5 T/SqM
Symbol
th_pcc s_pcc d_foundation _bgl s_slab th_slab d_p.beam_asb d_p.beam_ast d_column_bgl cc_tower cc_colums h_foundation_agl w_p.Beam s_Column
Description
Thickness of PCC Side of PCC below the slab Depth of Foundation below ground level Side of slab, Length or width Thickness of Slab Depth of Primary Beam above Slab bottom Depth of Primary Beam above Slab Top
Depth of Column below ground Level( d_foundation_bgl -th_slab))
Value
100 7600 2200 7500 400 800 400 1700 6000 5890 400 600 600 805
Units
mm mm mm mm mm mm mm mm mm mm mm mm mm mm
Tower Base Width, Back to back of tower legs Center to center distance of Twr Leg Colums Height of Foundation above Ground Level Width of Primary Beam
Side of (square)Column, for tower, width or depth
SECONDARY BEAMS ON SLAB Number of full Length Secondary Beams d_s.beam_asb W_s.Beam
Depth of secondary Beam above Slab Bottom, If applicable
Calculated Values Total Volume of PCC Volume of RCC for tower alone Total PCC +RCC Excavation , assuming vertical digging 5.78 30.60 36.38 132.85 CuM CuM CuM Cum
BAR
160 kmph Height of Tower SBC of Soil
BENDING
SCHEDULE
Cover For Cover For Cover For Column Beam Slab 40 mm 40 mm 25 mm Unit weight Kg/M 1.58 0.39 0.39 1.58 1.58 1.58 1.58 0.39 1.58 1.58 0.39 1.58 1.58 Tot Weight of Bar in kg in all Beam Column/slab 278.20 28.58 34.72 470.70 470.70 167.05 167.05 231.15 0.00 0.00 0.00 61.34 83.53 1993.03 Kg 2092.68
RAFT FOUNDATION
40.00 Meters 5.00 T/SQM
Drawing Descrip Reference Name P1 R1 R2 B1 , B2 T1,T2 M1 M2 R3 COLUMN Rings for Column Small Column Rings Bottom of Slab Top of Slab Top of Main Beam Bot Of Main Beam Ring for beams
Top of Sec Beam, If applicable Bot Of Sec Beam, If applicable Ring for Sec beams, If applicable
Size a mm 2452 528 528 7450 7450 6410 6410 520 6490 6490 0 500 6410
Size b mm 300 528 396 100 100 760 100 100 0 359
Size c mm 75 75 -
75
C1
Chairs C1
Side Bars for high P beam
75 200
Qty in Nos Tot Length both ways Each Pc. Or total for 4 Meters Beam/Colum 64 2.752 32 2.262 44 1.998 40 7.45 40 7.45 16 6.61 16 6.61 216 2.71 0 6.69 0 6.69 0 0.15 24 1.618 8 6.61
Notes: 1. Dimensions of Bars are along the center Lines. 2. All dimensions are in mm unless otherwise stated. 3. Bending of bars to be done as per IS 2502-1963. 4. Splicing of bars should not be more than 50%. Length of splice as per Standards 5. A clear cover of size as described above is to be provided to main rebars.
