LIST OF ATTEMPTED QUESTIONS AND ANSWERS

True/False
Question Maintenance department evaluation can be done by only one
method.
Correct Answer False

Your Answer False

Multiple Choice Multiple Answer


Question What are the content of initial cost?

Correct Answer Taxes , Basic Cost , Installation Charges

Your Answer Basic Cost , Installation Charges , Taxes

Multiple Choice Single Answer


Question Who, due to fear of losing the maintenance contract, may not
reveal enough technical information?
Correct Answer Vendor

Your Answer Vendor

True/False
Question Defect analysis gives us information about commonly faced
problems.
Correct Answer True

Your Answer True

Select The Blank


Question In India, most of the industrialist base their decisions to purchase
equipment on the ________.
Correct Answer Price of the equipment

Your Answer Price of the equipment

Match The Following


Question Correct Answer Your Answer

Time taken As low as possible As low as possible

Automation Decrease break down 0.99


time
Utilization of machine As high as possible As high as possible

Equipment selection Purchase dept Purchase dept

Multiple Choice Single Answer


Question Which document is called horoscope of that particular equipment
which can tell a lot about it to experienced engineer?
Correct Answer History Card

Your Answer History Card

Multiple Choice Multiple Answer


Question Which of the following are the constituents of fire?

Correct Answer Fuel , Heat , Oxygen

Your Answer Fuel , Heat , Oxygen

Multiple Choice Multiple Answer


Question Maintenance Control system is used to check following?

Correct Answer Correct starting time of Maintenance activities , Maintenance


planning , To get correct feedback
Your Answer Correct starting time of Maintenance activities , Maintenance
planning , To get correct feedback

Multiple Choice Multiple Answer


Question The maintenance department is responsible for :-

Correct Answer Protection of building and plant , Increasing utilization of plant ,


Controlling maintenance cost
Your Answer Protection of building and plant , Increasing utilization of plant ,
Controlling maintenance cost

Multiple Choice Single Answer


Question Normally Ratio of Unplanned work to planned work is given in :-

Correct Answer Maintenance Report & Analysis

Your Answer Maintenance Report & Analysis

Multiple Choice Single Answer


Question Which type of inspection is to be carried when the machine is
operating?
Correct Answer One-time inspection

Your Answer Sample inspection


True/False
Question Reliability is the probability that product will perform its intended
functions under desired operating conditions over a specified
period of time.
Correct Answer True

Your Answer True

Multiple Choice Single Answer


Question The flat part in the bath tub curve is called :-

Correct Answer Normal Life Time

Your Answer Normal Life Time

True/False
Question Hazardeous chemicals inventory should be kept at minimum
level
Correct Answer True

Your Answer True

Multiple Choice Single Answer


Question Which of the following is process variable which can affect the
equipment?
Correct Answer Flow rate of process fluid

Your Answer Flow rate of process fluid

Multiple Choice Multiple Answer


Question Following are the part of service installations in the buildings?

Correct Answer Asset register , Technical manuals , Suppliers manuals

Your Answer Asset register , Technical manuals , Suppliers manuals

Multiple Choice Single Answer


Question Which analysis gives information about faced problems, and
solution to avoid it?
Correct Answer Defect Analysis

Your Answer Defect Analysis

Select The Blank


Question Correct quantity of lubricant assures that lubricant will be used in
optimum quantity and will result in ________.
Correct Answer Economy

Your Answer Thermal stability

Multiple Choice Single Answer


Question The supplier should be competent enough to estimate & provide
means of reducing :-
Correct Answer Down time as minimum as possible

Your Answer Wear out as minimum as possible

Select The Blank


Question In Japan & Western countries equipment discarded after about
________ years.
Correct Answer 7

Your Answer 5

Select The Blank


Question The manufacturing time for spare parts can vary from________.

Correct Answer Zero to one year

Your Answer 1 day to 8 days

Multiple Choice Multiple Answer


Question What are the basis on which training programmes are designed?

