs 6%
10.00%
4%
- 0.00%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
GSD F3 GSD F4
Hyperlink F1 Hyperlink F2
GSD F5
Description of hyperlinks
4 detail
Description of objects
GSD F1 Revenue Column and line chart X-Axis – Months (Jan till current
and GM representing monthly month in curr FY)
revenue and GM for
GSD Primary Y-axis – Revenue in ‘000
USD plotted as columns
Secondary Y-axis – GM in %
plotted as a line
GSD F2 How the Stacked column chart X-Axis – Months (Jan till current
costs eat representing monthly month in curr FY)
into project direct costs, SL
revenues OH and bench costs, Primary Y-axis – The following
GSD management four parameters plotted as a
costs and gross stacked column chart, all in
margin for GSD ‘000 USD
1. Lowest stack: Project direct
costs
2. Next higher stack: SL OH
and bench costs
3. Next higher stack: GSD
mgmt costs
4. Highest stack: GSD gross
margin
50.00% 50.00%
20,000 20,000
40.00% 40.00%
15,000 15,000
Revenue Revenue
Go to detail
30.00%
30.00% GM%
GM%
10,000
10,000
20.00%
20.00%
5,000
5,000 10.00%
10.00%
Hyperlink GSD 1
- 0.00%
- 0.00%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Hyperlink GSD 3
GSD F_SL3
Description of hyperlinks
Description of objects
GSD F_SL1 Revenue Column and line chart X-Axis – All the current SL
and GM for representing current
each SL month revenue and Primary Y-axis – Revenue in ‘000
GM for each SL USD plotted as columns
Secondary Y-axis – GM in %
plotted as a line
GSD F_SL2 How the Stacked column X-Axis – All the current SL
costs eat representing current
into month project direct Primary Y-axis – The following
revenues costs, SL OH and four parameters plotted as a
for each SL bench costs and SL stacked column chart, all in
gross margin for each ‘000 USD
SL 1. Lowest stack: Project direct
costs
2. Next higher stack: SL OH
and bench costs
3. Highest stack: SL gross
margin
GSD F_SL3 Variance Table of variance The table has the following
analysis for analysis parameters:
current Column 1: SL name for all SL
month Column 2: Following parameters
for each SL: Revenue, Total cost,
GM, GM%
Column 3: Budget nos. for each
parameter in Col 2
Column 4: Actual nos. for each
parameter in Col 2
Column 5: Variance nos. w.r.t.
budget for each parameter in
Col 2
Column 6: Forecast nos. for
each parameter in Col 2
Column 7: Actual nos. for each
parameter in Col 2
Column 8: Variance nos. w.r.t.
forecast for each parameter in
Col 2
50.00% 50.00%
20,000 20,000
40.00% 40.00%
15,000 15,000
Revenue Revenue
Go to detail
30.00%
30.00% GM%
GM%
10,000
10,000
20.00%
20.00%
5,000
5,000 10.00%
10.00%
Hyperlink GSD 1
- 0.00%
- 0.00%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Hyperlink GSD 3
Description of hyperlinks
Description of objects
GSD F_AC1 Revenue Column and line chart X-Axis – All the current AC
and GM for representing current
each AC month revenue and Primary Y-axis – Revenue in ‘000
GM for each AC USD plotted as columns
Secondary Y-axis – GM in %
plotted as a line
GSD F_SL2 How the Stacked column chart X-Axis – All the current SL
costs eat representing current
into month project direct Primary Y-axis – The following
revenues costs, and gross four parameters plotted as a
for each AC margin for each stacked column chart, all in
account ‘000 USD
1. Lowest stack: Project direct
costs
2. Highest stack: AC gross
margin
Service line Metric Jan Feb Mar Q1 - Qtd Apr May Jun Q2 - QTD
Business Intelligence Revenue 528,038 397,386 455,525 1,380,948 455,896 455,896
Pr. direct expenses 9,239 4,012 762 14,014 3,745 3,745
Pr. std. costs 203,824 179,641 183,681 567,146 217,981 217,981
Total Pr. direct expenses 213,063 183,653 184,444 581,160 221,726 - - 221,726
Pr. gross margin 314,974 213,734 271,081 799,789 234,169 - - 234,169
Go to detail
Pr. gross margin % 60% 54% 60% 58% 51% 0% 0% 51%
SL Leadership labor and expenses 42,353 38,062 39,417 119,831 38,219 38,219
Bench cost 18,093 13,206 20,459 51,759 14,609 14,609
SL gross margin 254,528 162,466 211,205 628,199 181,341 - - 181,341
SL gross margin % 48.2% 40.9% 46.4% 45.5% 39.8% 39.8%
Hyperlink GSD 3
SL Leadership labor and expenses 41,366 26,776 33,427 101,569 39,082 39,082
Bench cost 61,101 59,587 65,396 186,084 48,146 48,146
SL gross margin 727,749 413,982 1,865,344 3,007,074 1,127,468 - - 1,127,468
SL gross margin % 54.0% 41.5% 72.0% 60.9% 59.4% 59.4%
Utilization
GSD F_SL_H1
Screen title and heading: Service line historical detail – Financial perspective
Description of hyperlinks
Description of objects
Service line Metric Jan Feb Mar Q1 - Qtd Apr May Jun Q2 - QTD
Business Intelligence Revenue 528,038 397,386 455,525 1,380,948 455,896 455,896
Pr. direct expenses 9,239 4,012 762 14,014 3,745 3,745
Pr. std. costs 203,824 179,641 183,681 567,146 217,981 217,981
Total Pr. direct expenses 213,063 183,653 184,444 581,160 221,726 - - 221,726
