rooflight
200mm mineral wool insulation quilt packed between 150 x 50mm joists and firrings
144 x 22mm sawn larch boards with 6mm air gaps between breather membrane on 12mm WBP ply 150 x 150mm sw frame infilled with 150mm Insulation bans 127 x 76mm UB
loft
1,5mm Cor-Ten cladding panel fixed to Cor-Ten cladding rail paired 75 X 150mm bearers bolted together at 600mm crs
outer pane of sandblasted gIa ss polyester powder-coated steel double-glazed window breather membrane on 12mm WBP ply vapour control layer on 13mm plasterboard -and skim
150 x 150mm sw sole plate dpc overlaps dpm Z-shaped Cor-Ten angle bolted back with spacers 20mm rigid insulation
17 February 2005
breather membrane on 12mm WBP ply 144 x 22mm sawn larch boards with 6mm air gaps between
sw frame infilled with 150mm insulation baits vapour control layer on plasterboard and skim
EXPLODED ISOMETRIC OF LOFT WINDOW 144 x 22mm sawn larch boards with 6mm air gaps between louvre screen of 40mm galv steel flats welded into frame at 40mm crs breather membrane on 12mm WBP ply sw frame Infilled with 150mm insulation batts vapour control layer an plasterboard and skim polyester powder-coated steel window frame double-glazed opening light breather membrane on 12mm WBP ply 1.5 mm Cor-Ten cladding panel fixed to Cor-Ten cladding rail timber frame filled with 150mm insulation vapour control layer on 13mm plasterboard and skim
fixed single-glared sand-blasted 6.4mm laminated glass pane double-glazed opening light with aIternative opening positions for ventilation and cleaning
polyester powder-coated steel window frame fixed with brackets to inner frame 4mm dia rods at 100mm crs
breather membrane on 12mm WBP ply DETAIL SECTION THROUGH LOFT WINDOW 144 x 22mm sawn larch boards with 6mm air gaps between louvre screen of 40mm galv steel flats welded inlo frame at 40mm crs 100 x 85mm cleats welded to frame and bolted to sw jambs DETAIL SECTION THROUGH GROUND FLOOR WINDOW 1.5mm Car-Ten cladding panel fixed to Cor-Ten cladding rail treated sw jamb timber frame filled with 150mm insulation vapour control layer on 13 mm plasterboard and skim
fixed single-glazed sand-blasted 6.4mm laminated glass pane PLAN AT GROUND FLOOR WINDOW JAMB
17 February 2005