Correct Answer Needs of Organisation , Type of Organisation , Category of


Pupils
Your Answer Needs of Organisation , Type of Organisation , Top Management

Multiple Choice Multiple Answer


Question Some of the elements of inventory carrying cost are :-

Correct Answer Storage expenses , Insurance charges , Cost of deterioration

Your Answer Storage expenses , Insurance charges , Cost of deterioration

Select The Blank


Question ________ should be allowed in case of real emergency.

Correct Answer Contingency purchasing

Your Answer JIT purchasing


Multiple Choice Multiple Answer
Question Which are probable period of annual shut Downs in the Year?

Correct Answer Demand for a product is Low , Festival Seasons , Supply of Raw
material is nil.
Your Answer Demand for a product is Low , Festival Seasons , Supply of Raw
material is nil.

Select The Blank


Question Reliability can be expressed as probability between________.

Correct Answer 0 to 1

Your Answer 0 to 100

True/False
Question Animal fats can be used as lubricants.

Correct Answer True

Your Answer True

Multiple Choice Multiple Answer


Question Master list of all the supplier should consist of information such
as :-
Correct Answer Name, address, telephone, fax nos , Financial status , His rating
for the year.
Your Answer Name, address, telephone, fax nos , Financial status , His rating
for the year.

True/False
Question Indian Standards Institution is Indian body of standardization.

Correct Answer True

Your Answer True

True/False
Question Audio cassettes are the part of tools of training.

Correct Answer True

Your Answer True

Multiple Choice Single Answer


Question What is necessary to avoid major breakdowns?

Correct Answer Maintenance at right time


Your Answer Maintenance at right time

Multiple Choice Multiple Answer


Question What type of details are given in Work order?

Correct Answer Specifications , Drawings , Manuals issued

Your Answer Specifications , Drawings , Manuals issued

True/False
Question Handling instruction is transportation instructions.

Correct Answer True

Your Answer True

Multiple Choice Single Answer


Question What type of task it is to repair & maintenance fire fighting
system?
Correct Answer Repetitive task

Your Answer Single contract task

True/False
Question Proper communication with related departments can result in
increased cost of spare.
Correct Answer False

Your Answer False

Multiple Choice Multiple Answer


Question What type of support equipments are required in Maintenance?

Correct Answer Tools , Spare Parts , Test Equipments

Your Answer Tools , Spare Parts , Test Equipments

Match The Following


Question Correct Answer Your Answer

Grease cups lubrication Every week Every week

Gear box sumps Every six months Every six months


lubrication
Electrical motor bearing Every year Every year
lubrication
Oil nipple lubricated parts Every day Every day
lubrication

Multiple Choice Multiple Answer


Question The performance of maintenance is indicated by :-

Correct Answer Low cost , Low down time , More uptime

Your Answer Low cost , Low down time , More uptime

Multiple Choice Single Answer


Question Lubrication helps in :-

Correct Answer Increase life of wear and tear parts

Your Answer Increase life of wear and tear parts

Select The Blank


Question Availability of ________ equipment is considered while deciding
maintenance system.
Correct Answer Stand by

Your Answer Stand by

Select The Blank


Question ________ ratio should be as high as possible.

Correct Answer Planned maintenance work

Your Answer Maintenance cost percentage to total sale

Select The Blank


Question The correct procedure is applied there is less chance of any
________.
Correct Answer Mistakes

Your Answer Mistakes

Multiple Choice Single Answer


Question Who is responsible for the design of proper maintenance
system?
Correct Answer Maintenance manger

Your Answer Maintenance manger

Select The Blank


Question Spare part lists will be comprehensive for complex equipment
with section wise details along with ________.
Correct Answer Order code numbers

Your Answer Part number

True/False
Question Preventive maintenance program reduces overall maintenance
cost which also include spare cost.
Correct Answer True

Your Answer True

Select The Blank


Question The ________ is done to check performance efficiency of a
plant.
Correct Answer Technological Review

Your Answer Control Quality


Select The Blank
Question When a new executive joins the organisation he is usually given________.

Correct Answer Induction training

Your Answer Induction training

Select The Blank


Question A unit called ________ measures illumination.

Correct Answer Lux

Your Answer Lux

True/False
Question Value analysis is one way to attempt for quality simplification.