Pr. gross margin 314,974 213,734 271,081 799,789 234,169 - - 234,169
Go to detail
Pr. gross margin % 60% 54% 60% 58% 51% 0% 0% 51%
SL Leadership labor and expenses 42,353 38,062 39,417 119,831 38,219 38,219
Bench cost 18,093 13,206 20,459 51,759 14,609 14,609
SL gross margin 254,528 162,466 211,205 628,199 181,341 - - 181,341
SL gross margin % 48.2% 40.9% 46.4% 45.5% 39.8% 39.8%
Hyperlink GSD 3
SL Leadership labor and expenses 41,366 26,776 33,427 101,569 39,082 39,082
Bench cost 61,101 59,587 65,396 186,084 48,146 48,146
SL gross margin 727,749 413,982 1,865,344 3,007,074 1,127,468 - - 1,127,468
SL gross margin % 54.0% 41.5% 72.0% 60.9% 59.4% 59.4%
Utilization
GSD F_AC_H1
Description of hyperlinks
4 detail
Description of objects
Go to detail 20,000
50.00%
40.00%
20,000
15,000
50.00%
40.00%
15,000
Revenue Revenue
Hyperlink GSD 1
30.00%
30.00% GM%
GM%
10,000
10,000
20.00%
20.00%
5,000
5,000 10.00%
10.00%
Hyperlink GSD 4
Description of hyperlinks
Version 0.1, 02/Jul/2003 Draft/Issue Page 50
2001 Viker Incorporated Uncontrolled if Copy/Printed Ref. No: METMISUR1
Metrics and MIS User Requirement Report
Description of objects
GSD C1 No. of Column and line chart X-Axis – All the months till
active representing monthly current month in current FY
clients and no. of active clients
avg. client and avg. client size Primary Y-axis – No. of active
size clients plotted as columns
GSD C2 Client Column and line chart X-Axis – All the months till
retention representing monthly current month in current FY
and repeat client retention and
business repeat business rates Primary Y-axis – Client retention
rate plotted as columns
Go to detail Internal
Hyperlink GSD 1 Process
Hyperlink GSD 2
Perspective
Hyperlink GSD 3
Hyperlink GSD 4
Hyperlink IP 1 Hyperlink IP 2 Hyperlink IP 3 Hyperlink IP 4
Description of hyperlinks
break-up in
cost
categories”
50.00% 50.00%
20,000 20,000
40.00% 40.00%
15,000 15,000
Revenue Revenue
Go to detail
30.00%
30.00% GM%
GM%
10,000
10,000
20.00%
20.00%
5,000
5,000 10.00%
10.00%
Hyperlink GSD 1
- 0.00%
- 0.00%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
GM
42% Project costs
48%
SL OH costs
GSD mgmt costs 6%
4%
GSD IPV3
Hyperlink IPV 1
GSD IPV4
Screen title and heading: Costs and Volume – Internal Process perspective summary
for GSD
Description of hyperlinks
hyperlink link
Description of objects
GSD IPV1 Cost break- Stacked column chart X-Axis – All the months till
up by representing monthly current month in current FY
category costs break-up into
Primary Y-axis – Stacked
salary, travel and
columns with the following
other costs for GSD
parameters (all in ‘000 USD)
1. Lowest stack – Salary costs
for GSD
2. Next higher stack – Travel
costs for GSD
3. Highest stack – Other costs
for GSD
GSD IPV2 FTE Column chart X-Axis – All the months till
equivalent representing monthly current month in current FY
billed billable hours in FTE
volume equivalent for GSD Y-axis – Total billable hours in
GSD in FTE equivalent
GSD IPV3 Cost break- Pie-chart representing The 3 parameters for the pie-
up by percentage break-up chart are: Salary cost for GSD,
category of costs into Travel cost for GSD and other
for current categories for current costs for GSD al in percentage
month month break
GSD IPV4 Variance Table of monthly The table has the following
analysis variance analysis on parameters:
Version 0.1, 02/Jul/2003 Draft/Issue Page 55
2001 Viker Incorporated Uncontrolled if Copy/Printed Ref. No: METMISUR1
Metrics and MIS User Requirement Report
50.00% 50.00%
20,000 20,000
40.00% 40.00%
15,000 15,000
Revenue Revenue
30.00%
30.00% GM%
GM%
10,000
10,000
20.00%
20.00%
5,000
5,000 10.00%
Go to detail
10.00%
- 0.00%
- 0.00%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Hyperlink GSD 4
GSD IPV_SL3
Screen title and heading: Costs and Volume – Current month SL detail for GSD
Version 0.1, 02/Jul/2003 Draft/Issue Page 56
2001 Viker Incorporated Uncontrolled if Copy/Printed Ref. No: METMISUR1
Metrics and MIS User Requirement Report
Description of hyperlinks
Description of objects
GSD Current Table of current month The table has the following
IPV_SL3 month variance analysis on parameters:
variance costs for each SL in Column 1: SL name – All SL in
analysis GSD GSD
Column 2: Headings for the
following parameters for each
month – Salary costs, Travel
Version 0.1, 02/Jul/2003 Draft/Issue Page 57
2001 Viker Incorporated Uncontrolled if Copy/Printed Ref. No: METMISUR1
Metrics and MIS User Requirement Report
Service line Metric Jan Feb Mar Q1 - Qtd Apr May Jun Q2 - QTD
Business Intelligence Revenue 528,038 397,386 455,525 1,380,948 455,896 455,896
Pr. direct expenses 9,239 4,012 762 14,014 3,745 3,745
Pr. std. costs 203,824 179,641 183,681 567,146 217,981 217,981
Total Pr. direct expenses 213,063 183,653 184,444 581,160 221,726 - - 221,726
Pr. gross margin 314,974 213,734 271,081 799,789 234,169 - - 234,169
