Professional Documents
Culture Documents
New Lake Travis Middle School with 1,200 Student Capacity $ 53,729,520
Construction, Fees, Permits, Furniture and Equipment, and Related Costs $ 49,959,939
Technology: purchase and installation of computer and peripheral equipment, instructional $ 3,469,581
software, audiovisual equipment, network infrastructure, equipment and applications, telephone
and PA/bell/clock/broadcast communication systems, and safety and security systems
Instructional Materials and Equipment: purchase of equipment, materials and supplies for science, $ 300,000
social studies, fine arts, extracurricular, and elective programs, specialized materials for the
Dyslexia, ESL, Special Education, Gifted and Talented, and Reading Intervention programs
Existing Lake Travis Middle School - Expand to 1,000 Student Capacity and Incorporate into Lake
Travis High School $ 20,624,740
Construction, Fees, Permits, Furniture and Equipment, and Related Costs $ 14,272,609
Technology: replacement of systems reaching end of life by 2017 including computer and $ 2,659,736
peripheral equipment, audiovisual equipment, network infrastructure equipment, telephone and
PA/bell/clock/broadcast communication systems, and safety and security systems; equip new
instructional areas
Instructional Materials and Equipment: purchase of library books, textbooks not funded by the $ 300,017
state, and fine arts/extracurricular uniforms and equipment; replace worn instructional materials
and science equipment
Maintenance: replacement of remaining roof from 2007 windstorm, building interior finishes, $ 1,559,800
mechanical/air conditioning equipment,original outside doors, auditorium dimmer and sound
system, cafeteria sound system, classroom blinds, courtyard benches and trash cans, and site
signage; maintenance of paving, drainage, irrigation and water quality pond; upgrade of safety,
lighting, plumbing and electrical systems
Fire Sprinkler Additions: installation of fire sprinkler system in the original construction areas of the $ 1,780,749
main building
Wastewater Service Impact Fees: additional impact fees are required due to campus growth $ 51,829
Safety and Security: installation of building access controls at campuses that currently without $ 525,875
them; upgrade of intrusion alarm systems at existing campuses
Instructional Material and Equipment: purchase of instructional materials for growth $ 50,000
Administration Building: replacement of building interior finishes, exterior doors, concrete window $ 1,072,400
lintels, and mechanical and electrical equipment; sealing of exterior block walls; installation of
security control at parking lot and secure entry vestibule and acoustical treatment at lobby;
reconfiguration of former mail room for offices
Educational Development Center: replacement of roof and original mechanical equipment; $ 429,000
repainting of building interior
Maintenance Equipment: replacement of aging equipment including floor scrubbers, burnishers, $ 105,540
washers, dryers, grounds maintenance equipment and trailers, and powerwashers
Special Education Cottage: replacement of all original carpet and vinyl floor tile $ 6,000
Transportation: replacement of aging buses and support vehicles; purchase of new buses for $ 2,981,497
expanded routes due to enrollment growth
Food and Nutrition Services: replacement of aging steamers, reach-in coolers and food warmers $ 40,800
Furniture and Equipment: replacement of aging student desks, cafeteria tables, teacher desks, file $ 311,281
cabinets and bookcases
Land: purchase of land for future facility needs $ 1,000,000
Portable Buildings: relocation and setup of existing portable buildings as needed $ 300,000
Overall Bond Contingency (3%) - contingency for inflation costs that may exceed estimated costs $ 4,548,846
Bond Reimbursements to General Fund - capital expenditures within 18 months prior to receipt of bond
proceeds may be reimbursed from the new bond proceeds $ 500,000
Bond Closing Costs - fees and other expenses related to the sale of bonds $ 1,800,000