Correct Answer True

Your Answer True

True/False
Question A timely corrective action avoids major fault.

Correct Answer True

Your Answer True

Multiple Choice Multiple Answer


Question The codification can be done by following methods :-

Correct Answer Mnemonics method , Decimal method , Field method numerical codes

Your Answer Mnemonics method , Special characters method , Decimal method , Field
method numerical codes

Multiple Choice Multiple Answer


Question What are the constituents of operating cost?

Correct Answer Cost of Equipment , Cost of Modifications , Cost of Tooling

Your Answer Cost of Equipment , Cost of Modifications , Cost of Tooling , Cost of


Transportation

Multiple Choice Single Answer


Question If equipment creates noise above permissible level then :-
Correct Answer It may produce vibration which may affect other equipment.

Your Answer It is recommended not to purchase such equipment.

Select The Blank


Question According to Lubrication Schedule provision of ________ is given for
maintenance.
Correct Answer Plant Shut Down

Your Answer Lubrication

Match The Following


Question Correct Answer Your Answer

Attention value category Frequency breakdown Frequency breakdown


equipment equipment
Vital category Critical equipment Critical equipment

Essential category Semi critical equipment Semi critical equipment

Normal category Non critical equipment Non critical equipment

Select The Blank


Question The spark can be generated due to ________ faults.

Correct Answer Phase to phase

Your Answer Phase to phase

Multiple Choice Multiple Answer


Question Satisfactory performance of maintenance contractor is :-

Correct Answer Quality of work , Skills of manpower , Equipment performance

Your Answer Quality of work , Skills of manpower , Equipment performance , High cost

Select The Blank


Question Quality should not be ________ at the cost of lower price.

Correct Answer Sacrificed

Your Answer Sacrificed

Multiple Choice Single Answer


Question How a molecule of fuel fragmented?

Correct Answer H+ and OH-

Your Answer H2O+CO2


True/False
Question Shelves, Closets such fittings are consider as costing centers for buildings in
the assets register.
Correct Answer True

Your Answer True

Multiple Choice Multiple Answer


Question Evaluation of maintenance function can be done by taking following steps :-

Correct Answer Set the achievable targets for maintenance dept for the expected
performance , Check results against set targets , Find out reasons for
variance
Your Answer Set the achievable targets for maintenance dept for the expected
performance , Check results against set targets , Find out reasons for
variance , Not to take any remedial action

Multiple Choice Multiple Answer


Question The energy saving can be achieved by following ways :-

Correct Answer By avoiding excess use , By avoiding wastage , By increasing efficiency of


the equipment
Your Answer By increasing inductive load , By avoiding excess use , By avoiding wastage ,
By increasing efficiency of the equipment

Multiple Choice Single Answer


Question The responsibility of maintenance Department is to ensure cost at :-

Correct Answer Minimum

Your Answer Minimum

True/False
Question Demulsibility is separating water from oil when the machine are kept stand
still.
Correct Answer True

Your Answer True

Select The Blank


Question There are two types of cost involved with any asset, one is the ________ and
second is initial cost.
Correct Answer Running Cost

Your Answer Running Cost

Multiple Choice Single Answer


Question It is objective of maintenance to make maximum availability of production
plant at :-
Correct Answer Minimum cost
Your Answer All time

Multiple Choice Single Answer


Question Which type of maintenance is called to the maintenance work initiated as a
result knowledge of the condition of an item from routine checking?
Correct Answer Condition based maintenance

Your Answer Condition based maintenance

True/False
Question On line inspection is carried out on machine itself but when it is shut down.

Correct Answer False

Your Answer False

Multiple Choice Single Answer


Question In any organization generally called thankless department is :-

Correct Answer Maintenance

Your Answer Maintenance

Select The Blank


Question Spare part lists will be comprehensive for complex equipment with section
wise details along with ________.
Correct Answer Order code numbers

Your Answer Order code numbers

Select The Blank


Question The progress of work inside the plant can be viewed at glance by putting up a
________ in the control room.
Correct Answer Schedule Board

Your Answer Schedule Board

Select The Blank


Question Reliability can be expressed as probability between________.