Go to detail
Pr. gross margin % 60% 54% 60% 58% 51% 0% 0% 51%
SL Leadership labor and expenses 42,353 38,062 39,417 119,831 38,219 38,219
Bench cost 18,093 13,206 20,459 51,759 14,609 14,609
SL gross margin 254,528 162,466 211,205 628,199 181,341 - - 181,341
SL gross margin % 48.2% 40.9% 46.4% 45.5% 39.8% 39.8%
Hyperlink GSD 3
SL Leadership labor and expenses 41,366 26,776 33,427 101,569 39,082 39,082
Bench cost 61,101 59,587 65,396 186,084 48,146 48,146
SL gross margin 727,749 413,982 1,865,344 3,007,074 1,127,468 - - 1,127,468
SL gross margin % 54.0% 41.5% 72.0% 60.9% 59.4% 59.4%
Utilization
GSD IPV_SL_H1
Description of hyperlinks
4 detail
Description of objects
1,400
50.00%
20,000
1,200
40.00%
15,000 1,000
Revenue
30.00% 800
GM% Volume
10,000 600
20.00%
400
5,000
Go to detail
10.00% 200
-
- 0.00%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Hyperlink GSD 3
Volume
1,200
1,000
800
Volume
600
400
200
-
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
GSD IPE 3
Hyperlink IPE 1
Screen title and heading: Efficiency summary for GSD – Internal Process Perspective
Description of hyperlinks
Description of objects
GSD IPE1 Utilization Column and line chart X-Axis – All the months till
and billable representing monthly current in current FY
population utilization and billable
Primary Y-axis – Columns
% population ratio for
Version 0.1, 02/Jul/2003 Draft/Issue Page 61
2001 Viker Incorporated Uncontrolled if Copy/Printed Ref. No: METMISUR1
Metrics and MIS User Requirement Report
1,400
50.00%
20,000
1,200
40.00%
15,000 1,000
Revenue
30.00% 800
GM% Volume
10,000 600
20.00%
400
5,000
Go to detail
10.00% 200
-
- 0.00%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Hyperlink GSD 3
Volume Volume
1,200
1,400
1,200
1,000 1,000
800 800
Volume Volume
600 600
400 400
200 200
- -
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Volume Volume
1,400 1,400
1,200 1,200
1,000 1,000
800 800
Volume Volume
600 600
400 400
200 200
- -
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Volume Volume
1,400 1,400
1,200 1,200
1,000 1,000
800 800
Volume Volume
600 600
400 400
200 200
- -
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Screen title and heading: SL detail – Efficiency – GSD Internal Process Perspective
Description of hyperlinks
Description of objects
25
Go to detail 20
Hyperlink GSD 1
15
No. of resorcereq. raised
No. of requisitions open
10
Hyperlink GSD 2 5
-
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Hyperlink GSD 3
GSD IPS 1
Hyperlink GSD 4
Screen title and heading: Staffing Efficiency GSD Summary – Internal Process
Perspective
Description of hyperlinks
hyperlink link
Description of objects
GSD IPS1 Resource Double column chart X-Axis – All the months till
requisitions representing the current month in current FY
raised and raised resource
Y-axis – Double columns
open requisitions and open
representing the following:
resource resource requisition
1. Raised resource requisitions
requisitions for each month
2. Open resource requisitions
Go to detail
Need to think about this one
Hyperlink GSD 1
Hyperlink GSD 2
Hyperlink GSD 3
Hyperlink GSD 4
Screen title and heading: Quality metrics GSD Summary – Internal Process
Perspective
Description of hyperlinks
hyperlink link
Description of objects
Need to
think
1,400
50.00%
20,000
1,200
40.00%
15,000 1,000
Revenue
30.00% 800
GM% Volume
10,000 600
Go to detail
20.00%
400
5,000
10.00% 200
-
- 0.00%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Hyperlink GSD 1
GSD OL 1 GSD OL 2
Hyperlink GSD 2
Hyperlink GSD 3
Hyperlink OL 1
Hyperlink GSD 4
Screen title and heading: Organizational Learning perspective summary for GSD
Description of hyperlinks
Description of objects
GSD OL1 No. of Column and line chart X-Axis – All the months till
associates representing monthly current in current FY
and associate nos. and
Primary Y-axis – Columns
retention retention rates for
representing no. of associates in
rate GSD
GSD
Secondary Y-axis – Line chart
representing retention rate for
GSD
GSD OL2 No. of Column chart X-Axis – All the months till
associates representing monthly current month in current FY
on the bench nos. in GSD
bench Y-axis – No. of associates on the
bench in GSD plotted as
columns
1,400
50.00%
20,000
1,200
40.00%
15,000 1,000
Revenue
30.00% 800
GM% Volume
10,000 600
Go to detail
20.00%
400
5,000
10.00% 200
-
- 0.00%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Hyperlink GSD 1
GSD OL_SL 1 GSD OL_SL 2
Hyperlink GSD 2
Hyperlink GSD 3
Hyperlink GSD 4
Description of hyperlinks
Description of objects
This appendix describes the screen content and layouts for all the screens
mentioned for Head GBD earlier in the document. For the overall screens
organization and screen flow, please refer the section on Specific Requirements /
Needs analysis – External Interfaces – User Interface earlier in the document.
