You are on page 1of 4

Resume

Kirubanandam
4501 Snell Ave, Apt#107
San Jose
CA - 95136
Ph: 480-747-0543
Email: kripa777@yahoo.com

EMPLOYMENT HISTORY / RESPONSE:

Employer: Infosys Technologies Limited, India From: September 1999 to: till date
Job Title: Project Manager
Current Role:
Consultant - Responsible for Testing and Validating
the Enterprise Wireless LAN Switch.

Overseas Experience:
• Currently working at the Client site Symbol Technologies Inc. San Jose, California for there
WirelessLAN Product.
• Worked in the Nortel Networks Research LAB in Ottawa, Canada. During this period I was involved
in developing the switch software for the next generation network synchronization and also involved in
extensive product testing of the same product.
• Worked in the field of wireless and have an extensive knowledge about wireless (GSM and TDMA) PSTN
interworking, SS7 Signaling and Intelligent Networks.

DETAILS OF THE PROJECTS WORKED ON:

01 Project Name Whistler: HP Procurve WLAN Switch and Access Port.

Client Symbol Technologies Inc, San Jose


Description of the project
HP ProCurve WLAN Control Module for the switch 5300 delivers 802.11 a/b/g wireless services,
management and security to wireless users on network connecting to switch 5300 using HP ProCurve Radio
Ports (HP Customized Symbol Access Port AP 300).

The Validation Module includes Wireless Security (WEP, WPA2 (AES –CCMP), WPA –TKIP), Rogue AP,
802.1x Authentication, Hot-Spot (IP- Redirection) and Acess-Port adoption , Authentication, Pre- WI-FI
Certification
Role : Consultant
Responsibility : 1. Product quality assurance, validation and certification.
2. Status reporting to the customer.
3. Gaining Expertise in 802.11 a/b/g domain.
4. Mentoring the team Members.
Duration : From: May 2005 To: Till Date
Hardware : HP work station, Intel Pentium PC , WS5K WLAN Switch, AP 300 Access Points,
Smart bits.

02 Project Name VOIP :BICC Operational Measurements(OM) Enhancements


Resume
Client Nortel Networks
Description of the project
This feature introduces new OM groups on the MSC Call Server to peg the information for ATM/Voip calls:

Role : Module Leader


Duration : From: May, 2004 To:April 2005.
Hardware : HP work station, Intel Pentium PC
Software : Protel-2,C, Unix, sos

03 Project Name GSM and UK ISUP Enhancements

Client Nortel Networks


Description of the project
This feature enhances UK ISUP to include the following capabilities:
1. INR/INF Enhancements to support the National Information Indicators
2. Suspend/Resume to RANAP/DTAP Notify mapping
3. Support of UK ISUP National Forward CalI Indicator (Link to Link)
4. Support of NOA Based routing for UK-ISUP.
5. Partial CLI and Default CLI Enhancements
This allows direct interconnection of the MSC to the PSTN. This introduces cost savings in terms of trunk
usage.
Role : Team Leader

Duration : From : May 2003 To: July 2004


Hardware : HP work station, Intel Pentium PC
Software : Protel-2, C, Unix, sos

04 Project Name GSM: Global Network Product Support

Client Nortel Networks


Description of the project
The Work involves the first level customer support to the Nortel Networks customer. I was involved in
resolving the issues which comes out from the field in the GSM and the PSTN domains. In addition to it , if a
code fix is required for any issues then a Patch is created with the fix for the issue and will be delivered to the
Customer.
Role : Programmer Analyst
Responsibility : 1.) To adhere to the SLA for each issues from the customer.
2.) To provide 24x7 support for ant outages or critical issues.
3.) To help cutomers if they face any provisioning or trunk control issues.

Duration : From: September 2002 To: April 2003


Hardware : HP work station, Intel Pentium PC
Software : Protel-2,C, Unix, sos

05 Project Name GSM:Location Update Reject Cause Enhancement


Resume
Client Nortel Networks
Description of the project
This feature deals with Altering the Location Update Reject Cause Value sent to the MS(Mobile Station) for
Local, national and International Roamers. This feature allows customization of all the reject cause values
sent to the MS.
Duration : From: March 2002 To: August 2002
Hardware : HP work station, Intel Pentium PC
Software : Protel-2,C, Unix, sos

06 Project Name SynchronizationResourceManager forTDM, ATM and SONET Networks.

Client Nortel Networks


Description of the project
This feature deals with the External clock synchronization for different networks like SONET/SDH, ATM, and
DMS node etc using spectrum peripheral module.
Role : Onsite Project Co-ordinator
Duration : From: June 2001 To: Feb 2002
Hardware : HP work station, Intel Pentium PC
Software : Protel-2, C, Unix, sos

07 Project Name TDMA Mobility Exchange

Client Nortel Networks


Description of the project
This is Wireless Custom Development done for specific Nortel wireless customers. This includes development works in
the areas of TDMA, CDMA, Handover and implementation of wireless protocols like IS-41,IS771,IS-826 etc .
Responsibility : 1. Handling the features CDMA MSINACT on PWRDOWN Registration,
CSD support for prepaid subscriber, CNIP for MOBDN and OM pegging
for Mobile Assisted Handoff (MAHO) till detailed design stage.
2. Design estimates for IS-826 protocol for prepaid subscriber.
3. Gain expertise in the WIN Architecture.
4. Configuration Controller for the MTXWCD team.

Duration : From: April 2001 To: May 2001

08 Project Name TDM Cellular Switch :ANSI41-D Set2 Capabilities

Client Nortel Networks


Description of the project
This is a development project for Nortel Networks being done at Nortel OSDC of Infosys. We develop
telecom software for the Nortel wireless switch, which is a wireless switch.
This project involves development of features for the MTX10 (wireless switch software) release the feature
work done currently is enhancement of ANSI-41D and IS771 protocol set for the WIN (Wireless Intelligent
Network). This feature includes addition of new parameters in WIN messages and processing of the
messages and parameters.

Role : Programmer
Responsibility : 1. Designing, Implementation and Testing of messages and parameters for
Resume
ANSI-41D & IS771 Messages.
2. Gain expertise in the WIN Architecture.
3. Testing work for the feature.

Duration : From: April 2000 To: March 2001


Hardware : HP work station, Intel Pentium PC
Software : Protel-2, Unix, SOS

09 Project Name GSM- Railways

Client Nortel Networks


Description of the project

This is a software sustaining work done for the GSM Railways Network for our Client Nortel Networks. Mainly
this project involves bug fixing in the telecom software running in the wireless switch. The GSM Railways is
used in the European Market to increase the mobility and to form a stable wireless network. It also involves
solving Non upward compatibility issues that are addressed in the GSMR01 release.
Role : Programmer
Responsibility : 1. Providing software solutions for design Bugs in the GSMR software.
2. Solving Non Upward compatibility service requests.
To gain domain knowledge in the wireless area.
Duration : From : January 2000 To: March 2000
Hardware : HP work station, Intel Pentium PC
Software : Protel-2, Unix, SOS

10 Project Name GSM – Sustainance

Client Nortel Networks


Description of the project

This is a sustenance work done for the GSM Network for our Client Nortel Networks. Mainly this project
involves bug fixing in the GSM software running in the GSM switch.
Role : Developer
Duration : From : September 1999 To : December 1999.

EDUCATION:
University: University of Madras, INDIA
Major: Electronics and communication
Degree: Bachelor of Engineering.
Graduation Date: April 1999