Guys,

There were three issues that I found with the ROS 1.1.1 spot build.

1. I was not included in the notification for the build (this was not your fault). I will get this
corrected.
2. The PVMM in the properties file was not set for April it was still set to March. This always
should be set to the correct month.
3. There was not a packaging group created in harvest for the release. I was able to get the
name of the package from the build request and create the packaging group for it.

You did a good job with the build except for items 2 and 3 just remember next time to set the
correct PVMM and create the package group before you promote the packages. When you get
another build request go ahead with the build if you want to just send me a copy of the build
request. You really did well for doing a build with no help. Just remember to follow these steps:

1. Create the package group in Harvest.


2. Promote the packages in Harvest
3. Set the property name="harvest.project" value= “to the release name”
4. property name="harvest.package" value= “to the build number”
5. property name="PT_1" value= “to the correct pt box”
6. property name="PT_2" value= “to the correct pt box”
7. property name="PVMM" value="to the correct month" April is PVMM value 5.5;
8. Perform the build
9. Verify the build is on the pt boxes and the website,

Gary

Gary,

We have placed the ROS Installer-2006.OC.Mar.Client 1.3 MSI files from H:\IIS
WEBS\PCGUIWEB\releases\level
(to)
H:\IIS WEBS\PCGUIWEB\releases\UAT25

Please FTP the build to 90.136.104.48 box as well.


I am sorry, I have missed this box.
_____________________________________________
From: Ramachandran, Sridhar
Sent: Wednesday, April 26, 2006 2:06 PM
To: Hollis, Ken; Swain, Rajiba; Thamotharan, Ramesh; 'e.subramaniam@accenture.com';
Subramaniam, Ezhilrasu; Siddaiah, Shashikala; Tantry, Shreevidya; Nallasamy, Sathish; Rutledge, Gary

Cc: Unkenholz, Robert D; DeCastra, Mike A; Elavally, Sudeep


Subject: Ready for 2006.0F.Jun Level 1 build.

All,
We are ready for the Level 1 build for 2006.0F.Jun. All the packages were promoted to
integrate state.
Please kick off the build for both Server and Client.
Upon successful completion of the build, please FTP the packages to the following
boxes.

Development Box: 90.136.104.65


SAT Box: 90.136.104.68 and 90.136.104.70

Let me know if you have any issues.

Placed in UAT

ROS SERVER LINK

\\90.136.104.5\home2\Documentation-
SNBGroup\ROS\Project\Management\ReleasePlanning\ServerSchedule.xls

All,

The harvest packages for the 2006.0G.Jul release are promoted to the integrate state. We
are ready for the Level 1 build.

Please kick start the ROS build on the following boxes.

Dev boxes

90.136.104.49

90.136.104.50

On successful completion of the builds Please FTP the builds to the following boxes

SAT boxes

90.136.104.67
90.136.104.79

Please inform the status to the Product Test team lead.

Thanks and Regards,

Sridhar Ramachandran| Team Lead| ROS- Customer Contact | VOIP: +1-312-752-9382