User: GBD
Go to detail
Hyperlink GBD 1
Need to decide what information
goes on the homepage dashboard
Hyperlink GBD 2
Hyperlink GBD 3
Hyperlink GBD 4
Description of hyperlinks
Description of objects
Need to
define
Volume 25
1,400
20
1,200
1,000 15
No. of resorce req. raised
800 No. of requisitions open
Volume 10
Go to detail 600
400 5
200
-
Hyperlink GBD 1 -
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Hyperlink GBD 3
25,000 60.00% Volume
1,200
40.00%
1,000
Need to define
15,000
Revenue
30.00% 800
GM%
Volume
10,000
600
20.00%
400
5,000
10.00%
200
- 0.00% -
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
GBD F3 GBD F4
Volume
1,400
1,200
1,000 GM
42% Project costs
800 48%
Volume
600
400 SL OH costs
GSD mgmt costs 6%
200 4%
-
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
GBD F5 GBD F6
Hyperlink GBD F1
Description of hyperlinks
Description of objects
GBD F2 Budget vs. Double column chart X-Axis – Months (Jan till current
actual costs representing monthly month in curr FY)
for GBD budget vs. actual
costs for the GBD Primary Y-axis – Double columns
function representing the following
parameters: Actual costs for
GBD in ‘000 USD and budgeted
costs for GBD in ‘000 USD
GDB F6 Accounts Pie chart representing Pie chart with the following
receivables aging information for parameters – AR <=45 days,
– ageing accounts receivables 45-60 days, 60-90 days and
>90 days
Volume 25
1,400
20
1,200
1,000 15
No. of resorce req. raised
800 No. of requisitions open
Volume 10
Go to detail 600
400 5
200
-
Hyperlink GBD 1 -
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Hyperlink GBD 3
25,000 60.00%
40.00%
Need to define
15,000
Revenue
30.00%
GM%
10,000
20.00%
5,000
10.00%
- 0.00%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
GBD F_IL3
Volume
1,400
1,200
1,000 GM
42% Project costs
800 48%
Volume
600
400 SL OH costs
GSD mgmt costs 6%
200 4%
-
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Screen title and heading: IL detail (current month) – Financial perspective – GBD
Description of hyperlinks
Description of objects
GDB F_IL5 Accounts Pie chart representing Pie chart with the following
Go to detail
Hyperlink GBD 1
Industry line 1 (Tag)
Hyperlink GBD 2 Volume
1,400
1,000
800
Volume
400
200
-
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
GBD F_IL_AC1
Volume
1,400
1,200
1,000 GM
42% Project costs
800 48%
Volume
600
400 SL OH costs
GSD mgmt costs 6%
200 4%
-
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1,400
1,200
1,000
800
Volume
600
400
200
-
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
GBD F_IL_AC1
Volume
1,400
1,200
1,000 GM
42% Project costs
800 48%
Volume
600
400 SL OH costs
GSD mgmt costs 6%
200 4%
-
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Description of hyperlinks
Version 0.1, 02/Jul/2003 Draft/Issue Page 76
2001 Viker Incorporated Uncontrolled if Copy/Printed Ref. No: METMISUR1
Metrics and MIS User Requirement Report
Description of objects
GDB Accounts Pie chart representing Pie chart with the following
F_IL_AC3 receivables contribution of parameters – Proportion of AC-
– age risk accounts to AR wise contribution towards AR
(for all by account greater than 90 days more than 90 days in that IL
tags) in that IL
Go to detail
Hyperlink GBD 1 Need to define
Hyperlink GBD 2
Hyperlink GBD 3
Hyperlink GBD 4
Description of hyperlinks
Description of objects
Need to
define
Go to detail
Hyperlink GBD 1 Need to define
Hyperlink GBD 2
Hyperlink GBD 3
Hyperlink GBD 4
Description of hyperlinks
Description of objects
Need to
define
1,400 50.00%
20,000
1,200
40.00%
Go to detail
1,000 15,000
Revenue
800 30.00%
GM%
Volume
10,000
600
20.00%
400
- - 0.00%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Hyperlink GBD 2
GBD C1 GBD C2
Hyperlink GBD 3
Hyperlink GBD 4
25,000 60.00%
50.00%
20,000
40.00%
15,000
Revenue
30.00%
GM%
10,000
20.00%
5,000
10.00%
- 0.00%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
GBD C2
Description of hyperlinks
Description of objects
GBD C2 Existing Column and double X-axis – Months (All months till
clients line chart representing
Version 0.1, 02/Jul/2003 Draft/Issue Page 80
2001 Viker Incorporated Uncontrolled if Copy/Printed Ref. No: METMISUR1
Metrics and MIS User Requirement Report
Volume 25
1,400
20
1,200
Go to detail
1,000 15
No. of resorcereq. raised
800
Volume No. of requisitions open
600 10
400
- -
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Hyperlink GBD 2
GBD IP1 GBD IP2
Hyperlink GBD 3
Hyperlink GBD 4
Screen title and heading: Internal process perspective summary – Head GBD
Description of hyperlinks
Description of objects
GBD IP1 Utilization Column chart X-Axis – Months (all months till
representing overall current month in current FY)
GSD utilization by
month Primary Y-axis – Monthly GSD
utilization plotted as columns
GBD IP2 Billing rates Double column and X-axis – Months (all months till
line chart representing current month in current FY)
monthly onsite,
offshore and blended Primary Y-axis – Monthly onsite
billing rates and offshore billing rates
plotted as columns
Go to detail
Hyperlink GBD 1
Industry line1 (tag)
Hyperlink GBD 2 25
Hyperlink GBD 3
20
15
No. of resorcereq. raised
No. of requisitions open
Hyperlink GBD 4 10
-
