You are on page 1of 8

LABOUR OUT TURN WORK

S.No

Item Description

Quantity

unit

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

Brick work in CM in Foundation and plinth Brick work in CM in Super Structure Brick in CM in Arches Brick in CM in Jack Arches Half Brick wall in partition CRS Masonary in CM including dressing RR Stone Masonary in CM Ashlar Masonary inCM Stone Arch Work Cement concrete 1:2:4 Rbwork RCC work 12mm Thick Plastering with CM Pointing with CM White washing or colour washing three coats White washing or colour washing three coats Painting or varnishing doors or windows one coat Coal tarring or solignum painting one coat Painting large surface one coat Distempering one coat 2.5cm CC floor

1.25 1 0.55 0.55 5 1.8 1 0.4 0.4 5 1 3 8 10 70 200 25 35 35 35 7.5

Cum Cum Cum Cum Sqm Cum Cum Cum Cum Cum Cum Cum Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm

22 23 24 25 26 27 28 29 30

Timber framing sal or teak wood Timber framing Country wood Door and window shutters panelled or glazed Door and window shutters battened Earth work in ecavation in ordinary soil Earth work in ecavation in hard soil excavation in rock Number of Bricks laid by a mason in Brickwork upto a height of 3m(10') Amount of work done by a mazdoor (helper) per day Mix Deliver brick to a distance of 15m Deliver mortar Scaffolding cost for Single Storey building

0.07 0.15 0.15 0.8 3 2 1 600

Cum Cum Sqm Sqm Cum Cum Cum No's

3 4000 5.5 0.5

Cum No's Cum Rupees

RK

Per Day

per Mason per Mason per Mason per Mason per Mason per Mason per Mason per Mason per Mason per Mason per Mason per Mason per Mason per Mason per whitewasher per whitewasher per Painter per Painter per Painter per Painter per Painter

Per Carpenter Per Carpenter Per Carpenter Per Carpenter per 1 Beldar & 1 Mazdoor per 1 Beldar & 1 Mazdoor per 1 Beldar & 1 Mazdoor per Mason

per Mazdoor per Mazdoor per Mazdoor per Cum of Brick work

MAZDOOR REQUIRED FOR DIFFERENT WORKS

L S.No Item Description Quantity unit Beldars 1 Earthworks per 28.30 cum (1000cft) Earth works excavation in foundations, trenches etc., in ordinary soil includingdisposal up to 30m and lift of 1.5m Refilling excavated earth in foundations, plinth etc. including consolidationin 15cms layers Disposal of surplus earth within alead of 30m 2 Cement concrete work per 2.83cum (100 cft) Laying Cement concrete 3 R.C.C work Laying Reinforced concrete Centring and shuttering for Flat surface Renforcement work for RCC 4 Stone work per 2.83 cum (100Cft) RR Masonary with blue stone in foundations 5 Brickwork per 2.83 cum Ist class brickwork in 1:4 CM insuper structure partition walls, junctions ofroof, parapet walls and string course 6 Flooring 4cm thick CC flooringof 40Sqm 7 Finishing Plastering with any mortar 12mm thick White washing or colour washing (3coats) Painting two coats such as chocolate, red, greyetc., on wood or steel 40.00 60.00 10.00 Sqm Sqm Sqm 40.00 Sqm 2.83 Cum 2.83 Cum 2.83 9.60 100.00 Cum Sqm Kgs 2.83 Cum 28.30 28.30 28.30 Cum Cum Cum -5 3 --2 -3 4 1 -3 ---4 -----

ERENT WORKS

Labour required Mazdoors -4 2 1 -3 -3 ---2 -4.5 -3 -3 1 2 Bhisti --0.5 --0.75 -1.5 ---0.5 -0.5 -1 -1 --Mason/White washer -----0.25 -0.5 ---3 -2.25 ---3 1 3 Carpenters --------4 -----------Fitter ---------1 -----------

0.3 x 0.35 x 0.3

1.2 Cft

MATERIALS FOR DIFFERENT ITEMS OF WORKS

S.No 1

Item Description Bricks of 9"x 4 1/2" x 3" Dry mortar for Brickwork 30% Stone for Rubble stone Masonary 125% Dry mortar for Rubble stone Masonary 42% Materials for Cementconcrete 1:2:4 Ballast or Grt 88% Sand 44% Cement 22%

Qty 1350 30 125 42

Per 100 100 100 100

unit Cft Cft Cft Cft

88 44 22

100 100

Cft Cft

1 bag of cement

RKS

13.7795276 9.24 1984.32 1.2 18.3333333 1728