Correct Answer 0 to 1

Your Answer 0 to 1

Multiple Choice Single Answer


Question Which analysis gives information about faced problems, and solution to avoid
it?
Correct Answer Defect Analysis

Your Answer Defect Analysis


Multiple Choice Multiple Answer
Question In the objective evaluation method, the performance indicators are :-

Correct Answer Overtime ratio , Availability of plant ratio , Spare part ratio

Your Answer Working capital ratio , Spare part ratio , Overtime ratio , Availability of plant
ratio

Multiple Choice Multiple Answer


Question The price of the spare part depends on :-

Correct Answer Demand and supply position , Urgency of buyer , Level of negotiations

Your Answer Demand and supply position , Urgency of buyer , Level of negotiations , Type
of customer

True/False
Question Computers can be used to predict failures and breakdowns by simulation
method well in advance.
Correct Answer True

Your Answer True

True/False
Question The schedule of lubrication of equipment is not a part of maintenance plan.

Correct Answer False

Your Answer False

Multiple Choice Single Answer


Question Preventive maintenance :-

Correct Answer Anticipates failures and necessary action

Your Answer Anticipates failures and necessary action

Multiple Choice Multiple Answer


Question Characteristics of spare parts are :-

Correct Answer The requirement of spares increases with the machine getting older. , The
stock out cost is always greater than the cost of spare parts. , There is always
possibility of duplication in the storage.
Your Answer The requirement of spares increases with the machine getting older. , The
stock out cost is always greater than the cost of spare parts. , There is always
possibility of duplication in the storage. , Identified by the type & group.

Multiple Choice Multiple Answer


Question What are the consisitutent of lubricating oil?

Correct Answer Mineral oil , Chemical compounds , Vegetables oils


Your Answer Mineral oil , Chemical compounds , Vegetables oils , Saw dust

True/False
Question Maintainability is defined as ease with which product can be serviced or
repaired.
Correct Answer True

Your Answer True

True/False
Question Reconditioning is bringing the old used part to its original condition by using
engineering process.
Correct Answer True

Your Answer True

Multiple Choice Single Answer


Question It is said that a failure never occurs without :-

Correct Answer Warnings

Your Answer Warnings

Multiple Choice Multiple Answer


Question Which utilities require to be planned as a function of maintenance manager?

Correct Answer Electricity , Waste disposal , Steam & gas

Your Answer Electricity , Waste disposal , Steam & gas

Select The Blank


Question The contract service is ________.

Correct Answer Too expensive

Your Answer Expensive

Multiple Choice Single Answer


Question One of the desired condition, which is required in a proper coding of the
overheads is :-
Correct Answer The people who operate it should easily remember it.

Your Answer It should not allow manual intervention

Multiple Choice Single Answer


Question As the frequency of maintenance is stepped up preventive maintenance cost
:-
Correct Answer Shoots up

Your Answer Shoots up


Multiple Choice Multiple Answer
Question In the off line inspection, which parameters can be monitored?

Correct Answer Crack detection , Alignment of connecting equipments , Lubricating oils

Your Answer Digital system , Crack detection , Alignment of connecting equipments ,


Lubricating oils

Multiple Choice Multiple Answer


Question What information is given in a manual of building?

Correct Answer Maintenance of building , Schedule of maintenance , Description of


maintenance
Your Answer Maintenance of building , Schedule of maintenance , Description of
maintenance

True/False
Question Most of the ordering costs are fixed in nature.

Correct Answer True

Your Answer True

Multiple Choice Single Answer


Question Which of the following is one of the causes of fire?

Correct Answer Smoking

Your Answer Smoking

Match The Following


Question Correct Answer Your Answer

Maintenance Record Recording of Time and Money Recording of Time and Money

Asset Register List of All Assets of Plant List of All Assets of Plant

Maintenance Schedule Instruction on Doing Scheduling on rolling basis


Maintenance
Principles of Scheduling Scheduling on rolling basis PERT

Select The Blank


Question ________ should be planned so that workers can approach the equipment
easily.
Correct Answer Gangways

Your Answer Gangways