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
GBD IP_IL1
20
15
No. of resorcereq. raised
No. of requisitions open
10
-
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
GBD IP_IL1
Description of hyperlinks
Description of objects
GBD IP_IL1 Billing rates Double column and X-axis – Months (all months till
line chart representing current month in current FY)
monthly onsite,
offshore and blended Primary Y-axis – Monthly onsite
billing rates for the and offshore billing rates
particular IL plotted as columns for that IL
25,000 60.00%
50.00%
20,000
40.00%
Go to detail
15,000
Revenue
30.00%
GM%
10,000
20.00%
- 0.00%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Hyperlink GBD 2
GBD E1
Hyperlink GBD 3
Hyperlink GBD 4
Description of hyperlinks
Description of objects
GBD E1 Employee Column and line chart X-axis – Months (all months till
nos. and representing current month in current FY)
retention employee information
rate for GBD Primary Y-axis – Monthly no. of
associates in GBD plotted as
columns
This appendix describes the screen content and layouts for all the screens
mentioned for CFO earlier in the document. For the overall screens organization and
screen flow, please refer the section on Specific Requirements / Needs analysis –
External Interfaces – User Interface earlier in the document.
Go to detail
Hyperlink CFO 1 Need to define
Hyperlink CFO 2
Hyperlink CFO 3
Hyperlink CFO 4
Description of hyperlinks
Description of objects
Need to
Version 0.1, 02/Jul/2003 Draft/Issue Page 86
2001 Viker Incorporated Uncontrolled if Copy/Printed Ref. No: METMISUR1
Metrics and MIS User Requirement Report
define
25,000 60.00% 25
50.00%
20,000 20
40.00%
15,000 15
Revenue No. of resorce req. raised
30.00%
GM% No. of requisitions open
10,000 10
20.00%
5,000
10.00% 5
Go to detail -
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
0.00%
-
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Hyperlink CFO 2
This month’s performance
Hyperlink CFO 3 25
Hyperlink CFO 4
20
15 GM
No. of resorce req. raised 42% Project costs
48%
No. of requisitions open
10
SL OH costs
5 GSD mgmt costs 6%
4%
-
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
CFO F3 CFO F4
Volume
1,400
1,200
1,000 GM
42% Project costs
800 48%
Volume
600
400 SL OH costs
GSD mgmt costs 6%
200 4%
-
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
CFO F5 CFO F6
1,400
50.00%
20,000
1,200
40.00%
1,000 15,000
Revenue
800 30.00%
Volume GM%
600
400
Need to define 10,000
20.00%
5,000
10.00%
200
- - 0.00%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
CFO F7 CFO F8
CFO F9
Description of hyperlinks
Description of objects
CFO F1 Revenue Column and line chart X-Axis – Months (Jan till current
and Net representing monthly month in curr FY)
profit revenue and net profit
Primary Y-axis – Revenue in ‘000
USD plotted as columns
CFO F2 Costs Double column chart X-Axis – Months (Jan till current
information representing monthly month in curr FY)
costs of revenue and
SGA costs. (Should Primary Y-axis – The following
budgets also be two parameters plotted as
incorporated?) columns for each month
1. Cost of revenues in ‘000 USD
2. SGA costs in ‘000 USD
CFO F3 Current Double column chart X-Axis – The following
month representing current parameters: Revenue, GM, EBIT
financials month financials and net profit
CFO F5 DSO trend Column chart X-axis: Months (all months till
representing monthly current month in current FY)
DSO
Y-axis: Monthly DSO plotted as
columns
CFO F6 AR ageing Pie chart representing Pie chart with the following
ageing information on parameters: Proportion of AR
accounts receivables <=45 days, 45-60 days, 60-90
days and more than 90 days
CFO F7 Backlog Need to define
and
pipeline
information
CFO F8 Revenue Column and line chart X-axis: Months (current month
and margin representing monthly till the future 12 months)
forecast revenue and margin
forecast for the future Primary Y-axis: Revenue
12 months forecast in ‘000 USD plotted as
columns
50.00% 50.00%
20,000 20,000
40.00% 40.00%
15,000 15,000
Revenue Revenue
Go to detail
30.00%
30.00% GM%
GM%
10,000
10,000
20.00%
20.00%
5,000
5,000 10.00%
10.00%
Hyperlink CFO 3
CFO F_SL3
Description of hyperlinks
4 detail
Description of objects
CFO F_SL1 Revenue Column and line chart X-Axis – All the current SL
and GM for representing current
each SL month revenue and Primary Y-axis – Revenue in ‘000
GM for each SL USD plotted as columns
Secondary Y-axis – GM in %
plotted as a line
CFO F_SL2 How the Stacked column X-Axis – All the current SL
costs eat representing current
into month project direct Primary Y-axis – The following
revenues costs, SL OH and four parameters plotted as a
for each SL bench costs and SL stacked column chart, all in
gross margin for each ‘000 USD
SL 1. Lowest stack: Project direct
costs
2. Next higher stack: SL OH
and bench costs
3. Highest stack: SL gross
margin
CFO F_SL3 Variance Table of variance The table has the following
analysis for analysis parameters:
current Column 1: SL name for all SL
month Column 2: Following parameters
for each SL: Revenue, Total cost,
GM, GM%
Column 3: Budget nos. for each
parameter in Col 2
Column 4: Actual nos. for each
parameter in Col 2
Column 5: Variance nos. w.r.t.
