“ Report Accompanying the Estimate for “Improment works to 'A' Type

Quarters From Quarter No:1 To 36 (i.e for 18 Blocks) and 'DEE'type Quarters

10Nos in T.G.P Camp colony @ K.R.Dam “

 Estimate Rs. 9,45,400/­

The Construction of Residential Quarters in T.G.P Camp Colony @ K.R.Dam was completed 

in the year 1985. The on wards the Residential Quarters are maintaing as per G.O Ms No:   dt    at the rate of 

1.60/sft for residential buildings and 1.80/sft for non Residential buildings. The was issued in the 1986 and the 

estimate is sanctioning with the 1986 rates which is not at all sufficient to maintain the Residential and non 

residential Quarters. Hene no major repair works are done since the construction of Quarters are competed, 

and the residential buildings are became in a deterated condition.                

As a part of development activity far rural areas, Andhra Pradesh, Government have decided 

to   establish   an   Institute   in   Kandaleru   Project   area.     In   this   connection   S.V.   University   Vice   Chancellor, 

Chairman for Higher Education Department, District Collector and Superintending Engineer, SSLC & SB 

Circle, Nellore along with Member of Legislative Assembly of Rapur inspected the dam site on 8.2.07 in the 

first   instance.     Subsequently  a   team   of   members   from   Higher   Education   Department   of   Andhra   Pradesh 

visited dam site along with Hon’ble Minister for information & Public relation and Tourism on 26.05.2007. 

They have decided to make use of the existing buildings in K.R. Dam.  As a part, workshop shed proposed a 

class   rooms   and   Mechanical   sub.division   office   as   Mess,   after   getting   necessary   renovation   work   done, 

accommodation   for   100   Nos.   of   students   and   12   Nos.   of   staf   in   the   Quarters   of   T.G.P.   Camp   colony   at 

K.R.Dam.

In this regard a meeting was conducted in Hon’ble Minister’s presence with Zilla Parishad 

Chairman, Nellore, Nelloe District Collector, 21st Century Gurukulam Co­Ordinators and Executive Engineer, 

SSLC & SB Division No.2, Nellore.

In above meeting it is decided to provided funds for class room shed Mess shed renovation 

work from ACDP funds, Collector’s fund,  Road, Gate, Fencing work from Z.P. funds and repairs to Quarters 

from T.G.P. Funds.

In this contest, the fact is that the construction of quarters, store shed, Mechanical workshop 

sheds   etc.,   were   constructed   during   the   year   1985.     The   formation   of   Kandaleru   Earth   dam   bund   was 

­ 1 ­
completed during the year 1997.  The Work shop yard and Store yard area and sheds were utilized by the then 

Mechanical staff.  After 1997 there is no maintenance activity in workshop as well as store yards.  Major part 

of Machinery kept idle were sold­out conducting auction.  At present only Major part is left out.

   

                          For 100 Nos of Studunts and 12 Nos Staff of College are to stay in Kandaleru Dam. Until 
their there construction of buildings for College and Hostel   they   decided to stay in T.G.P Camp Colony 

Quarters. For their accommodation it is necessary to bring up the above quarters in leaving condition. Hence 

this estimate was prepared for temporary repairs for above Quarter with the following provisions.  

­ 2 ­
1) White washing with best shell lime (or) snow ceam or equelent ceam one after
racking of old white washing including cost and conveyance of Brushes gangee
powder Or Gum watering the wall before white washing etc.complete as directed by
the department
2) Painting of doors and windows with best enamel paint cast including cost and
conveyance of all materials and labour charges, Centering, Scaffolding etc, complete
for finished Item of work.
3) Brick masonry in CM 1:5 using with country bricks including cost and conveyance of
all materials and labour charges etc complete.
4) Plastering with CM 1:4,12mm thick to the exposed faces of brick masonry including
cost and conveyance of all materials and labour charges
5) Ceiling plastering with CM 1:2,20 mm thick including scaffolding charges etc
including cost and conveyance of all materials and labour charges etc. complete for
finished item of work.
6) Supplying and fixing of 7/18 All minimum service wire (double)along with plastic cleats
at 0.3m C/C and ceramic egg insulators 3 nos and supporting G.I wire including cost
and conveyance of all materials and labour charges etc complete
7) Supplying and fixing of Main Switch board of TW of size 12" x 10" (0.3M X0.2 m)
including cost and conveyance of all materials and labour charges etc complete.
8) Supplying and fixing of main Switches of CI/MS of 32 AMPS including cost and
conveyance of all materials and labour charges etc complete for finished item of work
9) Supplying and fixing of Meter Boards of Size 0.2 mX0.3 M of TW (10"/12") made
including cost and conveyance of all materials and labour charges etc complete.
10) Supplying and fixing of 16 AMPS Fugues lings of Ceramic made including cost and
conveyance of al materials and labour charges etc. complete
11) Supplying and fixing of 6 AMPS Switches (Single) including wiring cost and
conveyance of all materials and labour charges etc. complete
12) Supplying and fixing of 6" X 8" TW switch board with lamination top including cost and
conveyance of all materials and labour charges etc. complete.

13) Supplying and fixing of 6" X 4" TW switch board with lamination top including cost and
conveyance of all materials and labour charges etc. complete.

14) Supplying and fixcing of 6 AMPS 2 in one socket and switch including wiring and cost
and conveyance of all materials and labour chares etc.complete.

15) Supplying and fixing of PVC battern Holders including wiring and cost and conveyance
of all materials and labour charges etc.complete.

16) Supplying and fixing of Bulk Heads along with wiring including cost and conveyance of
all materials and labour charges etc.complete
­ 3 ­
Rates :   The rates are obtained as per current SSR for the year 2007– 2008 and local Market rates.

Programme of Work:  The work is to be taken up on emergence basis with out calling tender and will be 

completed before their occupation. i.e 10/07.

Funds : Head of Account :­ MH 4701 on Major and Medium irrigation (01) Major irrigate ( commercial),SH 

(26) D & A  530 major works,533 buildings.  

         Assistant Engineer               Deputy Executive Engineer                   Executive Engineer

   SSLC &SB camp section       SSLC &SB Sub Division No: 4         SSLC &SB Division No: 2

              K.R.Dam `                  K.R.Dam        Nellore

         