Site Name
7.5 T/SqM
Symbol
th_pcc s_pcc d_foundation _bgl s_slab th_slab d_p.beam_asb d_p.beam_ast d_column_bgl cc_tower cc_colums h_foundation_agl w_p.Beam s_Column
Description
Thickness of PCC Side of PCC below the slab Depth of Foundation below ground level Side of slab, Length or width Thickness of Slab Depth of Primary Beam above Slab bottom Depth of Primary Beam above Slab Top
Depth of Column below ground Level( d_foundation_bgl -th_slab))
Value
100 7300 2300 7200 400 800 400 1800 6000 5890 400 600 600 655
Units
mm mm mm mm mm mm mm mm mm mm mm mm mm mm
Tower Base Width, Back to back of tower legs Center to center distance of Twr Leg Colums Height of Foundation above Ground Level Width of Primary Beam
Side of (square)Column, for tower, width or depth
SECONDARY BEAMS ON SLAB Number of full Length Secondary Beams d_s.beam_asb W_s.Beam
Depth of secondary Beam above Slab Bottom, If applicable
Calculated Values Total Volume of PCC Volume of RCC for tower alone 5.33 28.98 CuM CuM
34.31
CuM
127.90
Cum
BAR
160 kmph Height of Tower SBC of Soil
BENDING
SCHEDULE
Cover For Cover For Cover For Column Beam Slab 40 mm 40 mm 25 mm Unit weight Kg/M 1.58 0.39 0.39 1.58 1.58 1.58 1.58 0.39 1.58 1.58 0.39 1.58 1.58 Tot Weight of Bar in kg in all Beam Column/slab 288.31 35.73 34.72 429.16 429.16 208.82 167.05 231.15 0.00 0.00 0.00 61.34 83.53 1968.96 2067.41
RAFT FOUNDATION
40.00 Meters 7.50 T/SQM
Drawing Descrip Reference Name P1 R1 R2 B1 , B2 T1,T2 M1 M2 R3 COLUMN Rings for Column Small Column Rings Bottom of Slab Top of Slab Top of Main Beam Bot Of Main Beam Ring for beams
Top of Sec Beam, If applicable Bot Of Sec Beam, If applicable Ring for Sec beams, If applicable
Size a mm 2552 528 528 7150 7150 6410 6410 520 6490 6490 0 500 6410
Size b mm 300 528 396 100 100 760 100 100 0 359
Size c mm 75 75 -
75
C1
Chairs C1
Side Bars for high P beam
75 200
Qty in Nos Tot Length both ways Each Pc. Or total for 4 Meters Beam/Colum 64 2.852 40 2.262 44 1.998 38 7.15 38 7.15 20 6.61 16 6.61 216 2.71 0 6.69 0 6.69 0 0.15 24 1.618 8 6.61
Kg
Notes: 1. Dimensions of Bars are along the center Lines. 2. All dimensions are in mm unless otherwise stated. 3. Bending of bars to be done as per IS 2502-1963. 4. Splicing of bars should not be more than 50%. Length of splice as per Standards
Site Name
10 T/SqM
Symbol
th_pcc s_pcc d_foundation _bgl s_slab th_slab d_p.beam_asb d_p.beam_ast d_column_bgl cc_tower cc_colums h_foundation_agl w_p.Beam s_Column d_column_slab.end
Description
Thickness of PCC Side of PCC below the slab Depth of Foundation below ground level Side of slab, Length or width Thickness of Slab Depth of Primary Beam above Slab bottom Depth of Primary Beam above Slab Top
Depth of Column below ground Level( d_foundation_bgl -th_slab))
Value
100 7100 2300 7000 400 800 400 1800 6000 5890 400 600 600 555
Units
mm mm mm mm mm mm mm mm mm mm mm mm mm mm
Tower Base Width, Back to back of tower legs Center to center distance of Twr Leg Colums Height of Foundation above Ground Level Width of Primary Beam
Side of (square)Column, for tower, width or depth
SECONDARY BEAMS ON SLAB Number of full Length Secondary Beams d_s.beam_asb W_s.Beam
Depth of secondary Beam above Slab Bottom, If applicable
LADDER FOUNDATION s_Col_stairs Calculated Values Total Volume of PCC Volume of RCC for tower alone Total PCC +RCC Excavation , assuming vertical digging Side of ( square) Column for staircase
Volume of Slab Volume of Col Vol of P Beam Vol of S beam Vol of PCC
19.60 CUM 3.17 5.08 0.00 27.85 5.04 Cum CuM Cum Cum Cum
BAR
160 kmph Height of Tower SBC of Soil
BENDING
SCHEDULE
Cover For Cover For Cover For Column Beam Slab 40 mm 40 mm 25 mm Unit weight Kg/M 1.58 0.39 0.39 1.58 1.58 1.58 1.58 0.39 1.58 1.58 0.39 1.58 1.58 Tot Weight of Bar in kg in all Beam Column/slab 288.31 35.73 34.72 439.11 439.11 208.82 208.82 231.15 0.00 0.00 0.00 61.34 83.53 2030.63 2132.16
RAFT FOUNDATION
40.00 Meters 10.00 T/SQM
Drawing Descrip Reference Name P1 R1 R2 B1 , B2 T1,T2 M1 M2 R3 COLUMN Rings for Column Small Column Rings Bottom of Slab Top of Slab Top of Main Beam Bot Of Main Beam Ring for beams
Top of Sec Beam, If applicable Bot Of Sec Beam, If applicable Ring for Sec beams, If applicable
Size a mm 2552 528 528 6950 6950 6410 6410 520 6490 6490 0 500 6410
Size b mm 300 528 396 100 100 760 100 100 0 359
Size c mm 75 75 -
75
C1
Chairs C1
Side Bars for high P beam
75 200
Qty in Nos Tot Length both ways Each Pc. Or total for 4 Meters Beam/Colum 64 2.852 40 2.262 44 1.998 40 6.95 40 6.95 20 6.61 20 6.61 216 2.71 0 6.69 0 6.69 0 0.15 24 1.618 8 6.61
Kg
Notes: 1. Dimensions of Bars are along the center Lines. 2. All dimensions are in mm unless otherwise stated. 3. Bending of bars to be done as per IS 2502-1963. 4. Splicing of bars should not be more than 50%. Length of splice as per Standards 5. A clear cover of size as described above is to be provided to main rebars.