budget for each parameter in
Col 2
Column 6: Forecast nos. for
Version 0.1, 02/Jul/2003 Draft/Issue Page 92
2001 Viker Incorporated Uncontrolled if Copy/Printed Ref. No: METMISUR1
Metrics and MIS User Requirement Report
50.00% 50.00%
20,000 20,000
40.00% 40.00%
15,000 15,000
Revenue Revenue
Go to detail
30.00%
30.00% GM%
GM%
10,000
10,000
20.00%
20.00%
5,000
5,000 10.00%
10.00%
Hyperlink CFO 3
Description of hyperlinks
4 detail
Description of objects
CFO F_AC1 Revenue Column and line chart X-Axis – All the current AC
and GM for representing current
each AC month revenue and Primary Y-axis – Revenue in ‘000
GM for each AC USD plotted as columns
Secondary Y-axis – GM in %
plotted as a line
CFO F_AC2 How the Stacked column chart X-Axis – All the current SL
costs eat representing current
into month project direct Primary Y-axis – The following
revenues costs, and gross four parameters plotted as a
for each AC margin for each stacked column chart, all in
account ‘000 USD
1. Lowest stack: Project direct
costs
2. Highest stack: AC gross
margin
25 25
20 20
15 15
No. of resorce req. raised No. of resorce req. raised
No. of requisitions open No. of requisitions open
Go to detail
10 10
5 5
Hyperlink CFO 1 -
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
-
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Hyperlink CFO 3
25 25
Hyperlink GSD 4 20 20
15 15
No. of resorce req. raised No. of resorce req. raised
No. of requisitions open No. of requisitions open
10 10
5 5
- -
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
25 25
20 20
15 15
No. of resorce req. raised No. of resorce req. raised
No. of requisitions open No. of requisitions open
10 10
5 5
- -
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
25 25
20 20
15 15
No. of resorce req. raised No. of resorce req. raised
No. of requisitions open No. of requisitions open
10 10
5 5
- -
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Description of hyperlinks
Description of objects
CFO F_SN1 – Costs trend Double column and X-Axis – Months (all months
CFO F_SN8 information line chart representing till current month in current
for each monthly costs (actual FY)
function and forecasted and as
% of revenue) Primary Y-axis – Costs
(actual and forecasted)
The following functions plotted as columns
are covered: Office of
the CEO, GSD, GBD, Secondary Y-axis – Actual
GFA, GIT, GAP, GPR, costs as a percent of
GBA revenue
Service line Metric Jan Feb Mar Q1 - Qtd Apr May Jun Q2 - QTD
Business Intelligence Revenue 528,038 397,386 455,525 1,380,948 455,896 455,896
Pr. direct expenses 9,239 4,012 762 14,014 3,745 3,745
Pr. std. costs 203,824 179,641 183,681 567,146 217,981 217,981
Total Pr. direct expenses 213,063 183,653 184,444 581,160 221,726 - - 221,726
Pr. gross margin 314,974 213,734 271,081 799,789 234,169 - - 234,169
Go to detail
Pr. gross margin % 60% 54% 60% 58% 51% 0% 0% 51%
SL Leadership labor and expenses 42,353 38,062 39,417 119,831 38,219 38,219
Bench cost 18,093 13,206 20,459 51,759 14,609 14,609
SL gross margin 254,528 162,466 211,205 628,199 181,341 - - 181,341
SL gross margin % 48.2% 40.9% 46.4% 45.5% 39.8% 39.8%
Hyperlink CFO 3
SL Leadership labor and expenses 41,366 26,776 33,427 101,569 39,082 39,082
Bench cost 61,101 59,587 65,396 186,084 48,146 48,146
SL gross margin 727,749 413,982 1,865,344 3,007,074 1,127,468 - - 1,127,468
SL gross margin % 54.0% 41.5% 72.0% 60.9% 59.4% 59.4%
Utilization
CFO F_SL_H1
Screen title and heading: Service line historical detail – Financial perspective
Description of hyperlinks
4 detail
Description of objects
Service line Metric Jan Feb Mar Q1 - Qtd Apr May Jun Q2 - QTD
Business Intelligence Revenue 528,038 397,386 455,525 1,380,948 455,896 455,896
Pr. direct expenses 9,239 4,012 762 14,014 3,745 3,745
Pr. std. costs 203,824 179,641 183,681 567,146 217,981 217,981
Total Pr. direct expenses 213,063 183,653 184,444 581,160 221,726 - - 221,726
