You are on page 1of 3

CONFIDENTIAL

EH/OCT 2009/CHE555

UNIVERSITI TEKNOLOGI MARA FINAL EXAMINATION

COURSE COURSE CODE EXAMINATION TIME

NUMERICAL METHODS AND OPTIMIZATION CHE555 OCTOBER 2009 2 HOURS

INSTRUCTIONS TO CANDIDATES 1. 2. 3. This question paper consists of three (3) Questions. Answer ALL questions in the Answer Booklet. Start each answer on a new page. Do not bring any material into the examination room unless permission is given by the invigilator. Please check to make sure that this examination pack consists of: i) ii) the Question Paper an Answer Booklet - provided by the Faculty

DO NOT TURN THIS PAGE UNTIL YOU ARE TOLD TO DO SO


This examination paper consists of 3 printed pages
Hak Cipta Universiti Teknologi MARA CONFIDENTIAL

CONFIDENTIAL QUESTION 1

EH/OCT 2009/CHE555

a) The flow rate of oil leaving a large tanker during loading process was expressed as j r '(l.2 - f ) ( l - e 20(M) )c#, Evaluate the flowrate of oil at 1 minute using four intervals by
0

the following methods i) Multiple segment Simpson's -re?rule (11 marks) b) The following system of equation is designed to determine concentrations, C (g/m3) in a series of coupled reactors as a function of amount of mass input (gram per day) to each reactor. Solve the system of equations below using Gauss-Seidel method in direct format. Perform three iterations using the initial approximation C-, = 0.1, C2 = 0.8 and C3 = 0.5. 4C, + 2C2 + C3 = 4 C,+3C2+C3=4

ii) Multiple segment trapezoidal rule

3C,+2C2+6C3=7
(12 marks)

QUESTION 2 a) The concentration of salt, CA in a homemade soap maker is given as a function of time by

dC. ^ = -2^ 3 +12? 2 -20^ + 8.5 dt


At the initial time, the salt concentration in the tank is x(0) = 1 g/L. Estimate the salt concentration after 1 minute using the Euler's method with a step size of 0.5 min and 0.25 min. Calculate the true errors and comment your answer for the difference in step size. (15 marks) b) Based on the Newton Raphson method, find the iteration scheme of ~J~N where N is a positive real number. (2 marks)

Hak Cipta Universiti Teknologi MARA

CONFIDENTIAL

CONFIDENTIAL QUESTION 3

EH/OCT 2009/CHE555

The AP Circuit Company produces double-sided and multi-layered printed circuit board (PCB). Each multi-layered PCB takes four hours of labour from the manufacturing department and two hours of labour from the finishing department. Each double-sided PCB requires three hours of manufacturing and one hour of finishing. During the current week, 240 hours of manufacturing time are available and 100 hours of finishing time. Each multilayered PCB produced gives a profit of RM70 and each double-sided PCB a profit of RM50. Set up a linear programming problem to calculate the number of multi-layered and doublesided PCB should be made for maximum profit and solve it using Simplex method (20 marks)

END OF QUESTION PAPER

Hak Cipta Universiti Teknologi MARA

CONFIDENTIAL

You might also like