Customer Description Date received Date delivered
(working days)
NAPOCOR Repair of pattern January 4 January 4 1
MIRDC- FD Candle holder January 5 January 5 1
M. Pingol Metal Craft Stem and Moonstrance January 8 January 8 1
M. Pingol Metal Craft Jesus icon January 15 February 23 30
First & Finest Tech. Corp. Cathode contactors (L & R) January 16 March 1 33
M. Pingol Metal Craft Decorative January 17 February 23 28
562 Fabrication Center Nozzle fitting January 18 April 2 53
Althea Retreading Corp. Tire marker January 24 March 28 46
Sikatuna Equipment Corp. Frontheads February 5 April 26 56
Cosworth Multi-Resources
Ring gear February 7 February 28 16
Co. & Eng’g Services
Bromac Industrial Corp. Outside lever February 5 February 5 1
Bromac Industrial Corp. Inside lever February 5 April 16 48
South Bay Tooling Fork February 8 For delivery -
Bromac Industrial Corp. Outside lever February 8 February 8 1
Bromac Industrial Corp. Crown rest February 8 On going -
Enrod Copper Décor Prod. Stamp mold February 8 February 8 1
RVM Metals Fabrication &
Guitarman trophy February 9 February 23 10
Finishing Enterprise
Angel Arts Co. Inc. Guitarman casted brass February 22 March 23 22
KSS Philippines Wood pattern flask February 26 March 12 11
Euromerica Trade Phil. Five-tooth gear March 5 April 3 22
DY3M Metal Tech Lock frame, Lock holder & Lock March 22 March 22 1
FJ Lafuente Jar March 23 March 23 1
Lamon Bay Furniture Corp. Center decal, Corner decal & April 4 April 4 1
INDUSTR Y
INT EGRA TION in
Duration
Customer Description Date received Date delivered
(working days)
Footing
Pacific Plaza Condominium Window lock April 4 May 9 24
Pacific Plaza Condominium Window lock April 4 April 4 1
Front head 751, Front head 90
Aeropac Front head bushing, Front head April 13 May 24 28
60 & Lock retainer
Methods Materials
April 27 10
Bea Tech Philippines Corp. Brass impeller pattern April 16
Awaits
Poor job
schedule supply
Defective
Bea Tech Philippines Corp. Steel disc
castings
preform April 24 May 16 15
Insufficient
materials
of casting
products
Delay in
delivery
the
Figure 3. Fishbone Diagram of Delay in the Delivery of Casting Products
Lack of Furnace
Worker’s attitude worker Breakdown
towards their job
Unavailable
machines
Manpower Machines
INDUSTR Y
INT EGRA TION in
Figure 4. Process Flowchart of Conventional Casting (Left-side) and Investment Casting (Right-side)
INDUSTR Y
INT EGRA TION in
Fettling Pouring
Casting
Delivery
Knock-off
Finishing
Delivery
A
PPE NDI
XA
INDUSTR Y
INT EGRA TION in
A. Jobs -in-process
A. Jobs -in-process
A. Jobs -in-process
A. Jobs -in-process