Pr. gross margin 314,974 213,734 271,081 799,789 234,169 - - 234,169
Go to detail
Pr. gross margin % 60% 54% 60% 58% 51% 0% 0% 51%
SL Leadership labor and expenses 42,353 38,062 39,417 119,831 38,219 38,219
Bench cost 18,093 13,206 20,459 51,759 14,609 14,609
SL gross margin 254,528 162,466 211,205 628,199 181,341 - - 181,341
SL gross margin % 48.2% 40.9% 46.4% 45.5% 39.8% 39.8%
Hyperlink CFO 3
SL Leadership labor and expenses 41,366 26,776 33,427 101,569 39,082 39,082
Bench cost 61,101 59,587 65,396 186,084 48,146 48,146
SL gross margin 727,749 413,982 1,865,344 3,007,074 1,127,468 - - 1,127,468
SL gross margin % 54.0% 41.5% 72.0% 60.9% 59.4% 59.4%
Utilization
CFO F_AC_H1
Description of hyperlinks
4 detail
Description of objects
Go to detail 20,000
50.00%
40.00%
20,000
15,000
50.00%
40.00%
15,000
Revenue Revenue
Hyperlink CFO 1
30.00%
30.00% GM%
GM%
10,000
10,000
20.00%
20.00%
5,000
5,000 10.00%
10.00%
Hyperlink CFO 4
Description of hyperlinks
hyperlink link
Description of objects
CFO C1 No. of Column and line chart X-Axis – All the months till
active representing monthly current month in current FY
clients and no. of active clients
avg. client and avg. client size Primary Y-axis – No. of active
size clients plotted as columns
CFO C2 Client Column and line chart X-Axis – All the months till
retention representing monthly current month in current FY
and repeat client retention and
business repeat business rates Primary Y-axis – Client retention
rate plotted as columns
Volume 25
1,400
20
1,200
Go to detail
1,000 15
No. of resorcereq. raised
800
Volume No. of requisitions open
600 10
400
- -
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Hyperlink CFO 2
CFO IP1 CFO IP2
Hyperlink CFO 3
Hyperlink CFO 4
Volume Volume
1,400 1,400
1,200 1,200
1,000 1,000
800 800
Volume Volume
600 600
400 400
200 200
- -
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Description of hyperlinks
Description of objects
CFO IP1 Utilization Column chart X-Axis – Months (all months till
representing overall current month in current FY)
GSD utilization by
month Primary Y-axis – Monthly GSD
Version 0.1, 02/Jul/2003 Draft/Issue Page 103
2001 Viker Incorporated Uncontrolled if Copy/Printed Ref. No: METMISUR1
Metrics and MIS User Requirement Report
CFO IP2 Billing rates Double column and X-axis – Months (all months till
line chart representing current month in current FY)
monthly onsite,
offshore and blended Primary Y-axis – Monthly onsite
billing rates and offshore billing rates
plotted as columns
CFO IP3 Leverage Column chart X-axis – Months (all months till
ratio representing monthly the current month in current FY)
overall leverage ratio
trends Y-axis – Overall leverage ratio,
plotted as columns
CFO IP4 Avg. hourly Column chart X-axis – Months (all months till
cost per representing avg. the current month in the current
associate hourly cost per FY)
associate
Y-axis – Avg. hourly cost per
employee plotted as columns
50.00% 1,400
20,000
1,200
40.00%
Go to detail
15,000 1,000
Revenue
30.00% 800
GM%
Volume
10,000
600
20.00%
400
- 0.00% -
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Hyperlink CFO 2
CFO E1 CFO E2
Hyperlink CFO 3
Hyperlink CFO 4
Description of hyperlinks
Version 0.1, 02/Jul/2003 Draft/Issue Page 104
2001 Viker Incorporated Uncontrolled if Copy/Printed Ref. No: METMISUR1
Metrics and MIS User Requirement Report
Description of objects
CFO E1 Employee Column and line chart X-axis – Months (all months till
nos. and representing current month in current FY)
retention employee information
rate for Viker Primary Y-axis – Monthly no. of
associates in Viker plotted as
columns
This appendix describes the screen content and layouts for all the screens
mentioned for GPR earlier in the document. For the overall screens organization and
screen flow, please refer the section on Specific Requirements / Needs analysis –
External Interfaces – User Interface earlier in the document.
