DETAILED ESTIMATE
NAME OF WORK:- DRILLING AND GROUTING FOR THE FOUNDATION TREATMENT OF K.R.
DAM FROM T.B.L. AT 6.00MTS. INTERVALS FOR PRIMARY AND SECONDARY HOLES
BETWEEN KM.0.560 TO KM.8.000
33297x3.0=99891
99891
99891/20= 4995 4995
5) Backfilling the drilled holes with cement mortar 1:2 including 22/7X4X0.1X0.1X48546
cost and conveyance all meterials and labour charges.(As per
Separate Statement enclosed)
381
6) Manufacturing and supplying of country wood core boxes of size 1.8
m X0.45MX 0.1 m with inside partition arrangement as specified by
the department including cost and conveyance of all materials and
labour charges and painting etc.,
330
8) Provision for Technical Supervision charges L.S.
9) Provision for the Insurance premium L.S.
10) Provision for Geologist inspection charges and Loboratory
charges L.S.
11) Provision for sitting charges of Expert Committee members L.S.
SL DESCRIPTION OF ITEM SOURCE OF UNIT LEAD IN KMS INITIAL CONVE- DEDUCT ADD BLASTING TOTAL REMARKS
NO MATERIAL COST OF YANCE STACKING STORAGE
MATERIAL @ 1%
CT MR TOTAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14
CERTIFIED THAT :- 1)The leads provided in the lead statement are correct to the best of my knowledge
and sufficient qty of material is available at the quarry.
2 Seigniorage charges are payble to the above material.
2) 33297 Drilling holes of 75 mm dia ( NX Bit) with diamond drill in all 1221 1 Rmt 40655637
types of rocks in descending order only including redrilling
charges of already grouted zones including hire charges of
machinery etc complete to a depth where the permeabnility
value is below 5 lugeons below continuasly to a depth of 6
mts( ie in two zones ) including plain washing the holes water
jets etc., as directed by the department.( As per separate
statement enclosed)
3) 33297 RMT Conducting permeability test in drilled holes in stages in 103 1 Rmt 3429591
decending order only at 2 mts zone for the top 10 mts and the
balance depth 3 mts including cost and conveyance of all
material and labour charges etc.,
4) 4995 MT Grouting with cement slurry of specified consistancy with 6366 1 MT 31798170
required pressure including cement mortar grouting with 5%
by wt of cement of 600 micron seived sand and required
pressure whenever required and directed by the department
including cost and conveyance of all material and labour
charges
5) 381 Cum Backfilling the drilled holes with cement mortar 1:2 including 3815 1 Cum 1453515
cost and conveyance all meterials and labour charges
6) 330 Nos. Manufacturing and supplying of country wood core boxes of 1500 1 No. 495000
size 1.8 m X0.45MX 0.1 m with inside partition arrangement
as specified by the department including cost and
conveyance of all materials and labour charges and painting
etc.,
Amount for Graduate Engineer is Rs.324/One day X 25 days per month X 12 months
97,200
Amount for Diplomo Holders is Rs.250/ one day X 25 Days per month X 12 Months
75,000
CERTIFICATES
1) Certified that the Groud levels are considered as per the foundation Register of the
reach and in view of levels required at closure intervals interpolation of levels is made
for the estimate purpose.
2) Certified that stripped levels are considered as toe levels from the foundation Register
of the reach and in view of the levels required at closure intervals interpolation of levels
is made for the estimate purpose.
3) Certified that the existing Ground levels are recorded in L.Book No.147-TGP.2 vide
Page No.27 to 29.
1st 2nd
6Months 6Months
1 DRILLING IN ROCK 33297RMT 1600RMT 1697MT
2 GROUTING 4995MT 2500RMT 2495MT
3 FINANCIAL IN LAKHS 1200.00L 600.00L 600.00L