Shapes of Bars
SHAPE DESCRIPTION a Shape Name
A
b
B C
D
b c a b c
a c b a c b
a b
Site Name
15 T/SqM
Symbol
th_pcc s_pcc d_foundation _bgl s_slab th_slab d_p.beam_asb d_p.beam_ast d_column_bgl cc_tower cc_colums h_foundation_agl w_p.Beam s_Column
Description
Thickness of PCC Side of PCC below the slab Depth of Foundation below ground level Side of slab, Length or width Thickness of Slab Depth of Primary Beam above Slab bottom Depth of Primary Beam above Slab Top
Depth of Column below ground Level( d_foundation_bgl -th_slab))
Value
100 7100 2300 7000 350 800 450 1850 6000 5890 400 600 600 555
Units
mm mm mm mm mm mm mm mm mm mm mm mm mm mm
Tower Base Width, Back to back of tower legs Center to center distance of Twr Leg Colums Height of Foundation above Ground Level Width of Primary Beam
Side of (square)Column, for tower, width or depth
SECONDARY BEAMS ON SLAB Number of full Length Secondary Beams d_s.beam_asb W_s.Beam
Depth of secondary Beam above Slab Bottom, If applicable
Calculated Values Total Volume of PCC Volume of RCC for tower alone 5.04 26.10 CuM CuM
31.14 120.98
CuM Cum
BAR
160kmph Height of Tower SBC of Soil
BENDING
SCHEDULE
Cover For Cover For Cover For Column Beam Slab 40 mm 40 mm 25 mm Unit weight Kg/M 1.58 0.39 0.39 1.58 1.58 1.58 1.58 0.39 1.58 1.58 0.39 1.58 1.58 Tot Weight of Bar in kg in all Beam Column/slab 288.31 35.73 34.72 504.98 504.98 208.82 208.82 231.15 0.00 0.00 0.00 57.55 83.53 2158.57 2266.50
RAFT FOUNDATION
40.00 Meters 15.00 T/SQM
Drawing Descrip Reference Name P1 R1 R2 B1 , B2 T1,T2 M1 M2 R3 COLUMN Rings for Column Small Column Rings Bottom of Slab Top of Slab Top of Main Beam Bot Of Main Beam Ring for beams
Top of Sec Beam, If applicable Bot Of Sec Beam, If applicable Ring for Sec beams, If applicable
Size a mm 2552 528 528 6950 6950 6410 6410 520 6490 6490 0 500 6410
Size b mm 300 528 396 100 100 760 100 100 0 309
Size c mm 75 75 -
75
C1
Chairs C1
Side Bars for high P beam
75 200
Qty in Nos Tot Length both ways Each Pc. Or total for 4 Meters Beam/Colum 64 2.852 40 2.262 44 1.998 46 6.95 46 6.95 20 6.61 20 6.61 216 2.71 0 6.69 0 6.69 0 0.15 24 1.518 8 6.61
Kg
Notes: 1. Dimensions of Bars are along the center Lines. 2. All dimensions are in mm unless otherwise stated. 3. Bending of bars to be done as per IS 2502-1963. 4. Splicing of bars should not be more than 50%. Length of splice as per Standards 5. A clear cover of size as described above is to be provided to main rebars.