Volume Volume
1,400 1,400
1,200 1,200
1,000 1,000
800 800
Volume Volume
Go to detail 600
400
600
400
200 200
Hyperlink GPR 1 -
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
-
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1,400
Hyperlink GPR 4
20
1,200
1,000 15
No. of resorce req. raised
800
Volume No. of requisitions open
600 10
400
5
200
- -
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
GPR H3 GPR H4
Volume Volume
1,400 1,400
1,200 1,200
1,000 1,000
800 800
Volume Volume
600 600
400 400
200 200
- -
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
GPR H5 GPR H6
1,400
50.00%
20,000
1,200
40.00%
1,000 15,000
Revenue
800 30.00%
Volume GM%
600 10,000
20.00%
400
5,000
10.00%
200
- - 0.00%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
GPR H7 GPR H8
Description of hyperlinks
Description of objects
GPR H2 Billable QLs Column chart X-Axis – Months (all months till
representing the current month in the current
percentage of QL’s FY)
billable
Y-axis – Percentage of QL’s that
are billable plotted as columns
GPR H4 Process Double column and X-Axis – Months (all months till
group costs line chart representing the current month in the current
monthly costs for the FY)
Process Group dept
Primary Y-axis – Monthly total
cost, budget and actual, of the
Process Group dept. plotted
columns
GPR H7 CMM Status Stacked column chart X-Axis – Core ACs and all SL
representing CMM
status at levels 2, 3, 4 Y-axis – Stacked equal columns
and 5 for Levels 2, 3, 4 and 5. Each
stack can have one of three
colors – red, yellow or green
depending on the status for that
level in that SL/AC
GPR H8 Defect Column and line chart X-Axis – Months (all months till
density and representing monthly the current month in the current
productivity reduction in post FY)
changes delivery defect density
and improvement in Primary Y-axis – Month on
productivity month reduction in post
delivery defect density plotted
as columns
Go to detail
Need to define
Hyperlink GPR 1
Hyperlink GPR 2
Hyperlink GPR 3
Hyperlink GPR 4
Description of hyperlinks
Description of objects
Need to
define
Go to detail
Need to define
Hyperlink GPR 1
Hyperlink GPR 2
Hyperlink GPR 3
Hyperlink GPR 4
Description of hyperlinks
Description of objects
Need to
define
Go to detail
Need to define
Hyperlink GPR 1
Hyperlink GPR 2
Hyperlink GPR 3
Hyperlink GPR 4
Description of hyperlinks
Description of objects
Need to
define
Go to detail
Need to define
Hyperlink GPR 1
Hyperlink GPR 2
Hyperlink GPR 3
Hyperlink GPR 4
Description of hyperlinks
Description of objects
Need to
define
This appendix describes the screen content and layouts for all the screens
mentioned for GAP earlier in the document. For the overall screens organization and
screen flow, please refer the section on Specific Requirements / Needs analysis –
External Interfaces – User Interface earlier in the document.
Go to detail
Hyperlink GAP 1
Need to define
Hyperlink GAP 2
Hyperlink GAP 3
Hyperlink GAP 4
Description of hyperlinks
Description of objects
Need to
define
Go to detail
Hyperlink GAP 1
Need to define
Hyperlink GAP 2
Hyperlink GAP 3
Hyperlink GAP 4
Description of hyperlinks
Description of objects
Need to
define
Go to detail
Hyperlink GAP 1
Need to define
Hyperlink GAP 2
Hyperlink GAP 3
Hyperlink GAP 4
Description of hyperlinks
Description of objects
Need to
define
Go to detail
Hyperlink GAP 1
Need to define
Hyperlink GAP 2
Hyperlink GAP 3
Hyperlink GAP 4
Description of hyperlinks
Description of objects
Need to
define
Go to detail
Hyperlink GAP 1
Need to define
Hyperlink GAP 2
Hyperlink GAP 3
Hyperlink GAP 4
Description of hyperlinks
Description of objects
Need to
define
This appendix describes the screen content and layouts for all the screens
mentioned for GIT earlier in the document. For the overall screens organization and
screen flow, please refer the section on Specific Requirements / Needs analysis –
External Interfaces – User Interface earlier in the document.
Go to detail
Hyperlink GIT 1
Need to define
Hyperlink GIT 2
Hyperlink GIT 3
Hyperlink GIT 4
Description of hyperlinks
Description of objects
Need to
define
Go to detail
Hyperlink GIT 1
Need to define
Hyperlink GIT 2
Hyperlink GIT 3
Hyperlink GIT 4
Description of hyperlinks
Description of objects
Need to
define
Go to detail
Hyperlink GIT 1
Need to define
Hyperlink GIT 2
Hyperlink GIT 3
Hyperlink GIT 4
Description of hyperlinks
Description of objects
Need to
define
Go to detail
Hyperlink GIT 1
Need to define
Hyperlink GIT 2
Hyperlink GIT 3
Hyperlink GIT 4
Description of hyperlinks
Description of objects
Need to
define
Go to detail
Hyperlink GIT 1
Need to define
Hyperlink GIT 2
Hyperlink GIT 3
Hyperlink GIT 4
Description of hyperlinks
Description of objects
Need to
define
This appendix describes the screen content and layouts for all the screens
mentioned for GBA earlier in the document. For the overall screens organization and
screen flow, please refer the section on Specific Requirements / Needs analysis –
External Interfaces – User Interface earlier in the document.
Go to detail
Hyperlink GBA 1
Need to define
Hyperlink GBA 2
Hyperlink GBA 3
Hyperlink GBA 4
Description of hyperlinks
Description of objects
Need to
define
Go to detail
Hyperlink GBA 1
Need to define
Hyperlink GBA 2
Hyperlink GBA 3
Hyperlink GBA 4
Description of hyperlinks
Description of objects
Need to
define
Go to detail
Hyperlink GBA 1
Need to define
Hyperlink GBA 2
Hyperlink GBA 3
Hyperlink GBA 4
Description of hyperlinks
Description of objects
Need to
define
Go to detail
Hyperlink GBA 1
Need to define
Hyperlink GBA 2
Hyperlink GBA 3
Hyperlink GBA 4
Description of hyperlinks
Description of objects
Need to
define
Go to detail
Hyperlink GBA 1
Need to define
Hyperlink GBA 2
Hyperlink GBA 3
Hyperlink GBA 4
Description of hyperlinks
Description of objects
Need to
define
Document Control
AUTHORISATION
Document Owner Reviewed By Authorized By
AMENDMENT LOG
Version Date Section DCR A/M/D Brief Description of Change
dd mmm number